Search NASA⌕ Search

SEARCH · Search NASA

Results for “replacement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Sample sizes for confidence limits for reliability.

We recently performed an evaluation of the implications of a reduced stockpile of nuclear weapons for surveillance to support estimates of reliability. We found that one technique developed at Sandia National Laboratories (SNL) under-estimates the required sample size for systems-level testing. For a large population the discrepancy is not important, but for a small population it is important. We found that another technique used by SNL provides the correct required sample size. For systems-level testing of nuclear weapons, samples are selected without replacement, and the hypergeometric probability distribution applies. Both of the SNL techniques focus on samples without defects from sampling without replacement. We generalized the second SNL technique to cases with defects in the sample. We created a computer program in Mathematica to automate the calculation of confidence for reliability. We also evaluated sampling with replacement where the binomial probability distribution applies.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Final Report: Assessment of Combined Heat and Power Premium Power Applications in California

This report analyzes the current economic and environmental performance of combined heat and power (CHP) systems in power interruption intolerant commercial facilities. Through a series of three case studies, key trade-offs are analyzed with regard to the provision of black-out ridethrough capability with the CHP systems and the resutling ability to avoid the need for at least some diesel backup generator capacity located at the case study sites. Each of the selected sites currently have a CHP or combined heating, cooling, and power (CCHP) system in addition to diesel backup generators. In all cases the CHP/CCHP system have a small fraction of the electrical capacity of the diesel generators. Although none of the selected sites currently have the ability to run the CHP systems as emergency backup power, all could be retrofitted to provide this blackout ride-through capability, and new CHP systems can be installed with this capability. The following three sites/systems were used for this analysis: (1) Sierra Nevada Brewery - Using 1MW of installed Molten Carbonate Fuel Cells operating on a combination of digestor gas (from the beer brewing process) and natural gas, this facility can produce electricty and heat for the brewery and attached bottling plant. The major thermal load on-site is to keep the brewing tanks at appropriate temperatures. (2) NetApp Data Center - Using 1.125 MW of Hess Microgen natural gas fired reciprocating engine-generators, with exhaust gas and jacket water heat recovery attached to over 300 tons of of adsorption chillers, this combined cooling and power system provides electricity and cooling to a data center with a 1,200 kW peak electrical load. (3) Kaiser Permanente Hayward Hospital - With 180kW of Tecogen natural gas fired reciprocating engine-generators this CHP system generates steam for space heating, and hot water for a city hospital. For all sites, similar assumptions are made about the economic and technological constraints of the power generation system. Using the Distributed Energy Resource Customer Adoption Model (DER-CAM) developed at the Lawrence Berkeley National Laboratory, we model three representative scenarios and find the optimal operation scheduling, yearly energy cost, and energy technology investments for each scenario below: Scenario 1 - Diesel generators and CHP/CCHP equipment as installed in the current facility. Scenario 1 represents a baseline forced investment in currently installed energy equipment. Scenario 2 - Existing CHP equipment installed with blackout ride-through capability to replace approximately the same capacity of diesel generators. In Scenario 2 the cost of the replaced diesel units is saved, however additional capital cost for the controls and switchgear for blackout ride-through capability is necessary. Scenario 3 - Fully optimized site analysis, allowing DER-CAM to specify the number of diesel and CHP/CCHP units (with blackout ride-through capability) that should be installed ignoring any constraints on backup generation. Scenario 3 allows DER-CAM to optimize scheduling and number of generation units from the currently available technologies at a particular site. The results of this analysis, using real data to model the optimal schedulding of hypothetical and actual CHP systems for a brewery, data center, and hospital, lead to some interesting conclusions. First, facilities with high heating loads will typically prove to be the most appropriate for CHP installation from a purely economic standpoint. Second, absorption/adsorption cooling systems may only be economically feasible if the technology for these chillers can increase above current best system efficiency. At a coefficient of performance (COP) of 0.8, for instance, an adsorption chiller paired with a natural gas generator with waste heat recovery at a facility with large cooling loads, like a data center, will cost no less on a yearly basis than purchasing electricity and natural gas directly from a utility. Third, at marginal additional cost, if the reliability of CHP systems proves to be at least as high as diesel generators (which we expect to be the case), the CHP system could replace the diesel generator at little or no additional cost. This is true if the thermal to electric (relative) load of those facilities was already high enough to economically justify a CHP system. Last, in terms of greenhouse gas emissions, the modeled CHP and CCHP systems provide some degree of decreased emissions relative to systems with less CHP installed. The emission reduction can be up to 10% in the optimized case (Scenario 3) in the application with the highest relative thermal load, in this case the hospital. Although these results should be qualified because they are only based on the three case studies, the general results and lessons learned are expected to be applicable across a broad range of potential and existing CCHP systems.

25 ENERGY STORAGE↗

Demonstration Assessment of Light Emitting Diode (LED) Residential Downlights and Undercabinet Lights in the Lane County Tour of Homes, Eugene, Oregon

In August 2008 the Pacific Northwest National Laboratory (PNNL) conducted a light emitting diode (LED) residential lighting demonstration project for the U.S. Department of Energy (DOE), Office of Building Technologies, as part of DOE’s Solid State Lighting (SSL) Technology Demonstration Gateway Program. Two lighting technologies, an LED replacement for downlight lamps (bulbs) and an LED undercabinet lighting fixture, were tested in the demonstration which was conducted in two homes built for the 2008 Tour of Homes in Eugene, Oregon. The homes were built by the Lane County Home Builders Association (HBA), and Future B Homes. The Energy Trust of Oregon (ETO) also participated in the demonstration project. The LED downlight product, the LR6, made by Cree LED Lighting Solutions acts as a screw-in replacement for incandescent and halogen bulbs in recessed can downlights. The second product tested is Phillips/Color Kinetics’ eW® Profile Powercore undercabinet fixture designed to mount under kitchen cabinets to illuminate the countertop and backsplash surfaces. Quantitative and qualitative measurements of light performance and electrical power usage were taken at each site before and after initially installed halogen and incandescent lamps were replaced with the LED products. Energy savings and simple paybacks were also calculated and builders who toured the homes were surveyed for their responses to the LED products. The LED downlight product drew 12 Watts of power, cutting energy use by 82% compared to the 65W incandescent lamp and by 84% compared to the 75W halogen lamp. The LED undercabinet fixture drew 10 watts, cutting energy use by 83% to 90% compared to the halogen product, which was tested at two power settings: a low power 60W setting and a high power 105W setting. The LED downlight consistently provided more light than the halogen and incandescent lamps in horizontal measurements at counter height and floor level. It also outperformed in vertical illuminance measurements taken on the walls, indicating better lateral dispersion of the light. The undercabinet fixture’s light output was midway between the low and high power halogen undercabinet fixture light outputs (35.8 foot candle versus 13.4 fc and 53.4 fc) but it produced a more uniform light (max/min ratio of 7.0 versus 10.8). The color correlated temperature (CCT, the blue or yellowness) of the LED light correlated well with the halogen and incandescent lights (2675 K vs 2700 K). The color rendering of the LED downlight also correlated well at 92 CRI compared to 100 CRI for the halogen and incandescent lamps. The LED undercabinet fixture had measures of 2880 K CCT and 71 CRI compared to the 2700 K and 100 CRI scores for the halogen undercabinet fixture. Builders who toured the homes were surveyed; they gave the LED downlight high marks for brightness, said the undercabinet improved shadows and glare and said both products improved overall visibility, home appearance, and home value. Paybacks on the LED downlight ranged from 7.6 years (assuming electricity cost of 11 c/kWh) to 13.5 years (at 5C/kWh). Paybacks on the LED undercabinet fixture in a new home ranged from 4.4 years (11c/kWh electricity) to 7.6 years (5c/kWh) based on product costs of $95 per LED downlight and $140 per LED undercabinet fixture at 3 hrs per day of usage for the downlight and 2 hrs per day for the undercabinet lighting.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Feasibility analyses for HEU to LEU fuel conversion of the LAUE Langivin Institute (ILL) High Flux Reactor (RHF).

The High Flux Reactor (RHF) of the Laue Langevin Institute (ILL) based in Grenoble, France is a research reactor designed primarily for neutron beam experiments for fundamental science. It delivers one of the most intense neutron fluxes worldwide, with an unperturbed thermal neutron flux of 1.5 x 10{sup 15} n/cm{sup 2}/s in its reflector. The reactor has been conceived to operate at a nuclear power of 57 MW but currently operates at 52 MW. The reactor currently uses a Highly Enriched Uranium (HEU) fuel. In the framework of its non-proliferation policies, the international community presently aims to minimize the amount of nuclear material available that could be used for nuclear weapons. In this geopolitical context, most worldwide research and test reactors have already started a program of conversion to the use of Low Enriched Uranium (LEU) fuel. A new type of LEU fuel based on a mixture of uranium and molybdenum (UMo) is expected to allow the conversion of compact high performance reactors like the RHF. This report presents the results of reactor design, performance and steady state safety analyses for conversion of the RHF from the use of HEU fuel to the use of UMo LEU fuel. The objective of this work was to show that is feasible, under a set of manufacturing assumptions, to design a new RHF fuel element that could safely replace the HEU element currently used. The new proposed design has been developed to maximize performance, minimize changes and preserve strong safety margins. Neutronics and thermal-hydraulics models of the RHF have been developed and qualified by benchmark against experiments and/or against other codes and models. The models developed were then used to evaluate the RHF performance if LEU UMo were to replace the current HEU fuel 'meat' without any geometric change to the fuel plates. Results of these direct replacement analyses have shown a significant degradation of the RHF performance, in terms of both neutron flux and cycle length. Consequently, ANL and ILL have collaborated to investigate alternative designs. A promising candidate design has been selected and studied, increasing the total amount of fuel without changing the external plate dimensions by relocating the burnable poison. In this way, changes required in the fuel element are reasonably small. With this new design, neutronics analyses have shown that performance could be maintained at a high level: 2 day decrease of cycle length (to 47.5 days at 58.3 MW) and 1-2% decrease of brightness in the cold and hot sources in comparison to the current typical operation. In addition, studies have shown that the thermal-hydraulic and shutdown margins for the proposed LEU design would satisfy technical specifications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Technology Advancements to Lower Costs of Electrochromic Window Glazing

An Electrochromic (EC) Window is a solar control device that can electronically regulate the flow of sunlight and heat. In the case of the SageGlass{reg_sign} EC window, this property derives from a proprietary all-ceramic, intrinsically durable thin-film stack applied to an inner surface of a glass double-pane window. As solar irradiation and temperatures change, the window can be set to an appropriate level of tint to optimize the comfort and productivity of the occupants as well as to minimize building energy usage as a result of HVAC and lighting optimization. The primary goal of this project is to replace certain batch processes for EC thin film deposition resulting in a complete in-line vacuum process that will reduce future capital and labor coats, while increasing throughput and yields. This will require key technology developments to replace the offline processes. This project has enabled development of the next generation of electrochromic devices suitable for large-scale production. Specifically, the requirements to produce large area devices cost effectively require processes amenable to mass production, using a variety of different substrate materials, having minimal handling and capable of being run at high yield. The present SageGlass{reg_sign} production process consists of two vacuum steps separated by an atmospheric process. This means that the glass goes through several additional handling steps, including venting and pumping down to go from vacuum to atmosphere and back, which can only serve to introduce additional defects associated with such processes. The aim of this project therefore was to develop a process which would eliminate the need for the atmospheric process. The overall project was divided into several logical tasks which would result in a process ready to be implemented in the present SAGE facility. Tasks 2 and 3 were devoted to development and the optimization of a new thin film material process. These tasks are more complicated than would be expected, as it has been determined in the past that there are a number of interactions between the new material and the layers beneath, which have an important effect on the behavior of the device. The effects of these interactions needed to be understood in order for this task to be successful. Tasks 4 and 5 were devoted to production of devices using the novel technology developed in the previous tasks. In addition, characterization tests were required to ensure the devices would perform adequately as replacements for the existing technology. Each of these tasks has been achieved successfully. In task 2, a series of potential materials were surveyed, and ranked in order of desirability. Prototype device structures were produced and characterized in order to do this. This satisfied the requirements for Task 2. From the results of this relatively extensive survey, the number of candidate materials was reduced to one or two. Small devices were made in order to test the functionality of such samples, and a series of optimization experiments were carried out with encouraging results. Devices were fabricated, and some room temperature cycling carried out showing that there are no fundamental problems with this technology. This series of achievements satisfied the requirements for Tasks 3 and 4. The results obtained from Task 3 naturally led to scale-up of the process, so a large cathode was obtained and installed in a spare slot in the production coater, and a series of large devices fabricated. In particular, devices with dimensions of 60-inch x 34-inch were produced, using processes which are fully compatible with mass production. Testing followed, satisfying the requirements for Task 5. As can be seen from this discussion, all the requirements of the project have therefore been successfully achieved. The devices produced using the newly developed technology showed excellent optical properties, often exceeding the performance of the existing technology, equivalent durability results, and promise a significantly simplified manufacturing approach, thereby suggesting higher yields as a result of less handling, and therefore lower costs.

14 SOLAR ENERGY↗

Safety-assured, real-time neural active fault management for resilient microgrids integration

Federated-learning-based active fault management (AFM) is devised to achieve real-time safety assurance for microgrids and the main grid during faults. AFM was originally formulated as a distributed optimization problem. Here, federated learning is used to train each microgrid's network with training data achieved from distributed optimization. The main contribution of this work is to replace the optimization-based AFM control algorithm with a learning-based AFM control algorithm. The replacement transfers computation from online to offline. With this replacement, the control algorithm can meet real-time requirements for a system with dozens of microgrids. By contrast, distributed-optimization-based fault management can output reference values fast enough for a system with several microgrids. More microgrids, however, lead to more computation time with optimization-based method. Distributed-optimization-based fault management would fail real-time requirements for a system with dozens of microgrids. Controller hardware-in-the-loop real-time simulations demonstrate that learning-based AFM can output reference values within 10 ms irrespective of the number of microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comparison of CNN-Based Image Classification Approaches for Implementation of Low-Cost Multispectral Arcing Detection

Camera-based sensing has benefited in recent years from developments in machine learning data processing methods, as well as improved data collection options such as Unmanned Aerial Vehicles (UAV) mounted sensors. However, cost considerations, both for the initial purchase of sensors as well as updates, maintenance, or potential replacement if damaged, can limit adoption of more expensive sensing options for some applications. To evaluate more affordable options with less expensive, more available, and more easily replaceable hardware, we examine the use of machine learning-based image classification with custom datasets, utilizing deep learning based-image classification and the use of ensemble models for sensor fusion. Utilizing the same models for each camera to reduce technical overhead, we showed that for a very representative training dataset, camera-based detection can be successful for detection of electrical arcing. We also use multiple validation datasets, based on conditions expected to be of varying difficulty, to evaluate custom data. These results show that ensemble models of different data sources can mitigate risks from gaps in training data, though the system will be less redundant for those cases unless other precautions are taken. We found that with good quality custom datasets, data fusion models can be utilized without specialization in design to the specific cameras utilized, allowing for less specialized, more accessible equipment to be utilized as multispectral camera components. This approach can provide an alternative to expensive sensing equipment for applications in which lower-cost or more easily replaceable sensing equipment is desirable.

convolutional neural networks↗

A Sustainable and Environmentally Friendly Concrete for Structural Applications

The purpose of this study is to utilize waste products—precipitated calcium carbonate (PCC) and upcycled recycled concrete aggregate (upcycled RCA or UCA)—in civil works projects. To do so, tests must be performed to determine the engineering properties of the materials in which PCC and UCA are sequestered. PCC is a fine to coarse grain waste product generated during the production of sugar from sugar beets. UCA is produced from demolished and returned concrete by the extraction of primarily calcium and alkalinity. The study also includes the use of both PCC and UCA in the same concrete mix design. The test results on PCC alone show that the optimum content to achieve a minimum 28 MPa (4000 psi) compressive strength is 25% and 30%. The corresponding compressive strength of mixes in which conventional aggregate was replaced by UCA is about 48 MPa (7000 psi) to 55 MPa (8000 psi) at the same water: cement ratio (0.44) by weight. The compressive strength of concrete with 25% to 30% cement replaced by PCC and varying aggregates replaced with UCA ranges from 19.3 to 40 MPa (2800 to 5800 psi). Other tests on PCC and UCA include tensile strength of 2 to 3 MPa (293 to 423 psi) and flexural strength of 1.3 to 1.9 MPa (183 to 279 psi). Analytical techniques such as X-ray diffraction (XRD), energy-dispersive X-ray spectrometry (EDX), and scanning electron microscopy (SEM) were used to identify the constituent elements and chemical compounds present in PCC, including calcium carbonate and silica. Based on the test results, the composition of PCC by weight indicates 45.9% calcium, 39.4% oxygen, and 9.2% carbon. Based on the results of this study, we can expect to reduce carbon emissions in the production of cement and aggregates, as well as utilize waste products in the civil engineering field.

42 ENGINEERING↗

Quality control of silicon pixel wafers for the CMS Phase-1 pixel upgrade

The CMS detector at the CERN Large Hadron Collider features as its innermost component a silicon pixel detector. The original pixel detector was completely replaced during the 2016-2017 winter technical stop. One of the goals of this Phase-1 Upgrade of the pixel detector was to replace the sensors in the original CMS forward pixel detector with new, unirradiated sensors. The new CMS forward pixel detector must survive an integrated luminosity of 300 fb$^{-1}$ before being replaced again prior to the High-Luminosity LHC era. Just as in the original construction, the Phase-1 forward pixel sensors were made of n$^{+}$-in-n Diffusion Oxygenated Float Zone silicon. This note documents the quality spot-checking of the new sensors, comparing our results with those provided by the vendor. In general there was good agreement between the results.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Operations analysis (study 2.1): Payload designs for space servicing

Potential modes of operating in space in the space shuttle era are documented. The October 1973 NASA Mission Model provides a definition of various NASA and non-DOD automated payload configurations when employed in an expendable mode. The model also specifies a launch schedule for initial deployment of payloads as well as for subsequent replacements at periodic cycles. This model and its associated payload definitions serve as a foundation for the data presented in this report. The reference model has been revised to reflect automated space servicing of payloads as an operational concept instead of the existing expendable approach. The indication is that the bulk of a payload's subsystems and mission equipment require no support over the lifetime of the program. However, failure of a single unit could result in loss of the mission objectives. When space servicing is employed, the approach is to replace only that unit causing the anomaly. This concept affords an opportunity to standardize space replacable units, as well as to reduce the expense of logistics support, by allowing multiple servicing on any single upper stage/shuttle flight.

Wolfe, R. R.↗

Repairing a communications satellite on orbit

A review of past failures indicates that module exchange can satisfy most repair requirements of communications satellites. Emphasis is placed on the design of a serviceable communications satellites with 20 modules, on the development of an on-orbit servicer designed to remove failed modules from a body-stabilized spacecraft and to replace them with good modules, and on servicing operations. Benefits of servicing or repair include increased satellite availability, increased reliability, decreased life cycle costs, replacement of worn-out items, installation of updated equipment, and correction of design failures. The use of servicing instead of replacement could result in cost savings in excess of 40 percent. Significant savings are possible when the lifetime of a program is long relative to the satellite lifetime.

Gordon, G. D.↗

A microprocessor application to a strapdown laser gyro navigator

The replacement of analog circuit control loops for laser gyros (path length control, cross axis temperature compensation loops, dither servo and current regulators) with digital filters residing in microcomputers is addressed. In addition to the control loops, a discussion is given on applying the microprocessor hardware to compensation for coning and skulling motion where simple algorithms are processed at high speeds to compensate component output data (digital pulses) for linear and angular vibration motions. Highlights are given on the methodology and system approaches used in replacing differential equations describing the analog system in terms of the mechanized difference equations of the microprocessor. Standard one for one frequency domain techniques are employed in replacing analog transfer functions by their transform counterparts. Direct digital design techniques are also discussed along with their associated benefits. Time and memory loading analyses are also summarized, as well as signal and microprocessor architecture. Trade offs in algorithm, mechanization, time/memory loading, accuracy, and microprocessor architecture are also given.

Giardina, C.↗

Water-deuterium oxide exchange in polymers used in spacecraft applications

The replacement of water (H2O) by deuterium oxide (D2O) and the exchange between atmospheric water and adsorbed or absorbed D2O were investigated for the polymeric materials Kapton and Mylar using thermal gravimetric analysis and infrared spectroscopy. Replacement of H2O by D2O is easily accomplished. However, exposure of D2O samples to the ambient atmosphere or gases containing H2O results in rapid proton and deuteron exchange between H2O vapor and adsorbed D2O. Replacement of H2O by D2O would not be a practical solution to alleviate spectral interferences that would result from water outgassing in spacecraft orbital environments. Maintaining the materials of interest in a dehydrated state is a more reasonable approach.

Carre, D. J.↗

Space Telescope - Design for orbital maintenance

Maintenance and repair of the Shuttle launched Space Telescope (ST) are examined, noting that except for the basic structure, mirrors, cables, and several noncritical items, the entire ST is replaceable or reparable on-orbit. EVA tasks have been designed to avoid contamination, and to provide a reduction in Orbital Replacement Units, a minimal number of doors and openings, and minimized structural weight associated with free-volume. All removable components have been provided with tool-compatible fittings and releases, and standardization of parts has been compromised with considerations of interface with crew handling. Replacement and repair equipment will be carried as an added parcel on Shuttle flights and are not part of the standard Shuttle components. The necessity of designing for crew-aid at ST workstations is suggested to provide sound data for the design of other space-based equipment.

Fisher, H. T.↗

Staked Bearing Removal Tool

Tool with assembled components expedites bearing replacement in aircraft, ground vehicles, and other applications. New tool cuts lip on one side to facilitate bearing replacement. After bearing retaining lip is cut away, bearing pressed out. Tool makes it possible to replace bearings without disassembling structure.

Berson, L. A.↗

Missing observations in multiyear rotation sampling designs

Because Multiyear estimation of at-harvest stratum crop proportions is more efficient than single year estimation, the behavior of multiyear estimators in the presence of missing acquisitions was studied. Only the (worst) case when a segment proportion cannot be estimated for the entire year is considered. The effect of these missing segments on the variance of the at-harvest stratum crop proportion estimator is considered when missing segments are not replaced, and when missing segments are replaced by segments not sampled in previous years. The principle recommendations are to replace missing segments according to some specified strategy, and to use a sequential procedure for selecting a sampling design; i.e., choose an optimal two year design and then, based on the observed two year design after segment losses have been taken into account, choose the best possible three year design having the observed two year parent design.

Gbur, E. E.↗

Evaluation of Production Version of the NASA Improved Inorganic-Organic Separator

The technology of an inorganic-organic (I/O) separator, which demonstrated improved flexibility, reduced cost, production feasibility and improved cycle life was developed. Substrates to replace asbestos and waterbased separator coatings to replace the solvent based coatings were investigated. An improved fuel cell grade asbestos sheet was developed and a large scale production capability for the solvent based I/O separator was demonstrated. A cellulose based substrate and a nonwoven polypropylene fiber substrate were evaluated as replacements for the asbestos. Both the cellulose and polypropylene substrates were coated with solvent based and water based coatings to produce a modified I/O separator. The solvent based coatings were modified to produce aqueous separator coatings with acceptable separator properties. A single ply fuel cell grade asbestos with a binder (BTA) was produced. It has shown to be an acceptable substrate for the solvent and water based separator coatings, an acceptable absorber for alkaline cells, and an acceptable matrix for alkaline fuel cells. The original solvent based separator (K19W1), using asbestos as a substrate, was prepared.

Sheibley, D.↗

Impact reactivity of materials at very high oxygen pressure

The requirements for impact testing of materials in an oxygen atmosphere at pressures from 82.7 MPa (12,000 psi) to 172 MPa (25,000 psi) were evaluated. The impact tester system was evaluated for potential pressure increases from 69 MPa (10,000 psi) to 82.7 MPa (12,000 psi). The low pressure oxygen and nitrogen systems, the impact tower, the impact test cell, and the high pressure oxygen system were evaluated individually. Although the structural integrity of the impact test cell and the compressor were sufficient for operation at 82.7 MPa (12,000 psi), studies revealed possible material incompatibility at that pressure and above. It was recommended that if a component should be replaced for 82.7 MPa (12,000 psi) operation the replacement should meet the final objectives of 172 MPa (25,000 psi). Recommended changes in the system include; use of Monel 400 for pressures above 82.7 MPa (12,000 psi), use of bellows to replace the seal in the impact tester, use of a sapphire window attached to a fiber optic for event sensing, and use of a three diaphragm compressor.

Connor, H. W.↗