Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Module”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Research progress and accomplishments on International Space Station

The first research payloads reached the International Space Station (ISS) more than two years ago, with research operating continuously since March 2001. Seven research racks are currently on-orbit, with three more arriving soon to expand science capabilities. Through the first five expeditions, 60 unique NASA-managed investigations from 11 nations have been supported, many continuing into later missions. More than 90,000 experiment hours have been completed, and more than 1,000 hours of crew time have been dedicated to research, numbers that grow daily. The multidisciplinary program includes research in life sciences, physical sciences, biotechnology, Earth sciences, technology demonstrations as well as commercial endeavors and educational activities. The Payload Operations and Integration Center monitors the onboard activities around the clock, working with numerous Principal Investigators and Payload Developers at their remote sites. Future years will see expansion of the station with research modules provided by the European Space Agency and Japan, which will be outfitted with additional research racks. c2003 American Institute of Aeronautics and Astronautics. Published by Elsevier Science Ltd. All rights reserved.

long duration↗

An Assessment of the International Space Station's Trace Contaminant Control Subassembly Process Economics

The International Space Station (ISS) Environmental Control and Life Support System includes equipment speci.cally designed to actively remove trace chemical contamination from the cabin atmosphere. In the U.S. on-orbit segment, this function is provided by the trace contaminant control subassembly (TCCS) located in the atmosphere revitalization subsystem rack housed in the laboratory module, Destiny. The TCCS employs expendable adsorbent beds to accomplish its function leading to a potentially signi.cant life cycle cost over the life of the ISS. Because maintaining the TCCSs proper can be logistically intensive, its performance in .ight has been studied in detail to determine where savings may be achieved. Details of these studies and recommendations for improving the TCCS s process economics without compromising its performance or crew health and safety are presented and discussed.

Perry J. L.↗

Research Progress and Accomplishments on ISS

The first research payloads reached the International Space Station (ISS) more than two years ago, with research operating continuously since March 2001. Seven research racks are currently on-orbit, with three more arriving soon to expand science capabilities. Through the first five expeditions, 60 unique NASA-managed investigations from 11 nations have been supported, many continuing into later missions. More than 90,000 experiment hours have been completed, and more than 1,000 hours of crew time have been dedicated to research, numbers that grow daily. The multidisciplinary program includes research in life sciences, physical sciences, biotechnology, Earth sciences, technology demonstrations as well as commercial endeavors and educational activities. The Payload Operations and Integration Center monitors the onboard activities around the clock, working with numerous Principal Investigators and Payload Developers at their remote sites. Future years will see expansion of the station with research modules provided by the European Space Agency and Japan, which will be outfitted with additional research racks. The first research payloads arrived at ISS more than two years ago, and continuous science has been ongoing for more than one and a half years. During this time, the research capabilities have been tremendously increased, even as assembly of the overall platform continues. Despite significant challenges along the way, ISS continues to successfully support a large number of investigations in a variety of research disciplines. The results of some of the early investigations are reaching the publication stage. The near future looms with new challenges, but experience to date and dedicated efforts give reason to be optimistic that the challenges will be overcome and that new and greater successes will be added to past ones.

Roe, Lesa B.↗

Science Research Facilities - Versatility for Space Station

The Space Station Science Lab Module (SLM) and its interfaces are designed to minimize complexity and maximize user accommodations. The facilities provided encompass life sciences research, the control of external payloads, the servicing of customer equipment, and general scientific investigations. The SLM will have the unprecedented ability to diagnose, service, and replace equipment while in orbit. In addition, the SLM will have significant operational advantages over previous spacecraft in terms of available volume, power, and crew interaction possibilities.

Giannovario, J. A.↗

Summary Report of Mission Acceleration Measurements for STS-65, Launched 8 July 1994

The second flight of the International Microgravity Laboratory (IML-2) payload on board the STS-65 mission was supported by three accelerometer instruments: The Orbital Acceleration Research Experiment (OARE) located close to the orbiter center of mass; the Quasi-Steady Acceleration Measurement experiment, and the Space Acceleration Measurement System (SAMS), both in the Spacelab module. A fourth accelerometer, the Microgravity Measuring Device recorded data in the middeck in support of exercise isolation tests.Data collected by OARE and SAMS during IML-2 are displayed in this report. The OARE data represent the microgravity environment below 1 Hz. The SAMS data represent the environment in the 0.01 Hz to 100 Hz range. Variations in the environment caused by unique activities are presented. Specific events addressed are: crew activity, crew exercise, experiment component mixing activities, experiment centrifuge operations, refrigerator/freezer operations and circulation pump operations. The analyses included in this report complement analyses presented in other mission summary reports.

Rogers, Melissa J. B.↗

Rapidly Re-Configurable Flight Simulator Tools for Crew Vehicle Integration Research and Design

While simulation is a valuable research and design tool, the time and difficulty required to create new simulations (or re-use existing simulations) often limits their application. This report describes the design of the software architecture for the Reconfigurable Flight Simulator (RFS), which provides a robust simulation framework that allows the simulator to fulfill multiple research and development goals. The core of the architecture provides the interface standards for simulation components, registers and initializes components, and handles the communication between simulation components. The simulation components are each a pre-compiled library 'plugin' module. This modularity allows independent development and sharing of individual simulation components. Additional interfaces can be provided through the use of Object Data/Method Extensions (OD/ME). RFS provides a programmable run-time environment for real-time access and manipulation, and has networking capabilities using the High Level Architecture (HLA).

Pritchett, Amy R.↗

The Preliminary Design of a Universal Martian Lander

As part of the NASA/USRA program, nineteen West Virginia University students conducted a preliminary design of a manned Universal Martian Lander (UML). The WVU design considers descent to Mars from polar orbit, a six month surface stay, and ascent for rendezvous. The design begins with an unmanned UML landing at Elysium Mons followed by the manned UML landing nearby. During the six month surface stay, the eight modules are assembled to form a Martian base where scientific experiments are performed. The mission also incorporates hydroponic plant growth into a Controlled Ecological Life Support System (CELSS) for water recycling, food production, and to counteract psycho-logical effects of living on Mars. In situ fuel production for the Martian Ascent and Rendezvous Vehicle (MARV) is produced From gases in the Martian atmosphere. Following surface operations, the eight member crew uses the MARV to return to the Martian Transfer Vehicle (MTV) for the journey home to Earth.

Norman, Timothy L.↗

High-Fidelity Modeling Approach for Coupling Thermal, Fluid, and Neutronic Analysis in an NTP Engine

Nuclear thermal propulsion (NTP), with its increased efficiency compared to traditional rocket engines, is a potentially enabling technology for space missions of higher complexity, such as delivering heavy machinery or crew to the moon or other planets. Thus, exploring modeling approaches that can effectively couple the thermal, fluid, and neutronic behaviors of NTP reactors is essential to mitigate cost and schedule challenges with hardware development. This paper details one such approach which utilizes Cardinal to unify reactor physics analysis performed using OpenMC, heat transfer analysis performed using the MOOSE framework, and thermal hydraulic analysis performed using the MOOSE Thermal Hydraulic Module. This approach is demonstrated with a proof of concept that focuses on a legacy reactor geometry from the historic NERVA program. This preliminary model found an overprediction in, when compared to the reference data, axial power peaking and the temperatures of both solids and fluids by roughly 20%. It is clear, however, that the model conserved a number of broad trends, and a few model refinements should reduce the observed error. This approach has definite merit and should enable the production of informative results for more modern NTP systems. This work is a first step in creating a transient reactor model that can be updated across a sequence of time steps based on continually fluctuating, time-dependent boundary conditions.

Nuclear Thermal Propulsion↗

Ares V: Game Changer for National Security Launch

NASA is designing the Ares V cargo launch vehicle to vastly expand exploration of the Moon begun in the Apollo program and enable the exploration of Mars and beyond. As the largest launcher in history, Ares V also represents a national asset offering unprecedented opportunities for new science, national security, and commercial missions of unmatched size and scope. The Ares V is the heavy-lift component of NASA's dual-launch architecture that will replace the current space shuttle fleet, complete the International Space Station, and establish a permanent human presence on the Moon as a stepping-stone to destinations beyond. During extensive independent and internal architecture and vehicle trade studies as part of the Exploration Systems Architecture Study (ESAS), NASA selected the Ares I crew launch vehicle and the Ares V to support future exploration. The smaller Ares I will launch the Orion crew exploration vehicle with four to six astronauts into orbit. The Ares V is designed to carry the Altair lunar lander into orbit, rendezvous with Orion, and send the mated spacecraft toward lunar orbit. The Ares V will be the largest and most powerful launch vehicle in history, providing unprecedented payload mass and volume to establish a permanent lunar outpost and explore significantly more of the lunar surface than was done during the Apollo missions. The Ares V consists of a Core Stage, two Reusable Solid Rocket Boosters (RSRBs), Earth Departure Stage (EDS), and a payload shroud. For lunar missions, the shroud would cover the Lunar Surface Access Module (LSAM). The Ares V Core Stage is 33 feet in diameter and 212 feet in length, making it the largest rocket stage ever built. It is the same diameter as the Saturn V first stage, the S-IC. However, its length is about the same as the combined length of the Saturn V first and second stages. The Core Stage uses a cluster of five Pratt & Whitney Rocketdyne RS-68B rocket engines, each supplying about 700,000 pounds of thrust. Its propellants are liquid hydrogen and liquid oxygen. The two solid rocket boosters provide about 3.5 million pounds of thrust at liftoff. These 5.5-segment boosters are derived from the 4-segment boosters now used on the Space Shuttle, and are similar to those used in the Ares I first stage. The EDS is powered by one J-2X engine. The J-2X, which has roughly 294,000 pounds of thrust, also powers the Ares I Upper Stage. It is derived from the J-2 that powered the Saturn V second and third stages. The EDS performs two functions. Its initial suborbital burns will place the lunar lander into a stable Earth orbit. After the Orion crew vehicle, launched separately on an Ares I, docks with the lander/EDS stack, EDS will ignite a second time to put the combined 65-metric ton vehicle into a lunar transfer orbit. When it stands on the launch pad at Kennedy Space Center late in the next decade, the Ares V stack will be approximately 381 feet tall and have a gross liftoff mass of 8.1 million pounds. The current point-of-departure design exceeds Saturn V s mass capability by approximately 40 percent. Using the current payload shroud design, Ares V can carry 315,000 pounds to 29-degree low Earth orbit (LEO) or 77,000 pounds to a geosynchronous orbit. Another unique aspect of the Ares V is the 33-foot-diameter payload shroud, which encloses approximately 30,400 cubic feet of usable volume. A larger hypothetical shroud for encapsulating larger payloads has been studied. While Ares V makes possible larger payload masses and volumes, it may alternately make possible more cost-effective mission design if the relevant payload communities are willing to consider an alternative to the existing approach that has driven them to employ complexity to solve current launch vehicle mass and volume constraints. By using Ares V s mass and volume capabilities as margin, payload designers stand to reduce development risk and cost. Significant progress has been made on the Ares V to support a plaed fiscal 2011 authority-to-proceed (ATP) milestone. The Ares V team is actively reaching out to external organizations during this early concept phase to ensure that the Ares V vehicle can be leveraged for national security, science, and commercial development needs. This presentation will discuss Ares V vehicle configuration, the path to the current concept, accomplishments to date, and potential payload utilization opportunities.

Sumrall, Phil↗

Army-NASA aircrew/aircraft integration program: Phase 4 A(3)I Man-Machine Integration Design and Analysis System (MIDAS) software detailed design document

The Man-Machine Integration Design and Analysis System (MIDAS) is an integrated suite of software components that constitutes a prototype workstation to aid designers in applying human factors principles to the design of complex human-machine systems. MIDAS is intended to be used at the very early stages of conceptual design to provide an environment wherein designers can use computational representations of the crew station and operator, instead of hardware simulators and man-in-the-loop studies, to discover problems and ask 'what if' questions regarding the projected mission, equipment, and environment. This document is the Software Product Specification for MIDAS. Introductory descriptions of the processing requirements, hardware/software environment, structure, I/O, and control are given in the main body of the document for the overall MIDAS system, with detailed discussion of the individual modules included in Annexes A-J.

Banda, Carolyn↗

STS-73 Post Flight Presentation

The post flight presentation of the STS-73 Space Shuttle's United States Microgravity Lab. (USML) mission was presented by the flight crew, Cmdr. Kenneth Bowersox, Pilot Kent Rominger, Payload Specialists Albert Sacco and Fred Gregory, and Mission Specialists Kathryn Thornton, Catherine 'Cady' Collman, and Michael Lopez-Alegria, using color video and slides. Film footage includes the prelaunch and launch activities, the USML and Middeck experiments (Advanced Protein Crystallization Facility (APCF), the Astroculture(tm) (ASC) hardware and experiment, the Commercial Generic Bioprocessing Apparatus (CGBA), the Crystal Growth Furnace (CGF), the Drop Physics Module (DPM), the Geophysical Fluid Flow Cell (GFFC), the Glovebox (GBX), the Zeolite Crystal Growth (ZCG) experiment, the Surface Tension Driven Convection Experiment (STDCE), the Protein Crystal Growth (PCG) experiment, three Measuring Microgravity experiments (the Space Acceleration Measurement System (SAMS), the Three Dimensional Microgravity Accelerometer (3DMA), and the Orbital Acceleration Research Experiment (OARE)), and the High-Packed Digital Television (HI-PAC) demonstration system), pre-return flight systems checkout, reentry, and space shuttle landing. The USML experiments were monitored via the HI-PAC system downlink. Earth views included mostly geographical locations (Mediterranean Sea; Turkey; Lake Powell, Arizona/Utah area; San Francisco Bay; Baltimore, Maryland; Washington, DC; India; Tibet; China; Bhutan; Philadelphia; and the Himalayas).

Source record↗

Improving Robotic Operator Performance Using Augmented Reality

The Special Purpose Dexterous Manipulator (SPDM) is a two-armed robot that functions as an extension to the end effector of the Space Station Robotics Manipulator System (SSRMS), currently in use on the International Space Station (ISS). Crew training for the SPDM is accomplished using a robotic hardware simulator, which performs most of SPDM functions under normal static Earth gravitational forces. Both the simulator and SPDM are controlled from a standard robotic workstation using a laptop for the user interface and three monitors for camera views. Most operations anticipated for the SPDM involve the manipulation, insertion, and removal of any of several types of Orbital Replaceable Unit (ORU), modules which control various ISS functions. Alignment tolerances for insertion of the ORU into its receptacle are 0.25 inch and 0.5 degree from nominal values. The pre-insertion alignment task must be performed within these tolerances by using available video camera views of the intrinsic features of the ORU and receptacle, without special registration markings. Since optimum camera views may not be available, and dynamic orbital lighting conditions may limit periods of viewing, a successful ORU insertion operation may require an extended period of time. This study explored the feasibility of using augmented reality (AR) to assist SPDM operations. Geometric graphical symbols were overlaid on one of the workstation monitors to afford cues to assist the operator in attaining adequate pre-insertion ORU alignment. Twelve skilled subjects performed eight ORU insertion tasks using the simulator with and without the AR symbols in a repeated measures experimental design. Results indicated that using the AR symbols reduced pre-insertion alignment error for all subjects and reduced the time to complete pre-insertion alignment for most subjects.

Maida, James C.↗

iMETRO (Integrated Mobile Evaluation Testbed for Robotics Operations) Facility

Crew time in space is precious – every hour could yield immense scientific discoveries and exploration milestones. However, overhead tasks such as logistics, maintenance, and assembly take a large portion of crew time. Remotely operated robotics capabilities offer a way to free the crew from many overhead tasks, but operating mobile dexterous robots in human-centered environments presents many unknowns and challenges for potential technology providers, limiting adoption for flight missions. iMETRO is a NASA JSC robotics test facility for terrestrial robotic technology adaptation to space exploration use cases, including logistics, maintenance, and science utilization. iMETRO focuses on Intra-Vehicular (IVA) environments, such as surface habitats, pressurized rover cabins, and space station modules (both Gateway & LEO). Its goal is to advance the Technology Readiness Levels (TRL) of integrated technologies for missions requiring remote space robotics operations.

iMETRO↗

Rapidly Re-Configurable Flight Simulator Tools for Crew Vehicle Integration Research and Design

While simulation is a valuable research and design tool, the time and difficulty required to create new simulations (or re-use existing simulations) often limits their application. This report describes the design of the software architecture for the Reconfigurable Flight Simulator (RFS), which provides a robust simulation framework that allows the simulator to fulfill multiple research and development goals. The core of the architecture provides the interface standards for simulation components, registers and initializes components, and handles the communication between simulation components. The simulation components are each a pre-compiled library 'plug-in' module. This modularity allows independent development and sharing of individual simulation components. Additional interfaces can be provided through the use of Object Data/Method Extensions (OD/ME). RFS provides a programmable run-time environment for real-time access and manipulation, and has networking capabilities using the High Level Architecture (HLA).

Schutte, Paul C.↗

Independent Orbiter Assessment (IOA): Analysis of the instrumentation subsystem

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA approach features a top-down analysis of the hardware to determine failure modes, criticality, and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The independent analysis results for the Instrumentation Subsystem are documented. The Instrumentation Subsystem (SS) consists of transducers, signal conditioning equipment, pulse code modulation (PCM) encoding equipment, tape recorders, frequency division multiplexers, and timing equipment. For this analysis, the SS is broken into two major groupings: Operational Instrumentation (OI) equipment and Modular Auxiliary Data System (MADS) equipment. The OI equipment is required to acquire, condition, scale, digitize, interleave/multiplex, format, and distribute operational Orbiter and payload data and voice for display, recording, telemetry, and checkout. It also must provide accurate timing for time critical functions for crew and payload specialist use. The MADS provides additional instrumentation to measure and record selected pressure, temperature, strain, vibration, and event data for post-flight playback and analysis. MADS data is used to assess vehicle responses to the flight environment and to permit correlation of such data from flight to flight. The IOA analysis utilized available SS hardware drawings and schematics for identifying hardware assemblies and components and their interfaces. Criticality for each item was assigned on the basis of the worst-case effect of the failure modes identified.

Howard, B. S.↗

STS-113 Flight Day 2 Highlights

The second flight day of the STS-113 mission begins with a shot inside of the Destiny Laboratory Module. NASA ISS Science Officer Peggy Whitson is seen inside of the Destiny Laboratory where scientific research is performed. Mission Specialists John Herrington and Michael Lopez-Alegria are seen at the Mid-deck of the Space Shuttle Endeavor. Commander Jim Wetherbee and Ken Bowersox are also shown. Pilot Paul Lockhart is the EVA coordinator for this mission. Ken Bowersox, Don Pettit and Nikolai Budarin of the Space Station Expedition Six crew answer questions about the launch.

Source record↗

Building on the Past - Looking to the Future. Part 2: A Focus on Expanding Horizons

The history of space endeavors stretches far from the first liquid-fueled rocket created by the father of modern rocketry, Robert Goddard, in 1926 and will certainly extend far beyond the construction of the International Space Station (ISS) scheduled to be complete with the addition of the Permanent Multipurpose Module on STS-133/ULF5. National Aeronautics and Space Administration (NASA) and the ISS International Partners (IPs) will be the unrelenting venue used to satisfy the curiosities of man as we seek an understanding of space through various experiments (also referred to as payloads) conducted in microgravity. The NASA Payload Safety Review Panel (PSRP) continues to serve as the lead for the review and assessment of payload hardware to assure facility and crew safety. This is the second in a series of papers and presentations that illustrate challenges and lessons learned in the areas of communication, safety requirements, and processes which have been vital to the PSRP.

Nash, Sally K.↗

STS-106 Crew Interviews: Richard A. Mastracchio

Live footage of a preflight interview with Mission Specialist Richard A. Mastracchio is seen. The interview addresses many different questions including why Mastracchio became interested in the space program, the events that led to his interest, his 14 year career path through the Johnson Space Center (JSC) as an engineer before finally getting selected into the astronaut program. Other interesting information that this one-on-one interview discusses is the main goal of the STS-106 mission, and its scheduled docking with the new International Space Station (ISS) since the arrival and connection of the Zvezda Service Module. Mastracchio also mentions his responsibility during the much-anticipated docking and scheduled space-walk.

Source record↗