Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

13 HYDRO ENERGY↗

Extended performance solar electric propulsion thrust system study. Volume 1: Executive summary

Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed. Confirmation testing and analysis of thruster and power-processing components were performed, and the feasibility of satisfying extended performance requirements was verified. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined. Results are presented.

Poeschel, R. L.↗

Extended performance solar electric propulsion thrust system study. Volume 3: Tradeoff studies of alternate thrust system configurations

Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. Emphasis was placed on relatively high power missions. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed in sufficient detail for comparing mass, efficiency, reliability, structure, and thermal characteristics. Confirmation testing and analysis of thruster and power-processing components were performed. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined.

Hawthorne, E. I.↗

Pilot Implementation of a Field Study Design to Evaluate the Impact of Source Control Measures on Indoor Air Quality in High Performance Homes

To improve the indoor air quality in new, high performance homes, a variety of standards and rating programs have been introduced to identify building materials that are designed to have lower emission rates of key contaminants of concern and a number of building materials are being introduced that are certified to these standards. For example, the U.S. Department of Energy (DOE) Zero Energy Ready Home program requires certification under the U.S. Environmental Protection Agency (EPA) Indoor airPLUS (IaP) label, which requires the use of PS1 or PS2 certified plywood and OSB; low-formaldehyde emitting wood products; low- or no-VOC paints and coatings as certified by Green Seal Standard GS-11, GreenGuard, SCS Indoor Advantage Gold Standard, MPI Green Performance Standard, or another third party rating program; and Green Label-certified carpet and carpet cushions. However, little is known regarding the efficacy of the IAP requirements in measurably reducing contaminant exposures in homes. The goal of this project is to develop a robust experimental approach and collect preliminary data to support the evaluation of indoor air quality (IAQ) measures linked to IAP-approved low-emitting materials and finishes in new residential homes. To this end, the research team of Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) developed a detailed experimental plan to measure IAQ constituents and other parameters, over time, in new homes constructed with materials compliant with IAP’s low-emitting material and ventilation requirements (i.e., section 6.1, 6.2, 6.3, and 7.2) and similar homes constructed to the state building code with conventional materials. The IAQ in IAP and conventional homes of similar age, location, and construction style is quantified as the differences in the speciated VOC and aldehyde concentrations, normalized to dilution rates. The experimental plan consists of methods to evaluate the difference between low-emitting and “conventional” materials as installed in newly constructed residential homes using both (1) highly controlled, short-term active samples to precisely characterize the building-related chemical emissions and building contents and (2) a week-long passive sample designed to capture the impact of occupant behavior and related activities on measured IAQ contaminant levels indoors. The combination of detailed short-term measurements with the home under controlled/consistent conditions during pre- and post-occupancy and the week-long passive sampling data provide the opportunity to begin to separate the different emission sources and help isolate and quantify variability in the monitored homes. Between April and August 2014, the research team performed pre-occupancy and post-occupancy sampling in one conventional home and two homes built with low-emitting materials that were generally consistent with EPA’s Indoor airPLUS guidelines. However, for a number of reasons, the full experimental plan was not implemented. The project was intended to continue for up to three years to asses long-term changes in IAQ but the project was limited to one calendar year. As a result, several of the primary research questions related to seasonal impacts and the long-term trends in IAQ could not be addressed. In addition, there were several unexpected issues related to recruiting, availability of home types, and difficulty coordinating with builders/realtors/homeowners. Several field monitoring issues also came up that provide “lessons learned” that led to improvements to the original monitoring plan. The project produced a good experimental plan that is expected to be be useful for future efforts collecting data to support answering these same or similar research questions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Audio-Visual Biofeedback Does Not Improve the Reliability of Target Delineation Using Maximum Intensity Projection in 4-Dimensional Computed Tomography Radiation Therapy Planning

Purpose: To investigate whether coaching patients' breathing would improve the match between ITV{sub MIP} (internal target volume generated by contouring in the maximum intensity projection scan) and ITV{sub 10} (generated by combining the gross tumor volumes contoured in 10 phases of a 4-dimensional CT [4DCT] scan). Methods and Materials: Eight patients with a thoracic tumor and 5 patients with an abdominal tumor were included in an institutional review board-approved prospective study. Patients underwent 3 4DCT scans with: (1) free breathing (FB); (2) coaching using audio-visual (AV) biofeedback via the Real-Time Position Management system; and (3) coaching via a spirometer system (Active Breathing Coordinator or ABC). One physician contoured all scans to generate the ITV{sub 10} and ITV{sub MIP}. The match between ITV{sub MIP} and ITV{sub 10} was quantitatively assessed with volume ratio, centroid distance, root mean squared distance, and overlap/Dice coefficient. We investigated whether coaching (AV or ABC) or uniform expansions (1, 2, 3, or 5 mm) of ITV{sub MIP} improved the match. Results: Although both AV and ABC coaching techniques improved frequency reproducibility and ABC improved displacement regularity, neither improved the match between ITV{sub MIP} and ITV{sub 10} over FB. On average, ITV{sub MIP} underestimated ITV{sub 10} by 19%, 19%, and 21%, with centroid distance of 1.9, 2.3, and 1.7 mm and Dice coefficient of 0.87, 0.86, and 0.88 for FB, AV, and ABC, respectively. Separate analyses indicated a better match for lung cancers or tumors not adjacent to high-intensity tissues. Uniform expansions of ITV{sub MIP} did not correct for the mismatch between ITV{sub MIP} and ITV{sub 10}. Conclusions: In this pilot study, audio-visual biofeedback did not improve the match between ITV{sub MIP} and ITV{sub 10}. In general, ITV{sub MIP} should be limited to lung cancers, and modification of ITV{sub MIP} in each phase of the 4DCT data set is recommended.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SINGLE-SHELL TANK INTEGRITY PROJECT ANALYSIS OF RECORD-PRELIMINARY MODELING PLAN FOR THERMAL AND OPERATING LOADS

This document is a Phase I deliverable for the Single-Shell Tank Analysis of Record effort. This document is not the Analysis of Record. The intent of this document is to guide the Phase II detailed modeling effort. Preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. The preliminary analysis document reviews and preliminary modeling analysis results are reported herein. In addition, this report provides recommendations for the next phase of the SST AOR project, SST detailed modeling. Efforts and results discussed in this report do not include seismic modeling as seismic modeling is covered by a separate report. The combined results of both static and seismic models are required to complete this effort. The SST AOR project supports the US Department of Energy's (DOE) Office of River Protection (ORP) mission for obtaining a better understanding of the structural integrity of Hanford's SSTs. The 149 SSTs, with six different geometries, have experienced a range of operating histories which would require a large number of unique analyses to fully characterize their individual structural integrity. Preliminary modeling evaluations were conducted to determine the number of analyses required for adequate bounding of each of the SST tank types in the Detailed Modeling Phase of the SST AOR Project. The preliminary modeling was conducted in conjunction with the Evaluation Criteria report, Johnson et al. (2010). Reviews of existing documents were conducted at the initial stage of preliminary modeling. These reviews guided the topics that were explored in the SST preliminary modeling. The reviews determined the level of detail necessary to perform the analyses of the SSTs. To guide the Phase II detailed modeling effort, preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. Conclusions were derived from case studies on one of the tank types when no additional runs of similar cases on other types of tanks were found necessary to derive those conclusions. The document reviews provided relatively complete temperature histories for Type IV tanks. The temperature history data for Type I, II, and III tanks was almost nonexistent for years prior to 1975. Document reviews indicate that there might be additional useful data in the US Department of Energy, Richland Operations Office (DOE-RL) records in Seattle, WA, and these records need to be reviewed to extract data that might have been disregarded during previous reviews. Thermal stress analyses were conducted using different temperature distribution scenarios on Type IV tanks. Such studies could not be carried out for other tank types due to lack of temperature history data. The results from Type IV tank analyses indicate that factors such as temperature distribution in the tank waste and rate of rise in waste temperature have a significant impact on the thermal stresses in the tank structures. Overall, the conclusion that can drawn from the thermal stress analyses is that these studies should be carried out for all tank types during the detailed analysis phase with temperature values that are reasonably close to the typical temperature histories of the respective tank types. If and/or when additional waste temperature data is acquired for tank Type I, II, and III tanks, additional cases need to be considered as tank structural integrity is sensitive to thermal loads. A few case studies were also performed using Type IV-b models to comprehend the effects of excavation boundaries, change in soil stratigraphy (layer thickness and properties), and radial extent of soil in the finite element models. The result from the case studies indicates that the slight variation in soil stratigraphy has little effects on the tank sections force and moment demands under mechanical loads. The case study for excavation slope or backfill transition boundary indicated that inclusion of such boundary yields conservative demands in the wall region while demands at other locations remain unaffected. Hence this excavation slope will be modeled in the detailed analysis of SSTs.

54 ENVIRONMENTAL SCIENCES↗

The role of water vapor in climate. A strategic research plan for the proposed GEWEX water vapor project (GVaP)

The proposed GEWEX Water Vapor Project (GVaP) addresses fundamental deficiencies in the present understanding of moist atmospheric processes and the role of water vapor in the global hydrologic cycle and climate. Inadequate knowledge of the distribution of atmospheric water vapor and its transport is a major impediment to progress in achieving a fuller understanding of various hydrologic processes and a capability for reliable assessment of potential climatic change on global and regional scales. GVap will promote significant improvements in knowledge of atmospheric water vapor and moist processes as well as in present capabilities to model these processes on global and regional scales. GVaP complements a number of ongoing and planned programs focused on various aspects of the hydrologic cycle. The goal of GVaP is to improve understanding of the role of water vapor in meteorological, hydrological, and climatological processes through improved knowledge of water vapor and its variability on all scales. A detailed description of the GVaP is presented.

Starr, D. OC.↗

Boston Architectural College Urban Sustainability Initiative

The Boston Architectural College's Urban Sustainability initiative is a demonstration project as defined by the National Energy Technology Laboratory. BAC's proposed project with the U.S. Department of Energy - NETL, is a large part of that overall initiative. The BAC's Urban Sustainability Initiative is a multi-part project with several important goals and objectives that will have a significant impact on the surrounding neighborhood including: energy conservation, reduction of storm water runoff, generation of power through alternative energy sources, elimination/reduction of BAC carbon footprint, and to create a vehicle for ongoing public outreach and education. Education and outreach opportunities will serve to add to the already comprehensive Sustainability Design courses offered at BAC relative to energy savings, performance and conservation in building design. At the finish of these essential capital projects there will be technical materials created for the education of the design, sustainability, engineering, community development and historic preservation communities, to inform a new generation of environmentally-minded designers and practitioners, the city of Boston and the general public. The purpose of the initiative, through our green renovations program, is to develop our green alley projects and energy saving renovations to the BAC physical plant, to serve as a working model for energy efficient design in enclosed 19th century and 20th century urban sites and as an educational laboratory for teaching ecological and sustainable technologies to students and the public while creating jobs. The scope of our project as it relates to the BAC and the U.S. Department of Energy- NETL combined efforts includes: Task I of the project is Phase II (Green Alley). Task I encompasses various renovation activities that will demonstrate the effectiveness of permeable paving and ground water recharge systems. It will aid in the reduction of storm water runoff into the Charles River Basin in one of its most significantly polluted sections and, will provide a green renovation mechanism for the redirected storm water of a public alley way. This activity is designed to improve the quality of water recharging the ground water and protecting the vulnerable wood pilings under many of the historic masonry buildings in Boston's Back Bay. Sustainable design research and system monitoring opportunities will also be incorporated, providing ongoing tools for public outreach and education through innovative signage and "virtual tour" technology. The monitoring will include a "building performance dash board" that reflects real time operating conditions and improvements in environmental and economic performance to be prominently displayed on the face of our 320 Newbury Street building (approximately 1.5 million people walk by annually). The project site and demonstration area is located at the rear of 951 Boylston Street, Boston, MA 02115 and the parking area adjacent to Public Alley #444 in Boston's historic Back Bay. Task II of the project is Geothermal Solution. This task involves the installation of approximately seven Geothermal wells which will tap into the earth's constant underground temperatures to provide air-conditioning and heating for BAC facilities. The environmentally friendly geothermal system uses no fossil fuel, produces no emissions and runs silently, providing a sustainable model for commercial and residential buildings throughout Boston. Ultimately the combination of this project and other projects will assist in making the BAC "carbon-neutral", and could generate enough additional energy to provide free power to the Engine 33 and Ladder 15 Firehouse located at 941 Boylston Street. The project is located at the rear of 951 Boylston Street, Boston, MA 02115 and the parking area adjacent to Public Alley #444 in Boston's historic Back Bay. Task III of the project is the Sustainability Design Curriculum at the BAC. The BAC is the nation’s largest independent, multi-disciplinary college of spatial design, and a leader in sustainable design education. The Sustainabiltiy Design program, in particular, focuses on energy efficiency,energy performance, energy modeling, energy and air quality principles, green building, renewable energy alternatives and much more. Additionally, the Urban Sustainability Initiative has an objective of providing courses relative to the BAC's demonstration project with DOE, the project’s period of performance activities, subsequent performance data and anticipated sustainability teaching tools. In keeping with BAC's practice based curriculum, students have been involved in the discussion and planning of this project since its inception and sustainability issues have become a part of other programs throughout the college as well. Students will continue to benefit from this hands-on learning opportunity. The project is located at 320 Newbury Street Boston, MA 02115. Task IV of the project is Program Management and Reporting. This task will involve BAC's oversight and general management of the entire project including subcontract administration, contracts administration, technical and financial reporting, design and renovation assistance, other deliverables in accordance with the Federal Assistance reporting Checklist and other contractual obligations and provisions.

15 GEOTHERMAL ENERGY↗

Radiation Hardened Telerobotic Dismantling System Development Final Report CRADA No. TC-1340-96

This project was a collaborative effort between the University of California, LLNL and RedZone Robotics, Inc. for the development of radiation-hardened telerobotic dismantling systems for use in applications such as nuclear facility remediation, nuclear accident response, and Chemobyltype remediation. The project supported the design, development, fabrication and testing of a Ukrainian robotic systems. The project was completed on time and within budget. All deliverables were completed. The final project deliverables were consistent with the plans developed in the original project with the exception that the fabricated systems remained in Ukraine.

42 ENGINEERING↗

Hardening DOE R&D Software Tools for Web-based Visualization SBIR Phase I Final Report

Ubiquitous web-based visualization is essential to delivering large-scale data visualization to various stakeholders, from the scientist to the board member. These stakeholders will not tolerate a stalled application or a pop-up window asking them to wait for the processing to complete. They require a responsive and interactive visualization environment with high-quality imagery suitable for detailed analysis and boardroom presentations. At Kitware, Inc., we have accomplished web visualization to this point, leveraging state-of-the-art tools like HTML5, CSS3, SVG, Canvas, and WebGL. Solutions that leverage a combination of these technologies are necessary to handle workloads that vary significantly in data size efficiently. However, it is not always practical to move large data to the web client for visualization. Kitware's ParaView as a Service combines client-side visualization using both distributed processing and remote rendering on big data impractical to move. Existing distributed processing and remote rendering solution's interactivity is below the expectations of web-based applications. Our project examined proposed solutions to the areas outlined above in ParaView as a Service. We have investigated concurrent pipelines, streaming images, progressive rendering, and optimization of algorithms and data movement to address these concerns. For the Phase I project, we completed the proposed work plan. As a result, the project produced three prototypes of essential importance for web visualization and the ParaView as a Service community. We created a simple desktop application for an interactive streamline placement prototype, a web-based interactive streamline placement prototype, and a web-based progressive rendering utilizing raytracing prototype. These prototypes relied on the hardening of emerging software toolkits funded by the Department of Energy (DOE) Advanced Scientific Computing Research (ASCR) program (such as ParaView, VTK-m, and Mochi). We blended these components into web-based visualization prototypes that meet the industry's expectations for interactivity and responsiveness. The Phase I project had four essential focus areas: 1. Develop prototype ParaView as a Service backend server using asynchronous, non-blocking design principles. 2. Develop a prototype web application that uses the ParaView as a Service backend server for remote data visualization. 3. Implement image streaming with encoding/compression and progressive rendering capabilities in the proposed platform. 4. Evaluate the prototype developed and summarize observations, including the challenges and pitfalls of our approach. After our successful completion of Phase I, we are strongly positioned to propose a successful Phase II project.

Geveci, Berk↗

Feasibility Study to Interactive Workshop: Building End-user Capacity to Integrate Earth Observation Data into Federally Endangered Atlantic Salmon (Salmo salar) Habitat Monitoring in Main

Changes in temperature and precipitation patterns, along with alterations in land cover threaten ongoing conservation efforts for Federally Endangered Atlantic salmon (Salmo salar) in Maine. Earth observation data offers a unique perspective for habitat monitoring that can complement habitat restoration and conservation activity on the ground. As a dual capacity building program, the NASA DEVELOP National Program strives to build the capacity of program participants by leveraging Earth observation data to address environmental concerns across the globe, while also building capacity in partner organizations to integrate Earth observation data into their decision making practices. Between September 2021 and August 2022, three NASA DEVELOP teams demonstrated the feasibility of utilizing NASA Earth observations including Aqua Moderate Resolution Imaging Spectroradiometer (MODIS), Terra MODIS, Landsat 5 Thematic Mapper (TM), Landsat 8 Operation Land Imager (OLI), and Shuttle Radar Topography Mission (SRTM) in conjunction with Sentinel-2 MultiSpectral Instrument (MSI) to assess temperature, precipitation, and land use land cover (LULC) over time throughout salmon habitat in Maine. While the first two teams completed projects that were categorized as NASA DEVELOP’s traditional feasibility projects, the third and final project team generated resources and planned an interactive workshop to transfer project methods to end-user organizations. Ultimately, the goal of this work was to not only inform the partner’s ongoing salmon population recovery and habitat restoration initiatives but provide tools that allow partner organizations to continue integrating Earth observation data into their work beyond their partnership with the program. This project serves as a case study within the NASA DEVELOP Program and provides lessons learned for moving beyond traditional feasibility studies to more interactive partner engagement and knowledge transfer practices.

Nicole Ramberg-Pihl↗

American Samoa: Unlocking Renewable Energy Potential

Located approximately between Hawaii and New Zealand, American Samoa is the only U.S. territory in the southern hemisphere. American Samoa faces similar climate and energy resilience challenges as other Pacific islands: geographic remoteness, dependence on imported fossil fuels, and increased vulnerability to natural hazards like earthquakes, cyclones, and tsunamis. In 2022, the average electricity price for residential customers in American Samoa was approximately 45 cents/kilowatt-hour (kWh) - almost three times the U.S. average of 15 cents/kWh. Renewable energy represents a small but growing power system contribution, although American Samoa relies almost entirely on imported fossil fuels. The territory possesses substantial solar resources and wind and biomass resource potential. Planned renewable power projects include utility-scale solar photovoltaic (PV) and wind generation with battery storage systems.

American Samoa↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Development of a security-by-design handbook.

There is an increasing awareness that efficient and effective nuclear facility design is best achieved when requirements from the 3S disciplines Safety, Safeguards, and Security - are balanced and intrinsic to the facility design. This can be achieved when policy, processes, methods, and technologies are understood and applied in these areas during all phases of the design process. For the purposes of this paper, Security-by-design will be defined as the system level incorporation of the physical protection system (PPS) into a new or retrofitted nuclear power plant (NPP) or nuclear facility (NF) resulting in intrinsic security. Security-by-design can also be viewed as a framework to achieve robust and durable security systems. This paper reports on work performed to date to create a Security-by-Design Handbook, under a bilateral agreement between the United States and Japan, specifically, a review of physical protection principles and best practices, and a decommissioning to better understand where these principles and practices can be applied. This paper describes physical protection principles and best practices to achieve security-by- design that were gathered from International, Japanese, and U.S. sources. Principles are included for achieving security early in the design process where security requirements are typically less costly and easier to incorporate. The paper then describes a generic design process that covers the entire facility lifecycle from scoping and planning of the project to decommissioning and decontamination. Early design process phases, such as conceptual design, offer opportunities to add security features intrinsic to the facility design itself. Later phases, including design engineering and construction, are important for properly integrating security features into a coherent design and for planning for and assuring the proper performance of the security system during the operation and decommissioning of the facility. The paper also describes some future activities on this bilateral project to create a Security-by-Design Handbook. When completed, the Handbook is intended to assist countries with less experience in nuclear power programs to apply principles and best practices in an effective and efficient manner as early in the design as possible to achieve robust and durable security.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Report for the portion performed in the University of Illinois on the project entitled "Optimizing the Cloud-Aerosol-Radiation Ensemble Modeling System to Improve Future Climate Change Projections at Regional to Local Scales"

This is the final report for the closure of the research tasks on the project that have performed during the entire reporting period in the University of Illinois. It contains a summary of the achievements and details of key results as well as the future plan for this project to be continued in the University of Maryland.

58 GEOSCIENCES↗

Current status of R and D activities and future plan and role of JAEA's two generic URLs - 15356

The Japan Atomic Energy Agency (JAEA) has promoted R and D on geological disposal technology contribute to the implementation and safety regulation for high-level radioactive waste(HLW) disposal. JAEA launched two purpose-built generic URL projects to cover the diversity of geological environments in Japan, in accordance with 'Long-Term Program for Development and Utilization of Nuclear Energy' published in 1994 by the Japan Atomic Energy Commission. One is the Mizunami URL Project started in 1996. The Mizunami URL Project is a comprehensive geo-scientific research project investigating the deep underground environment within crystalline rock at Mizunami City in Gifu Prefecture, central Japan. The other one is the Horonobe URL Project started in 2001. The Horonobe URL Project consists of two major research areas, geo-scientific studies and R and D on geological disposal technology in the sedimentary rock environment at Horonobe Town in Hokkaido Prefecture, northern Japan. Both of the URL projects have been planned to proceed in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', with a total duration of about 20 years. Currently, the construction of research galleries in both of the Mizunami and the Horonobe URLs has been completed to 500 m and 350 m depths, respectively. R and D activities in Phase III are being conducted at both URLs. According to the latest five-year plan, announced in September 2014, JAEA will promote R and D activities in Phase III including study of the effects of long-term evolution of the geological environment on geological characteristics such as groundwater flow and chemistry for reducing the uncertainty inherent in the evaluation of the long-term stability of the geological environment. This has been a very critical issue for HLW geological disposal in Japan after the Great East Japan Earthquake in 2011. Furthermore, JAEA will contribute to international cooperation especially with countries having a similar geological environment such as those in the Circum-Pacific area, development of human resources and communication amongst stakeholders through the generic URL projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Information Automation and Human Technology Integration to Implement Integrated Operations for Nuclear

The purpose of the research effort described in this report is to develop and demonstrate an approach to the design and implementation of advanced, automated systems intended to increase operational efficiencies at nuclear power plants. In particular, we describe methods for considering human-technology integration (HTI) issues throughout the various phases of system design, test, and implementation and how these considerations help promote effective design. This research project will develop planning tools and comprehensive guidance on how HTI principles and methods, in combination with information automation technologies, can enable effective data integration and coordination for full nuclear plant modernization. Specifically, this research project will develop an approach to automate the mapping of data from plant systems and processes to application needs, thereby significantly reducing the amount of human workload currently required for the execution of these tasks. In addition to developing an automated solution as a replacement for these tasks, this research will also analyze digitalization’s effectiveness in reducing operational costs of compliance related activities. Compliance activities are estimated to account for as much as 50% of operations and maintenance (i.e., non-fuel and non-capital) costs of plant operation.

97 MATHEMATICS AND COMPUTING↗

Neural nets for aligning optical components in harsh environments: Beam smoothing spatial filter as an example

The goal is to develop an approach to automating the alignment and adjustment of optical measurement, visualization, inspection, and control systems. Classical controls, expert systems, and neural networks are three approaches to automating the alignment of an optical system. Neural networks were chosen for this project and the judgements that led to this decision are presented. Neural networks were used to automate the alignment of the ubiquitous laser-beam-smoothing spatial filter. The results and future plans of the project are presented.

Decker, Arthur J.↗