Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Development of an Integrated Natural Barrier Database System for Site Evaluation of a Deep Geologic Repository in Korea - 13527

Korea Radioactive-waste Management Corporation (KRMC) established in 2009 has started a new project to collect information on long-term stability of deep geological environments on the Korean Peninsula. The information has been built up in the integrated natural barrier database system available on web (www.deepgeodisposal.kr). The database system also includes socially and economically important information, such as land use, mining area, natural conservation area, population density, and industrial complex, because some of this information is used as exclusionary criteria during the site selection process for a deep geological repository for safe and secure containment and isolation of spent nuclear fuel and other long-lived radioactive waste in Korea. Although the official site selection process has not been started yet in Korea, current integrated natural barrier database system and socio-economic database is believed that the database system will be effectively utilized to narrow down the number of sites where future investigation is most promising in the site selection process for a deep geological repository and to enhance public acceptance by providing readily-available relevant scientific information on deep geological environments in Korea. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Past Approaches for Spent Nuclear Fuel, Transuranic, and High-Level Waste Disposal in the United States—Part 2: Siting Process, Staged Development, and Public Preferences

This report presents pertinent aspects of the ~50-year United States experience in siting a mined geologic disposal repository for spent nuclear fuel (SNF), transuranic (TRU) waste, and high-level radioactive waste (HLW) as related to site selection and the staged process for site investigations as specified in the Nuclear Waste Policy Act of 1982 and generic and site-specific regulations of the US Department of Energy (DOE), US Environmental Protection Agency (EPA), and US Nuclear Regulatory Commission (NRC). The roles of the Environmental Impact Statement and guidance in international consensus standards by the International Atomic Energy Agency are also mentioned. The focus is on siting and developing the Waste Isolation Pilot Plant, an operating repository for TRU waste from atomic energy defense activities, and the proposed Yucca Mountain repository for commercial SNF and HLW. In the social dimension, the role of institutional stakeholders is described. Past national surveys related to waste management options for storage and disposal provide insight on public preferences of other stakeholders. The descriptions are intended to help other countries more fully understand the stages adopted for siting and developing repositories in the United States.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nye County Nevada Perspectives on the State of the Yucca Mountain Project - 12388

Responding to the Department of Energy decision to try to withdraw the Yucca Mountain license application and the Administration actions to close down the Yucca Mountain project, Nye County undertook a number of activities to articulate its support for continuing the Yucca Mountain project. The activities included responding to inquiries from federal agencies, including investigations undertaken by the Government Accountability Office addressing other potential uses for the Yucca Mountain site, responding to a Draft Environmental Impact Statement on the possible use of Yucca Mountain for disposal of Greater than Class C wastes, testifying in hearings, and interacting with the President's Blue Ribbon Commission on America's Nuclear Future. The paper summarizes Nye County's position on the Yucca Mountain repository, Nye County's perspectives on the various activities that were developed and considered by the Government Accountability Office, Nye County's concerns with the use of the Nevada National Security Site for Disposal of Greater than Class C Low-Level Radioactive Wastes, testimony of Nye County officials expressing local community support for the Yucca Mountain project, and Nye County's perspectives on recommendations provided by the Blue Ribbon Commission to move the nation's high-level radioactive waste disposal programs forward without consideration of the role Yucca Mountain could have served in those recommendations. Nye County believes that every effort should be made to, at a minimum, fund the Nuclear Regulatory Commission to complete the license application review. Then, if Congress does decide to change the Nuclear Waste Policy Act, there will be valuable information available to support new policy development. This administration contends that Congressional language associated with the FY2010 and FY2011 appropriations and authorization process is sufficient evidence of its intent to terminate the Yucca Mountain repository program. The appropriation process needs to be explicit that, absent explicit language to the contrary, the Nuclear Waste Policy Act stands. It also should include language that requires the Department of Energy to preserve all necessary records until the Nuclear Waste Policy Act is amended or rescinded by specific Congressional action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Issues that Need to Be Addressed in Preparing a Large Program to Transport SNF and HLW - 20093

The U.S. Nuclear Waste Technical Review Board (Board) has been interested for many years in the Department of Energy (DOE) activities related to transporting spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The Board has conducted several public meetings and issued associated reports on this topic. In September 2019, the Board issued a report entitled Preparing for Nuclear Waste Transportation-Technical Issues that Need to Be Addressed in Preparing for a Nationwide Effort to Transport Spent Nuclear Fuel and High-Level Radioactive Waste [1] that focuses on the issues DOE will need to address to plan and implement an integrated transportation program. In its report, the Board describes 30 broad technical issues that DOE needs to address and offers three sets of findings and recommendations to DOE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Study on Optimized Management Options for the Wolsong Low- and Intermediate - Level Waste Disposal Center in Korea - 13479

The safe and effective management of radioactive waste is a national task required for sustainable generation of nuclear power and for energy self-reliance in Korea. Currently, for permanent disposal of low- and intermediate-level waste (LILW), the Wolsong LILW Disposal Center (WLDC) is under construction. It will accommodate a total of 800,000 drums at the final stage after stepwise expansion. As an implementing strategy for cost-effective development of the WLDC, various disposal options suitable for waste classification schemes would be considered. It is also needed an optimized management of the WLDC by taking a countermeasure of volume reduction treatment. In this study, various management options to be applied to each waste class are analyzed in terms of its inventory and disposal cost. For the volume reduction and stabilization of waste, the vitrification and plasma melting methods are considered for combustible and incombustible waste, respectively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Site-Specific Deinventory Report for Connecticut Yankee

This report has been developed to satisfy solicitation number 6400014223 under subcontract number 4000138474 issued by UT-Battelle, LLC, managing contractor of Oak Ridge National Laboratory (ORNL) to AREVA Federal Services (AFS). The purpose of this report is to assist the United States (U.S.) Department of Energy (DOE) in laying the groundwork for implementing an integrated waste management system. This includes preparing for future large-scale transport of Spent Nuclear Fuel (SNF), High-Level Radioactive Waste (HLW), and Greater Than Class C (GTCC) Low Level Radioactive Waste (LLW). This report addresses the tasks, equipment, and interfaces necessary for the complete deinventory of the Connecticut Yankee (CY) independent spent fuel storage installation (ISFSI) site located on the eastern shore of the Connecticut River near Haddam Neck, CT; about 13 miles southeast of Middletown and 25 miles southeast of Hartford, CT. As such, this report is intended to provide information useful for planning options within the integrated waste management system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial Site-Specific De-Inventory Report for Kewaunee

This report has been developed to satisfy the Statement of Work for Task Order #3 for the Department of Energy (DOE) – Office of Nuclear Energy under contract number DE-NE0008491 issued to AREVA Federal Services (AFS). The purpose of this report is to assist the United States (U.S.) DOE in laying the groundwork for implementing an integrated nuclear waste management system. This includes preparing for future large-scale transport of Spent Nuclear Fuel (SNF), High-Level Radioactive Waste (HLW), and Greater Than Class C (GTCC) Low Level Radioactive Waste (LLW). This report addresses the tasks, equipment, and interfaces necessary for the complete de-inventory of the Kewaunee Power Station (KPS) independent spent fuel storage installation (ISFSI) site located in the town of Carlton, WI (but with a Kewaunee mailing address), approximately 30 miles southeast of Green Bay, WI and 90 miles north of Milwaukee, WI. As such, this report is intended to provide information useful for planning options within an integrated nuclear waste management system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial Site-Specific De-Inventory Report for Trojan

This report has been developed to satisfy solicitation number 6400014223 under subcontract number 4000146712 issued by UT-Battelle, LLC, managing contractor of Oak Ridge National Laboratory (ORNL) to AREVA Federal Services (AFS). The purpose of this report is to assist the United States (U.S.) Department of Energy (DOE) in laying the groundwork for implementing an integrated waste management system. This includes preparing for future large-scale transport of Spent Nuclear Fuel (SNF), High-Level Radioactive Waste (HLW), and Greater Than Class C (GTCC) Low Level Radioactive Waste (LLW). This report addresses the tasks, equipment, and interfaces necessary for the complete de-inventory of the Trojan independent spent fuel storage installation (ISFSI) located in northwestern Oregon along the Columbia River at river mile 72.5 and approximately 42 miles north of Portland, OR. As such, this report is intended to provide information useful for planning options within the integrated waste management system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial Site-Specific De-Inventory Report for Maine Yankee

This report has been developed to satisfy solicitation number 6400014223 under subcontract number 4000146712 issued by UT-Battelle, LLC, managing contractor of Oak Ridge National Laboratory (ORNL) to AREVA Federal Services (AFS). The purpose of this report is to assist the United States (U.S.) Department of Energy (DOE) in laying the groundwork for implementing an integrated waste management system. This includes preparing for future large-scale transport of Spent Nuclear Fuel (SNF), High-Level Radioactive Waste (HLW), and Greater Than Class C (GTCC) Low Level Radioactive Waste (LLW). This report addresses the tasks, equipment, and interfaces necessary for the complete de-inventory of the Maine Yankee (MY) independent spent fuel storage installation (ISFSI) site located in the mid-coast region of Maine approximately 25 miles south of Augusta, ME and 45 miles northeast of Portland, ME. As such, this report is intended to provide information useful for planning options within the integrated waste management system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterisation of imperial college reactor centre legacy waste using gamma-ray spectrometry

Waste characterisation is a principal component in waste management strategy. The characterisation includes identification of chemical, physical and radiochemical parameters of radioactive waste. Failure to determine specific waste properties may result in sentencing waste packages which are not compliant with the regulation of long term storage or disposal. This project involved measurement of intensity and energy of gamma photons which may be emitted by radioactive waste generated during decommissioning of Imperial College Reactor Centre (ICRC). The measurement will use High Purity Germanium (HPGe) as Gamma-ray detector and ISOTOPIC-32 V4.1 as analyser. In order to ensure the measurements provide reliable results, two quality control (QC) measurements using difference matrices have been conducted. The results from QC measurements were used to determine the accuracy of the ISOTOPIC software.

07 ISOTOPE AND RADIATION SOURCES↗

X-Ray Diffraction of Slag-Based Sodium Salt Waste Forms

Cementitious materials are used to solidify and stabilize aqueous based radioactive waste containing sodium salts. The types and proportions of cementitious ingredients used to treat aqueous radioactive waste streams containing sodium salts depend on the performance objectives for the waste forms and the compositions of the waste streams. Matrix phases can stabilize certain contaminants (co-precipitation, substitution, ion exchange, and / or sorption), influence processing properties, and are responsible for physical properties and durability of the cured waste forms. Consequently, characterization of the matrix (binder) mineralogy (chemical compositions and crystalline / non crystalline structures) is important for predicting contaminant leaching and evolution of the materials as a function of time and changing conditions This report documents sample preparation and x-ray diffraction results for a series of mixtures of sodium salt waste and cementitious binders. The objective of this study was to provide initial phase characterization for the CBP reference case cementitious salt waste form. This information can be used to: 1) generate a base line for the evolution of the waste form as a function of time and conditions, 2) potentially to design new binders based on mineralogy of the binder, 3) understand and predict anion and cation leaching behavior of contaminants of concern, and 4) predict performance of the waste forms for which phase solubility and thermodynamic data are available. Characterization of the mineralogy is also important for understanding the buffering effects that the waste form has on infiltrating water / leachates. More specifically, identification of hydrated phases capable of sequestering anions in the structures and crystallinity of the calcium silicate binder phases were of particular interest. The intent was to use this characterization data as a starting point for more detailed phase characterization using neutron diffraction techniques in addition to quasi-elastic neutron scattering techniques for characterization of water at the ORNL Spallation Neutron Source, Oak Ridge, TN. The initial characterization is complete. Due to extensive substitutions of cations and anions in the layered double hydroxide phases and the very fine intermixing of poorly crystalline hydrated phases in the reference case blend (10 : 45 : 45 cement : slag : fly ash), electron diffraction and transmission electron spectroscopy are recommended as the next step for characterization. In summary, the hydrated mixtures of Type II portland cement, Grade 100 ground granulated blast furnace slag (GGBFS) and carbon burn-out (CBO) Class F Fly ash contained hydrated phase assemblages which were typical of those reported in the literature. Based on x-ray diffraction results, no significant differences were detected in samples cured 2 months and 14 months in sealed containers at ambient indoor temperatures.

36 MATERIALS SCIENCE↗

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solidification of spent ion exchange resins into the SIAL matrix at the Dukovany NPP, Czech Republic

Based on the decision of the State Office for Nuclear Safety, the Dukovany NPP has been obliged to secure the efficient capacities for the disposal of spent ion exchange resins. Therefore, in September 2010, based on the contract with supplier company AMEC Nuclear Slovakia s.r.o. has begun with pumping and treatment of ion exchange resins from the storage tank 0TW30B02, situated in the auxiliary building. The SIAL{sup R} technology, developed in AMEC Nuclear Slovakia, has been used for the solidification purposes. This technology allows an on-site treatment of various special radioactive waste streams (resins, sludge, sludge/resins and borates) at the room temperature. The SIAL{sup R} matrix and technology were licensed by the Czech State Office for Nuclear Safety in 2007. On-site treatment and solidification of spent ion exchange resins at Dukovany NPP involves process of resin removal from tank using remotely operated manipulator, resin transportation, resin separation from free water, resin filling into 200 dm{sup 3} drums and solidification into SIAL{sup R} matrix in 200 dm{sup 3} drums using the FIZA S 200 facility. The final product is observed for compressive strength, leachability, radionuclide composition, dose rate, solids and total weight. After meeting the requirements for final disposal and consolidation, the drums are being transported for the final disposal to the Repository at Dukovany site. During the 3 month's trial operation in 2010, and the normal operation in 2011 and 2012, 189 tons of dewatered resins have been treated into 1960 drums, with total activity higher than 920 GBq. At the end of trial run (2010), 22 tons of dewatered resins were treated into 235 drums. During standard operation approximately 91 tons in 960 drums (2011) and 76 tons in 765 drums (2012) were treated. The weights of resins in the drum ware in the range from 89 - 106 kg and compressive strength limit (10 MPa) has already been achieved 24 hours after fixation. The final measured strength values ranged from 19.0 - 34.7 MPa and real leachability values ranged from 0.03 - 0.65%, far below the 4% limit value. Collective effective dose of all workers in 2012 was 7.7 mSv (12.6 mSv in 2011, 6.2 mSv in 2010). Average individual effective dose in 2012 was 0.55 mSv (14 workers), and maximal individual effective dose was 2.25 mSv. This approach allows fast, safe and cost effective immobilization and transformation of dangerous radioactive waste such as sludge and resins into the solid form, which is suitable for long term storage or disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Importance of Experience Based Decommissioning Planning - 16242

Decommissioning of a nuclear facility is an extensive and multidisciplinary task which involves the management and technical actions associated with ceasing operation and thereafter the step by step transfer of the facility from an operating plant to an object under decommissioning. The decommissioning phase includes dismantling of systems and components, decontamination and clearance, demolition of buildings, remediation of any contaminated ground and finally a survey of the site. Several of these activities generate radioactive or potentially radioactive waste which has to be managed properly prior to clearance or disposal. What makes decommissioning of nuclear installations unique is to a large extent the radioactive waste management. No other industries have that complex regulatory frameworks for waste management. If a decommissioning project in the nuclear industry does not consider the waste aspects to the extent required, there is a large risk of failure causing a reduced trust by the regulators and other stakeholders as well as cost and schedule overruns. This paper will give an overview of important aspects and findings gathered during decades of planning and conducting decommissioning and nuclear facility modernization projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

REAL WASTE TESTING OF SPHERICAL RESORCINOL-FORMALDEHYDE ION EXCHANGE RESIN

This report presents data on batch contact and column testing tasks for spherical resorcinol-formaldehyde (sRF) resin. The testing used a non-radioactive simulant of SRS Tank 2F dissolved salt, as well as an actual radioactive waste sample of similar composition, which are both notably high in sodium (6 M). The resin was Microbeads batch 5E-370/641 which had been made on the hundred gallon scale. Equilibrium batch contact work focused on cesium at a temperature of 25 C due to the lack of such data to better benchmark existing isotherm models. Two campaigns were performed with small-scale ion exchange columns, first with Tank 2F simulant, then with actual dissolved salt in the Shielded Cells. An extrapolation of the batch contact results with radioactive waste over-predicted the cesium loaded onto the IX sRF resin bed by approximately 11%. This difference is not unexpected considering uncertainties from measurement and extrapolation and because the ion exchange that occurs when waste flows through a resin bed probably cannot reach the same level of equilibrium as when waste and resin are joined in a long term batch contact. Resin was also characterized to better understand basic chemistry issues such as holdup of trace transition metals present in the waste feed streams. The column tests involved using two beds of sRF resin in series, with the first bed referred to as the Lead column and the second bed as the Lag column. The test matrix included two complete IX cycles for both the simulant and actual waste phases. A cycle involves cesium adsorption, until the resin in the Lead column reaches saturation, and then regenerating the sRF resin, which includes eluting the cesium. Both the simulated and the actual wastes were treated with two cycles of operation, and the resin beds that were used in the Lead and Lag columns of simulant test phase were regenerated and reused in the actual waste test phase. This task is the first to demonstrate the treatment of SRS waste with sRF resin and the tests clearly demonstrated cesium decontamination for actual waste. The results of the column tests were similar for both the simulated and the actual waste and demonstrated Cs removal with sRF from both wastes. For a flowrate of 1.4 bed volumes (BV)/hour at 25 C those results with sRF resin were: (1) Simulant and actual waste results are equivalent; (2) Cs breakthrough began between 200 and 250 BV; (3) Cs breakthrough reached 100% at around 400 BV; (4) Cs breakthrough curve from 5% to 100% is approximately linear; (5) Cs elution with 0.5 M HNO3 starts at 2 BV and ends at 6BV; (6) Most, if not all, of Cs adsorbed during treatment is released during elution; (7) At 100% breakthrough of Cs the resin bed adsorbs approximately 85% of full capacity before detection in the effluent; the remaining 15% is adsorbed at saturation; (8) Approximately 90% of resin bed changes (color and volume) are complete by 6 BV; and (9) During elution the resin shrinks to about 80% of its fully working (sodium form) BV.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Italian Activities in the Field of Nuclear Waste Management - 12439

The Italian situation in the field of nuclear waste management is characterized by a relative small quantity of wastes, as a consequence of the giving up of energy production by nuclear generation in 1986. Notwithstanding this situation, Italy is a unique case study since the country needs to undertake the final decommissioning of four shut-down NPPs (size 100-200 MWe), each one different from the others. Therefore all the regulatory, technical, and financial actions are needed in the same way as if there was actual nuclear generation. Furthermore, the various non-power generating applications of nuclear energy still require management, a legal framework, a regulatory body, an industrial structure, and technical know-how. Notwithstanding the absence of energy production from nuclear sources, the country has the burden of radioactive waste management from the previous nuclear operations, which obliges it to implement at first a robust legislative framework, then to explore all the complex procedures to achieve the localization of the national interim storage facility, not excluding the chance to have a European regional facility for geologic disposal, under the clauses of the Council Directive of 19 July 2011 'Establishing a Community Framework for the Responsible and Safe Management of Radioactive Waste'. Then, as far as industrial, medical and R and D aspects, the improvement of the legislative picture, the creation of a regulatory body, is a good start for the future, to achieve the best efficiency of the Italian system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Site-Specific De-Inventory Report for Big Rock Point

This report has been developed to satisfy solicitation number 6400013399 under subcontract number 4000138474 issued by UT-Battelle, LLC, managing contractor of Oak Ridge National Laboratory to AREVA Federal Services (AFS). The purpose of this report is to assist the United States (U.S.) Department of Energy (DOE) in laying the groundwork for implementing an integrated waste management system. This includes preparing for future large-scale transport of Spent Nuclear Fuel (SNF), High-Level Radioactive Waste (HLW) and Greater Than Class C (GTCC) Low-Level Radioactive Waste (LLW). This report addresses the tasks, equipment, and interfaces necessary for the complete de-inventory of the Big Rock Point (BRP) site on the eastern shore of Lake Michigan about 4 miles north of Charlevoix and approximately 11 miles west of Petoskey, MI. As such, this report is intended to provide information useful for planning options within the integrated waste management system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

International Collaboration Activities on Engineered Barrier Systems

The Used Fuel Disposition Campaign (UFDC) within the DOE Fuel Cycle Technologies (FCT) program has been engaging in international collaborations between repository R&D programs for high-level waste (HLW) disposal to leverage on gathered knowledge and laboratory/field data of near- and far-field processes from experiments at underground research laboratories (URL). Heater test experiments at URLs provide a unique opportunity to mimetically study the thermal effects of heat-generating nuclear waste in subsurface repository environments. Various configurations of these experiments have been carried out at various URLs according to the disposal design concepts of the hosting country repository program. The FEBEX (Full-scale Engineered Barrier Experiment in Crystalline Host Rock) project is a large-scale heater test experiment originated by the Spanish radioactive waste management agency (Empresa Nacional de Residuos Radiactivos S.A. – ENRESA) at the Grimsel Test Site (GTS) URL in Switzerland. The project was subsequently managed by CIEMAT. FEBEX-DP is a concerted effort of various international partners working on the evaluation of sensor data and characterization of samples obtained during the course of this field test and subsequent dismantling. The main purpose of these field-scale experiments is to evaluate feasibility for creation of an engineered barrier system (EBS) with a horizontal configuration according to the Spanish concept of deep geological disposal of high-level radioactive waste in crystalline rock. Another key aspect of this project is to improve the knowledge of coupled processes such as thermal-hydro-mechanical (THM) and thermal-hydro-chemical (THC) operating in the near-field environment. The focus of these is on model development and validation of predictions through model implementation in computational tools to simulate coupled THM and THC processes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗