Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Real-Time Dispatcher for a Distributed Energy Resource Power Plant to Provide Grid Services [SWR-25-17]

This software dispatches the aggregated power of a distributed energy resource (DER) plant located on an electrical distribution network. It is designed to provide the following services to the grid in real-time: (i) voltage support of the distribution network, (ii) virtual power plant at the substation with power factor support, and (iii) operating reserves for automatic generator control for the transmission system. This dispatcher integrates with the local power plant controller and utilizes the battery energy storage system (BESS) to smooth the volatile net power output from the DERs. It can also integrate with a day-ahead scheduler to strategically charge and discharge.

Comden, Joshua [National Renewable Energy Laborato↗

Prediction of Total Dissolved Gas Exchange at Hydropower Dams

Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.

13 HYDRO ENERGY↗

XPRESS: eXascale PRogramming Environment and System Software

The XPRESS project is the research and development of a complete software architecture for Exascale computing. The four major R&D thrusts include: 1) an Exascale lightweight kernel operating system (LXK), based on the Kitten operating system (OS), to manage billion way hardware parallelism, management of faults and power, management of global virtual name space, and other features of future system architectures; 2) a runtime system (HPX-5), co-designed with LXK, based on the ParalleX execution model that supports dynamic resource management and task scheduling; 3) system interfaces for interoperability between the runtime system and both the OS and the runtime system (RIOS); 4) compilation strategies and systems to translate MPI and OpenMP legacy codes to a form that can be run with performance at least as good as a native code implementation. The software architecture development has been driven by performance evaluation of mini-applications developed at Department of Energy Co-Design Centers as well as ancillary in-house developed applications and benchmarks. Research on the ParalleX execution model has been driven by the development of formal semantics and model checkers for the execution model. The major components of the software architecture are: ParalleX execution model – guiding principles for co-design of components of the system stack with advances in locality management and task prioritization through introspection; HPX runtime system – support of application dynamic adaptive resource management, task scheduling, and introspective control policies; LXK operating system – lightweight kernel operating system for order-constant scalability and low/no noise to manage resources; RIOS – a realm of Exascale system operation unique in the XPRESS project that includes the relationship between the new generation of lightweight kernel operating systems and runtime system software; XPI advanced programming model – intermediate form and low-level (readable) programming interface reflecting the ParalleX model, providing a target for source-to- source high level parallel language translation, and supporting early direct programming experimentation and measurement; Performance models & metrics – providing parameters and their mutual sensitivities to guide co-design and quantify operational behavior; Legacy migration – ensuring seamless transition of legacy codes and programming methods to the future generation of ParalleX-based Exascale systems; . Experiments and evaluation – critical to determining degree of effectiveness and likelihood of ultimate success as well as guiding corrective design changes to achieve DOE objectives; and Applications – collaborations with Co-Design Centers and other mission critical codes. The exemplar implementation of the ParalleX execution model, HPX-5, has been released along with five fully ported applications (LULESH, HPCG, SSSP, WAMR, and DASHMM) and multiple microbenchmarks. Using these applications, the system architecture demonstrated dynamic load balancing through active migration, legacy code migration, and data-driven approaches to for graph-like applications. Crucially for Exascale and billion way parallelism, the needs and patterns of irregular applications in HPX-5 were addressed using local flow control rather than relying on globally synchronized data structures.

97 MATHEMATICS AND COMPUTING↗

Conceptual design of the MHD Engineering Test Facility

The reference conceptual design of the MHD engineering test facility, a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commerical feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are included and the engineering issues that should be reexamined are identified.

Bents, D. J.↗

Planning in time - Windows and durations for activities and goals

The present general purpose automated planner/scheduler generates parallel plans aimed at the achievement of goals having imposed time constraints, with both durations and start time windows being specifiable for sets of goal conditions. Deterministic durations of such parallel plan activities as actions, events triggered by circumstances, inferences, and scheduled events entirely outside the actor's control, are explicitly modeled and may be any computable function of the activity variables. The final plan network resembles a PERT chart. Examples are given from the traditional 'blocksworld', and from a realistic 'Spaceworld' in which an autonomous spacecraft photographs objects in deep space and transmits the information to earth.

Vere, S. A.↗

Conflict-free trajectory planning for air traffic control automation

As the traffic demand continues to grow within the National Airspace System (NAS), the need for long-range planning (30 minutes plus) of arrival traffic increases greatly. Research into air traffic control (ATC) automation at ARC has led to the development of the Center-TRACON Automation System (CTAS). CTAS determines optimum landing schedules for arrival traffic and assists controllers in meeting those schedules safely and efficiently. One crucial element in the development of CTAS is the capability to perform long-range (20 minutes) and short-range (5 minutes) conflict prediction and resolution once landing schedules are determined. The determination of conflict-free trajectories within the Center airspace is particularly difficult because of large variations in speed and altitude. The paper describes the current design and implementation of the conflict prediction and resolution tools used to generate CTAS advisories in Center airspace. Conflict criteria (separation requirements) are defined and the process of separation prediction is described. The major portion of the paper will describe the current implementation of CTAS conflict resolution algorithms in terms of the degrees of freedom for resolutions as well as resolution search techniques. The tools described in this paper have been implemented in a research system designed to rapidly develop and evaluate prototype concepts and will form the basis for an operational ATC automation system.

Slattery, Rhonda↗

Toward a Real-Time Measurement-Based System for Estimation of Helicopter Engine Degradation Due to Compressor Erosion

This paper presents a preliminary demonstration of an automated health assessment tool, capable of real-time on-board operation using existing engine control hardware. The tool allows operators to discern how rapidly individual turboshaft engines are degrading. As the compressor erodes, performance is lost, and with it the ability to generate power. Thus, such a tool would provide an instant assessment of the engine s fitness to perform a mission, and would help to pinpoint any abnormal wear or performance anomalies before they became serious, thereby decreasing uncertainty and enabling improved maintenance scheduling. The research described in the paper utilized test stand data from a T700-GE-401 turboshaft engine that underwent sand-ingestion testing to scale a model-based compressor efficiency degradation estimation algorithm. This algorithm was then applied to real-time Health Usage and Monitoring System (HUMS) data from a T700-GE-701C to track compressor efficiency on-line. The approach uses an optimal estimator called a Kalman filter. The filter is designed to estimate the compressor efficiency using only data from the engine s sensors as input.

Litt, Jonathan S.↗

Full-Scaled Advanced Systems Testbed: Ensuring Success of Adaptive Control Research Through Project Lifecycle Risk Mitigation

The National Aeronautics and Space Administration's Dryden Flight Research Center completed flight testing of adaptive controls research on the Full-Scale Advance Systems Testbed (FAST) in January of 2011. The research addressed technical challenges involved with reducing risk in an increasingly complex and dynamic national airspace. Specific challenges lie with the development of validated, multidisciplinary, integrated aircraft control design tools and techniques to enable safe flight in the presence of adverse conditions such as structural damage, control surface failures, or aerodynamic upsets. The testbed is an F-18 aircraft serving as a full-scale vehicle to test and validate adaptive flight control research and lends a significant confidence to the development, maturation, and acceptance process of incorporating adaptive control laws into follow-on research and the operational environment. The experimental systems integrated into FAST were designed to allow for flexible yet safe flight test evaluation and validation of modern adaptive control technologies and revolve around two major hardware upgrades: the modification of Production Support Flight Control Computers (PSFCC) and integration of two, fourth-generation Airborne Research Test Systems (ARTS). Post-hardware integration verification and validation provided the foundation for safe flight test of Nonlinear Dynamic Inversion and Model Reference Aircraft Control adaptive control law experiments. To ensure success of flight in terms of cost, schedule, and test results, emphasis on risk management was incorporated into early stages of design and flight test planning and continued through the execution of each flight test mission. Specific consideration was made to incorporate safety features within the hardware and software to alleviate user demands as well as into test processes and training to reduce human factor impacts to safe and successful flight test. This paper describes the research configuration, experiment functionality, overall risk mitigation, flight test approach and results, and lessons learned of adaptive controls research of the Full-Scale Advanced Systems Testbed.

Pavlock, Kate M.↗

A Novel Application of TMA to Converging Runway Operations in a Simulated NextGen Environment

In 2013, the Airspace Operations Laboratory at NASA Ames Research Center conducted a human-in-the-loop simulation that examined the feasibility of applying a number of Next Generation Air Transportation System (NextGen) solutions to complex arrival operations in and around the New York metroplex. The delivery of arrivals to Newark Liberty International Airport (EWR) was the focus of this simulation, which involved extending the Terminal Sequencing and Spacing (TSS) scheduling capability to precisely schedule arrivals to intersecting runways 22 Left and 11. An important enabler for the concept was the availability of a dependent runway scheduler that was able to coordinate arrival times between aircraft landing on intersecting runways. At the time of the study, there was no functionality within the TSS scheduler to automatically create the dependent runway schedules. Instead, a Traffic Management Coordinator (TMC) manually created a de-conflicted schedule, which allowed for the concept to be tested as well as provided valuable insight into the tool requirements for a dependent runway scheduler. Throughout the course of preparations for the simulation, the individual serving as the TMC developed a number of strategies and procedures for manually adjusting the Scheduled Time of Arrival (STA) of the EWR arrivals in order to ensure that adequate spacing was provided between runway 22L and 11 arrival pairs. This paper describes the strategies and procedures that were developed and details how they were successfully applied during the simulation. Results will also be presented that shed additional light on exactly how the schedules were manipulated and their impact on delivery performance and safety. Ideas for additional TSS enhancements and next steps, based on participant feedback, will also be presented.

Homola, Jeffrey↗

100 MW e Baseload Molten Salt Plant Phase 1 & 2 Summary Report: Summary of Conceptual Design, Preliminary Design, Commercialization and Risk Reduction Activities

This document describes steps taken to develop our conceptual and preliminary designs of a modular concept for deploying a 75% capacity factor, 100-MW e solar power plant. The modular approach consists of 14 solar power towers interconnected by hot and cold salt piping leading back to a central power block where the salt storage tanks and power generation systems are located. The plant is described in several sections. First, the overall plant is described, including the general arrangement, process and heat flow diagrams, system interface definitions, and electrical description. Next, each system is described in detail following the flow of energy from incident sunlight, through the plant, to the grid. These systems include the solar collector system (SCS), solar receiver system (SRS), thermal storage system (TSS), steam generator system (SGS), and power generation system (PGS). Then, the plant control system (PCS) and balance of plant (BOP) are discussed as supporting entities. Each system of the plant is described in sufficient detail to allow for the following to be developed: material cost, erection cost, project schedule, EPC bids, detailed performance modeling, and operations and maintenance cost. Cost, schedule, and performance estimates are not described in this document. Two approaches to demonstration of the technology are presented: a single tower integrated into an existing power block and a four tower stand alone 50 MW e power plant. Various demonstration partners have expressed interested in both approaches. The process by which a detailed plant performance model was developed is described to support the development of accurate LCOE data. Information on material and instrument testing is also provided for critical materials and instruments required for molten salt service.

14 SOLAR ENERGY↗

Agent-based microgrid architecture for generation following protocols

A system for predicting power and loads over a single, relatively short time horizon. More specifically, a system comprising a Storage Agent (S-agent) Cohort within a grid control society, wherein the system expands G and L intra-cohort protocols to allow the S-cohort to participate in power management of the grid by scheduling storage components in source or load roles as determined by the time-varying state of the power imbalance and by the risk-adjusting capacity margin relationship between the G and L cohorts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Psyche Planning Software Subsystem: Creating a Robust Toolset for a Discovery-class Mission

Psyche is a Discovery-class mission to the small metal-rich asteroid (16) Psyche, and is slated to launch in 2022. Psyche, like many missions, requires low-cost activity planning and sequence generation that serves as the backbone to overall uplink design. Such tools must be maintainable over long periods of operations, and powerful enough to solve complex issues that deep-space one-off missions encounter. In this paper we introduce cost-effective solutions that leverage inner- and open-source principles to meet a variety of common and novel use cases.The uplink process that was designed to meet these challenges is presented, as well as the data-flow through the high-level architecture of the planning software subsystem. The user-facing planning tools are described, particularly the Science Opportunity Analyzer, the Plan Editor, Psyche’s planning automation in the Blackbird framework, and Psyche Simulation Reports. All these applications are either new or have been substantially revamped to meet Psyche’s concept of operations. In particular, ensuring the entire toolchain can correctly process epoch-relative activities is discussed. Underlying the main applications are a common set of dependencies developed and maintained by a new cross-mission association of planning developers. In this way, Psyche can inherit well-tested functionality which saves effort and ensures its developers can focus on solving domain challenges. Quality control of the applications and libraries is ensured with a code-review and unit-test based novel ‘CM lite’ process. Collaboration with international industry and academia using the open-source modules is already occurring.The planning and scheduling software is designed to maximize operator awareness of the integrated plan at every step of the process and use common interfaces and file formats to easily transfer information. Design choices plus the team’s test-driven development process enables more expansive capabilities compared to the decentralized planning and sequence generation functions typical of Discovery-class orbiters without significant development cost increases. Benefits and drawbacks of Psyche’s approach are discussed, including comparison to other missions and tools where appropriate.

Ramanathan, Keshav↗

Design, Manufacturing and Performance Considerations in Reactor System, Components and Materials

Idaho National Laboratory (INL) is the national and global leader of the Department of Energy (DOE) ’s nuclear energy research, development, and demonstration programs. Developing critical design criteria of new advanced reactor systems, components and materials requires an understanding of fabrication and the irradiation environment during normal operating and accident conditions. Next generation researchers and designers, are, therefore challenged not only by demands for ever improved performance but must also work to shorten the development and commercialization lifecycle for new nuclear reactors and systems to remain competitive. This provides unique and exciting opportunities for all contributors to this field of study. This presentation will offer a strategic overview of the competitively funded R&D awards by the Advanced Methods for Manufacturing (AMM) program of the DOE’s office of Nuclear Energy (NE). This program conducts research and development (R&D) to accelerate innovations by reducing the cost and schedule of constructing new nuclear plants and to make fabrication of nuclear power plant components faster, cheaper, and more reliable. By evaluating state-of-the-art practices found in other large manufacturing industries, the nuclear community has identified six major areas of innovation to reach the objectives of this DOE-NE program. Additionally, typical research case studies performed at INL, will be presented, showing the vast variety of opportunities for which, the next generation of researchers can seek solutions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

From Paper to Production: An Update on NASA's Upper Stage Engine for Exploration

The NASA/industry team responsible for developing the J-2X Upper Stage Engine for the Constellation Program's Ares I and Ares V launch vehicles has made significant progress toward moving the design from paper to production during the past year. The J-2X exemplifies the Constellation goal of using proven technology and experience from more than 50 years of United States spaceflight experience and seeking where possible to employ common hardware in the Ares I crew launch vehicle and the Ares V cargo launch vehicle. The J-2X will power the Ares I upper stage to place the Orion crew vehicle in orbit. For the Ares V, the J-2X will place the Earth departure stage (EDS) and lunar lander in orbit and later re-start to send the Orion and lander to the Moon. Pratt & Whitney Rocketdyne (PWR) is under contract to develop and produce the engine, leveraging its flight-proven LH2/LOX, gas generator cycle J-2 and RS-68 engine capabilities, recent experience with the X-33 aerospike XRS-2200 engine, and development knowledge of the J-2S tap-off cycle engine. The J-2X employs a gas generator operating cycle designed to produce 294,000 pounds of thrust in primary operating mode for the Ares I and Ares V ascent phases. It also has a secondary mode, during which it operates at 80 percent thrust by altering its mixture ratio to perform the TLI burn for the Ares V lunar sortie and lunar cargo missions. The J-2X development philosophy is based on proven hardware, an aggressive development schedule, and early risk reduction. NASA Marshall Space Flight Center (MSFC) and PWR began development of the J-2X in June 2006. The government/industry team of more than 600 people within NASA and PWR successfully completed the Critical Design Review (CDR) in November 2008, following extensive risk mitigation testing. The team is working toward a first flight of the J-2X on the Orion 1 mission in 2014. This paper will discuss the J-2X development background and provide top-level information on design and testing to date. Details will be provided on overcoming challenges such as gas generator instability, turbine blade life, and nozzle extension selection and materials.

Kynard, Mike↗

Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

99 GENERAL AND MISCELLANEOUS↗

Estimating Controller Intervention Probabilities for Optimized Profile Descent Arrivals

Simulations of arrival traffic at Dallas/Fort-Worth and Denver airports were conducted to evaluate incorporating scheduling and separation constraints into advisories that define continuous descent approaches. The goal was to reduce the number of controller interventions required to ensure flights maintain minimum separation distances of 5 nmi horizontally and 1000 ft vertically. It was shown that simply incorporating arrival meter fix crossing-time constraints into the advisory generation could eliminate over half of the all predicted separation violations and more than 80% of the predicted violations between two arrival flights. Predicted separation violations between arrivals and non-arrivals were 32% of all predicted separation violations at Denver and 41% at Dallas/Fort-Worth. A probabilistic analysis of meter fix crossing-time errors is included which shows that some controller interventions will still be required even when the predicted crossing-times of the advisories are set to add a 1 or 2 nmi buffer above the minimum in-trail separation of 5 nmi. The 2 nmi buffer was shown to increase average flight delays by up to 30 sec when compared to the 1 nmi buffer, but it only resulted in a maximum decrease in average arrival throughput of one flight per hour.

continous descent arrivals↗

Space shuttle main engine controller assembly, phase C-D

System design and system analysis and simulation are slightly behind schedule, while design verification testing has improved. Input/output circuit design has improved, but digital computer unit (DCU) and mechanical design continue to lag. Part procurement was impacted by delays in printed circuit board, assembly drawing releases. These are the result of problems in generating suitable printed circuit artwork for the very complex and high density multilayer boards.

Source record↗