Search NASA⌕ Search

SEARCH · Search NASA

Results for “hardware failure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Composite Overwrapped Pressure Vessels (COPV): Flight Rationale for the Space Shuttle Program

Each Orbiter Vehicle (Space Shuttle Program) contains up to 24 Kevlar49/Epoxy Composite Overwrapped Pressure Vessels (COPV) for storage of pressurized gases. In the wake of the Columbia accident and the ensuing Return To Flight (RTF) activities, Orbiter engineers reexamined COPV flight certification. The original COPV design calculations were updated to include recently declassified Kevlar COPV test data from Lawrence Livermore National Laboratory (LLNL) and to incorporate changes in how the Space Shuttle was operated as opposed to orinigially envisioned. 2005 estimates for the probability of a catastrophic failure over the life of the program (from STS-1 through STS-107) were one-in-five. To address this unacceptable risk, the Orbiter Project Office (OPO) initiated a comprehensive investigation to understand and mitigate this risk. First, the team considered and eventually deemed unfeasible procuring and replacing all existing flight COPVs. OPO replaced the two vessels with the highest risk with existing flight spare units. Second, OPO instituted operational improvements in ground procedures to signficiantly reduce risk, without adversely affecting Shuttle capability. Third, OPO developed a comprehensive model to quantify the likelihood of occurrance. A fully-instrumented burst test (recording a lower burst pressure than expected) on a flight-certified vessel provided critical understanding of the behavior of Orbiter COPVs. A more accurate model was based on a newly-compiled comprehensive database of Kevlar data from LLNL and elsewhere. Considering hardware changes, operational improvements and reliability model refinements, the mean reliability was determined to be 0.998 for the remainder of the Shuttle Program (from 2007, for STS- 118 thru STS-135). Since limited hardware resources precluded full model validation through multiple tests, additional model confidence was sought through the first-ever Accelerated Stress Rupture Test (ASRT) of a flown flight article. A Bayesian statistical approach was developed to interpret possible test results. Since the lifetime observed in the ASRT exceeded initial estimates by one to two orders of magnitude, the Space Shuttle Program deemed there was significant conservatism in the model and accepted continued operation with existing flight hardware. Given the variability in tank-to-tank original prooftest response, a non-destructive evaluation (NDE) technique utilizing Raman Spectroscopy was developed to directly measure COPV residual stress state. Preliminary results showed that patterns of low fiber elastic strains over the outside vessel surface, together with measured permanent volume growth during proof, could be directly correlated to increased fiber stress ratios on the inside fibers adjacent to the liner, and thus reduced reliability.

Kezirian, Michael T.↗

Kennedy Space Center: Swamp Works

When I began my internship with the Granular Mechanics and Regolith Operations laboratory (GMRO), also known as Swamp Works, I was given the unique opportunity to shadow many teams working on various projects, and decide what projects I wanted to take part in. Before I go into details of my experiences at Swamp Works, I would like to take a moment to explain what I discovered Swamp Works to be. Swamp Works is a family of hardworking, dedicated, and driven people from various backgrounds and skill sets. These people all work to advance technologies and make science fiction science fact through means of rapid prototyping. They support and encourage failure as an option when learning new things, as long as lesson learned from said failure. In fact, their motto states "Fail, Fast, Forward." What this means is, not if but when one fails he or she must do so quickly and spring forward from the failure so that his or her progress is not delayed. With this acceptance, it provided me the confidence to dive into a multitude of projects working in various fields and with a wide range of skill sets. The first project I joined was Badger. My motivation for taking on this project was the opportunity I would have to obtain valuable experience working with 3D modeling and 3D printing technologies. Badger was a digging apparatus to be used in a highly dusty environment in a material known as Regolith. Regolith is a scientific term for the dirt or top soil found on planetary bodies. Regolith contains a large quantity of sediments less than lOppm and as a result poses a challenge of keeping it out of any cracks and crevices. Furthermore, regolith can create high levels of electrostatic energy, which can prove damaging to sensitive electrical hardware. With these characteristics in mind, I decided to take on the task of designing and manufacturing a dust proof cover for the sensitive electrical hardware. When I began this project, I did not have the slightest idea as to how to use 3D modeling software or a means of manufacturing a viable product. As I went along with variants of the design, I became very proficient with a 3D modeling program known as CREO 2.0. Upon completion of my 3D design, I then had the task of manufacturing and having, in my hands, a usable model. To do this I had to work with additive printing technologies also known as 3D printing. Through my experiences working with Badger, I realized that 3D modeling is the focal point in much of engineering. With this in mind, I have embraced this fact and decided to further my experience with this software so that I may become a more valuable asset to any firm later in my career. Mid-way through work with Badger, I picked up another project in which I found much interest. I ha~ the opportunity to work side by side with a materials and composites guru in manufacturing carbon composite coupons (test strips) for performing stress, strain, and sheer analysis on. Being from a surfing, kiteboarding, and other water sport background I have always been interested in board design. With this in mind, it is no wonder why I found interest in such a project. I had the opportunity to refine Mold preparatory, composite layup, and composite curing techniques. Following manufacturing of these composite strips, I then performed various stress tests and logged my results. With these results, future teams could create lighter, stronger, and more cost effective composite structures for use in varieties of applications. After my experiences with materials and composites testing, I have obtained crucial appreciation for detailed documentation and analysis that material sciences involve. However, as interesting as composite materials testing has been, I do not feel this is where my future career lies. Another, more on the side, project I have been involved in is building a 626 cubic foot regolith containment chamber for doing full scale testing of robotic systems. This chamber is built of high strength aluminum scaffold materials, 80/20, and massive panels of Lexan. Once the chamber is completed, it is be filled with 120 tons of regolith and dubbed the largest regolith test chamber in the world. Through my experiences with building "Big Bin" as we called it, I discovered my demand for engaging and hands on activities. Through all of my incredible experiences working with the Swamp Works at Kennedy Space Center; I have obtained crucial knowledge, insights, and experiences that have fuelled, shaped, and will continue to drive me toward my ultimate goal of obtaining not only a degree in Engineering, but obtaining a job that I can call a career. I want to give much thanks to all of those who mentored me along my journey, and to all who made this opportunity a reality.

DeFilippo, Anthony Robert↗

Fast Dynamic Simulation-Based Small Signal Stability Assessment and Control

Power grid planning and operation decisions are made based on simulation of the dynamic behavior of the system. Enabling substantial energy savings while increasing the reliability of the aging North American power grid through improved utilization of existing transmission assets hinges on the adoption of wide-area measurement systems (WAMS) for power system stabilization. However, adoption of WAMS alone will not suffice if the power system is to reach its full entitlement in stability and reliability. It is necessary to enhance predictability with "faster than real-time" dynamic simulations that will enable the dynamic stability margins, proactive real-time control, and improve grid resiliency to fast time-scale phenomena such as cascading network failures. Present-day dynamic simulations are performed only during offline planning studies, considering only worst case conditions such as summer peak, winter peak days, etc. With widespread deployment of renewable generation, controllable loads, energy storage devices and plug-in hybrid electric vehicles expected in the near future and greater integration of cyber infrastructure (communications, computation and control), monitoring and controlling the dynamic performance of the grid in real-time would become increasingly important. The state-of-the-art dynamic simulation tools have limited computational speed and are not suitable for real-time applications, given the large set of contingency conditions to be evaluated. These tools are optimized for best performance of single-processor computers, but the simulation is still several times slower than real-time due to its computational complexity. With recent significant advances in numerical methods and computational hardware, the expectations have been rising towards more efficient and faster techniques to be implemented in power system simulators. This is a natural expectation, given that the core solution algorithms of most commercial simulators were developed decades ago, when High Performance Computing (HPC) resources were not commonly available.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EVA Hazards due to TPS Inspection and Repair

Tile inspection and repair activities have implicit hazards associated with them. When an Extra Vehicular Activities (EVA) crewmember and associated hardware are added into the equation, additional hazards are introduced. Potential hazards to the Extravehicular Mobility Unit (EMU), the Orbiter or the crew member themselves are created. In order to accurately assess the risk of performing a TPS inspection or repair, an accurate evaluation of potential hazards and how adequately these hazards are controlled is essential. The EMU could become damaged due to sharp edges, protrusions, thermal extremes, molten metal or impact with the Orbiter. Tools, tethers and the presence of a crew member in the vicinity of the Orbiter Thermal Protection System (TPS) pose hazards to the Orbiter. Hazards such as additional tile or Reinforced Carbon-Carbon (RCC) damage from a loose tool, safety tethers, crewmember or arm impact are introduced. Additionally, there are hazards to the crew which should be addressed. Crew hazards include laser injury, electrical shock, inability to return to the airlock for EMU failures or Orbiter rapid safing scenarios, as well as the potential inadvertent release of a crew member from the arm/boom. The aforementioned hazards are controlled in various ways. Generally, these controls are addressed operationally versus by design, as the majority of the interfaces are to the Orbiter and the Orbiter design did not originally account for tile repair. The Shuttle Remote Manipulator System (SRMS), for instance, was originally designed to deploy experiments, and therefore has insufficient design controls for retention of the Orbiter Boom Sensor System (OBSS). Although multiple methods to repair the Orbiter TPS exist, the majority of the hazards are applicable no matter which specific repair method is being performed. TPS Inspection performed via EVA also presents some of the same hazards. Therefore, the hazards common to all TPS inspection or repair methods will be addressed.

Stewart, Christine E.↗

Bumper 3 Update for IADC Protection Manual

The Bumper code has been the standard in use by NASA and contractors to perform meteoroid/debris risk assessments since 1990. It has undergone extensive revisions and updates [NASA JSC HITF website; Christiansen et al., 1992, 1997]. NASA Johnson Space Center (JSC) has applied BUMPER to risk assessments for Space Station, Shuttle, Mir, Extravehicular Mobility Units (EMU) space suits, and other spacecraft (e.g., LDEF, Iridium, TDRS, and Hubble Space Telescope). Bumper continues to be updated with changes in the ballistic limit equations describing failure threshold of various spacecraft components, as well as changes in the meteoroid and debris environment models. Significant efforts are expended to validate Bumper and benchmark it to other meteoroid/debris risk assessment codes. Bumper 3 is a refactored version of Bumper II. The structure of the code was extensively modified to improve maintenance, performance and flexibility. The architecture was changed to separate the frequently updated ballistic limit equations from the relatively stable common core functions of the program. These updates allow NASA to produce specific editions of the Bumper 3 that are tailored for specific customer requirements. The core consists of common code necessary to process the Micrometeoroid and Orbital Debris (MMOD) environment models, assess shadowing and calculate MMOD risk. The library of target response subroutines includes a board range of different types of MMOD shield ballistic limit equations as well as equations describing damage to various spacecraft subsystems or hardware (thermal protection materials, windows, radiators, solar arrays, cables, etc.). The core and library of ballistic response subroutines are maintained under configuration control. A change in the core will affect all editions of the code, whereas a change in one or more of the response subroutines will affect all editions of the code that contain the particular response subroutines which are modified. Note that the Bumper II program is no longer maintained or distributed by NASA.

Christiansen, Eric L.↗

Rocky Flats CAAS System Recalibrated, Retested, and Analyzed to Install in the Criticality Experiments Facility at the Nevada Test Site

Neutron detectors and control panels transferred from the Rocky Flats Plant (RFP) were recalibrated and retested for redeployment to the CEF. Testing and calibration were successful with no failure to any equipment. Detector sensitivity was tested at a TRIGA reactor, and the response to thermal neutron flux was satisfactory. MCNP calculated minimum fission yield (~2 x 10 15 fissions) was applied to determine the thermal flux at selected detector positions at the CEF. Thermal flux levels were greater than 6.39 x 10 6 (n/cm 2 -sec), which was about four orders of magnitude greater than the minimum alarm flux. Calculations of detector survivable distances indicate that, to be out of lethal area, a detector needs to be placed greater than 15 ft away from a maximum credible source. MCNP calculated flux/dose results were independently verified by COG. CAAS calibration and the testing confirmed that the RFP CAAS system is performing its functions as expected. New criteria for the CAAS detector placement and 12-rad zone boundaries at the CEF are established. All of the CAAS related documents and hardware have been transferred from LLNL to NSTec for installation at the CEF high bay areas.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparison of Distributive Consensus Algorithms for AnomalyDetection on the Power-Grid

As an increasing number of devices in the power-grid rely on high-precision clocks to measure electrical properties and time stamp data, GPS receivers have become a vulnerability on the power-grid. GPS spoofing attacks, in which a fake signal is transmitted, can cause sensor measurement errors that can misinform protective equipment and grid operators for both the transmission and distribution grid. The technology being developed to secure precision clocks in the transmission grid are not appropriate for the distribution grid. Thus, there is a need to developed anomaly detection algorithms that are suitable for the hardware available on the distribution grid. Traditionally, a distributed detection framework is comprised of spatially distributed nodes which acquire observations about a quantity of interest and sends the data to the fusion center, where a global decision is made. Instead the distribution grid has low-power devices, such as smart inverters and microPMUs, that could be used to perform highly parallelized calculations. Having on node calculations is beneficial since it is more network and computation efficient, as the more calculations can be performed where the data is being captured instead of communicating across a slow network to a centralized fusion center. Instead, we could employ an alternate peer-to-peer type of information exchange on the distribution grid that can still reach a global decision. A decentralized approach to anomaly detection makes efficient use of the computational and network bandwidth that exists, and it also lacks the single point of failure of a centralized approach. Thus, a decentralized local information exchange and/or inference is preferred. Lastly, the unreliability of the distribution grid network connections and potential noise or error in the measurements must be considered. In order to produce an effective detection tool, a Byzantine-fault tolerant and asynchronous algorithm must be developed. Thus, the first phase of our project is to develop a distributed, decentralized, asynchronous, Byzantine-fault tolerant, collaborative autonomy-based anomaly detection algorithm to collectively analyze clusters of data for signs of a malicious attack.

97 MATHEMATICS AND COMPUTING↗

Solar Photovoltaics Resilient Fasteners Levelized Cost of Energy (LCOE) Tool

Solar photovoltaics (PV) module fasteners are one of the most common structural failure points on PV systems, particularly in high winds and coastal areas with ocean spray. Some fastener types have been shown to survive these conditions at higher rates than others. The fastener type, material, quantity, and placement all impact performance. Fasteners that fail less often typically have a higher upfront cost, but this investment can pay off in savings from less frequent torque audits (which reduces O&M costs), reduced system damage, and decreased system downtime. We developed an Excel-based tool to evaluate different module fasteners for a PV system - either a new or retrofit project - and compare differences in upfront and outyear costs to determine the expected life cycle costs and simple payback periods of different fastener options. The tool is site-specific, with inputs including system attributes (such as system size, location, price of power) and fastener attributes (such as design, washer type, nut type, use of locking hardware, materials, installation time, and torque audit requirements). A baseline fastener scenario can be compared to up to four proposed fastener scenarios. In addition to presenting expected life cycle cost implications of the different fastener options, the tool produces results showing the reductions in outyear costs needed to offset any initial cost premiums for more reliable fasteners across four categories: preventative O&M, avoided damage, reduced downtime, and reduced insurance premiums. These numbers can serve as decision aids for users when considering fastener options on new or existing projects. This poster will present the tool, methodology, and scenarios using example sites to highlight the tool capabilities and how it can inform different fastener decisions on different projects. Future work includes incorporating lifetime expected damage costs by embedding damage function curves that the authors are developing from field data.

14 SOLAR ENERGY↗

Advanced Stirling Radioisotope Generator Engineering Unit 2 Anomaly Investigation

The Advanced Stirling Radioisotope Generator (ASRG) Engineering Unit 2 (EU2) is the highest fidelity electrically heated Stirling radioisotope generator built to date. NASA Glenn Research Center completed the assembly of the ASRG EU2 in September 2014 using hardware from the now cancelled ASRG flight development project. The ASRG EU2 integrated the first pair of Sunpower's Advanced Stirling Convertors (ASC−E3 #1 and #2) in an aluminum generator housing with Lockheed Martin's (LM's) Engineering Development Unit (EDU) 4 controller. After just 179 hr of EU2 generator operation, the first power fluctuation occurred on ASC−E3 #1. The first power fluctuation occurred 175 hr later on ASC−E3 #2. Over time, the power fluctuations became more frequent on both convertors and larger in magnitude. Eventually the EU2 was shut down in January 2015. An anomaly investigation was chartered to determine root cause of the power fluctuations and other anomalous observations. A team with members from Glenn, Sunpower, and LM conducted a thorough investigation of the EU2 anomalies. Findings from the EU2 disassembly identified proximate causes of the anomalous observations. Discussion of the team's assessment of the primary possible failure theories, root cause, and conclusions is provided. Recommendations are made for future Stirling generator development to address the findings from the anomaly investigation. Additional findings from the investigation are also discussed.

Stirling convertors↗

Improving Interlaminar Shear Strength

To achieve NASA's mission of space exploration, innovative manufacturing processes are being applied to the fabrication of complex propulsion elements.1 Use of fiber-reinforced, polymeric composite tanks are known to reduce weight while increasing performance of propulsion vehicles. Maximizing the performance of these materials is needed to reduce the hardware weight to result in increased performance in support of NASA's missions. NASA has partnered with the Mississippi State University (MSU) to utilize a unique scalable approach of locally improving the critical properties needed for composite structures. MSU is responsible for the primary development of the concept with material and engineering support provided by NASA. The all-composite tank shown in figure 1 is fabricated using a prepreg system of IM7 carbon fiber/CYCOM 5320-1 epoxy resin. This is a resin system developed for out-of-autoclave applications. This new technology is needed to support the fabrication of large, all composite structures and is currently being evaluated on a joint project with Boeing for the Space Launch System (SLS) program. In initial efforts to form an all composite pressure vessel using this prepreg system, a 60% decrease in properties was observed in scarf joint regions. Inspection of these areas identified interlaminar failure in the adjacent laminated structure as the main failure mechanism. This project seeks to improve the interlaminar shear strength (ILSS) within the prepreg layup by locally modifying the interply region shown in figure 2.2

Jackson, Justin↗

Characterization of Performance Degradation Mechanisms in Low-Cost High Throughput DI-O3 Layer for Passivated Contact Silicon Solar Cells

Characterization and mitigating performance limiting defects in Silicon (Si) PV is one of key areas to be addressed to improve PV hardware costs and energy yield in order to lower the levelized cost of energy (LCOE) of installed PV cost to $0.02/kWh. As Si PV cells efficiencies have surpassed 22% and approaching 23%, the recombination at the metal contacts have become the focus point to be addressed. Passivated contact technologies—having a heterojunction with a band-gap larger than silicon between the metal and silicon—have emerged as a great potential for future highand ultrahigh-efficiency solar cells, as it concurrently reduces recombination and increases carrier selectivity, by incorporating thin films within the contact structure. Passivated contact Si solar cell technologies use a wide variety of tunnel layers—playing a crucial role to passivate metal contacts and tunnel charge carriers—including stoichiometric silicon oxide (SiO 2 ) grown by thermal oxidation and Low-Pressure Chemical Vapor Deposition (LPCVD) technique and silicon oxide (SiO x ) by hot nitric acid. However, thorough investigations on understanding the failure and performance degradation mechanisms associated with tunnel layers are still limited to date. Unlocking those degradation characteristics in crucial tunnel layers could improve the reliability and energy yield of passivated contact Si solar cells. Besides, the technique of growing aforementioned tunneling layers are low throughput, and requires high temperature processes and/or a vacuum environment. In this project, we investigated the performance degradation mechanisms of a low-cost high-throughput ozonated oxide (DI-O 3 ) tunnel layer for the passivated contact Si solar cells.

14 SOLAR ENERGY↗

Meeting the Challenges of Exploration Systems: Health Management Technologies for Aerospace Systems With Emphasis on Propulsion

The constraints of future Exploration Missions will require unique Integrated System Health Management (ISHM) capabilities throughout the mission. An ambitious launch schedule, human-rating requirements, long quiescent periods, limited human access for repair or replacement, and long communication delays all require an ISHM system that can span distinct yet interdependent vehicle subsystems, anticipate failure states, provide autonomous remediation, and support the Exploration Mission from beginning to end. NASA Glenn Research Center has developed and applied health management system technologies to aerospace propulsion systems for almost two decades. Lessons learned from past activities help define the approach to proper ISHM development: sensor selection- identifies sensor sets required for accurate health assessment; data qualification and validation-ensures the integrity of measurement data from sensor to data system; fault detection and isolation-uses measurements in a component/subsystem context to detect faults and identify their point of origin; information fusion and diagnostic decision criteria-aligns data from similar and disparate sources in time and use that data to perform higher-level system diagnosis; and verification and validation-uses data, real or simulated, to provide variable exposure to the diagnostic system for faults that may only manifest themselves in actual implementation, as well as faults that are detectable via hardware testing. This presentation describes a framework for developing health management systems and highlights the health management research activities performed by the Controls and Dynamics Branch at the NASA Glenn Research Center. It illustrates how those activities contribute to the development of solutions for Integrated System Health Management.

Melcher, Kevin J.↗

Instrumentation and Control Needs for Reliable Operation of Lunar Base Surface Nuclear Power Systems

As one of the near-term goals of the President's Vision for Space Exploration, establishment of a multi-person lunar base will require high-endurance power systems which are independent of the sun, and can operate without replenishment for several years. These requirements may be obtained using nuclear power systems specifically designed for use on the lunar surface. While it is envisioned that such a system will generally be supervised by humans, some of the evolutions required maybe semi or fully autonomous. The entire base complement for near-term missions may be less than 10 individuals, most or all of which may not be qualified nuclear plant operators and may be off-base for extended periods thus, the need for power system autonomous operation. Startup, shutdown, and load following operations will require the application of advanced control and health management strategies with an emphasis on robust, supervisory, coordinated control of, for example, the nuclear heat source, energy conversion plant (e.g., Brayton Energy Conversion units), and power management system. Autonomous operation implies that, in addition to being capable of automatic response to disturbance input or load changes, the system is also capable of assessing the status of the integrated plant, determining the risk associated with the possible actions, and making a decision as to the action that optimizes system performance while minimizing risk to the mission. Adapting the control to deviations from design conditions and degradation due to component failures will be essential to ensure base inhabitant safety and mission success. Intelligent decisions will have to be made to choose the right set of sensors to provide the data needed to do condition monitoring and fault detection and isolation because of liftoff weight and space limitations, it will not be possible to have an extensive set of instruments as used for earth-based systems. Advanced instrumentation and control technologies will be needed to enable this critical functionality of autonomous operation. It will be imperative to consider instrumentation and control requirements in parallel to system configuration development so as to identify control-related, as well as integrated system-related, problem areas early to avoid potentially expensive work-arounds . This paper presents an overview of the enabling technologies necessary for the development of reliable, autonomous lunar base nuclear power systems with an emphasis on system architectures and off-the-shelf algorithms rather than hardware. Autonomy needs are presented in the context of a hypothetical lunar base nuclear power system. The scenarios and applications presented are hypothetical in nature, based on information from open-literature sources, and only intended to provoke thought and provide motivation for the use of autonomous, intelligent control and diagnostics.

Turso, James↗

Advanced Stirling Radioisotope Generator EU2 Anomaly Investigation

The Advanced Stirling Radioisotope Generator (ASRG) Engineering Unit 2 (EU2) is the highest fidelity electrically-heated Stirling radioisotope generator built to date. NASA Glenn Research Center (GRC) completed the assembly of the ASRG EU2 in September, 2014 using hardware from the now cancelled ASRG flight development project. The ASRG EU2 integrated the first pair of Sunpower's ASC-E3 Stirling convertors (ASC-E3 #1 and #2) in an aluminum generator housing with Lockheed Martin's Engineering Development Unit (EDU) 4 controller. After just 179 hours of EU2 generator operation, the first power fluctuation occurred on ASC-E3 #1. The first power fluctuation occurred 175 hours later on ASC-E3 #2. Over time, the power fluctuations became more frequent on both convertors and larger in magnitude. Eventually the EU2 was shut down in January, 2015. An anomaly investigation was chartered to determine root cause of the power fluctuations and other anomalous observations. A team with members from GRC, Sunpower, and Lockheed Martin conducted a thorough investigation of the EU2 anomalies. Findings from the EU2 disassembly identified proximate causes of the anomalous observations. Discussion of the team's assessment of the primary possible failure theories, root cause, and conclusions is provided. Recommendations are made for future Stirling generator development to address the findings from the anomaly investigation. Additional findings from the investigation are also discussed.

Lewandowski, Edward J.↗

Distributed Quantum-Enhanced Optimization: A Topographical Preconditioning Approach for High-Dimensional Search

Optimization problems become fundamentally challenging as the number of variables increases. Because the volume of the search space grows exponentially, classical algorithms frequently fail to locate the global minimum of non-convex functions. While quantum optimization offers a potential alternative, mapping continuous problems onto near-term quantum hardware introduces severe scaling limits and barren plateaus. To bridge this gap, we propose the Distributed Quantum-Enhanced Optimization (D-QEO) framework. Instead of forcing the quantum processor to find the exact minimum, we use it simply as a topographical preconditioner. The QPU maps the landscape to locate the most promising basin of attraction, generating high-quality seed points for a classical GPU-accelerated solver to refine. To make this approach viable for utility-scale problems, we exploit the mathematical structure of separable functions. This allows us to cut a 50-qubit (i.e., $2^{50}$) global search space into independent and manageable sub-spaces using 5-qubit subcircuits. By executing these fragments concurrently with CUDA-Q, we completely bypass the overhead of cross-register entanglement and classical tensor knitting for separable functions. Benchmarks on the 10-dimensional Rastrigin and Ackley functions show that D-QEO prevents the exponential failure rates observed in purely classical algorithms. Furthermore, this quantum warm-start significantly reduces the number of classical BFGS iterations required to converge, providing a highly practical blueprint for utilizing near-term quantum resources in complex global search.

Soos, Dominik [Old Dominion U.]↗

Development of dispensing hardware for safe fueling of heavy duty vehicles

The development of safe dispensing equipment for the fueling of heavy duty (HD) vehicles is critical to the expansion of this newly and quickly expanding market. This paper discusses the development of a HD dispenser and nozzles assembly (nozzle, hose, breakaway) for these new, larger vehicles where flow rates are more than double compared to light duty (LD) vehicles. This equipment must operate at nominal pressures of 700 bar, -40o C gas temperature, and average flow rate of 5-10 kg/min at a high throughput commercial hydrogen fueling station without leaking hydrogen. The project surveyed HD vehicle manufacturers, station developers, and component suppliers to determine the basic specifications of the dispensing equipment and nozzle assembly. The team also examined existing codes and standards to determine necessary changes to accommodate HD components. From this information, the team developed a set of specifications which will be used to design the dispensing equipment. In order to meet these goals, the team performed computational fluid dynamic, pressure modelling, and temperature analysis in order to determine the necessary parameters to meet existing safety standards modified for HD fueling. The team also considered user, operational, and maintenance requirements, such as freeze lock which has been an issue which prevents the removal of the nozzle from LD vehicles. The team also performed a failure mode and effects analysis (FMEA) to identify the possible failures in the design. The dispenser and nozzle assembly will be tested separately, and then installed on an innovative, HD fueling station which will use a HD vehicle simulator to test the entire system.

08 HYDROGEN↗

International Linear Collider Accelerator Physics R&D

ILC work at Illinois has concentrated primarily on technical issues relating to the design of the accelerator. Because many of the problems to be resolved require a working knowledge of classical mechanics and electrodynamics, most of our research projects lend themselves well to the participation of undergraduate research assistants. The undergraduates in the group are scientists, not technicians, and find solutions to problems that, for example, have stumped PhD-level staff elsewhere. The ILC Reference Design Report calls for 6.7 km circumference damping rings (which prepare the beams for focusing) using “conventional” stripline kickers driven by fast HV pulsers. Our primary goal was to determine the suitability of the 16 MeV electron beam in the AØ region at Fermilab for precision kicker studies.We found that the low beam energy and lack of redundancy in the beam position monitor system complicated the analysis of our data. In spite of these issues we concluded that the precision we could obtain was adequate to measure the performance and stability of a production module of an ILC kicker, namely 0.5%. We concluded that the kicker was stable to an accuracy of ~2.0% and that we could measure this precision to an accuracy of ~0.5%. As a result, a low energy beam like that at AØ could be used as a rapid-turnaround facility for testing ILC production kicker modules. The ILC timing precision for arrival of bunches at the collision point is required to be 0.1 picosecond or better. We studied the bunch-to-bunch timing accuracy of a “phase detector” installed in AØ in order to determine its suitability as an ILC bunch timing device. A phase detector is an RF structure excited by the passage of a bunch. Its signal is fed through a 1240 MHz high-Q resonant circuit and then down-mixed with the AØ 1300 MHz accelerator RF. We used a kind of autocorrelation technique to compare the phase detector signal with a reference signal obtained from the phase detector’s response to an event at the beginning of the run. We determined that the device installed in our beam, which was instrumented with an 8-bit 500 MHz ADC, could measure the beam timing to an accuracy of 0.4 picoseconds. Simulations of the device showed that an increase in ADC clock rate to 2 GHz would improve measurement precision by the required factor of four. As a result, we felt that a device of this sort, assuming matters concerning dynamic range and long-term stability can be addressed successfully, would work at the ILC. Cost effective operation of the ILC will demand highly reliable, fault tolerant and adaptive solutions for both hardware and software. The large numbers of subsystems and large multipliers associated with the modules in those subsystems will cause even a strong level of unit reliability to become an unacceptable level of system availability. An evaluation effort is underway to evaluate standards associated with high availability, and to guide ILC development with standard practices and well-supported commercial solutions. One area of evaluation involves the Advanced Telecom Computing Architecture (ATCA) hardware and software. We worked with an ATCA crate, processor monitors, and a small amount of ATCA circuit boards in order to develop a backplane “spy” board that would let us watch the ATCA backplane communications and pursue development of an inexpensive processor monitor that could be used as a physics-driven component of the crate-level controls system. We made good progress, and felt that we had determined a productive direction to extend this work. We felt that we had learned enough to begin designing a workable processor monitor chip if there were to be sufficient interest in ATCA shown by the ILC community. Fault recognition is a challenging issue in the crafting a high reliability controls system. With tens of thousands of independent processors running hundreds of thousands of critical processes, how can the system identify that a problem has arisen and determine the appropriate steps to take to correct, or compensate, for the failure? One possible solution might come through the use of the OpenClovis supervisory system, which runs on Linux processors and allows a select set of processors to monitor the behavior of individual processes and processors in a large, distributed controls network. We found that OpenClovis exhibited an irritating amount of sensitivity to the exact version of the Linux kernel running on the processors, and that it was poorly equipped to help us sort through problems that arose through conflicts so deep in the operating systems of the processors. But once this issue was addressed, we found that it performed as expected, recognizing crashes and process (and processor) failures.

43 PARTICLE ACCELERATORS↗

Ensuring Safe Exploration: Ares Launch Vehicle Integrated Vehicle Ground Vibration Testing

Ground vibration testing has been an integral tool for developing new launch vehicles throughout the space age. Several launch vehicles have been lost due to problems that would have been detected by early vibration testing, including Ariane 5, Delta III, and Falcon 1. NASA will leverage experience and testing hardware developed during the Saturn and Shuttle programs to perform ground vibration testing (GVT) on the Ares I crew launch vehicle and Ares V cargo launch vehicle stacks. NASA performed dynamic vehicle testing (DVT) for Saturn and mated vehicle ground vibration testing (MVGVT) for Shuttle at the Dynamic Test Stand (Test Stand 4550) at Marshall Space Flight Center (MSFC) in Huntsville, Alabama, and is now modifying that facility to support Ares I integrated vehicle ground vibration testing (IVGVT) beginning in 2012. The Ares IVGVT schedule shows most of its work being completed between 2010 and 2014. Integrated 2nd Stage Ares IVGVT will begin in 2012 and IVGVT of the entire Ares launch stack will begin in 2013. The IVGVT data is needed for the human-rated Orion launch vehicle's Design Certification Review (DCR) in early 2015. During the Apollo program, GVT detected several serious design concerns, which NASA was able to address before Saturn V flew, eliminating costly failures and potential losses of mission or crew. During the late 1970s, Test Stand 4550 was modified to support the four-body structure of the Space Shuttle. Vibration testing confirmed that the vehicle's mode shapes and frequencies were better than analytical models suggested, however, the testing also identified challenges with the rate gyro assemblies, which could have created flight instability and possibly resulted in loss of the vehicle. Today, NASA has begun modifying Test Stand 4550 to accommodate Ares I, including removing platforms needed for Shuttle testing and upgrading the dynamic test facilities to characterize the mode shapes and resonant frequencies of the vehicle. The IVGVT team expects to collect important information about the new launch vehicles, greatly increasing astronaut safety as NASA prepares to explore the Moon and beyond.

Tuma, M. L.↗