Search NASA⌕ Search

SEARCH · Search NASA

Results for “Systems Engineering and Program Integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Suit Port Aft Bulkhead Mockup 2008 Test Results

The Lunar Electric Rover (LER), formerly called the Small Pressurized Rover (SPR), is currently being carried as an integral part of the current Lunar Surface Architectures under consideration in the Constellation program. One element of the LER is the suit port, the means by which the crew performs Extravehicular Activities (EVAs). Two suit port deliverables were produced in fiscal year 2008: an aft bulkhead mockup for functional integrated testing with the 1-G LER mockup and a functional and pressurizable Engineering Unit (EU). This paper focuses on the aft bulkhead mockup test results from Desert Research and Technology Studies (D-RATS) October 2008 testing at Black Point Lava Flow (BPLF), Arizona. Refer to 39th International Conference on Environmental Systems (ICES) for test results of the EU. The suit port aft bulkhead mockup was integrated with the mockup of the LER cabin and chassis. It is located on the aft bulkhead of the LER cabin structure and includes hatches, a locking mechanism, seals, interior and exterior suit don/doff aids, and exterior platforms to accommodate different crewmember heights. A lightweight mockup of the Mark III suit was tested with the suit port aft bulkhead mockup. There are several limitations to the suit port and mockup suits, and results of the suit port evaluation are presented and interpreted within the context of the limitations.

Romig, Barbara A.↗

NASA Tech Briefs, November 2009

Topics covered include: Cryogenic Chamber for Servo-Hydraulic Materials Testing; Apparatus Measures Thermal Conductance Through a Thin Sample from Cryogenic to Room Temperature; Rover Attitude and Pointing System Simulation Testbed; Desktop Application Program to Simulate Cargo-Air-Drop Tests; Multimodal Friction Ignition Tester; Small-Bolt Torque-Tension Tester; Integrated Spacesuit Audio System Enhances Speech Quality and Reduces Noise; Hardware Implementation of a Bilateral Subtraction Filter; Simple Optoelectronic Feedback in Microwave Oscillators; Small X-Band Oscillator Antennas; Free-Space Optical Interconnect Employing VCSEL Diodes; Discrete Fourier Transform Analysis in a Complex Vector Space; Miniature Scroll Pumps Fabricated by LIGA; Self-Assembling, Flexible, Pre-Ceramic Composite Preforms; Flight-speed Integral Image Analysis Toolkit; Work Coordination Engine; Multi-Mission Automated Task Invocation Subsystem; Autonomously Calibrating a Quadrupole Mass Spectrometer; Determining Spacecraft Reaction Wheel Friction Parameters; Composite Silica Aerogels Opacified with Titania; Multiplexed Colorimetric Solid-Phase Extraction; Detecting Airborne Mercury by Use of Polymer/Carbon Films; Lattice-Matched Semiconductor Layers on Single Crystalline Sapphire Substrate; Pressure-Energized Seal Rings to Better Withstand Flows; Rollerjaw Rock Crusher; Microwave Sterilization and Depyrogenation System; Quantifying Therapeutic and Diagnostic Efficacy in 2D Microvascular Images; NiF2/NaF:CaF2/Ca Solid-State High-Temperature Battery Cells; Critical Coupling Between Optical Fibers and WGM Resonators; Microwave Temperature Profiler Mounted in a Standard Airborne Research Canister; Alternative Determination of Density of the Titan Atmosphere; Solar Rejection Filter for Large Telescopes; Automated CFD for Generation of Airfoil Performance Tables; Progressive Classification Using Support Vector Machines; Active Learning with Irrelevant Examples; A Data Matrix Method for Improving the Quantification of Element Percentages of SEM/EDX Analysis; Deployable Shroud for the International X-Ray Observatory; Improved Model of a Mercury Ring Damper; Optoelectronic pH Meter: Further Details; X-38 Advanced Sublimator; and Solar Simulator Represents the Mars Surface Solar Environment.

Source record↗

Development of Tailorable Electrically Conductive Thermal Control Material Systems

The optical characteristics of surfaces on spacecraft are fundamental parameters in controlling its temperature. Passive thermal control coatings with designed solar absorptance and infrared emittance properties have been developed and have been in use for some time. In this total space environment, the coating must be stable and maintain its desired optical properties as well as mechanical properties for the course of the mission lifetime. The mission lifetimes are increasing and in our quest to save weight, newer substrates are being integrated which limit electrical grounding schemes. All of this has added to already existing concerns about spacecraft charging and related spacecraft failures or operational failures. The concern is even greater for thermal control surfaces that are very large. One way of alleviating such concerns is to design new thermal control material systems (TCMS) that can help to mitigate charging via providing charge leakage paths. The objective of this program was to develop two types of passive electrically conductive TCMS. The first was a highly absorbing/emitting black surface and the second was a low (alpha(sub s)/epsilon(sub N)) type white surface. The surface resistance goals for the black absorber was 10(exp 4) to 10(exp 9) Omega/square, and for the white surfaces it was 10(exp 6) to 10(exp 10) Omega/square. Several material system concepts were suggested and evaluated for space environment stability and electrical performance characterization. Our efforts in designing and evaluating these material systems have resulted in several developments. New concepts, pigments and binders have been developed to provide new engineering quality TCMS. Some of these have already found application on space hardware, some are waiting to be recognized by thermal designers, and some require further detailed studies to become state-of-the-art for future space hardware and space structures. Our studies on baseline state-of-the-art materials and conductive concepts have resulted in several important findings that are of interest to all thermal designers and systems integrators.

Deshpande, M. S.↗

Terry Turbopump Expanded Operating Band Full-Scale Integral Long-Term Low-Pressure Experiments — Preliminary Test Plan

This document details the milestone approach to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 5 (full-scale integral long-term low-pressure operations) efforts. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

International Space Station Sustaining Engineering: A Ground-Based Test Bed for Evaluating Integrated Environmental Control and Life Support System and Internal Thermal Control System Flight Performance

As the International Space Station's (ISS) various habitable modules are placed in service on orbit, the need to provide for sustaining engineering becomes increasingly important to ensure the proper function of critical onboard systems. Chief among these are the Environmental Control and Life Support System (ECLSS) and the Internal Thermal Control System (ITCS). Without either, life onboard the ISS would prove difficult or nearly impossible. For this reason, a ground-based ECLSS/ITCS hardware performance simulation capability has been developed at NASA's Marshall Space Flight Center. The ECLSS/ITCS Sustaining Engineering Test Bed will be used to assist the ISS Program in resolving hardware anomalies and performing periodic performance assessments. The ISS flight configuration being simulated by the test bed is described as well as ongoing activities related to its preparation for supporting ISS Mission 5A. Growth options for the test facility are presented whereby the current facility may be upgraded to enhance its capability for supporting future station operation well beyond Mission 5A. Test bed capabilities for demonstrating technology improvements of ECLSS hardware are also described.

Ray, Charles D.↗

Semi-Annual Report for Modular Integrated Gas High Temperature Reactor Development during Performance Period April 2022 - September 2022

Horizontal Compact High Temperature Gas Reactor (HC-HTGR) is being designed by a multidisciplinary team of nuclear, mechanical, and structural engineers under the support of a DOE-NE Advanced Reactor Demonstration Program’s Advanced Reactor Concepts-20 (ARC-20) award. The objective of this ARC-20 project is to deliver a conceptual design for the proposed HC-HTGR in 3 years and support its commercialization as a safe, low-cost HTGR. Argonne National Laboratory (Argonne) is responsible for the design and analysis of the reactor cavity cooling system (RCCS) as a safety system for passive decay heat removal of the reactor concept. Additionally, Argonne is providing analysis of the primary coolant system to ensure temperatures within the core remain below safety margins during steady-state and potential accident scenarios. This second semi-annual report summarized the progress made at Argonne on the two tasks during the second half of FY22. As a part of the RCCS design task, a scoping calculation in estimating HVAC capability for the HC-HTGR reactor building was performed. A water panel modeling study was first performed with the test case, which confirms the capability of the RELAP5-3D modeling approach to explore various design options of the HC-HTGR RCCS under consideration. Then, a reference RELAP5-3D model for the unit geometry of the preliminary design of the HC-HTGR RCCS was developed. A preliminary performance analysis was conducted to evaluate the performances of a single-phase natural circulation and panel conduction in various operating conditions. For the primary coolant system analysis task, preliminary thermal hydraulic analysis of the HC-HTGR core design was performed with a high resolution 1D fluid-3D solid coupled model using the System Analysis Module (SAM) to assess the assembly coolant channel and bypass flow mass flow rate distribution. Some preliminary work on the development of a full core reduced order model was discussed following the assembly level model to predict the core wide coolant flow distribution and to model certain operational and accidental transients.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

2011 Remediation Effectiveness Report for the U.S. Department of Energy Oak Ridge Reservation, Oak Ridge, Tennessee - Data and Evaluations

Under the requirements of the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency, (EPA) and the Tennessee Department of Environment and Conservation (TDEC) in 1992, all environmental restoration activities on the ORR are performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Since the 1990s, the environmental restoration activities have experienced a gradual shift from characterization to remediation. As this has occurred, it has been determined that the assessment of the individual and cumulative performance of all ORR CERCLA remedial actions (RAs) is most effectively tracked in a single document. The Remediation Effectiveness Report (RER) is an FFA document intended to collate all ORR CERCLA decision requirements, compare pre- and post-remediation conditions at CERCLA sites, and present the results of any required post-decision remediation effectiveness monitoring. First issued in 1997, the RER has been reissued annually to update the performance histories of completed actions and to add descriptions of new CERCLA actions. Monitoring information used in the 2011 RER to assess remedy performance was collected and/or compiled by DOE's Water Resources Restoration Program (WRRP). Only data used to assess performance of completed actions are provided. In addition to collecting CERCLA performance assessment data, the WRRP also collects baseline data to be used to gauge the effectiveness of future actions once implemented. These baseline data are maintained in the Oak Ridge Environmental Information System and will be reported in future RERs, as necessary, once the respective actions are completed. However, when insufficient data exist to assess the impact of the RAs, e.g., when the RA was only recently completed, a preliminary evaluation is made of early indicators of effectiveness at the watershed scale, such as contaminant trends at surface water integration points (IFs). Long-term stewardship (LTS) information used in this report is collected, compiled, and tracked by the WRRP in conjunction with the Bechtel Jacobs Company LLC (BJC) Surveillance and Maintenance (S&M) program, the BJC Radiation Protection Organization at East Tennessee Technology Park (ETTP), ETTP Environmental Compliance Program, B&W Y-12 Liquid Waste Treatment Operations, and UT Battelle Facilities Management Division. Additionally, documentation verifying the implementation of administrative land use controls (LUCs) [i.e., property record restrictions, property record notices, zoning notices, and excavation/penetration permit (EPP) program] is also obtained from many sources throughout the fiscal year (FY), including County Register of Deeds offices for property record restrictions and property record notices, City Planning Commission for zoning notices, and BJC project engineers for EPP program verification. Copies of this documentation are obtained by the WRRP and maintained with the project RER files.

54 ENVIRONMENTAL SCIENCES↗

Exe-Guard Project

The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirus methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a typical manual scanning process. Control systems are vulnerable to performance losses if off-the-shelf blacklist antivirus solutions aren’t implemented with care. This investment in configuration in addition to constant decommissioning to perform manual signature file updates is unprecedented and impractical. Additionally, control systems are often disconnected or islanded from the network making the delivery of signature updates difficult. Exe-Guard project developed a white list antivirus solution that mitigated the above drawbacks and allows control systems to cost-effectively apply malware protection while maintaining high reliability. The application of security patches can also be minimized since white listing maintains constant defense against unauthorized code execution. Security patches can instead be applied in less frequent intervals where system decommissioning can be scheduled and planned for. Since control systems are less dynamic than IT environments, the feasibility of maintaining a secure baselined state is more practical. Because upgrades are performed in infrequent, calculated intervals, it allows a new security baseline to be established before the system is returned to service. Exe-Guard built on the efforts of SNL under the Code Seal project. SNL demonstrated prototype Trust Anchors on the project which are independent monitoring and control devices that can be integrated into untrustworthy components. The exe-Guard team started with the lessons learned under this project then designed commercial solution for white list malware protection. Malware is a real threat, even on islanded or un-networked installations, since operators can unintentionally install infected files, plug in infected mass storage devices, or infect a piece of equipment on the islanded local area network that can then spread to other connected equipment. Protection at the device level is one of the last layers of defense in a security-in-depth defense model before an asset becomes compromised. This project provided non-destructive intrusion, isolation and automated response solution, achieving a goal of the Department of Energy (DOE) Roadmap to Secure Control Systems. It also addressed CIP-007-R4 which requires asset owners to employ malicious software prevention tools on assets within the electronic security perimeter. In addition, the CIP-007-R3 requirement for security patch management is minimized because white listing narrows the impact of vulnerabilities and patch releases. The exe-Guard Project completed all tasks identified in the statement of project objective and identified additional tasks within scope that were performed and completed within the original budget. The cost share was met and all deliverables were successfully completed and submitted on time. Most importantly the technology developed and commercialized under this project has been adopted by the Energy sector and thousands of devices with exe-Guard technology integrated in them have now been deployed and are protecting our power systems today

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy efficient engine: Turbine transition duct model technology report

The Low-Pressure Turbine Transition Duct Model Technology Program was directed toward substantiating the aerodynamic definition of a turbine transition duct for the Energy Efficient Engine. This effort was successful in demonstrating an aerodynamically viable compact duct geometry and the performance benefits associated with a low camber low-pressure turbine inlet guide vane. The transition duct design for the flight propulsion system was tested and the pressure loss goal of 0.7 percent was verified. Also, strut fairing pressure distributions, as well as wall pressure coefficients, were in close agreement with analytical predictions. Duct modifications for the integrated core/low spool were also evaluated. The total pressure loss was 1.59 percent. Although the increase in exit area in this design produced higher wall loadings, reflecting a more aggressive aerodynamic design, pressure profiles showed no evidence of flow separation. Overall, the results acquired have provided pertinent design and diagnostic information for the design of a turbine transition duct for both the flight propulsion system and the integrated core/low spool.

Leach, K.↗

Evaluation of Propulsion Systems for Mach 2.4 and 3.2 High Speed Civil Transports

Advanced technology high speed civil transport (HSCT) engine cycles equipped with low emissions combustors and low noise exhaust nozzles were investigated. The objectives were as follows: (1) evaluate a range of cycle variables for engine types appropriate for Mach 2.4 and 3.2 HSCT; (2) select the most promising propulsion systems; and (3) identify and define the critical/key technology development and demonstration programs needed to be conducted prior to initiation of the product engine development and certification program. Two types of variable engines were studied: turbine bypass engines (TBE) and variable stream control engines (VSCE). This study identified payoffs in terms of aircraft gross weight, airline economics, stratospheric cruise emissions, and airport noise improvements. Comparison between the the TBE and VSCE showed the TBE to be clearly superior for Mach 2.4 and 3.2 cruise cruise operation. Critical technology areas were also identified which included the following: (1) Low emissions combustor; (2) Low noise exhaust system; (3) High temperature materials and coatings; (4) Advanced turbine cooling and aerodynamics; (5) Integrated propulsion system (inlet/engine/nozzle) and airframe controls; (6) Advanced fan/compressor aerodynamics; and (7) Magnetic bearings.

Turbine Bypass Engine (TBE)↗

Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedback during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.

Agile Development↗

Propulsion Flight Research at NASA Dryden From 1967 to 1997

From 1967 to 1997, pioneering propulsion flight research activities have been conceived and conducted at the NASA Dryden Flight Research Center. Many of these programs have been flown jointly with the United States Department of Defense, industry, or the Federal Aviation Administration. Propulsion research has been conducted on the XB-70, F-111 A, F-111E, YF-12, JetStar, B-720, MD-11, F-15, F- 104, Highly Maneuverable Aircraft Technology, F-14, F/A-18, SR-71, and the hypersonic X-15 airplanes. Research studies have included inlet dynamics and control, in-flight thrust computation, integrated propulsion controls, inlet and boattail drag, wind tunnel-to-flight comparisons, digital engine controls, advanced engine control optimization algorithms, acoustics, antimisting kerosene, in-flight lift and drag, throttle response criteria, and thrust-vectoring vanes. A computer-controlled thrust system has been developed to land the F-15 and MD-11 airplanes without using any of the normal flight controls. An F-15 airplane has flown tests of axisymmetric thrust-vectoring nozzles. A linear aerospike rocket experiment has been developed and tested on the SR-71 airplane. This paper discusses some of the more unique flight programs, the results, lessons learned, and their impact on current technology.

Burcham, Frank W., Jr.↗

Drop Analysis of Department of Energy Standard Canister with Fort Saint Vrain SNF

DOE manages over 300 types of SNF, most of which are located at the INL site. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF at the INL site for ?road-ready dry storage?. ?Road-ready dry storage? is a SNF management concept where SNF is packaged into dry and sealed canisters, which are then placed in on-site storage in anticipation of later transportation. The forward-looking goal of the Demonstration is establishing the foundation for a large-scale road-ready dry storage program at the INL site. The Demonstration will first package Fort Saint Vrain SNF currently stored at INL into several DOE Standard Canisters. These Standard Canisters will then be loaded into another commercial transportation or storage containment system (e.g., storage cask or transportation package). The Standard Canister is a class of standardized canisters designed for containing the large variety of DOE-managed SNF during interim storage, transportation and/or disposal at a geological repository. One critical aspect of road-ready dry storage is the ability to license the DOE Standard Canisters and its associated transportation package to 10 CFR 71. Depending on the SNF and transportation strategy, the Standard Canisters may have to maintain structural integrity under normal conditions of transport and hypothetical accident scenarios (i.e., drop events). The Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs. However, no analysis has been completed to support the recent Demonstration. This analysis will consider the Ø0.5 m × 5.1 m Standard Canister under drop scenario(s) considered in previous INL tests and analyses, including the 9 m drop at 80 degree off vertical. However, this analysis will consider the more recent Fort Saint Vrain loading configurations proposed for the Demonstration. This analysis will performed using strain-based acceptance criteria established by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III, Division 3. It will be compared to previous analyses and form the foundation of further formal calculations that will be used to support licensing efforts of the road-ready dry storage system at INL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

New Observing Strategies Testbed (NOS-T)

The New Observing Strategies (NOS) initiative within the NASA Earth Science Technology Office(ESTO)Advanced Information Systems Technology(AIST) program envisions future Earth science missions with distributed sensors(nodes) interconnected by a communications fabric that enables dynamic and intelligent operations [1].Some NOS concepts resemble systems-of-systems or collaborative systems where operational authority is distributed among multiple systems, necessitating new methods for systems engineering and design to cope with more decentralized control over constituent systems[2].The New Observing Strategies Testbed (NOS-T, verbalized as "enoh es tee") is a computational environment to develop, test, mature, and socialize new operating concepts and technology for NOS. NOS-T provides infrastructure to integrate and orchestrate user-contributed applications for system-of-systems test cases with true distributed control over constituent systems. The overall concept, illustrated in Figure 1, interconnects individual user applications and a NOS-T manager application via common information system infrastructure to coordinate the execution of virtual Earth science missions. NOS-T enables principal investigators to conduct test runs in the same environment, systematically changing variables to assess the overall efficacy of the proposed new observing strategies. Recorded data and outcomes provide evidence to advance technology readiness level and improve or innovate upon existing Earth science measurement techniques

Paul Grogan↗

Ares Launch Vehicles Overview: Space Access Society

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-X, scheduled for spring 2009. The Exploration Launch Projects team conducted the Ares I System Requirements Review (SRR) at the end of 2006. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the safety, operability, reliability, and affordability goals outlined by the Constellation Program. The Ares V is in the early design stage, focusing its activities on requirements validation and ways to develop this heavy-lift system so that synergistic hardware commonality between it and the Ares I can reduce the operational footprint and foster sustained exploration across the decades ahead.

Cook, Steve↗

Independent Reliability Assessment of the NASA GSFC Laser Transmitter for the LISA Program

The Laser Interferometer Space Antenna (LISA) is a partnership between the European Space Agency (ESA) and NASA to build a Gravitational Wave (GW) observatory. The observatory, which consists of a three-spacecraft constellation with a nominal separation of 2.5 million km between each spacecraft, provides a tool for scientists to directly detect gravitational waves generated from various astronomical phenomena in a waveband that is not accessible from Earth. NASA is developing laser transmitters as one of the potential US contributions to LISA. The NASA laser design leverages lessons learned from previous flight missions and included the latest technologies in photonics packaging and reliability engineering to ensure a laser lifetime of >16 years covering integration and test through a possible extended mission phase. As part of the laser development process, NASA’s Goddard Space Flight Center (GSFC) requested support from the NASA Engineering and Safety Center (NESC) to independently assess the Technology Readiness Level (TRL) of the LISA Laser System (LS). The independent assessment included the following tasks: (a) assess the design for weaknesses and suggest improvements to mitigate risks, (b) assess the laser reliability plan for weaknesses and suggest improvements to mitigate risks and improve effectiveness, and (c) assess the current redundancy plan on laser subsystems for weaknesses and suggest improvements to mitigate risks and improve effectiveness. The NESC team comprised of a team of subject matter experts (SMEs) and performed a 12-month review of every aspect of the laser design. We present the assessment findings and the current development progress of the LISA laser to meet the mission requirements with a delivery of a form, fit, and functional TRL6 laser to the LSIA mission by late 2023.

LISA↗

Integration of Landsat data into the Saginaw River Basin geographic information system

One of the objectives of the Saginaw River Basin study is related to the development of a computer model to predict flood damages. The computer model is to be operational in June 1985. In order to achieve this objective, the input of land-use data into a data base consisting of 198,000 grid cells will be required. A planning technique using Spatial Analysis Methodology (SAM) was developed by the Corps of Engineers Hydrologic Engineering Center (HEC) to systematically handle these data. The HEC-SAM system uses the spatially oriented map data in a series of data management and analysis software programs for input to the Corps hydrologic and environmental models. Attention is given to data base development, Landsat digital data, the placement of the Landsat data into the grid cell data base, and the development of the land cover classification. The Landsat-2 MSS scene covering 85 percent of the Saginaw River Basin was geometrically corrected to a UTM coordinate system.

Mckim, H. L.↗