Search NASA⌕ Search

SEARCH · Search NASA

Results for “State Level Concept”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Molecular-Level Design of Heterogeneous Chiral Catalysts

A recent major focus of catalyst research has been on improving the selectivity or atom efficiency of catalytic processes. Perhaps the most subtle and difficult form of selectivity to control is enantioselectivity, a catalyst’s ability to preferentially yield one enantiomer of a chiral product. Since two enantiomers are identical in all respects except for their mirror reflection symmetry, both are formed in non-chiral environments at exactly equal rates; only by introducing some type of chiral modification to the system can the rate of formation of one enantiomer be favored over the other. This has been successfully achieved for homogeneous-phase, organometallic catalysts, but the empirical development of heterogeneous-phase analogs has proven elusive. The design of such heterogeneous-phase catalysts would obviate the need for inefficient purification steps to remove the heavy-metal catalysts. The goal of the proposed research by the Chiral Catalysis Group is to understand the interactions of prochiral reactants on chirally modified surfaces that lead to the preferential formation of one enantiomer over the other. There are two general concepts for designing heterogeneous-phase enantioselective catalysts. The first adopts the strategy used in homogeneous phase, by adding a chiral modifier to the surface. This approach, while conceptually simple has challenges associated with modifying an extended surface. The second concept, which is unique to extended surfaces, is the idea of creating surfaces that are themselves naturally chiral. A fundamental understanding of the interactions that control enantioselectivity will enable the Chiral Catalysis Group to develop the concepts necessary to design novel, heterogenous catalytic materials. Enantioselectivity is also central to catalytic processes that underpin the pharmaceutical and agrochemical industries. With funding from the Department of Energy, the Chiral Catalysis Group has played a leading role in developing a fundamental understanding of chiral catalysis and of the adsorbate structures, interactions and kinetic effects that control heterogenous-phase enantioselectivity. The proposed research program is organized conceptually around three types of enantiospecific interactions: interactions with naturally chiral surfaces; those with modified surfaces categorized as chirally templated surfaces; and one-to-one interactions of prochiral molecules with chiral surface modifiers. Our specific goals are to: (1) determine the structures of chiral surfaces, prochiral reactants, chiral products and chiral modifiers; (2) understand the enantiospecific interactions that occur between prochiral reactants and chiral products with chirally modified surfaces; (3) develop methods for detection of enantiospecific surface phenomena; and (4) elucidate enantioselective reaction pathways and the interactions that control them. The range of expertise within the Chiral Catalysis Group includes molecular-scale theory, surface science experiments, state-of-the-art spectroscopic, kinetic and atomic-scale imaging capabilities carried out in vacuum and under more-realistic liquid- and gas-phase environments complemented by catalytic measurements. By fully integrating such a breadth of approaches and extensive expertise, the Chiral Catalysis Group will, for the first time, be able to understand, rationally design and then control active sites for optimal enantioselectivity. In addition to having a significant impact on the field of chiral catalysis, the proposed research program will further our general understanding of the molecular-scale origins of catalytic selectivity.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Unforeseen Events Alter Stewardship Strategies at the Decommissioned BONUS Reactor in Puerto Rico - 19572

The decommissioned Boiling Nuclear Superheater (BONUS) reactor northwest of Rincon, Puerto Rico, was developed as a prototype nuclear power plant to investigate the feasibility of the integral boiling superheating concept. Through a combined effort of the US Atomic Energy Commission (AEC) and the Puerto Rico Water Resources Authority (PRWRA), the reactor first achieved a controlled nuclear chain reaction in 1964 and remained operational until June 1968. It was the eighth nuclear reactor constructed in the world and one of only two boiling-water superheater reactors ever developed in the United States. Following its decommissioning in 1970, AEC, the predecessor to the US Department of Energy (DOE), and PRWRA, the predecessor to the Puerto Rico Electric Power Authority (PREPA), worked together post-closure to address the remaining residual contamination and safely open the facility to the public for science educational outreach. Presently, the DOE Office of Legacy Management (LM) has long-term stewardship responsibilities for the reactor entombment, which includes periodic site inspections of the entombment system and oversight of the Radiological Protection Program (RPP) implemented by PREPA. PREPA has responsibility for conducting radiological measurements in accordance with the approved RPP for the facility, recordkeeping and reporting, and facility control and maintenance. The entombment system has a design life of 140 years; DOE has an obligation to ensure long-term protectiveness at the site for the next 90 years until the contact dose of the entombment system reaches background conditions. As part of the long-term protectiveness strategy, in September 2000, the BONUS reactor facility was renamed the Dr. Modesto Iriarte Technology Museum, and then in 2007, the facility was listed under the National Register of Historical Places. The museum contains numerous displays that recount the history of the BONUS site, as well as the development of electric power and nuclear energy, and receives approximately 100 visitor requests each year. The best long-term strategies need to be flexible and are subject to change. As such, the long-term maintenance responsibilities at the BONUS reactor facility were formerly documented in the 2010 Letter of Agreement between LM and PREPA to reaffirm the joint commitment of long-term protectiveness. This commitment did not waiver despite two devastating hurricanes in 2017, Irma and Maria, and the recent bankruptcy filing by the territory of Puerto Rico. To address the financial uncertainties facing PREPA, secure LM's commitment to long-term stewardship liabilities in the future, and offer a level of care similar to that at other LM sites, LM has offered several strategic opportunities to ensure the long-term sustainability of the site. Both LM and PREPA share a common and long-term stewardship commitment at the BONUS reactor facility, which includes ensuring protectiveness of the entombed radiological waste material. Protection of human health and the environment is at the forefront of the DOE mission, and the beneficial reuse of legacy sites continues to be a goal of the agency. The collaborative ability of both organizations to transform a Cold War-era facility such as a former nuclear reactor to an educational center embodies a unique ability to present local history while educating future generations on LM's mission to protect human health and the environment across the 92 sites it manages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wireless Instrumented RB Experiment Preliminary Design and Analysis

The ability to deploy new nuclear fuels for current or future reactor concepts requires carefully designed experiments to generate data to support fuel qualification. Ideally these experiments would include state of-the-art sensing to maximize the amount of in situ data that can be collected during operation. Furthermore, advanced reactor systems can take advantage of integrated in-core sensing technologies to maximize fuel utilization, reduce unnecessary conservativism in design margins, and improve operator’s understanding of limiting peaking factors. Before any novel sensing technologies can be readily adopted for nuclear applications, they must first demonstrate acceptable performance in test reactors. This report summarizes the preliminary design and analysis of the most highly instrumented irradiation experiment ever performed in the removable beryllium (RB) positions of the High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL). The Wireless Instrumented RB Experiment 2021 (WIRE-21) will test a wide range of sensors including wireless sensors being developed by Westinghouse Electric Company (WEC) that could provide in situ measurements of peak fuel temperatures and fuel rod pressurization due to fission gas release. The ability to wirelessly transmit a signal through the fuel rod’s cladding is critical to improving fuel monitoring capabilities without requiring signal penetrations through the cladding pressure boundary, which would significantly impact fuel fabrication, handling, and operation. Other sensors that will be tested in WIRE-21 include an array of thermocouples, self-powered neutron detectors (SPNDs), and spatially distributed fiber-optic temperature sensors. More generally, WIRE-21 will establish a flexible irradiation vehicle design to allow accelerated, economical testing of advanced sensor technologies while leveraging the extremely high neutron flux that is available in HFIR. This report summarizes the mechanical design for WIRE-21, the experimental test matrix, initial neutronic and thermal design analyses, and the active monitoring and control system enhancements necessary to support testing of advanced sensor technologies. The containment for WIRE-21 is similar to previous RB irradiation vehicles but includes a few modifications, most notably the use of integrated compression seals to pass a larger number of sensor leads through the experiment’s pressure boundary. In addition to the sensor leads, inert gas lines are passed into the experiment to enable active temperature control and the ability to pneumatically actuate a bellows-driven pressure sensor. WIRE-21 is targeting temperatures (300–350°C) and neutron fluence levels (~10 22 n/cm 2 ) relevant to light water reactors (LWRs), but the flexible design of the experiment vehicle allows much higher operating temperatures (>1,100°C). Neutronic calculations determine the neutron flux conditions as well as the nuclear heating within the experiments. These results are used as inputs to detailed thermal finite element calculations, which are required to evaluate the complex, three-dimensional heat transfer that occurs within WEC’s wireless sensor enclosures. Initial results show that the temperatures of the sensors’ enclosures and the metal bellows can be operated near the temperature range of LWR coolants and cladding while simultaneously increasing the temperature of a surrogate fuel material to values in the range of 800–1200°C to simulate centerline fuel temperatures during LWR operation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Implementation of ALARA radiation protection on the ISS through polyethylene shielding augmentation of the Service Module Crew Quarters

With 5-7 month long duration missions at 51.6 degrees inclination in Low Earth Orbit, the ionizing radiation levels to which International Space Station (ISS) crewmembers are exposed will be the highest planned occupational exposures in the world. Even with the expectation that regulatory dose limits will not be exceeded during a single tour of duty aboard the ISS, the "as low as reasonably achievable" (ALARA) precept requires that radiological risks be minimized when possible through a dose optimization process. Judicious placement of efficient shielding materials in locations where crewmembers sleep, rest, or work is an important means for implementing ALARA for spaceflight. Polyethylene (CnHn) is a relatively inexpensive, stable, and, with a low atomic number, an effective shielding material that has been certified for use aboard the ISS. Several designs for placement of slabs or walls of polyethylene have been evaluated for radiation exposure reduction in the Crew Quarters (CQ) of the Zvezda (Star) Service Module. Optimization of shield designs relies on accurate characterization of the expected primary and secondary particle environment and modeling of the predicted radiobiological responses of critical organs and tissues. Results of the studies shown herein indicate that 20% or more reduction in equivalent dose to the CQ occupant is achievable. These results suggest that shielding design and risk analysis are necessary measures for reducing long-term radiological risks to ISS inhabitants and for meeting legal ALARA requirements. Verification of shield concepts requires results from specific designs to be compared with onboard dosimetry. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.

NASA Center JSC↗

Next Generation System Analysis Model: Recently Added Features and Future Plans

To better enable informed decision-making regarding the back-end of the nuclear fuel cycle, the Integrated Waste Management System (IWMS) program within the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) has been sponsoring the development and application of system analysis tools capable of analyzing various system options for the management of spent nuclear fuel (SNF) and high-level radioactive waste (HLW).With these tools, IWMS architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool expressly designed to be capable of modeling features within various IWMS architectures. NGSAM imports data from Oak Ridge National Laboratory (ORNL)’s unified database (e.g., historic assembly information, thermal profiles for assembly heat, and at-reactor dry storage loadings) to ensure that each simulation initializes with a realistic representation of the state of commercial SNF in the U.S. Recent major enhancements implemented into NGSAM in the period since NGSAM was last presented at the WM2019 conference include: • Tracking of railroad escort car acquisition and buffer car acquisition • The addition of heavy haul truck (HHT) and barge routes for some sites, as well as support for user-defined inter-modal routes • Updates to the logic that checks the transportation cask thermal limit maps prior to package transport • An allocation method that predicts when reactor sites would pack assemblies from their spent fuel pools for dry storage, and prioritizes shipments directly from the pools of those reactor sites in the preceding periods (before the predicted loadings to dry storage), thus reducing the number of casks loaded into dry storage at reactor sites • The addition of “reactor site family” operational limits to restrict the number of loads of SNF taken from the pool and from dry storage at a given reactor site each year • Added support for multiple canister loading map options and packages with multiple compatible transportation overpacks • Updates to the handling of non-commercial SNF, including a new database that contains data to support the updates • Updates to allow analysis of hypothetical scenarios which include repackaging at reactor sites, e.g., for possible comparative analysis with other scenarios • Implementation of additional output reports, or modification of existing ones • The ability to generate and implement user edits via the NGSAM website • The ability to model loading SNF from pool storage at an interim storage facility (ISF) into dry storage at the ISF • The ability to model consolidating SNF from different existing storage containers at a DOE site into the same DOE standard canister • The ability to model transferring SNF casks from one transportation mode to another, e.g., from HHT to rail, referred to as transloading. These new features have improved NGSAM capabilities and users’ experience with the model. Preliminary NGSAM requirements for modeling advanced reactor fuels, reprocessing, treatment, and conditioning were considered, and this paper describes them at a high level. Other nuclear fuel cycle system analysis tools developed under sponsorship of DOE-NE, like the VISION code developed at Idaho National Laboratory, might be better suited for initial high-level analysis of those technologies and advanced fuel cycles. As technologies are developed and system concepts evolve, NGSAM could provide value by providing more detailed modeling of transport, storage, and disposal of spent fuel and wastes from advanced reactors and advanced fuel cycles at the fuel element and waste container level.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Differential GPS and system integration of the Low Visibility Landing and Surface Operations (LVLASO) demonstration

The LVLASO Flight Demonstration of ASTA concepts (FDAC) integrates NASA-Langley's electronic moving map display and Transport Systems Research Vehicle (TSRV) (a modified Boeing 737 aircraft); ARINC's VHF data link, GPS ground station, and automated controller workstation; and Norden's surface radar/airport movement safety system. Aircraft location is shown on the electronic map display in the cockpit. An approved taxi route as well as other aircraft and surface traffic are also displayed. An Ashtech Z12 Global Positioning System (GPS) receiver on the TSRV estimates the aircraft's position. In Differential mode (DSPS), the Ashtech receiver accepts differential C/A code pseudorange corrections from a GPS ground station. The GPS ground station provides corrections up to ten satellites. The corrections are transmitted on a VHF data link at a 1 Hz. rate using the RTCM-104 format. DGPS position estimates will be within 5 meters of actual aircraft position. DGPS position estimates are blended with position, velocity, acceleration, and heading data from the TSRV Air Data/Inertial Reference System (ADIRS). The ADIRS data is accurate in the short-term, but drifts over time. The DGPS data is used to keep the ADIRS position accurate. Ownship position, velocity, heading, and turn rate are sent at a 20 Hz. rate to the electronic map display. Airport traffic is detected by the airport surface radar system. Aircraft and vehicles such as fuel trucks and baggage carts are detected. The traffic's location, velocity, and heading are sent to the TSRV. To prevent traffic symbology from jumping each second when a location update arrives, velocity and heading are used to predict a new traffic location for each display update. Possible runway incursions and collisions can be shown on the electronic map. Integrating the different systems used in the FDAC requires attention to the underlying coordinate systems. The airport diagram displayed on the electronic map is obtained from published navigational charts. The charts reference the North American Datum of 1927 (NAD27) or a local state-plane coordinate system. GPS uses the World Geodetic Standard of 1984 (WGS84). Both NAD27 and WGS84 model the Earth as an ellipsoid, however, they use a different origin and different size ellipsoids. Latitudes and longitudes given in these systems can be converted to a Cartesian system with the origin at the Earth's center. The surface radar detects traffic in a locally-level, rho-theta coordiante system. The electronic airport diagram is stored using a flat XY coordinate system. The map origin is at the tower and is referenced as True North up. All ownship and other traffic positions must be converted to the electronic map's frame of reference for display.

Rankin, James M.↗

MPEX AI Digital Twins

All magnetically confined plasma fusion power plant concepts (Tokamak, Spherical Tokamak, Stellarator, Mirror, ...) must exhaust the heat and plasma from the core confinement region to the material walls. The primary channel for this exhaust is through a plasma divertor which directs plasma along open magnetic field lines to a material target. The Material Plasma Exposure eXperiment (MPEX) illustrated in Figure 1, is a high-power, steady-state linear plasma device designed to produce the plasma material interaction (PMI) conditions of the divertor of future magnetic confinement fusion power plants: energy flux 20MW/m 2 , ion fluence 1031/m 2 , pulse duration 106 sec. These goals of plasma exposure in MPEX are well beyond those achieved in magnetic fusion experimental devices. Successfully achieving these high power steady state conditions for long pulses requires operational control of the heating and particle sources and the plasma flux to the walls and target. The MPEX AI Hot Spot Controller, proposed in this project, will help achieve the operational milestones of MPEX. The MPEX device will begin commissioning at the end of FY26. A smaller proto-MPEX was operated for 14,666 plasma discharges and will resume operation in September of 2025 as proto-MPEX-lite, with reduced capability, to test a new window for the Helicon plasma source. The proto-MPEX data has undergone surrogate modeling with machine learning methods (R. Archibald, 2022 IEEE International Conference on Big Data). This proto-MPEX data will be used to begin development of the AI digital twins described in this white paper. The scientific mission of MPEX is to qualify materials of different composition for use in the high energy and plasma flux conditions of a fusion power plant. The materials exposed in MPEX will in some cases be exposed to high neutron fluxes at other ORNL facilities to measure the changes to their PMI properties. The targets exposed in MPEX will be transported under vacuum to a Surface Analysis Station (SAS). The SAS will be equipped with the following diagnostics: Focused Ion Beam (FIB) for trench milling, 100-400 angstrom resolution scanning electron microscope (SEM), surface mapping x-ray spectrometer, high resolution camera, and a future upgrade to a laser induced breakdown spectroscopy quadruple mass spectrometer (LIBS-QMS). The MPEX experiments will generate diverse pre- and post-exposure measurement data of detailed material properties down to the crystal grain level in 3D for post-exposure assessment of PMI damage (e.g. cracking, melting, erosion and redeposition of the material). Physics models for the PMI, and how the material composition and manufacturing impact its performance under high energy plasma exposure, need to be validated with MPEX data to guide the selection of new candidate materials. Our vision for the MPEX AI Digital Twins project is to supply experimental and physics model simulation data to train Artificial Intelligence (AI) models for data processing, analysis, operational control, PMI and materials simulation to maximize the scientific output of the MPEX device. Ultimately, an AI digital twin of MPEX material assessment metrics for tested and synthetic material types with simulated PMI will be trained by the AI Modeling Teams on the experimental and physics simulation data submitted to the American Science Cloud by this project. A purely empirical search for the best material is inefficient given the finite number of samples that can be tested on MPEX. In order to expand the material properties database for training the MPEX Material Assessment AI Digital Twin, and to gain physics understanding of the PMI processes, physics models of the material properties and PMI processes are required. The physics simulations provide detailed simulation data, like impact angles for plasma ions, sputtering yields, transport of the ionized sputtered target material in the plasma, and redeposition locations. This simulation data expands the measurement data for deeper physics understanding. The experimental data is essential to validate the PMI and material structure simulation models. The validated models can then be used to generate new simulation data of MPEX material assessments for synthetic material compositions that have not been exposed in MPEX. These predictive simulations, plus the whole experimental dataset, will be used to train the MPEX Material Assessment AI Digital Twin allowing a rapid generative AI search for new materials with reduced PMI damage by interpolating the domain of the training set. These new optimum materials can be simulated with the physics codes and/or tested in MPEX. The ability of AI neural networks to interpolate multi-dimensional parameter spaces and generate virtual data is exploited for a more efficient search for optimum materials. The advent of the Transformational AI Models Consortium (TAIMC) is an opportunity to engage with state of the art private and public AI developers to achieve the goals of the AI digital twins and AI accelerated physics models proposed in this project. Our partners at ORNL from the Advance Scientific Computing Research (ASCR) organization will collaborate in accelerating the integrated plasma material interaction simulation framework. This simulation framework will provide a platform for generating simulation data across a range of physical fidelities, including hybrid methods that produce multi-fidelity results. This data will be leveraged for AI model development, both for generation of surrogates and the automation of simulation campaigns. A part of the research below will include collaborative efforts with the TAIMC to (i) adapt data storage approaches to ensure AI-readiness, (ii) provide a protypical exemplar to inform and exercise constructed workflows, and (iii) generate and share data, using the TAIMC unified AI data standard, for foundational models that will be trained from multiple sources across the DOE complex. We will also collaborate with the TAIMC, as well as the planned AI modeling teams, to develop approaches for reducing the cost of data generation. These include tailored multi-fidelity approaches as well as fine-tuning strategies to augment general, large-scale foundational models.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

SDN-NGenIA, a Software Defined Next Generation Integrated Architecture for HEP and Data Intensive Science

This project aims to enable the LHC and other leading programs in high energy physics and other global science domains funded by the DOE to operate with a new level of efficiency and control, through the development of a Next Generation Integrated Architecture (NGenIA) based on intelligent software defined network (SDN)-driven network systems coupled to high throughput applications. While the initial focus is on the challenging LHC use case, the systems and products being developed are general, and apply to many fields of data intensive science ranging from astrophysical sky surveys to bioinformatics and earth observation, as well as other organizations facing the challenges of extracting knowledge from distributed multi-petabyte data stores. A central concept in this development program is a new paradigm ‘consistent network operations’ among widely distributed computing and storage facilities, where stable high throughput flows, at set rates, cross load-balanced network paths, up to flexible high water marks that are adjusted in real time to accommodate other network traffic. The large smooth flows are launched and managed by SDN services that act in concert with the experiments’ site-resident data distribution and management systems, to meet the expanding needs of the science programs. The technical goals include the construction of autonomous, intelligent site-resident services that interact dynamically with network-resident services, and with the science programs’ principal data distribution and management tools, to request or command network resources in support of high throughput petascale to exascale workflow Specific work items include: 1. Developing compact Data Transfer Nodes (DTNs) with auto-tuning functions that support data transfer rates in the 100 Gbps to the 1 Tbps range when used with high throughput data transfer applications 2. Deep site orchestration among virtualized clusters, storage subsystems and subnets to successfully coschedule CPU, storage and network resources 3. Science-program designed site architectures, operational modes, and policy and resource usage priorities, adjudicated across multiple network domains and virtual organizations, using the orchestration functions and methods 4. Seamlessly extending end-to-end operation across both extra-site and intra-site boundaries through the use of Open vSwitch (OVS), FireQoS + next generation Science DMZs 5. Novel methods of system integration that enable granular control of extreme scale long distance transfers through flow matching of scattered source-destination address pairs to multi-domain dynamic circuits 6. Funneling massive sets of streams to DTNs at the site edge hosting petascale buffer pools configured for flows of 100 Gbps and up, exploiting state of the art data transfers 7. Adaptive scheduling based on pervasive end-to-end monitoring, including DTN or compute-node resident agents providing comprehensive end-system profiling 8. Developing unsupervised and supervised machine learning and modeling methods to optimize the workflow involving terabyte to multi-petabyte datasets.

47 OTHER INSTRUMENTATION↗

HIGHWAY INFRASTRUCTURE FOCUS AREA NEXT-GENERATION INFRASTRUCTURE MATERIALS VOLUME I - TECHNICAL PROPOSAL & MANAGEMENTENHANCEMENT OF TRANSPORTATION INFRASTRUCTURE WITH IRON-BASED AMORPHOUS-METAL AND CERAMIC COATINGS

The infrastructure for transportation in the United States allows for a high level of mobility and freight activity for the current population of 300 million residents, and several million business establishments. According to a Department of Transportation study, more than 230 million motor vehicles, ships, airplanes, and railroads cars were used on 6.4 million kilometers (4 million miles) of highways, railroads, airports, and waterways in 1998. Pipelines and storage tanks were considered to be part of this deteriorating infrastructure. The annual direct cost of corrosion in the infrastructure category was estimated to be approximately $22.6 billion in 1998. There were 583,000 bridges in the United States in 1998. Of this total, 200,000 bridges were steel, 235,000 were conventional reinforced concrete, 108,000 bridges were constructed using pre-stressed concrete, and the balance was made using other materials of construction. Approximately 15 percent of the bridges accounted for at this point in time were structurally deficient, primarily due to corrosion of steel and steel reinforcement. Iron-based amorphous metals, including SAM2X5 (Fe{sub 49.7}Cr{sub 17.7}Mn{sub 1.9}Mo{sub 7.4}W{sub 1.6}B{sub 15.2}C{sub 3.8}Si{sub 2.4}) and SAM1651 (Fe{sub 48}Mo{sub 14}Cr{sub 15}Y{sub 2}C{sub 15}B{sub 6}) have been developed, and have very good corrosion resistance. These materials have been prepared as a melt-spun ribbons, as well as gas atomized powders and thermal-spray coatings. During electrochemical testing in several environments, including seawater at 90 C, the passive film stabilities of these materials were found to be comparable to that of more expensive high-performance alloys, based on electrochemical measurements of the passive film breakdown potential and general corrosion rates. These materials also performed very well in standard salt fog tests. Chromium (Cr), molybdenum (Mo) and tungsten (W) provided corrosion resistance, and boron (B) enabled glass formation. The high boron content of this particular amorphous metal made it an effective neutron absorber, and suitable for criticality control applications. These amorphous alloys appear to maintain their corrosion resistance up to the glass transition temperature. Visionary research is proposed to extend the application of corrosion-resistant iron-based amorphous metal coatings, and variants of these coatings, to protection of the Nation's transportation infrastructure. Specific objectives of the proposed work are: (1) fabrication of appropriate test samples for evaluation of concept; (2) collection of production and test data for coated steel reinforcement bars, enabling systematic comparison of various coating options, based upon performance and economic considerations; and (3) construction and testing of concrete structures with coated steel reinforcement bars, thereby demonstrating the value of amorphous-metal coatings. The benefits of ceramic coatings as thermal barriers will also be addressed.

36 MATERIALS SCIENCE↗

The Maintainable Fusion Pilot Plant

The US fusion community has coalesced around the goal of building an FPP as described by the National Academies of Science, Engineering, and Medicine (NASEM). In addition to demonstrating the viability of the technologies necessary to operate such a plant, including demonstration of net energy and electricity production, NASEM found that a “fusion pilot plant will need to demonstrate the ability to efficiently perform remote maintenance and replacement in support of the design of a power plant, taking into account details of the consequences of the fusion environment, such as material activation and tritium retention in components.” Current designs of fusion demonstration reactors do usually foresee a regular exchange of their first wall modules, including the tritium breeding blankets. In the European Power Plant Conceptual Studies, it is assumed that a fusion reactor will need to change its divertor every 2 years and its first wall blanket module every 5 to 6 years to reach acceptable availability. Underlying this capability are remote-handling technologies to keep the outage for the exchange of these components short. There are many uncertainties in the remote-handling schemes, and most schemes are at a preconceptual level at best. In addition, the exchange of these components would either produce an enormous rad-waste stream or would require an enormous refurbishment activity with huge cost-prohibitive hot-cells. Past Fusion Nuclear Science Facility (FNSF) preconceptual studies have led to hot cell dimensions of an unbelievable size, likely costing tens of billions of dollars. Already at The Way (previously International Thermonuclear Experimental Reactor, ITER), hot-cells have become cost-prohibitive, demanding redesigns of the ITER first wall to reduce the toxic rad-waste/inventory. In this in-situ PFC repair project, a concept for a long-life, maintainable first wall module concept is developed and tested. This first wall concept relies on innovative remote handling to repair the first wall modules in-situ, avoiding costly refurbishments outside of the tokamak vessel. This approach was highlighted in the Fusion Energy Sciences Advisory Committee (FESAC) report on Transformative Enabling Capabilities for Efficient Advance Toward Fusion Energy. In general, the damage of the first wall armor is due to particle and radiation exposures. Load conditions vary from one fusion reactor design to another. In tokamaks, first wall Plasma Facing Components (PFCs) are exposed to far-Scrape-Off-Layer plasma fluxes, electromagnetic radiation, energetic CX neutrals, and potentially runaway electron beams. Protecting the first wall to the worst-case load conditions would require the design of a very thick first wall armor. Transient heat and particle fluxes due to disruptions or edge localized modes can lead to excessive heat loads resulting potentially in melting PFCs down to the cooling channel. Catastrophic events like these need to be avoided by appropriate disruption mitigation systems. However, failure of these systems will still put a first wall at an unacceptable risk. Hence, a first wall design needs to accommodate the occasional transient heat loads by introducing sacrificial limiters, which will absorb these transients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Project Development of an Electrochemical Denitration and Caustic Generation System for HLW Pretreatment at Hanford - 26350

An engineering-scale electrochemical processing skid is proposed to perform the denitration of Hanford tank waste, which would help to mitigate a key process concern with the direct feed processing of the Hanford Tank Waste Treatment and Immobilization Plant (WTP). The reduction of nitrates and organic compounds in the waste feed will directly reduce hazardous NOx and ammonia gases generated during the vitrification process, which in turn will aid in addressing potential regulatory and safety challenges associated with processing large volumes of tank waste. This paper highlights the past legacy work, project layout, accomplishments from Phase 1 and research and development envisioned for Phase 2. An innovative electrochemical denitration and caustic generation (EDCGe) process was demonstrated for the pretreatment of tank waste at the Savannah River Site (SRS) in the early 2000s. The denitration electrolyzer, off-gas abatement system, and caustic generator electrolyzer are being developed with the intent that the denitration electrolyzer will convert nitrate and nitrite anions to nitrogen gas while also yielding other gaseous byproducts, which may include N2O, NH3, VOCs, and H2. The gaseous byproducts will be managed via a tandem off-gas catalyst-bed treatment system. The caustic generation electrolyzer will recycle NaOH from the feed to produce a clean caustic stream for use within the batching tanks at Hanford, aiding in the preparation of waste for WTP. The reduction in hazardous emissions and improved waste treatment processes provides a robust solution for nuclear waste management, contributing to environmental safety and regulatory compliance. The EDCGe technology is being adapted, modified, and updated for the preparation of the Direct Feed-High Level Waste (DF-HLW) flowsheet at Hanford. Phase 1 demonstrated a bench-scale proof-of-concept for reactions involving the denitration electrolyzer and gas phase abatement of ammonia. The electrochemical technology is drawing on the scientific outcomes that were reported in the legacy work. The results from Phase 1 demonstrated the viability of the EDCGe system in reducing the nitrogen species of simple non-radioactive waste simulants. Commercially available alloys used as electrode materials and membranes are being studied for the denitration and caustic generation electrolyzers. The continuation of this project holds promise for broader applications, such as energy-efficient ammonia production, and contributes significant advancements in nuclear waste management. Additional material discovery has been investigated into ceramic Na super ion conductive (NaSICON) materials and off-gas abatement catalyst discovery. NaSICON is of interest for selective transport of Na within the electrolyzers to make a clean caustic stream. Future integration and optimization efforts, informed by Phase 1 results and ongoing research, will continue to drive advancements in nuclear waste management technology. The technology developed for the EDCGe treatment of tank waste will also have broader potential to inform other fields, such as energy-efficient ammonia production, as well as ammonia abatement catalysis through the lessons learned in electrochemical nitrate reduction. The applications and benefits of this research extend beyond Hanford and the Savannah River Site, supported by a collaborative team of scientists and engineers from national labs, academia, and industry, ensuring a comprehensive approach to solving complex waste treatment challenges. The team is leveraging advanced electrochemical technologies, machine learning, novel catalysts tailored for gaseous nitrogen species, and cutting-edge reactor systems to enhance the process efficiency and effectiveness of the denitration process.

Rodene, Dylan [Savannah River National Laboratory ↗

Preliminary Safety Analysis of the Gorleben Site: Safety Concept and Application to Scenario Development Based on a Site-Specific Features, Events and Processes (FEP) Database - 13304

Based upon the German safety criteria, released in 2010 by the Federal Ministry of the Environment (BMU), a safety concept and a safety assessment concept for the disposal of heat-generating high-level waste have both been developed in the framework of the preliminary safety case for the Gorleben site (Project VSG). The main objective of the disposal is to contain the radioactive waste inside a defined rock zone, which is called containment-providing rock zone. The radionuclides shall remain essentially at the emplacement site, and at the most, a small defined quantity of material shall be able to leave this rock zone. This shall be accomplished by the geological barrier and a technical barrier system, which is required to seal the inevitable penetration of the geological barrier by the construction of the mine. The safe containment has to be demonstrated for probable and less probable evolutions of the site, while evolutions with very low probability (less than 1 % over the demonstration period of 1 million years) need not to be considered. Owing to the uncertainty in predicting the real evolution of the site, plausible scenarios have been derived in a systematic manner. Therefore, a comprehensive site-specific features, events and processes (FEP) data base for the Gorleben site has been developed. The safety concept was directly taken into account, e.g. by identification of FEP with direct influence on the barriers that provide the containment. No effort was spared to identify the interactions of the FEP, their probabilities of occurrence, and their characteristics (values). The information stored in the data base provided the basis for the development of scenarios. The scenario development methodology is based on FEP related to an impairment of the functionality of a subset of barriers, called initial barriers. By taking these FEP into account in their probable characteristics the reference scenario is derived. Thus, the reference scenario describes a comprehensive set of probable future evolutions of the repository site. By stepwise consideration of less probable FEP or less probable characteristics of FEP within this process, alternative scenarios are also developed, which are characterized by a lower probability of occurrence. An important methodological aspect is that some assumptions had to be made for the scenario development. They allow, on the one hand, to deal systematically with incomplete knowledge regarding the geological situation below ground owing to restricted site investigations, and, on the other hand, to structure the scenario development process. The consideration of alternative assumptions may result in additional alternative scenarios. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pathways for practical high-energy long-cycling lithium metal batteries

Lithium (Li)-ion batteries play a critical role in modern day technologies, but their specific energy (Wh kg-1) and energy density (Wh L-1) are approaching the maximum practically achievable values based on existing manufacturing processes with the conventional cathode and anode materials. Developing the next generation rechargeable batteries with a specific energy higher than 300 Wh kg-1, up to 500 Wh kg-1, is a significant challenge. This paper discusses the pathways to build the next generation 500 Wh kg-1 rechargeable Li battery based on Li metal anode and a high nickel-content lithium nickel-manganese-cobalt oxide (high-Ni NMC) cathode. The fundamental requirements and practical technical approaches will be explored to hopefully address this grand challenge. In particular, we discuss the detailed cell level requirements and parameters to achieve high energy density, as well as the significant scientific challenges and potential solutions, including but not limited to enable the direct utilization of Li metal anode with high efficiency and long-term cycling stability, dendrite-free Li metal deposition, high utilization of the cathode materials with high mass loading and reasonable electrode thickness along with minimum parasitic weight in the cathode side. The cell level understanding and validation of the materials properties for high performance and control of interfacial reactions across the whole cell will be explored. New concepts in emerging multifunctional materials and electrolytes/additives and their implications will also be discussed.

lithium metal anode, lithium nickel manganese coba↗

Particle Beam Acceleration Using 3 Petawatt Laser Pulses

The Zettawatt-Equivalent Ultrashort pulse laser System (ZEUS) is presently operational at the Gerard Mourou Center for Ultrafast Optical Science (CUOS) at the University of Michigan. ZEUS is a significant upgrade of the previous high power laser systems at CUOS and consists of two beamlines thatoperate in perfect synchronization. The 500 TW beamline became operational in 2023, 2 PW operation started in 2025 and full 3 PW power levels will be available in 2026. It is presently the highest power laser system in the US. In this grant the high field science group at CUOS has leveraged this unique high power laser facility to investigate laser wake field acceleration (LWFA) in ultra-high power laser plasma interactions and have shown how this can scale for future electron–positron colliders at high energy. The dual beam experimental configuration enables flexibility for many frontier experiments in laser-driven acceleration research, in particular, enabling extended channelling/acceleration experiments, positron generation/acceleration experiments and proof-of-principle transverse pumping “dephasingless” electron acceleration experiment and theory. LWFA may be able to miniaturize particle accelerators for high energy physics and also enable new sources of ultrafast, extreme brightness and precise x-rays for a wide variety of applications. In laser wake field acceleration, an electron bunch “surfs” on the electron plasma wave (the “wake field”) generated by the ponderomotive force of an intense laser. The plasma wave has a strong longitudinal electric field that stays in phase with the relativistic driver. A relativistic charged particle may, therefore, remain in phase with the accelerating field over long distances and gain ultra-relativistic energies. The accelerating electric field strength that the plasma wave can support can be many orders of magnitude higher than that of conventional accelerators, which makes laser wakefield acceleration an exciting prospect as an advanced accelerator concept. In this research project we have investigated the scaling of this mechanism to laser powers of 2 PW and have measured the x-ray emission and radio frequency emission resulting from the acceleration process. We have also performed theoretical investigation of mechanisms to scale laser driven accelerators to much higher energy using dephasingless acceleration processes.

43 PARTICLE ACCELERATORS↗

Report of On-Site Inspection Workshop-20: Debriefing on OSI Build-Up Exercises (BUE) I and II/IV and Preparations for BUE III

OSI Workshop-20, “Debriefing on OSI Build-Up Exercises (BUE) I and II/IV and Preparations for BUE III”, took place on 29 October – 2 November 2012 at the Vienna International Centre. There were a total of 83 participants from both the Provisional Technical Secretariat (PTS) and 19 States Signatories. This workshop is part of the planning and preparation process leading up to the 2014 Integrated Field Exercise (IFE14). The opening plenary session provided an overview of the build-up exercises (BUEs) and the overall planning process for IFE14 and preparations for BUE I and BUE II/IV, and the closing session provided a summary of findings. Other sessions consisted of a summary of the preparations for BUE I (launch phase), review and discussion of the execution of BUE I, review and discussion of BUE II/IV (pre-inspection and post-inspection phases), and review and planning of elements of BUE III (inspection phase) and IFE14. BUE I was conducted in mid-April and BUE II/IV in mid-September 2012. BUE III is planned for 26 May – 7 June 2013 and IFE14 for November-December 2014. The purpose of this workshop was to give the participants who took part in the exercises and participants at the workshop a chance to review the preparation and execution of BUE I and BUE II/IV, assess them as to their value to the exercise build-up process, determine what went well and what did not go well, and provide recommendations to help the planning for BUE III and IFE14. This was accomplished by means of presentations by PTS staff and other participants, discussions following the presentations and separate expert working group discussions. The consensus of the participants was that BUE I and BUE II/IV validated the exercise concept contained in CTBT/PTS/INF.1105 (Concept for Preparation and Conduct of the Next Integrated Field Exercise). The many details dealt with in the launch, pre-inspection and post inspection exercises provided an opportunity to test a host of issues prior to IFE14. The exercises showed that the PTS has made considerable progress in developing capabilities in logistics, administration and planning of an OSI since IFE08, and pointed as well to a number of areas where more attention is needed – most notably in the areas of health and safety and equipment checking at the base of operations. A number of areas for which results from the two initial exercises can be applied to BUE III and IFE14 were identified. Also, the review of plans and preparations for BUE III and IFE14 provided the participants with an excellent baseline of information on these two exercises. Probably the most significant impressions that resulted from this workshop are the significant level of complexity involved with preparing the OSI verification regime, the extent of planning involved in the preparation of exercises, and the great value of these types of BUE for assessing and building OSI capabilities. The recommendations section at the end of this report contains the findings of the workshop, grouped into lessons learned from the first two BUEs, proposals relevant to BUE III and IFE14 and issues for the attention of Working Group B.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Central Asia Seismic Hazard Assessment (CASHA): A Probabilistic Seismic Hazard Assessment for Kazakhstan, Kyrgyzstan and Tajikistan

Probabilistic seismic hazard assessments (PSHA) underpin the calculation of earthquake loads in most building codes around the world. In Central Asia, the building codes are slowly being updated to incorporate some of the contemporary concepts of seismic hazard representation. There is also a regional desire to coordinate hazard assessments and building code modernization. However, some challenges remain. Expertise in the region related to seismic hazard assessments is still largely compartmentalised, requiring a significant amount of training and capacity building in seismic hazard assessment related topics. In addition, there are vast amounts of seismic data (bulletin and waveforms), both from analogue and digital eras, that the region’s countries stored but until recently did not use or share among themselves or with the broader seismological community around the world. Finally, after the collapse of the Soviet Union in the 1990s, many of the countries’ seismic networks suffered a major setback with the lack of attention and budget to update existing equipment and installation of new instruments. In order to address these issues, the United States Department of Energy through Lawrence Livermore National Laboratory (LLNL) initiated a project in 2016 to engage and train local scientists in Central Asia to install new equipment, to enhance the quality of seismic monitoring and reporting, to improve and harmonise the regional earthquake catalogue, and to conduct national probabilistic seismic hazard assessments using the new and improved datasets. To achieve the seismic hazard assessment related goals, a series of workshops were held in Almaty, Kazakhstan; Bishkek, Kyrgyzstan; and Dushanbe, Tajikistan from 2016 until 2020. During the time that the COVID-19 pandemic restricted travel, workshops continued online (22 online workshops were hosted in two years). Finally, in May 2022, an in-person workshop in Istanbul, Turkey brought together all project participants along with civil engineers engaged with building code activities in their respective countries, providing a platform to discuss the implementation of the hazard models into updates of building codes in each country, as well as to discuss model parameters, sensitivity analyses and model results in terms of hazard maps, uniform hazard spectra and hazard deaggregations. The workshops were a combination of lectures and hands-on exercises, and included international participation as well as local scientists and engineers. The workshops served several purposes, including training, coordination of data collection, interactions between local earth scientists and engineers, and brainstorming and knowledge exchange among local and international experts. This report outlines the new earthquake catalogue compilation effort and the PSHA project undertaken in Kyrgyzstan, Tajikistan, and Kazakhstan as part of this initiative. The southern part of this region is tectonically active with moderate to high levels of both shallow crustal seismic activity and occurrence of deeper earthquakes under the Hindu Kush and Pamir mountain ranges. Deeper earthquakes also occur near southwestern Kazakhstan, under the eastern Greater Caucasus and Caspian Sea. Large portions of central and northern Kazakhstan, on the other hand, are in stable continental regions with low levels of seismic activity. This study systematically compiles and improves all available data on local seismicity, active faults, and ground motion attenuation characteristics of the region; and builds a framework to enable a contemporary PSHA to be carried out with the engagement of local scientists. While the project was regional, the seismic hazard assessments are primarily driven by the countries’ own national preferences and understanding of data collection, interpretation, and validation of results.

58 GEOSCIENCES↗

LONG-TERM TECHNETIUM INTERACTIONS WITH REDUCING CEMENTITIOUS MATERIALS

Technetium is among the key risk drivers at the Saltstone Facility. The way that it is immobilized in this cementitious waste form is by converting its highly mobile Tc(VII) form to a much less mobile Tc(IV) form through reduction by the cement's blast furnace slag. This report includes a review of published data and experimental results dealing with Tc leaching from Portland cement waste forms. The objectives for the literature study were to document previous reports of Tc interactions with slag-containing cementitious materials. The objectives for the laboratory study were to measure Tc-saltstone Kd values under reducing conditions. From the literature it was concluded: (1) Spectroscopic evidence showed that when Tc(IV) in a slag-cement was exposed to an oxidizing environment, it will convert to the more mobile Tc(VII) species within a short time frame, 2.5 years. (2) SRS saltstone will reduce Tc(VII) in the absence of NaS or sodium dithionite in a reducing atmosphere. (3) Only trace concentrations of atmospheric oxygen (30 to 60 ppm O{sub 2}; Eh 120 mV) at the high pH levels of cementitious systems is required to maintain Tc as Tc(VII). (4) Experimental conditions must be responsible for wide variability of measured K{sub d} values, such that they are either very low, {approx}1 mL/g, or they are very high {approx}1000 mL/g, suggesting that Tc(VII) or Tc(IV) dominate the systems. Much of this variability appears to be the result of experimental conditions, especially direct controls of oxygen contact with the sample. (5) A field study conducted at SRS in the 1980s indicated that a slag-saltstone immobilized Tc for 2.5 years. Below background concentrations of Tc leached out of the slag-containing saltstone, whereas Tc leached out of the slag-free saltstone at the rate of nitrate loss. One possible explanation for the immobilization of Tc in this study was that the slag-saltstone maintained reducing conditions within the core of the 55-gallon sample, whereas in the small-scale lab experiments, where samples were crushed to <1mm, oxygen diffused through the particles and reoxidize the slag during the contact period. (6) Present site specific reduction capacity value of 820 {micro}eq/g is in the realm of literature values that were either measured or theoretically estimated based on thermodynamic calculations. (7) Almond and Kaplan (2011) measured desorption K{sub d} values from a Vault 4 saltstone core sample. Desorption leaching tests were conducted in a glovebag maintained at 30 to 60 ppm O2. A ground olive-colored saltstone sample, as compared to black monolith sample, was used in this study, indicating the sample had been exposed to O2, which is likely the cause for the lower then anticipated Kd value measured, 139 mL/g. Tc adsorption experiments were conducted under reducing conditions (<0.5 ppm O{sub 2}(g) -585 mV, 2% H{sub 2}, pH 11.66) and obtained K{sub d} values of {approx}1000 mL/g in a saltstone formulated with 45% slag (nominal concentration) and a K{sub d} of 10,000 mL/g when the saltstone contained 95% slag. The K{sub d} values logarithmically increased from 1 day to 56 days, with little sorption generally occurring in the first eight days. Steady state had not been achieved during the initial 56 days. However, the slag-free cement control samples also had K{sub d} values near 1000 mL/g and extremely low redox conditions, due to the 2% H{sub 2} atmosphere. A key concept that this literature review and the experimental results provide is that Tc immobilization is dependent on experimental conditions, specifically, the available oxygen that can oxidize technetium in a portland cement or saltstone-like monolith. The shrinking core model used in the saltstone performance assessment describes the existence of an oxidized outer layer of concrete surrounding a shrinking core of reducing intact saltstone. A sharp boundary between the two zones moves slowly inward, resulting in oxidation of Tc(IV). This work largely reinforced our conceptual model of the shrinking core model, but more importantly provided clarity regarding process kinetics, mechanisms, and input values for future detailed modeling. The shrinking core model in itself is devoid of geochemical mechanisms. This study provided more geochemical detail to this conceptual numerical model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel and core testing plan for a target fueled isotope production reactor.

In recent years there has been an unstable supply of the critical diagnostic medical isotope 99Tc. Several concepts and designs have been proposed to produce 99Mo the parent nuclide of 99Tc, at a commercial scale sufficient to stabilize the world supply. This work lays out a testing and experiment plan for a proposed 2 MW open pool reactor fueled by Low Enriched Uranium (LEU) 99Mo targets. The experiments and tests necessary to support licensing of the reactor design are described and how these experiments and tests will help establish the safe operating envelop for a medical isotope production reactor is discussed. The experiments and tests will facilitate a focused and efficient licensing process in order to bring on line a needed production reactor dedicated to supplying medical isotopes. The Target Fuel Isotope Reactor (TFIR) design calls for an active core region that is approximately 40 cm in diameter and 40 cm in fuel height. It contains up to 150 cylindrical, 1-cm diameter, LEU oxide fuel pins clad with Zircaloy (zirconium alloy), in an annular hexagonal array on a {approx}2.0 cm pitch surrounded, radially, by a graphite or a Be reflector. The reactor is similar to U.S. university reactors in power, hardware, and safety/control systems. Fuel/target pin fabrication is based on existing light water reactor fuel fabrication processes. However, as part of licensing process, experiments must be conducted to confirm analytical predictions of steady-state power and accident conditions. The experiment and test plan will be conducted in phases and will utilize existing facilities at the U.S. Department of Energy's Sandia National Laboratories. The first phase is to validate the predicted reactor core neutronics at delayed critical, zero power and very low power. This will be accomplished by using the Sandia Critical Experiment (CX) platform. A full scale TFIR core will be built in the CX and delayed critical measurements will be taken. For low power experiments, fuel pins can be removed after the experiment and using Sandia's metrology lab, relative power profiles (radially and axially) can be determined. In addition to validating neutronic analyses, confirming heat transfer properties of the target/fuel pins and core will be conducted. Fuel/target pin power limits can be verified with out-of-pile (electrical heating) thermal-hydraulic experiments. This will yield data on the heat flux across the Zircaloy clad and establish safety margin and operating limits. Using Sandia's Annular Core Research Reactor (ACRR) a 4 MW TRIGA type research reactor, target/fuel pins can be driven to desired fission power levels for long durations. Post experiment inspection of the pins can be conducted in the Auxiliary Hot Cell Facility to observe changes in the mechanical properties of the LEU matrix and burn-up effects. Transient tests can also be conducted at the ACRR to observe target/fuel pin performance during accident conditions. Target/fuel pins will be placed in double experiment containment and driven by pulsing the ACRR until target/fuel failure is observed. This will allow for extrapolation of analytical work to confirm safety margins.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗