Search NASA⌕ Search

SEARCH · Search NASA

Results for “SYSTEM MONITORING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Monitoring the Microgravity Environment Quality On-Board the International Space Station Using Soft Computing Techniques

This paper presents an artificial intelligence monitoring system developed by the NASA Glenn Principal Investigator Microgravity Services project to help the principal investigator teams identify the primary vibratory disturbance sources that are active, at any moment in time, on-board the International Space Station, which might impact the microgravity environment their experiments are exposed to. From the Principal Investigator Microgravity Services' web site, the principal investigator teams can monitor via a graphical display, in near real time, which event(s) is/are on, such as crew activities, pumps, fans, centrifuges, compressor, crew exercise, platform structural modes, etc., and decide whether or not to run their experiments based on the acceleration environment associated with a specific event. This monitoring system is focused primarily on detecting the vibratory disturbance sources, but could be used as well to detect some of the transient disturbance sources, depending on the events duration. The system has built-in capability to detect both known and unknown vibratory disturbance sources. Several soft computing techniques such as Kohonen's Self-Organizing Feature Map, Learning Vector Quantization, Back-Propagation Neural Networks, and Fuzzy Logic were used to design the system.

Jules, Kenol↗

Front-end Electronics for Unattended Measurement (FEUM). Results of Prototype Evaluation

The International Atomic Energy Agency (IAEA) deploys unattended monitoring systems to provide continuous monitoring of nuclear material within safeguarded facilities around the world. As the number of unattended monitoring instruments increases, the IAEA is challenged to become more efficient in the implementation of those systems. In 2010, the IAEA initiated the Front-End Electronics for Unattended Measurement (FEUM) project with the goals of greater flexibility in the interfaces to various sensors and data acquisition systems, and improved capabilities for remotely located sensors (e.g., where sensor and front-end electronics might be separated by tens of meters). In consultation with the IAEA, a technical evaluation of a candidate FEUM device produced by a commercial vendor has been performed. This evaluation assessed the device against the IAEA’s original technical specifications and a broad range of important parameters that include sensor types, cable lengths and types, industrial electromagnetic noise that can degrade signals from remotely located detectors, and high radiation fields. Testing data, interpretation, findings and recommendations are provided.

Conrad, Ryan C.↗

New Hayabusa2 and OSIRIS REx Curation Facilities at Nasa Johnson Space Center

Asteroids are made up of rocky material that is left over from the formation of our solar system [1]. This material holds the key to unlocking information about the history of the planets and our sun. Hayabusa2 and OSIRIS-REx are two sample return missions that have collected rocky material from carbonaceous asteroids which are rich in water, carbon, and organic compounds [1]. Hayabusa2 is a spacecraft that collected samples from asteroid Ryugu launched by the Japan Aerospace Exploration Agency (JAXA). Samples were returned to Earth in December 2020 and 10 percent of the collected material is currently housed in a state-of-the-art laboratory at NASA Johnson Space Center (JSC) dedicated to Ryugu material [1]. OSIRIS-REx is a spacecraft launched by NASA that collected samples from asteroid Bennu. The samples are on their journey to Earth and will arrive in September 2023. They will be stored in a separate cleanroom dedicated to Bennu material. From these two missions, scientists will examine dust particles and rocky material to research clues on how the early solar system formed and how life began [2]. Because these samples are so precious and rare, it is important to keep them free from Earth contamination. In September of 2020, a massive construction project began to provide curation facilities to meet the needs of two incoming asteroid collections, Hayabusa2 and OSIRIS-REx. Despite numerous setbacks caused by the coronavirus pandemic, these facilities have been completed in the fall of 2021. Some of these setbacks included strict PPE requirements, keeping safe working distances as well as access to the facilities as NASA was operating under a Stage 3 condition in response to the pandemic. These facilities will provide curation laboratories to safely house the precious asteroid samples as well as facilities to manipulate samples, do sample preparation and process samples into and out of the labs for future studies by the scientific community. The lab suite consists of several different rooms including an initial anteroom (ISO 7), a staging area (ISO 7), two gowning areas (one for OSIRIS-REx and one for Hayabusa2; both ISO 6)), the Haybusa2 Curation Laboratory (ISO 5), the OSIRIS-REx Curation Laboratory (ISO 5), an ultramicrotomy laboratory (ISO 7) and a thin section laboratory (not a cleanroom). To maintain cleanliness levels necessary for these lab spaces quarterly to monthly Balazs organic and inorganic sampling has been conducted on a regular basis before, during and after the construction project to monitor the cleanliness levels in the new labs that will house the asteroid samples. These new facilities feature a Ruuvi (Grafana) monitoring system that measures temperature, humidity, and pressure of the lab suite. This is a small puck shaped sensor that sends signals to the Grafana cloud where the data can be plotted and set up on dashboards within the lab suite. These sensors are easy to set up and install and they run off a cell battery that is good for 3-5 years before needing replacement. This system can deliver text messages and emails to the appropriate personnel when values fall outside of set limits. In addition to the monitoring system, this new lab suite features viewing windows from several different locations and sliding motion censored doors. We have obtained some state-of-the-art equipment to outfit the lab spaces (desiccators, microscopes, ultramicrotome) and are in the process of outfitting the suite with additional items such as: nitrogen gloveboxes, additional desiccators, micromanipulators, etc. The Hayabusa2 samples provided to NASA by JAXA included 23 millimeter sized grains and 4 containers with finer material. OSIRIS-REx is expected to return as much as 400 grams of asteroid Bennu. Samples will be stored in a nitrogen glove box and separated into nitrogen sealed transfer containers. Small Bennu and Ryugu particles will be handled and prepared (e.g., ultra-thin sections for scanning electron microscopy (SEM) or transmission electron microscopy (TEM)) using an Axis Pro micromanipulator and Leica EM UC7 ultramicrotome. Analyzing samples at the atomic scale will provide greater insight to the origins of the solar system and life formation on Earth. All the curation preparation for these sample collections is essential to ongoing research and efforts to understand our solar system, both nowand for future generations.

Curation↗

Automated Impedance Tomography for Monitoring Permeable Reactive Barrier Health

The objective of this research was the development of an autonomous, automated electrical geophysical monitoring system which allows for near real-time assessment of Permeable Reactive Barrier (PRB) health and aging and which provides this assessment through a web-based interface to site operators, owners and regulatory agencies. Field studies were performed at four existing PRB sites; (1) a uranium tailing site near Monticello, Utah, (2) the DOE complex at Kansas City, Missouri, (3) the Denver Federal Center in Denver, Colorado and (4) the Asarco Smelter site in East Helena, Montana. Preliminary surface data over the PRB sites were collected (in December, 2005). After the initial round of data collection, the plan was modified to include studies inside the barriers in order to better understand barrier aging processes. In September 2006 an autonomous data collection system was designed and installed at the EPA PRB and the electrode setups in the barrier were revised and three new vertical electrode arrays were placed in dedicated boreholes which were in direct contact with the PRB material. Final data were collected at the Kansas City, Denver and Monticello, Utah PRB sites in the fall of 2007. At the Asarco Smelter site in East Helena, Montana, nearly continuous data was collected by the autonomous monitoring system from June 2006 to November 2007. This data provided us with a picture of the evolution of the barrier, enabling us to examine barrier changes more precisely and determine whether these changes are due to installation issues or are normal barrier aging. Two rounds of laboratory experiments were carried out during the project. We conducted column experiments to investigate the effect of mineralogy on the electrical signatures resulting from iron corrosion and mineral precipitation in zero valent iron (ZVI) columns. In the second round of laboratory experiments we observed the electrical response from simulation of actual field PRBs at two sites: the Kansas City barrier and the East Helena barrier. As these sites are also used for our field monitoring efforts, this allowed for a comparison between field and laboratory. In column studies with high concentrations of calcium and carbonate/bicarbonate, we observed that the increase of electrical resistivity and decrease of polarization magnitude is significant and is mainly controlled by the precipitation of calcium carbonates. In general, the electrical properties of all of the barriers studied follow a pattern. New barriers are fairly resistive with in-situ conductivity only a few times background (outside the barrier) values. Older barriers get increasingly conductive, with failed barriers showing values of over 100 S/m. The induced polarization response is more complicated. Chargeability values increase over time for young barriers, are largest for healthy barriers in the middle of their lifespan, and decrease as the barrier ages These results suggest that normalized IP appears promising as a measure of barrier age.

54 ENVIRONMENTAL SCIENCES↗

Photovoltaic at Hollywood and Desert Breeze Recreational Centers

In accordance with the goals of the Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy for promoting solar energy as clean, carbon-free and cost-effective, the County believed that a recreational center was an ideal place to promote solar energy technologies to the public. This project included the construction of solar electricity generation facilities (40kW) at two Clark County facility sites, Desert Breeze Recreational Center and Hollywood Recreational Center, with educational kiosks and Green Boxes for classroom instruction. The major objectives and goals of this Solar Project include demonstration of state of the art technologies for the generation of electricity from solar technology and the creation of an informative and educational tool in regards to the benefits and process of generating alternative energy. Clark County partnered with Anne Johnson (design architect/consultant), Affiliated Engineers Inc. (AEI), Desert Research Institute (DRI), and Morse Electric. The latest photovoltaic technologies were used in the project to help create the greatest expected energy savings for60443 each recreational center. This coupled with the data created from the monitoring system will help Clark County and NREL further understand the real time outputs from the system. The educational portion created with AEI and DRI incorporates material for all ages with a focus on K - 12. The AEI component is an animated story telling the fundamentals of how sunlight is turned into electricity and DRI‘s creation of Solar Green Boxes brings environmental education into the classroom. In addition to the educational component for the public, the energy that is created through the photovoltaic system also translates into saved money and health benefits for the general public. This project has helped Clark County to further add to its own energy reduction goals created by the energy management agenda (Resolution to Encourage Sustainability) and the County’s Eco-initiative. Each site has installed photovoltaic panels on the existing roof structures that exhibit suitable solar exposure. The generation systems utilize solar energy creating electricity used for the facility’s lighting system and other electrical requirements. Unused electricity is sent to the electric utility grid, often at peak demand times. Educational signage, kiosks and information have been included to inform and expand the public’s understanding of solar energy technology. The Solar Green Boxes were created for further hands on classroom education of solar power. In addition, data is sent by a Long Term PV performance monitoring system, complete with data transmission to NREL (National Renewable Energy Laboratory), located in Golden, CO. This system correlates local solar irradiance and weather with power production. The expected outcomes of this Solar Project are as follows: (1) Successful photovoltaic electricity generation technologies to capture solar energy in a useful form of electrical energy. (2) Reduction of greenhouse gas emissions and environmental degradation resulting from reduced energy demand from traditional electricity sources such as fossil fuel fired and nuclear power plants. (3) Advance the research and development of solar electricity generation. (4) The education of the general public in regards to the benefits of environmentally friendly electricity generation and Clark County’s efforts to encourage sustainable living practices. (5) To provide momentum for the nexus for future solar generation facilities in Clark County facilities and buildings and further the County’s energy reduction goals. (6) To ultimately contribute to the reduction of dependence on foreign oil and other unsustainable sources of energy. This Solar Project addresses several objectives and goals of the U.S. Department of Energy’s Solar Energy Technology Program. The project improves the integration and performance of solar electricity directly through implementation of cutting edge technology. The project further addresses this goal by laying important ground work and infrastructure for integration into the utility grid in future related projects. There will also be added security, reliability, and diversity to the energy system by providing and using reliable, secure, distributed electricity in Clark County facilities as well as sending such electricity back into the utility electric grid. A final major objective met by the Solar Project will be the displacement of energy derived by fossil fuels with clean renewable energy created by photovoltaic panels.

14 SOLAR ENERGY↗

Comprehensive Monitoring for Heterogeneous Geographically Distributed Storage

Storage capacity at CMS Tier-1 and Tier-2 sites reached over 100 Petabytes in 2014, and will be substantially increased during Run 2 data taking. The allocation of storage for the individual users analysis data, which is not accounted as a centrally managed storage space, will be increased to up to 40%. For comprehensive tracking and monitoring of the storage utilization across all participating sites, CMS developed a space monitoring system, which provides a central view of the geographically dispersed heterogeneous storage systems. The first prototype was deployed at pilot sites in summer 2014, and has been substantially reworked since then. In this paper we discuss the functionality and our experience of system deployment and operation on the full CMS scale.

Ratnikova, N.↗

AP-105 Melter Offgas Condensate and EMF Evaporator Concentrate Raman and LIBS Qualitative Evaluation for the use of In-Line Monitoring (Rev. 0)

The Pacific Northwest National Laboratory (PNNL) was tasked to perform Raman spectroscopy and laser induced breakdown spectroscopy (LIBS) testing on the melter off-gas condensate generated during low-activity waste process testing of a sample from Hanford Site tank AP-105 and/or evaporate from evaporation of the condensate. This was a proof-of-principle demonstration that Raman spectroscopy and LIBS have the potential to be used as analytical tools for in-line process analysis of key aqueous phase analytes in radioactive process streams associated with the Hanford Waste Treatment and Immobilization Plant. The work completed under this project complements work completed for WRPS with the development of in-line monitoring systems to characterize and quantify constituents of tank waste following Cs removal and filtration. The WRPS work is currently limited to Raman sensors and utilizes chemometric models for quantification of several anionic species in the sample system. It should be noted that while this approach can be applied to off-gas condensate streams, new chemometric models are needed to accurately quantify analytes under off-gas condensate conditions. The work completed under this project makes timely use of available samples and equipment at PNNL. The project utilized the opportunity to collect off-gas samples from planned AP-105 processing work and included the direct condensate and the evaporate from the DFLAW Radioactive Waste Test Platform. Samples were characterized by instruments already in place at PNNL including a Raman spectrometer optimized for in-line monitoring of flowing and stationary samples as well as a LIBS instrument, which was optimized for static liquid droplet analysis. The ultimate objective was to determine if these techniques could be used to qualitatively characterize analytes present within the off-gas samples. The testing confirmed the use of the Raman as an in-line monitoring system was able to qualitatively observe NO 3 - , NO 2 - , aluminum (as aluminate, Al(OH) 4 - ), SO 4 2- , CrO 4 2- , CO 3 2- , and PO 4 3- in the AP-105 melter feed evaporator condensate samples. The testing also confirmed LIBS as a potential useful technique for in-line monitoring, able to qualitatively detect Na, N, Al, and tentatively Cr and Cl in a simulant stock evaporate solution.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-sensor analysis techniques for SSME safety monitoring

Two algorithms were developed which utilized multi-sensor analysis techniques to complement the current Space Shuttle Main Engine (SSME) safety monitoring system. The first algorithm analyzed the accumulative error between actual and predicted values of the engine parameter set, while the second algorithm combined these error terms into a response pattern and correlated each pattern with a standard pattern. These algorithms were applied to twelve SSME anomalous test firings and were found to produce improved failure detection times in eight of those twelve compared to the current engine safety monitoring system. Of the eight detected anomalous test firings, the first algorithm detected all eight, while the second algorithm detected seven of the eight. No false alarms were indicated by either algorithm for twelve nominal test firings. An initial parametric study of these algorithms for optimized parameter selection is presented and algorithm robustness to sensor failure is demonstrated.

Maul, William A., III↗

Neutron emission measurement at the HL-2A tokamak device with a liquid scintillation detector

Neutron emission measurement at the HL-2A tokamak device with a liquid scintillation detector is described. The detector was placed at a location with little structure material in the field of view, and equipped with a gain monitoring system which could provide the possibility to evaluate the gain variation as well as to correct for the detector response. Time trace of the neutron emissivity was obtained and it was consistent with the result of a standard {sup 235}U fission chamber. During the plasma discharge the neutron yield could vary by about four orders of magnitude and the fluctuation of the detector gain was up to about 6%. Pulse height spectrum of the liquid scintillation detector was constructed and corrected with the aid of the gain monitoring system, and the correction was found to be essential for the assessment of the neutron energy spectrum. This successful measurement offered experience and confidence for the application of liquid scintillation detectors in the upcoming neutron camera system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Monitoring the Migrations of Wild Snake River Spring/Summer Chinook Salmon Juveniles, 2007-2008

This report provides results from an ongoing project to monitor the migration behavior and survival of wild juvenile spring/summer Chinook salmon in the Snake River Basin. Data reported is from detections of PIT tagged fish during late summer 2007 through mid-2008. Fish were tagged in summer 2007 by the National Marine Fisheries Service (NMFS) in Idaho and by the Oregon Department of Fish and Wildlife (ODFW) in Oregon. Our analyses include migration behavior and estimated survival of fish at instream PIT-tag monitors and arrival timing and estimated survival to Lower Granite Dam. Principal results from tagging and interrogation during 2007-2008 are: (1) In July and August 2007, we PIT tagged and released 7,390 wild Chinook salmon parr in 12 Idaho streams or sample areas. (2) Overall observed mortality from collection, handling, tagging, and after a 24-hour holding period was 1.4%. (3) Of the 2,524 Chinook salmon parr PIT tagged and released in Valley Creek in summer 2007, 218 (8.6%) were detected at two instream PIT-tag monitoring systems in lower Valley Creek from late summer 2007 to the following spring 2008. Of these, 71.6% were detected in late summer/fall, 11.9% in winter, and 16.5% in spring. Estimated parr-to-smolt survival to Lower Granite Dam was 15.5% for the late summer/fall group, 48.0% for the winter group, and 58.5% for the spring group. Based on detections at downstream dams, the overall efficiency of VC1 (upper) or VC2 (lower) Valley Creek monitors for detecting these fish was 21.1%. Using this VC1 or VC2 efficiency, an estimated 40.8% of all summer-tagged parr survived to move out of Valley Creek, and their estimated survival from that point to Lower Granite Dam was 26.5%. Overall estimated parr-to-smolt survival for all summer-tagged parr from this stream at the dam was 12.1%. Development and improvement of instream PIT-tag monitoring systems continued throughout 2007 and 2008. (4) Testing of PIT-tag antennas in lower Big Creek during 2007-2008 showed these antennas (and anchoring method) are not adequate to withstand high spring flows in this drainage. Future plans involve removing these antennas before high spring flows. (5) At Little Goose Dam in 2008, length and/or weight were taken on 505 recaptured fish from 12 Idaho stream populations. Fish had grown an average of 40.1 mm in length and 10.6 g in weight over an average of 288 d. Their mean condition factor declined from 1.25 at release (parr) to 1.05 at recapture (smolt). (6) Mean release lengths for detected fish were significantly larger than for fish not detected the following spring and summer (P < 0.0001). (7) Fish that migrated through Lower Granite Dam in April and May were significantly larger at release than fish that migrated after May (P < 0.0001) (only 12 fish migrated after May). (8) In 2008, peak detections at Lower Granite Dam of parr tagged during summer 2007 (from the 12 stream populations in Idaho and 4 streams in Oregon) occurred during moderate flows of 87.5 kcfs on 7 May and high flows of 197.3 kcfs on 20 May. The 10th, 50th, and 90th percentile passage occurred on 30 April, 11 May, and 23 May, respectively. (9) In 2007-2008, estimated parr-to-smolt survival to Lower Granite Dam for Idaho and Oregon streams (combined) averaged 19.4% (range 6.2-38.4% depending on stream of origin). In Idaho streams the estimated parr-to-smolt survival averaged 21.0%. This survival was the second highest since 1993 for Idaho streams. Relative parr densities were lower in 2007 (2.4 parr/100 m2) than in all previous years since 2000. In 2008, we observed low-to-moderate flows prior to mid-May and relatively cold weather conditions throughout the spring migration season. These conditions moved half of the fish through Lower Granite Dam prior to mid-May; then high flows moved 50 to 90% of the fish through the dam in only 12 days. Clearly, complex interrelationships of several factors drive the annual migrational timing of the stocks.

13 HYDRO ENERGY↗

Monitoring the Migrations of Wild Snake River Spring/Summer Chinook Salmon Juveniles, 2007-2008 Report of Research.

This report provides results from an ongoing project to monitor the migration behavior and survival of wild juvenile spring/summer Chinook salmon in the Snake River Basin. Data reported is from detections of PIT tagged fish during late summer 2007 through mid-2008. Fish were tagged in summer 2007 by the National Marine Fisheries Service (NMFS) in Idaho and by the Oregon Department of Fish and Wildlife (ODFW) in Oregon. Our analyses include migration behavior and estimated survival of fish at instream PIT-tag monitors and arrival timing and estimated survival to Lower Granite Dam. Principal results from tagging and interrogation during 2007-2008 are listed below: (1) In July and August 2007, we PIT tagged and released 7,390 wild Chinook salmon parr in 12 Idaho streams or sample areas. (2) Overall observed mortality from collection, handling, tagging, and after a 24-hour holding period was 1.4%. (3) Of the 2,524 Chinook salmon parr PIT tagged and released in Valley Creek in summer 2007, 218 (8.6%) were detected at two instream PIT-tag monitoring systems in lower Valley Creek from late summer 2007 to the following spring 2008. Of these, 71.6% were detected in late summer/fall, 11.9% in winter, and 16.5% in spring. Estimated parr-to-smolt survival to Lower Granite Dam was 15.5% for the late summer/fall group, 48.0% for the winter group, and 58.5% for the spring group. Based on detections at downstream dams, the overall efficiency of VC1 (upper) or VC2 (lower) Valley Creek monitors for detecting these fish was 21.1%. Using this VC1 or VC2 efficiency, an estimated 40.8% of all summer-tagged parr survived to move out of Valley Creek, and their estimated survival from that point to Lower Granite Dam was 26.5%. Overall estimated parr-to-smolt survival for all summer-tagged parr from this stream at the dam was 12.1%. Development and improvement of instream PIT-tag monitoring systems continued throughout 2007 and 2008. (4) Testing of PIT-tag antennas in lower Big Creek during 2007-2008 showed these antennas (and anchoring method) are not adequate to withstand high spring flows in this drainage. Future plans involve removing these antennas before high spring flows. (5) At Little Goose Dam in 2008, length and/or weight were taken on 505 recaptured fish from 12 Idaho stream populations. Fish had grown an average of 40.1 mm in length and 10.6 g in weight over an average of 288 d. Their mean condition factor declined from 1.25 at release (parr) to 1.05 at recapture (smolt). (6) Mean release lengths for detected fish were significantly larger than for fish not detected the following spring and summer (P < 0.0001). (7) Fish that migrated through Lower Granite Dam in April and May were significantly larger at release than fish that migrated after May (P < 0.0001) (only 12 fish migrated after May). (8) In 2008, peak detections at Lower Granite Dam of parr tagged during summer 2007 (from the 12 stream populations in Idaho and 4 streams in Oregon) occurred during moderate flows of 87.5 kcfs on 7 May and high flows of 197.3 kcfs on 20 May. The 10th, 50th, and 90th percentile passage occurred on 30 April, 11 May, and 23 May, respectively. (9) In 2007-2008, estimated parr-to-smolt survival to Lower Granite Dam for Idaho and Oregon streams (combined) averaged 19.4% (range 6.2-38.4% depending on stream of origin). In Idaho streams the estimated parr-to-smolt survival averaged 21.0%. This survival was the second highest since 1993 for Idaho streams. Relative parr densities were lower in 2007 (2.4 parr/100 m{sup 2}) than in all previous years since 2000. In 2008, we observed low-to-moderate flows prior to mid-May and relatively cold weather conditions throughout the spring migration season. These conditions moved half of the fish through Lower Granite Dam prior to mid-May; then high flows moved 50 to 90% of the fish through the dam in only 12 days. Clearly, complex interrelationships of several factors drive the annual migrational timing of the stocks.

13 HYDRO ENERGY↗

Context and future directions for integrating forest carbon into sub-national climate mitigation planning in the RGGI region of the U.S.

International frameworks for climate mitigation that build from national actions have been developed under the United National Framework Convention on Climate Change and advanced most recently through the Paris Climate Agreement. In parallel, sub-national actors have set greenhouse gas (GHG) reduction goals and developed corresponding climate mitigation plans. Within the U.S., multi-state coalitions have formed to facilitate coordination of related science and policy. Here, utilizing the forum of the NASA Carbon Monitoring System’s Multi-State Working Group, we collected and reviewed climate mitigation plans for 11 states in the Regional Greenhouse Gas Initiative region of the Eastern U.S. For each state we reviewed the (a) policy framework for climate mitigation, (b) GHG reduction goals, (c) inclusion of forest activities in the state’s climate action plan, (d) existing science used to quantify forest carbon estimates, and (e) stated needs for forest carbon monitoring science. Across the region, we found important differences across all categories. While all states have GHG reduction goals and framework documents, nearly three-quarters of all states do not account for forest carbon when planning GHG reductions; those that do account for forest carbon use a variety of scientific methods with various levels of planning detail and guidance. We suggest that a common, efficient, standardized forest carbon monitoring system would provide important benefits to states and the geographic region as a whole. In addition, such a system would allow for more effective transparency and progress tracking to support state, national, and international efforts to increase ambition and implementation of climate goals.

Rachel L Lamb↗

Applying Waveform Correlation to Aftershock Sequences Using a Global Sparse Network

Agencies that monitor for underground nuclear tests are interested in techniques that automatically characterize earthquake aftershock sequences to reduce the human analyst effort required to produce high-quality event bulletins. Waveform correlation is effective in detecting similar seismic waveforms from repeating earthquakes, including aftershock sequences. We report the results of an experiment that uses waveform templates recorded by multiple stations of the Comprehensive Nuclear-Test-Ban Treaty International Monitoring System during the first twelve hours after a mainshock to detect and identify aftershocks that occur during the subsequent week. We discuss approaches for station and template selection, threshold setting, and event detection that are specialized for aftershock processing for a sparse, global network. We apply the approaches to three aftershock sequences to evaluate the potential for establishing a set of standards for aftershock waveform correlation processing that can be effective for operational monitoring systems with a sparse network. We compare candidate events detected with our processing methods to the Reviewed Event Bulletin of the International Data Center to develop an intuition about potential reduction in analyst workload.

58 GEOSCIENCES↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Airborne laser ranging system for monitoring regional crustal deformation

Alternate approaches for making the atmospheric correction without benefit of a ground-based meteorological network are discussed. These include (1) a two-color channel that determines the atmospheric correction by measuring the time delay induced by dispersion between pulses at two optical frequencies; (2) single-color range measurements supported by an onboard temperature sounder, pressure altimeter readings, and surface measurements by a few existing meteorological facilities; and (3) inclusion of the quadratic polynomial coefficients as variables to be solved for along with target coordinates in the reduction of the single-color range data. It is anticipated that the initial Airborne Laser Ranging System (ALRS) experiments will be carried out in Southern California in a region bounded by Santa Barbara on the norht and the Mexican border on the south. The target area will be bounded by the Pacific Ocean to the west and will extend eastward for approximately 400 km. The unique ability of the ALRS to provide a geodetic 'snapshot' of such a large area will make it a valuable geophysical tool.

Degnan, J. J.↗

Environmental Radiation Monitoring at the Areas of the Former Military Technical Bases at the Russian Far East - 12445

After termination of operation at the serviced facilities of the nuclear fleet of the former Soviet Union, the Military Technical Base in Sysoeva Bay has been reorganized to the site for SNF and RW temporary storage (STS). The main activities of STS are receipt, storage and transmission to radioactive waste reprocessing. Establishment of the RW management regional centre in the Far-Eastern region at the STS in Sysoeva Bay implies intensification of SNF and RW management in this region that can result in increasing ecological load to the adjacent areas and settlements. Regulatory supervision of the radiation safety at the areas of the Former Military Technical Bases at the Russian Far East is one of the regulatory functions of the Federal Medical Biological Agency (FMBA of Russia). To regulate SNF an RW management and provide the effective response to changing radiation situation, the environmental radiation monitoring system is arranged. For this purpose, wide range of environmental media examinations at the Sysoeva Bay STS was performed by Burnasyan Federal Medical Biophysical Centre - a technical support organization of FMBA of Russia in collaboration with the Federal State Geological Enterprise 'Hydrospecgeology' (Federal Agency for Entrails). Regulation during the RW and SNF management is continuous process, which the FMBA of Russia implements in close cooperation with other Russian responsible authorities - the State Atomic Energy Corporation 'Rosatom' and Federal Agency for Entrails. The Environmental radiation monitoring findings served as a basis for the associated databank arrangement. The radio ecological monitoring system was arranged at the facilities under inspection for the purpose of the dynamic control of the radiation situation. It presupposes regular radiometry inspections in-situ, their analysis and assessment of the radiation situation forecast in the course of the STS remediation main stages. Some new data on the radiation situation at the facilities will appear in future and the prognostic assessment will become more precise. The mentioned natural, practical and theoretical works is a base for the development of the set of regulatory documents to assure radiation protection and safety of workers, public and environment, as well as development of documents to regulate SNF and RW management at the STS facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automatic Seismic Phase Picking Using Deep Learning for the EGS Collab project

Microseismic monitoring plays an important role in many energy-related and environmental industries.The microseismic event catalog and seismic structure of the subsurface are two of the primary outputsof the microseismic monitoring system. Though rough locations of microseismic events can be estimated automatically, obtaining high-resolution microseismic event locations requires a significant amount of human laborespecially on seismic phase picking. Unlike traditional automatic pickers that are usually less precise than human analysts, a fewrecently proposed algorithms based on deepneural networks(DNN)were able to match or surpass human performance for earthquake signals. Due to differences in the spatial scale of the study area, sensor sampling rate, and geometry of the monitoring system, it is not clear whether these deepneural networkmodels can be used to speed up microseismic data processing. In this paper, we adapted the DNN based technique for automatic phase picking of microseismic signals. We usedmicroseismic data recorded at the experiment 1 site of the enhancedgeothermal system (EGS) Collab project anddesigneda workflowthat we call transfer-learning aided double-difference tomography (TADT),thatcombines transfer learning and seismic tomography. We re-train an existing DNN with our data to obtain a newmodel using around 3500 seismogramsand associated manual phase picks. Thistransfer learnedmodel is able to reach human performance but muchfaster than human analysts. The transfer-learning-derived phase pickswereused to improve microseismic event locations and imagethesubsurface. The results are similar to or slightly better than those obtained with manual phase picks.

Chai, Chengping↗

Method for Simultaneously Making a Plurality of Acoustic Signal Sensor Elements

A fetal heart monitoring system preferably comprising a backing plate having a generally concave front surface and a generally convex back surface, and at least one sensor element attached to the concave front surface for acquiring acoustic fetal heart signals produced by a fetus within a body. The sensor element has a shape that conforms to the generally concave back surface of the backing plate. In one embodiment, the at least one sensor element comprises an inner sensor, and a plurality of outer sensors surrounding the inner sensor. The fetal heart monitoring system can further comprise a web belt, and a web belt guide movably attached to the web belt. The web belt guide being is to the convex back surface of the backing plate.

Timothy D Bryant↗