Search NASA⌕ Search

SEARCH · Search NASA

Results for “RECOMMENDATIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Stranded Fuel, Orphan Sites, Dead Plants: Transportation Planning Considerations After the BRC Report - 13393

The author explores transportation, packaging and storage questions related to a primary recommendation of the Blue Ribbon Commission on America's Nuclear Future; i.e., that fuel from shutdown plants be removed to consolidated storage as soon as possible to enable final decommissioning and beneficial re-use of those sites. The paper discusses the recommendations of the BRC, the implications and challenges that implementing those recommendations present, and provides recommended solutions for beginning the multi-year planning, coordination, material acquisition, and communications processes that will be needed to move fuel from shutdown plants when a destination site becomes available. Removal of used nuclear fuel from shutdown reactor sites (which are serving no other purpose other than storing SNF and GTCC, at considerable expense) was a central recommendation of the BRC, for a number of reasons. This recommendation was one of the most widely acclaimed that the Commission put forward. However, there are significant challenges (such as availability of fuel canister overpacks, lack of infrastructure, handling constraints and others) that will need to be addressed, apart from the critically important identification of a suitable and workable storage destination site. Resolving these logistical challenges will need to begin even before a destination site is identified, given the long lead-times required for planning and procurement. Based on information available today, it is possible to make informed predictions about what will be needed to modify existing contractual arrangements with utilities, address equipment and infrastructure needs, and begin working with states, tribes and local governments to start initial preparation needs. If DOE, working with industry and other experienced parties, can begin planning and acquisition activities in the near term, overall schedule risk can be reduced and potential cost avoidance achieved. The most immediate benefit will accrue to the operators of the shutdown plants, but beginning to accept fuel as required under the NWPA will reduce the liability to the federal government, and also offer some assurance to other utilities and the public that DOE (or another entity if one is established) is capable of meeting its obligations under the NWPA. The indirect benefits, therefore, will be quite broad. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Clinicians’ and Pharmacists’ Reported Implementation of Vaccination Practices for Adults

Introduction: Despite the proven effectiveness of immunization in preventing morbidity and mortality, adult vaccines remain underutilized. The objective of this study was to describe clinicians’ and pharmacists’ self-reported implementation of the Standards for Adult Immunization Practice (“the Standards”; i.e., routine assessment, recommendation, and administration/referral for needed vaccines, and documentation of administered vaccines, including in immunization information systems). Methods: Two Internet panel surveys (one among clinicians and one among pharmacists) were conducted during February–March 2017 and asked respondents about their practice’s implementation of the Standards. T-tests assessed associations between clinician medical specialty, vaccine type, and each component of the Standards (March–August 2017). Results: Implementation of the Standards varied substantially by vaccine and provider type. For example, >80.0% of providers, including obstetrician/gynecologists and subspecialists, assessed for and recommended influenza vaccine. However, 24.3% of obstetrician/gynecologists and 48.9% of subspecialists did not stock influenza vaccine for administration. Although zoster vaccine was recommended by >89.0% of primary care providers, <58.0% stocked the vaccine; by contrast, 91.6% of pharmacists stocked zoster vaccine. Vaccine needs assessments, recommendations, and stocking/referrals also varied by provider type for pneumococcal; tetanus, diphtheria, acellular pertussis; tetanus diphtheria; human papillomavirus; and hepatitis B vaccines. Conclusions: This report highlights gaps in access to vaccines recommended for adults across the spectrum of provider specialties. Greater implementation of the Standards by all providers could improve adult vaccination rates in the U.S. by reducing missed opportunities to recommend vaccinations and either vaccinate or refer patients to vaccine providers.

60 APPLIED LIFE SCIENCES↗

Clinical pharmacology information in regulatory submissions and labeling: A comparative analysis of orphan and non-orphan drugs approved by the FDA

Clinical pharmacology is an integral discipline supporting the development, regulatory evaluation, and clinical use of drugs for the treatment of both common and rare diseases. Here, we evaluated the recommendations and information available from select clinical pharmacology studies in the therapeutic product labeling of new molecular entities (NMEs) approved from 2017 to 2019 for both common and rare diseases. A total of 151 NMEs, including 72 orphan and 79 non-orphan drugs, were analyzed for recommendations and information available related to food–drug interaction, drug–drug interaction, renal impairment, hepatic impairment, QT assessment, and human radiolabeled mass balance studies using data collected from the original labeling and other regulatory documents. The analysis showed no statistically significant difference in the recommendations between orphan and non-orphan drugs except for renal impairment related recommendations in section 8 of the labeling. Although not significant, fewer hepatic impairment labeling recommendations were available for orphan drugs when compared with non-orphan drugs. At the time of initial approval, 79 postmarketing requirements (PMRs) and postmarketing commitments (PMCs) for 33 orphan drugs and 39 PMRs and PMCs for 19 non-orphan drugs were established; with most difference observed for drug–drug interaction, hepatic impairment, and QT assessment. Overall, although there was a trend for more labeling recommendations and fewer postmarketing studies and clinical trials for non-orphan drugs, there appeared to be no substantial differences in how these select clinical pharmacology studies are leveraged during the development and approval of orphan and non-orphan drugs.

60 APPLIED LIFE SCIENCES↗

WE-AB-201-03: TPS Commissioning and QA: Incorporating the Entire Planning Process

Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar defects in the future. Finally, the Gamma test has become a popular metric for reporting TPS Commissioning and QA results. It simplifies complex testing into a numerical index, but noisy data and casual application can make it misleading. A brief review of the issues around the use of the Gamma test will be presented. TPS commissioning and QA: A process orientation and application of control charts (Michael Sharpe) A framework for commissioning a treatment planning system will be presented, focusing on preparations, practical aspects of configuration, priorities, specifications, and establishing performance. The complexity of the modern TPS make modular testing of features inadequate, and modern QA tools can provide “too much information” about the performance of techniques like IMRT and VMAT. We have adopted a process orientation and quality tools, like control charts, for ongoing TPS QA and assessment of patient-specific tests. The trending nature of these tools reveals the overall performance of the TPS system, and quantifies the variations that arise from individual plans, discrete calculations, and experimentation based on discrete measurements. Examples demonstrating application of these tools to TPS QA will be presented. TPS commissioning and QA: Incorporating the entire planning process (Sasa Mutic) The TPS and its features do not perform in isolation. Instead, the features and modules are key components in a complex process that begins with CT Simulation and extends to treatment delivery, along with image guidance and verification. Most importantly, the TPS is used by people working in a multi-disciplinary environment. It is very difficult to predict the outcomes of human interactions with software. Therefore, an interdisciplinary approach to training, commissioning and QA will be presented, along with an approach to the physics chart check and end-to-end testing as a tool for TPS QA. The role of standardization and automation in QA will also be discussed. The recommendations of MPPG #5 and practical implementation strategies (Jennifer Smilowitz) The recently published recommendations from Task Group No. 244, Medical Physics Practice Guideline on Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams will be presented. The recommendations focus on the validation of commissioning data and dose calculations. Tolerance values for non-IMRT beam configurations are summarized based on established criteria and data collected by the IROC. More stringent evaluation criteria for IMRT dose calculations are suggested to test the limitations of the TPS dose algorithms for advanced delivery conditions. The MPPG encourages users to create a suite of validation tests for dose calculation for various conditions for static photon beams, heterogeneities, IMRT/VMAT and electron beams. This test suite is intended to be used for subsequent testing, including TPS software upgrades. In the past, the recommendations of some reports have not been widely implemented due to practical limitations. Implementation strategies, tools and processes developed by multiple centers for efficient and “do-able” MPPG #5 testing will be presented, as well as a discussion on the overall validation experience. Learning Objectives: Identify some of the key documents relevant for TPS commissioning and QA Understand strategies for testing TPS software Gain a practical knowledge of the Gamma test criteria Increase familiarity with the process of commissioning a TPS Learn about the use of Control Charts for TPS QA Review the role of the TPS in the overall planning process Increase awareness of the link between TPS QA and chart checking Gain an increased appreciation for the importance of interdisciplinary communication Understand the new recommendations from MPPG #5 on TPS Dose Algorithm Commissioning and QC/QA Learn practical implementation processes and tools for MPPG #5 validation recommendations.

60 APPLIED LIFE SCIENCES↗

Establishing a sustainable regulatory framework for the security of radioactive sources through harmonization with a safety regulatory framework

In order to establish and maintain sustainable nuclear security regulatory infrastructures for radioactive sources, it is important for States to develop nuclear security regulations with regulatory requirements and relevant criteria for security, which are consistent and well integrated with those for radiation safety. In establishing national regulations, experts worldwide follow the international recommendations on safety and security of radioactive sources published by the International Atomic Energy Agency (IAEA). Within the IAEA publications on safety and security of radioactive sources, some international recommendations are identical or very similar for both safety and security, for example, the requirement for the establishment of a national registry of radioactive sources. However, some other international recommendations are unique to the security area, such as the recommendation to examine the trustworthiness of employees, or to the safety area, such as the need to establish public exposure controls. Additionally, many international recommendations fall somewhere in between, such as the need for effective authorization of facilities and activities, a regulatory inspection and enforcement regime and the graded approach to establish and apply regulatory requirements. This paper examines how the IAEA international recommendations for establishing regulatory frameworks for safety and security relate to one another.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Draft Electric Rule 21 Test Protocols for Advanced Inverter Functions

Disclaimer: The following document includes draft certification protocols and should not be viewed as a consensus-based performance standard. Distributed energy resources (DERs), such as photovoltaic (PV) systems, when deployed in a large scale, are capable of significantly influencing the operation of bulk and local power systems. Looking to the future, European and American stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. One of the jurisdictions considering modifications to the DER interconnection requirements is California. To determine what changes could improve electric grid reliability and allow greater penetrations of renewable energy, the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC), in conjunction with consultant Frances Cleveland, convened the Smart Inverter Working Group (SIWG) in January 2013. The SIWG--composed of state agencies, utility engineers, national laboratories, manufacturers, trade associations, and advocacy groups--provided the CPUC a set of recommendations in early 2014 1 . The recommendations included specific advanced DER functions and interoperability requirements, along with a proposed timeline, for California to add new capabilities to grid-interconnected DER. On August 18, 2014 the three California Investor-Owned Utilities (IOUs)--Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE) and San Diego Gas & Electric Company (SDG&E)--drafted a Advice Letter filing to the CPUC setting forth revisions to Electric Tariff Rule 21 to conform to the seven recommendations made by the Working Group 2 . After a comment period, the CPUC issued an update to the IOU recommendations 3 . At the time of this publication, there was no final legal ruling on the CPUC Rulemaking (R.) 11-09-011 ("Order Instituting Rulemaking on the Commission's Own Motion to improve distribution level interconnection rules and regulations for certain classes of electric generators and electric storage resources"). In the U.S., Nationally Recognized Test Laboratories (NRTLs) independently verify products to safety and functional standards. PV inverters are certified to Underwriters Laboratories (UL) Standard 1741 4 . However, new advanced inverter functions described in the SIWG and IOU proposals are not included in this standard, so there is a critical need to develop test protocols for these functions in preparation of a positive ruling by the CPUC. Through a California Solar Initiative Grant, Sandia National Laboratories (Sandia or SNL), Underwriters Laboratories (UL), Electric Power Research Institute, Inc. (EPRI), Xanthus Consulting, SunSpec Alliance, Loggerware, and utility and PV inverter manufacturers have collaborated to draft this certification protocol for the Rule 21 SIWG Phase 1 advanced inverter functions. This report also includes test procedures for Phase 2 and Phase 3 functions that will be demonstrated later in the CSI4 project. This collaborative effort was performed in close junction with the UL 1741 Standards Technical Panel (STP) working group. This document represents a snapshot of the draft testing protocols at the time of publication and not a consensus certification protocol for advanced inverters. 1 California Public Utilities Commission, "Recommendations for Updating the Technical Requirements for Inverters in Distributed Energy Resources, Smart Inverter Working Group Recommendations," Filed 7 Feb 2014. 2 J.J. Newlander, R.G. Litteneker, S.W. Walter, M. Dwyer, Joint motion of Pacific Gas and Electric Company (U 39 E), Southern California Edison Company (U 338 E) and San Diego Gas & Electric Company (U 902 E) regarding implementation of smart inverter functionalities, Rulemaking 11-09-011 Advice Letter, 18 July, 2014. 3 J.T. Sullivan, CPUC Rulemaking 11-09-011 Agenda ID #13460, 13 Nov, 2014. 4 Underwriters Laboratories Std. 1741 Ed. 2, "Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources," 2010.

42 ENGINEERING↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Data standards for the Space Station Freedom Program

The Space Station Freedom Program (SSFP) plans to utilize several of the Recommendations of the Consultative Committee for Space Data Systems (CCSDS). This paper discusses four aspects of the effect of the Advanced Orbiting Systems (AOS) within the SSFP which are of special interest. It is first noted that the AOS is a new Recommendation of the CCSDS, and the SSFP has been in the unique position of playing a major role in the development of the Recommendation. Interactions of the process by the Program and the CCSDS are shown. Second, the specific application of the CCSDS AOS Recommendation to each of the four SSFP flight elements and the resulting sets of services provided on each element are discussed. Third, the usefulness and importance of the AOS Recommendation within the context of the international nature of the SSFP and as part of the generation of interorganizational support agreements within NASA are discussed. Finally, the current status of baselining various CCSDS Recommendations, especially the AOS, into the SSFP requirements structure is given.

Carper, Richard D.↗

STS-61 mission director's post-mission report

To ensure the success of the complex Hubble Space Telescope servicing mission, STS-61, NASA established a number of independent review groups to assess management, design, planning, and preparation for the mission. One of the resulting recommendations for mission success was that an overall Mission Director be appointed to coordinate management activities of the Space Shuttle and Hubble programs and to consolidate results of the team reviews and expedite responses to recommendations. This report presents pre-mission events important to the experience base of mission management, with related Mission Director's recommendations following the event(s) to which they apply. All Mission Director's recommendations are presented collectively in an appendix. Other appendixes contain recommendations from the various review groups, including Payload Officers, the JSC Extravehicular Activity (EVA) Section, JSC EVA Management Office, JSC Crew and Thermal Systems Division, and the STS-61 crew itself. This report also lists mission events in chronological order and includes as an appendix a post-mission summary by the lead Payload Deployment and Retrieval System Officer. Recommendations range from those pertaining to specific component use or operating techniques to those for improved management, review, planning, and safety procedures.

Newman, Ronald L.↗

Return to Flight Task Group

It has been 29 months since Columbia was lost over East Texas in February 2003. Seven months after the accident, the Columbia Accident Investigation Board (CAIB) released the first volume of its final report, citing a variety of technical, managerial, and cultural issues within NASA and the Space Shuttle Program. To their credit, NASA offered few excuses, embraced the report, and set about correcting the deficiencies noted by the accident board. Of the 29 recommendations issued by the CAIB, 15 were deemed critical enough that the accident board believed they should be implemented prior to returning the Space Shuttle to flight. Some of these recommendations were relatively easy, most were straightforward, a few bordered on the impossible, and others were largely overcome by events, particularly the decision by the President to retire the Space Shuttle by 2010. The Return to Flight Task Group (RTF TG, or simply, the Task Group) was chartered by the NASA Administrator in July 2003 to provide an independent assessment of the implementation of the 15 CAIB return-to-flight recommendations. An important observation must be stated up-front: neither the CAIB nor the RTF TG believes that all risk can be eliminated from Space Shuttle operations; nor do we believe that the Space Shuttle is inherently unsafe. What the CAIB and RTF TG do believe, however, is that NASA and the American public need to understand the risks associated with space travel, and that NASA must make every reasonable effort to minimize such risk. Since the release of the CAIB report, NASA and the Space Shuttle Program expended enormous effort and resources toward correcting the causes of the accident and preparing to fly again. Relative to the 15 specific recommendations that the CAIB indicated should be implemented prior to returning to flight, NASA has met or exceeded most of them the Task Group believes that NASA met the intent of the CAIB for 12 of these recommendations. The remaining three recommendations were so challenging that NASA could not comply completely with the intent of the CAIB.

Source record↗

Equitable Letters for Space Physics

Equitable Letters in Space Physics (ELSP) is an organization that aims to encourage merit-based recommendations and nominations in the space physics community by providing resources and reviews. Recommendation and award nomination letters are a known source of bias that affect education and job opportunities, career progression, and recognition for scientists from underrepresented backgrounds. ELSP was founded to mitigate this bias within the current system by providing a proof-reading service that focuses on identifying phrasing and structure within letters that unintentionally undermines the purpose of the recommendation or nomination. If you are writing a recommendation letter for someone you know professionally, you can send it to us and we will send it out to our reviewers. They will provide recommendations on how you can make your letter more equitable and less biased, using a combination of the techniques and resources described on our site, with the aim to make unbiased recommendation letters more accessible to all. If you are interested in being a reviewer or having your writing reviewed, please reach out to us. We're a relatively young initiative and are keen to engage with and involve many diverse voices. Our website with more information, sample letters, and other resources can be found at https://equitableletterssp.github.io/ELSP/

Angeline G. Burrell↗

An Analytical Impact Assessment Framework for Wildlife to Inform the Siting and Permitting of Wind Energy Facilities

In the United States overall electrical generation capacity is expected to increase by 10-25 gigawatts (GW) per year to meet increases in demand. Wind energy is a key component of state and federal renewable energy standards, and central to the Department of Energy’s 20% by 2030 wind production goals. Increased wind energy development may present increased resource conflict with avian wildlife, and environmental permitting has been identified as a potential obstacle to expansion in the sector. ICF developed an analytical framework to help applicants and agencies examine potential impacts in support of facility siting and permitting. A key objective of our work was to develop a framework that is scalable from the local to the national level, and one that is generalizable across the different scales at which biological communities operate – from local influences to meta-populations. The intent was to allow natural resource managers to estimate the cumulative impacts of turbine strikes and habitat changes on long-term population performance in the context of a species demography, genetic potential, and life history. We developed three types of models based on our literature review and participation in the scientific review processes. First, the conceptual model was developed as a general description of the analytical framework. Second, we developed the analytical framework based on the relationships between concepts, and the functions presented in the scientific literature. Third, we constructed an application of the model by parameterizing the framework using data from and relevant to the Altamont Pass Wind Resource Area (APWRA), and an existing golden eagle population model. We developed managed source code, database create statements, and written documentation to allow for the reproduction of each phase of the analysis. ICF identified a potential template adaptive management system in the form of the US Fish & Wildlife Service (USFWS) Adaptive Harvest Management (AHM) program, and developed recommendations for the structure and function of a similar wind-facility related program. We provided a straw-man implementation of the analytical framework based on assumptions for APWRA-wide golden eagle fatalities, and presented a statistical examination of the model performance. APWRA-wide fatality rates appear substantial at all scales examined from the local APWRA population to the Bird Conservation Region. Documented fatality rates significantly influenced population performance in terms of non-territorial non-breeding birds. Breeder, Juvenile, Subadult, and Adult abundance were mostly unaffected by Baseline APWRA-wide fatality rates. However, increased variability in fatality rates would likely have impacts on long-term population performance, and would result in a substantially larger loss of resources. We developed four recommendations for future study. First, we recommend establishment of concept experts through the existing system of non-profits, regulatory agencies, academia, and industry in the wind energy sector. Second, we recommend the development of a central or distributed shared data repository, and establish guidelines for data sharing and transparency. Third, we recommend development a forum and process for model selection at the local and national level. Last, we recommend experimental implementation of the prescribed system at broader scales, and refinement the expectations for modeling and adaptive management.

54 ENVIRONMENTAL SCIENCES↗

The inclusion of migrants in health impact assessments: A scoping review

This article reports the findings of a scoping review assessing the extent and ways in which migrants have been included in health impact assessments (HIAs) and HIA evaluations worldwide. A total of 117 HIAs and two HIA evaluations were included. Only 14% of hand-searched HIAs mentioned migrants, 5% analysed migrants and only 2% included them in their recommendations. Nonetheless, migrants would be expected to be part of the analysis based on the reasons for which migrants were most commonly mentioned. Although the majority of HIAs included in the review mentioned migrants in baseline conditions and impact analysis steps, migrants were seldom included in recommendations. Furthermore, the use of frameworks or tools guiding the completion of an HIA was negatively associated with the inclusion of migrants in recommendations. This is a pivotal risk of frameworks not mentioning migrants. Although workshops and stakeholder engagement were a frequent way of including migrants in HIAs, this usually involved organizations representing migrants, and only seldom included members of the migrant community themselves. The main barriers to including migrants in the HIA impact analysis were the lack of available data on migrants and the significant additional resources required to gather and analyse additional data on migrants. Guidance is needed on ways to optimally include migrants in HIAs and ensure that recommendations for mitigation measures are optimal. - Highlights: • Scoping review found 14% of hand-searched HIAs mentioned migrants • Migrants are seldom mentioned in recommendations even when analysed • Guiding frameworks can hinder the inclusion of migrants if not explicitly mentioned • Often migrants organizations are the ones included in engagement • Main barriers to including migrants are available data and resources required.

54 ENVIRONMENTAL SCIENCES↗

Physician Beliefs and Practices for Adjuvant and Salvage Radiation Therapy After Prostatectomy

Purpose: Despite results of randomized trials that support adjuvant radiation therapy (RT) after radical prostatectomy (RP) for prostate cancer with adverse pathologic features (APF), many clinicians favor selective use of salvage RT. This survey was conducted to evaluate the beliefs and practices of radiation oncologists (RO) and urologists (U) regarding RT after RP. Methods and Materials: We designed a Web-based survey of post-RP RT beliefs and policies. Survey invitations were e-mailed to a list of 926 RO and 591 U. APF were defined as extracapsular extension, seminal vesicle invasion, or positive surgical margin. Differences between U and RO in adjuvant RT recommendations were evaluated by comparative statistics. Multivariate analyses were performed to evaluate factors predictive of adjuvant RT recommendation. Results: Analyzable surveys were completed by 218 RO and 92 U (overallresponse rate, 20%). Adjuvant RT was recommended based on APF by 68% of respondents (78% RO, 44% U, p <0.001). U were less likely than RO to agree that adjuvant RT improves survival and/or biochemical control (p < 0.0001). PSA thresholds for salvage RT were higher among U than RO (p < 0.001). Predicted rates of erectile dysfunction due to RT were higher among U than RO (p <0.001). On multivariate analysis, respondent specialty was the only predictor of adjuvant RT recommendations. Conclusions: U are less likely than RO to recommend adjuvant RT. Future research efforts should focus on defining the toxicities of post-RP RT and on identifying the subgroups of patients who will benefit from adjuvant vs. selective salvage RT.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

WE-G-BRA-04: Common Errors and Deficiencies in Radiation Oncology Practice

Purpose: Dosimetric errors in radiotherapy dose delivery lead to suboptimal treatments and outcomes. This work reviews the frequency and severity of dosimetric and programmatic errors identified by on-site audits performed by the IROC Houston QA center. Methods: IROC Houston on-site audits evaluate absolute beam calibration, relative dosimetry data compared to the treatment planning system data, and processes such as machine QA. Audits conducted from 2000-present were abstracted for recommendations, including type of recommendation and magnitude of error when applicable. Dosimetric recommendations corresponded to absolute dose errors >3% and relative dosimetry errors >2%. On-site audits of 1020 accelerators at 409 institutions were reviewed. Results: A total of 1280 recommendations were made (average 3.1/institution). The most common recommendation was for inadequate QA procedures per TG-40 and/or TG-142 (82% of institutions) with the most commonly noted deficiency being x-ray and electron off-axis constancy versus gantry angle. Dosimetrically, the most common errors in relative dosimetry were in small-field output factors (59% of institutions), wedge factors (33% of institutions), off-axis factors (21% of institutions), and photon PDD (18% of institutions). Errors in calibration were also problematic: 20% of institutions had an error in electron beam calibration, 8% had an error in photon beam calibration, and 7% had an error in brachytherapy source calibration. Almost all types of data reviewed included errors up to 7% although 20 institutions had errors in excess of 10%, and 5 had errors in excess of 20%. The frequency of electron calibration errors decreased significantly with time, but all other errors show non-significant changes. Conclusion: There are many common and often serious errors made during the establishment and maintenance of a radiotherapy program that can be identified through independent peer review. Physicists should be cautious, particularly in areas highlighted herein that show a tendency for errors.

60 APPLIED LIFE SCIENCES↗

Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency (Release 3)

This guide highlights operations and maintenance programs targeting energy and water efficiency that are estimated to save 5% to 20% on energy bills without a significant capital investment. The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not designed to provide the reader with step-by-step procedures for performing O&M on any specific piece of equipment. Rather, this guide first directs the user to the manufacturer's specifications and recommendations. In no way should the recommendations in this guide be used in place of manufacturer's recommendations. The recommendations in this guide are designed to supplement those of the manufacturer, or, as is all too often the case, provide guidance for systems and equipment for which all technical documentation has been lost. As a rule, this guide will first defer to the manufacturer's recommendations on equipment operation and maintenance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Perspectives on distributed computing : thirty people, four user types, and the distributed computing user experience.

This report summarizes the methodology and results of a user perspectives study conducted by the Community Driven Improvement of Globus Software (CDIGS) project. The purpose of the study was to document the work-related goals and challenges facing today's scientific technology users, to record their perspectives on Globus software and the distributed-computing ecosystem, and to provide recommendations to the Globus community based on the observations. Globus is a set of open source software components intended to provide a framework for collaborative computational science activities. Rather than attempting to characterize all users or potential users of Globus software, our strategy has been to speak in detail with a small group of individuals in the scientific community whose work appears to be the kind that could benefit from Globus software, learn as much as possible about their work goals and the challenges they face, and describe what we found. The result is a set of statements about specific individuals experiences. We do not claim that these are representative of a potential user community, but we do claim to have found commonalities and differences among the interviewees that may be reflected in the user community as a whole. We present these as a series of hypotheses that can be tested by subsequent studies, and we offer recommendations to Globus developers based on the assumption that these hypotheses are representative. Specifically, we conducted interviews with thirty technology users in the scientific community. We included both people who have used Globus software and those who have not. We made a point of including individuals who represent a variety of roles in scientific projects, for example, scientists, software developers, engineers, and infrastructure providers. The following material is included in this report: (1) A summary of the reported work-related goals, significant issues, and points of satisfaction with the use of Globus software; (2) A method for characterizing users according to their technology interactions, and identification of four user types among the interviewees using the method; (3) Four profiles that highlight points of commonality and diversity in each user type; (4) Recommendations for technology developers and future studies; (5) A description of the interview protocol and overall study methodology; (6) An anonymized list of the interviewees; and (7) Interview writeups and summary data. The interview summaries in Section 3 and transcripts in Appendix D illustrate the value of distributed computing software--and Globus in particular--to scientific enterprises. They also document opportunities to make these tools still more useful both to current users and to new communities. We aim our recommendations at developers who intend their software to be used and reused in many applications. (This kind of software is often referred to as 'middleware.') Our two core recommendations are as follows. First, it is essential for middleware developers to understand and explicitly manage the multiple user products in which their software components are used. We must avoid making assumptions about the commonality of these products and, instead, study and account for their diversity. Second, middleware developers should engage in different ways with different kinds of users. Having identified four general user types in Section 4, we provide specific ideas for how to engage them in Section 5.

97 MATHEMATICS AND COMPUTING↗

SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transport and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is dependent on the confidence that DOE has in the long term mission for T Plant, is proposed: (1) If the confidence level in a durable, extended T Plant mission independent of sludge storage is high, then the Sludge Treatment Project (STP) would continue to implement the path forward previously described in the Alternatives Report (HNF-39744). Risks to the sludge project can be minimized through the establishment of an Interface Control Document (ICD) defining agreed upon responsibilities for both the STP and T Plant Operations regarding the transfer and storage of sludge and ensuring that the T Plant upgrade and operational schedule is well integrated with the sludge storage activities. (2) If the confidence level in a durable, extended T Plant mission independent of sludge storage is uncertain, then the ASF conceptual design should be pursued on a parallel path with preparation of T Plant for sludge storage until those uncertainties are resolved. (3) Finally, if the confidence level in a durable, extended T Plant mission independent of sludge storage is low, then the ASF design should be selected to provide independence from the T Plant mission risk.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗