SEARCH · Search NASA
Results for “Annulus”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Numerical Simulation of Gas Migration in a Cement Slurry in a Wellbore Annulus
APS March Meeting 2022, Virtual, March 13-18, 2022
Development and Deployment of Hybrid ML Models for Critical Heat Flux Prediction in Annulus Geometries
Explore the source record for details and available documents.
Discovery of the First Leaking Double-Shell Tank - Hanford Tank 241-AY-102
Full text - Long Abstract. A routine video inspection of the annulus region of double-shell tank 241-A Y-102 in August of 2012 indicated the presence material in the annulus space between the primary and secondary liners. A comparison was made to previous inspections performed in 2006 and 2007. which indicated that a change had occurred. The material was observed at two locations on the floor of the annulus and one location at the top of the annulus region where the primary and secondary top knuckles meet (RPP-ASMT-53793). Subsequent inspections were performed. leading to additional material observed on the floor of the annulus space in a region that had not previously been inspected (WRPS-PER-2012-1363). The annulus Continuous Air Monitor (CAM) was still operational and was not indicating elevated radiation levels in the annulus region. When the camera from the inspections was recovered. it also did not indicate increased radiation above minimum contamination levels (WRPS-PER-2012-1363). A formal leak assessment team was established August 10, 2012 to review tank 241-AY-102 construction and operating histories and to determine whether the material observed in the annulus had resulted from a leak in the primary tank. The team consisted of individuals from Engineering. Base Operations and Environmental Protection. As this was a first-of-its-kind task. a method for obtaining a sample of the material in the annulus was needed. The consistency of the material was unknown.and the location of a majority of the material was not conducive to using the sampling devices that were currently available at Hanford. A subcontractor was tasked with the development fabrication.and testing of a sampling device that would be able to obtain multiple samples from the material on the annulus floor. as well as the material originating from a refractory air-slot near the floor of the annulus space. This sampler would need to be able to collect and dispense the material it collected into a sample jar retrieval device for transportation of the material to the 222-S laboratory on the Hanford site for analysis. The subcontractor agency fabricated a remote underground sampler by modifying off-the-shelf robotics and parts. Limited testing of the sampler was conducted using a mock-up of the tank annulus and one simulated material type -a salt block. The mock-up testing indicated that the sampler would be able to maneuver within the confined space and that the device worked with full functionality. A total of six weeks had passed from initiation to implementation of the new sampler in the 241-AY-102 tank annulus. Initial sample material was obtained from the annulus floor using the Off-Riser Sampler System that has been used at Hanford tor years to obtain material from the primary tanks. This could be used at the location near Riser 83 since the material was collected directly from the annulus floor and not from a location on the wall or behind a pipe, as was needed from the two locations near Riser 90. After obtaining a small sample of the material on the annulus floor.this sampler sustained terminal damage due to conduit pipes it had to transverse in order to collect and recover material from this location. Several issues were also encountered during deployment of the new sampler into the annulus near Riser 90. These included: Difficulty fitting the sampler down the 12-inch riser into the annulus due to a small tolerance in the size of the sampler; Failure of sampler components and functions during deployment including the camera. pneumatics.and bearing seals; Delays in the field due to supporting equipment issues including cables. cameras. and scaffolding; and, Low recovery of sample material obtained for analysis. The complications that occurred during deployment and use of the new sampler during the sampling event ultimately resulted in lower recovery of material from these locations in the annulus than was obtained using the Off-Riser Sampler System and limited the analyses that could be performed for determining the origin of the material. Following completion of the sample analyses and the assessment of its construction history and use. there was a consensus among the leak assessment team members that two of the three materials sampled from the annulus floor region were the result of waste leaking from a breach in the primary tank. The probable leak cause was identified as corrosion at high temperatures in a tank whose containment margins had been reduced due to construction difficulties (RPP-ASMT-53793). A formal Lessons Learned was created concerning designing equipment tor unique purposes under time constraints. This document was published in OPEXShare on May 20. 2013. It highlighted some of the issues that arose with the subcontractor sampler development and provided recommendations to prevent a recurrence should this task need to be performed again in the future. The document can be found at http://msa.hanford.gov/opex/lesson.cfm/2013/5/20/3481/AY-102-Annulus-Sampler-Designing-Equipment-for-Unique-Purposes-under-Time-Constraints/.
Double-Shell Tank Visual Inspection Changes Resulting from the Tank 241-AY-102 Primary Tank Leak
As part of the Double-Shell Tank (DST) Integrity Program, remote visual inspections are utilized to perform qualitative in-service inspections of the DSTs in order to provide a general overview of the condition of the tanks. During routine visual inspections of tank 241-AY-102 (AY-102) in August 2012, anomalies were identified on the annulus floor which resulted in further evaluations. In October 2012, Washington River Protection Solutions, LLC determined that the primary tank of AY-102 was leaking. Following identification of the tank AY-102 probable leak cause, evaluations considered the adequacy of the existing annulus inspection frequency with respect to the circumstances of the tank AY-102 1eak and the advancing age of the DST structures. The evaluations concluded that the interval between annulus inspections should be shortened for all DSTs, and each annulus inspection should cover > 95 percent of annulus floor area, and the portion of the primary tank (i.e., dome, sidewall, lower knuckle, and insulating refractory) that is visible from the annulus inspection risers. In March 2013, enhanced visual inspections were performed for the six oldest tanks: 241-AY-101, 241-AZ-101,241-AZ-102, 241-SY-101, 241-SY-102, and 241-SY-103, and no evidence of leakage from the primary tank were observed. Prior to October 2012, the approach for conducting visual examinations of DSTs was to perform a video examination of each tank's interior and annulus regions approximately every five years (not to exceed seven years between inspections). Also, the annulus inspection only covered about 42 percent of the annulus floor.
Method and apparatus for a substantially coaxial injector element
A system to provide a two piece robust fluid injector. According to various embodiments, the fluid injector is a fuel injector for a combustion engine. The injector includes two coaxially formed annuluses. One annulus is formed in a face plate and the second annulus or hole is defined by a tube extending through the face plate. The tube extends through the face plate in a portion of a through bore which also is used to define the second annulus. The second annulus is formed using a throughbore through which the tube extends. This allows the second annulus to always be formed inherently and precisely substantially coaxial with the first annulus. Moreover, the second annulus can be formed with a much greater tolerance than if other independent components needed to be added.
Staged fuel and air injection in combustion systems of gas turbines
A gas turbine including a working fluid flowpath extending aftward from a forward injector in a combustor. The combustor may include an inner radial wall, an outer radial wall, and, therebetween, a flow annulus, and a third radial wall formed about the outer radial wall that forms an outer flow annulus. A staged injector may intersect the flow annulus so to attain an injection point within the working fluid flowpath by which aftward and forward annulus sections are defined. Air directing structure may include an aftward intake section corresponding to the aftward annulus section and a forward intake section corresponding to the forward annulus section. The air directing structure may include a switchback coolant flowpath to direct air from the compressor discharge cavity to the staged injector. The switchback coolant flowpath may include an upstream section through the flow annulus, and a downstream section through the outer flow annulus.
Staged fuel and air injection in combustion systems of gas turbines
A gas turbine that includes a working fluid flowpath extending aftward from a forward injector in a combustor. The combustor may include an inner radial wall, an outer radial wall, and, therebetween, a flow annulus. A staged injector may intersect the flow annulus so to attain an injection point within the working fluid flowpath by which aftward and forward annulus sections are defined. Air directing structure may include an aftward intake section that corresponds to the aftward annulus section and a forward intake section that corresponds to the forward annulus section. The air directing structure may be configured to: direct air entering through the aftward intake section through the aftward annulus section in a forward direction to the staged injector; and direct air entering through the forward intake section through the forward annulus section in a forward direction to the forward injector.
Staged fuel and air injection in combustion systems of gas turbines
A gas turbine that includes a working fluid flowpath extending aftward from a forward injector in a combustor. The combustor may include an inner radial wall, an outer radial wall, and, therebetween, a flow annulus. A staged injector may intersect the flow annulus so to attain an injection point within the working fluid flowpath by which aftward and forward annulus sections are defined. Air directing structure may include an aftward intake section that corresponds to the aftward annulus section and a forward intake section that corresponds to the forward annulus section. The air directing structure may be configured to: direct air entering through the aftward intake section through the aftward annulus section in a forward direction to the staged injector; and direct air entering through the forward intake section through the forward annulus section in an aftward direction to the staged injector.
Long-Term Heating to Improve Receiver Performance
The buildup of hydrogen in the heat transfer fluid (HTF) that circulates through components of parabolic trough power plants decreases receiver thermal efficiency, and ultimately, it decreases plant performance and electricity output. The generation and occurrence of hydrogen in the HTF provides the driving force for hydrogen to permeate from the HTF through the absorber tube wall and into the receiver annulus. Getters adsorb hydrogen from the annulus volume until they saturate and are no longer able to maintain low hydrogen pressure. The increase in hydrogen pressure within the annulus significantly degrades thermal performance of the receiver and decreases overall power-plant efficiency. NREL and Acciona Energy North America (Acciona) are developing a method to control the levels of dissolved hydrogen in the circulating HTF. The basic approach is to remove hydrogen from the expansion tanks of the HTF subsystem at a rate that maintains hydrogen in the circulating HTF to a target level. Full-plant steady-state models developed by the National Renewable Energy Laboratory (NREL) predict that if hydrogen is removed from the HTF within the expansion tanks, the HTF that circulates through the collector field remains essentially free of hydrogen until the HTF returns to the power block in the hot headers. One of the key findings of our modeling is the prediction that hydrogen will reverse-permeate out of the receiver annulus if dissolved hydrogen in the HTF is kept sufficiently low. To test this prediction, we performed extended heating of an in-service receiver that initially had high levels of hydrogen in its annulus. The heating was performed using NREL's receiver test stand. Results of our testing showed that receiver heat loss steadily decreased with daily heating, resulting in a corresponding improvement in receiver thermal efficiency.
Validation of RELAP-7 for Forced Convective and Natural Circulation Reactor Flows
New reactor designs such as small modular reactors and newly proposed passive safety systems rely on natural circulation two-phase flow cooling of the reactor core under accident conditions. Without a pump to drive the flow, the circulation rate is a strong function of void fraction. Under these conditions where the flow rate, pressure drop, and heat transfer are all closely coupled through the mixture density, the accurate prediction of void fraction is pivotal. Furthermore, while these passive systems boast a more reliable cooling option, the sensitivity of the system to two-phase flow instabilities is more likely than in forced convective cooling and can result in dangerous density wave or flow excursion conditions. Improvement of one-dimensional system codes and further development of three-dimensional code capability are all important efforts in addressing these issues. The proposed work is a critical step towards providing confidence through validation of the capability of thermal-hydraulic tools to meet the emerging challenges in reactor simulation. Historically, system analysis codes develop a stiffness over time due to fine-tuning of adjustable code parameters that result in a reluctance or inability to adopt improved models. Therefore, a rigorous effort should be invested in preparation for RELAP-7 to identify required modeling improvements of constitutive relations and validation of the code applicability to the wide range of possible reactor flow conditions. Part of this validation involves the uncertainty quantification which is a critical step in the Code Scaling, Applicability, and Uncertainty (CSAU) methodology and Best-Estimate Plus Uncertainty (BEPU) licensing method. BEPU allows recovery of safety margins and potentially optimizing plant performance, resulting in economic benefit for the reactor operators. Beginning with the collection of past experimental data covering prototypic LWR conditions, this document reviews three critical datasets available for the validation of system codes. The experimental methods, procedures, facilities, instrumentation, and supplementary information are consolidated to aid the validation efforts of this work and future projects. These three datasets (824 conditions) are chosen due to their wide acceptance and demonstrated application for code validation. Two experimental datasets from the Nuclear Power Engineering Corporation (NUPEC) span prototypic conditions of Boiling Water Reactors (BWR) and Pressurized Water Reactors (PWR). These datasets are labeled as the BFBT (BWR Full-size Fine-mesh Bundle Test) and the PSBT (PWR Subchannel and Bundle Test) datasets respectively. The third dataset is taken in an internally heated annulus that is scaled based on a BWR subassembly and includes two-phase flows important to post-blowdown analysis. Together, the datasets consider the full range of pressure and mass flux expected in LWR forced convective flows from steady-state to long term cooling conditions. Recognizing the deficiency of available data under low-pressure, low-flow, a new natural circulation dataset consisting of 107 conditions is obtained. With system pressures ranging between 145 and 950 kPa, natural circulation is driven by a heat flux up to 275 kW/m2 in a 3 m long heated region of the annulus test section which is followed by a 2 m long unheated region before entering a condenser. Stable natural circulation flow rates in this facility were measured to be between 182 and 590 kg/m2-s. Pressure and temperature are measured at ten locations in the facility. In addition, measurements of void fraction, interfacial area concentration, and gas velocity are obtained at five axial locations in the annulus test section. The RELAP5-3D code demonstrates good accuracy for void fraction predictions in BFBT and PSBT benchmarks, but shows relatively large discrepancy in the annulus experiments at lower pressures. In two-phase natural circulation, large oscillations are observed in many system parameters during the simulation of 19 experiment cases which were conducted at low pressures, and the model shows good predictive performance with the remaining 88 experiment cases. However, some discrepancies in void fraction and temperature predictions are found which may require improved constitutive modeling under these low-pressure, low-flow condition. The quantified uncertainty in void fraction predictions in three forced convection benchmarks due to uncertainties in boundary conditions and geometries are relatively small, except for a few cases in the annulus experiment. The output uncertainty of the natural circulation model is quantified by considering the measurement error in boundary conditions, and it is shown that the output uncertainty ranges are relatively small for the range of conditions considered. Through this work, a clear pathway is provided for validation of RELAP7 once the code is available.
An evaluation of the use of new Doppler methods for detecting longitudinal function abnormalities in a pacing-induced heart failure model
BACKGROUND: Doppler tissue echocardiography and color M-mode Doppler flow propagation velocity have proven useful in evaluating cross-sections of patients with left ventricular (LV) dysfunction, but experience with serial changes is limited. Purpose and methods: We tested their use by evaluating the temporal changes of LV function in a pacing-induced congestive heart failure model. Rapid ventricular pacing was initiated and maintained in 20 dogs for 4 weeks. Echocardiography was performed at baseline and weekly during brief pacing cessation. RESULTS: With rapid pacing, LV volume significantly increased and ejection fraction (57%-28%), stroke volume (37-18 mL), and mitral annulus systolic velocity (16.1-6.6 cm/s) by Doppler tissue echocardiography significantly decreased, with ejection fraction and mitral annulus systolic velocity closely correlated (r = 0.706, P <.0001). In contrast to the mitral inflow velocities, mitral annulus early diastolic velocity decreased steadily (12.3-7.3 cm/s) resulting in a dramatic decrease in mitral annulus early/late (1.22-0.57) diastolic velocity with no tendency toward pseudonormalization. The color M-mode Doppler flow propagation velocity also showed significant steady decrease (57-24 cm/s) throughout the pacing period. Multiple regression analysis chose mitral annulus systolic velocity (r = 0.895, P <.0001) and propagation velocity (r = 0.782, P <.0001) for the most important factor predicting LV systolic and diastolic function, respectively. CONCLUSIONS: Doppler tissue echocardiography and color M-mode Doppler flow could evaluate the serial deterioration in LV dysfunction throughout the pacing period. These were more useful in quantifying progressive LV dysfunction than conventional ehocardiographic techniques, and were probably relatively independent of preload. These techniques could be suitable for longitudinal evaluation in addition to the cross-sectional study.
ADMINISTRATIVE AND ENGINEERING CONTROLS FOR THE OPERATION OF VENTILATION SYSTEMS FOR UNDERGROUND RADIOACTIVE WASTE STORAGE TANKS
Liquid radioactive wastes from the Savannah River Site are stored in large underground carbon steel tanks. The majority of the waste is confined in double shell tanks, which have a primary shell, where the waste is stored, and a secondary shell, which creates an annular region between the two shells, that provides secondary containment and leak detection capabilities should leakage from the primary shell occur. Each of the DST is equipped with a purge ventilation system for the interior of the primary shell and annulus ventilation system for the secondary containment. Administrative flammability controls require continuous ventilation to remove hydrogen gas and other vapors from the waste tanks while preventing the release of radionuclides to the atmosphere. Should a leak from the primary to the annulus occur, the annulus ventilation would also serve this purpose. The functionality of the annulus ventilation is necessary to preserve the structural integrity of the primary shell and the secondary. An administrative corrosion control program is in place to ensure integrity of the tank. Given the critical functions of the purge and annulus ventilation systems, engineering controls are also necessary to ensure that the systems remain robust. The system consists of components that are constructed of metal (e.g., steel, stainless steel, aluminum, copper, etc.) and/or polymeric (polypropylene, polyethylene, silicone, polyurethane, etc.) materials. The performance of these materials in anticipated service environments (e.g., normal waste storage, waste removal, etc.) was evaluated. The most aggressive vapor space environment occurs during chemical cleaning of the residual heels by utilizing oxalic acid. The presence of NO{sub x} and mercury in the vapors generated from the process could potentially accelerate the degradation of aluminum, carbon steel, and copper. Once identified, the most susceptible materials were either replaced and/or plans for discontinuing operations are executed.
Feedwater temperature control methods and systems
A system for controlling the power level of a natural circulation boiling water nuclear reactor (NCBWR) may include a heating subsystem for heating feedwater flowing into an annulus of the NCBWR to increase the temperature of recirculation water flowing through the core above a predetermined recirculation water operating temperature. Additionally the system may include a temperature sensor operable to sense the temperature of the feedwater flowing into the annulus. The temperature sensor is communicatively connected to a temperature controller operable to command the heating subsystem to increase the temperature of the feedwater flowing into the annulus to a requested temperature above a predetermined operating temperature of the feedwater flowing into the annulus. By increasing the temperature of the feedwater flowing into the annulus, the temperature of the recirculation water is increased above the predetermined recirculation water operating temperature causing a reduction in the power level generated by the NCBWR core.
Double-Shell Tank Primary Bottom Inspection Development - 19067
Double-Shell Tank (DST) integrity at Hanford is maintained with a variety of activities such as ultrasonic and visual inspections, chemistry controls, corrosion monitoring and structural analyses methods [1]. A pressing need for the Double-Shell Tank Integrity Program is the ability to inspect the bottom of the tanks. Though the DSTs' annulus spaces (the space between the internal and external tank walls) have been inspected visually since 1992 and with Ultrasonic Testing (UT) since 1996, WRPS has been unable to conduct inspections of the tank bottoms due to limitations of available technology, omitting about 40 percent of the tank surface below the maximum fill level from routine inspection. Visual inspections of the tank annulus have been conducted up to five times in some DSTs and the annulus space for all of the DSTs has been inspected twice with UT. The annulus region includes the walls of the primary tank and secondary liner along with accessible portions of the secondary liner bottom. Due to the lack of under-tank inspection technology, degradation of the primary tank bottom in Tank AY-102 was undetected until the tank leaked into its annulus space, confirmed in 2012 [2]. Since that time, WRPS has been working with the nondestructive examination community and the Pacific Northwest National Laboratory to evaluate potential technologies to conduct these challenging remote inspections. Recent work has included the development, testing, and deployment of several remote visual inspection technologies to observe the condition of the primary tank bottom of the DSTs by leveraging air distribution slots in the refractory pad on which it rests. Robotic solutions to conduct this inspection were developed with a detailed understanding of the physical configuration and operational logistics. Understanding and subsequent communication of these details to vendors within the robotics and nondestructive examination community was a critical component to the successful production of these new tools. In total, two remote visual inspection tools were produced by two vendors. The first tool was designed to leverage existing ultrasonic testing magnetic wall crawler technology in use within the double-shell tank annuli at Hanford. This resulted in a cost savings, immediate familiarization with the equipment, and a more streamlined shop to field experience. The second tool was developed from the ground up, and represents a more tailored and purpose-built solution to the problem. While costlier and more complex, it is also more versatile and capable of future growth or adaptation. Initial design of both tools began in early FY17 with fabrication and testing completed in early FY18. The tools were designed to be deployed alongside existing inspection operations and expand coverage. Development of visual inspection tools to evaluate the primary tank bottom region of the double-shell tanks was planned as the first stage of inspection. Continued development of volumetric sensors and incorporation of these inspection tools into Hanford's ongoing Double-Shell Tank Integrity Program are the next steps, continuously seeking to expand understanding of asset integrity and remaining useful life. (authors)
Double-Shell Tank Primary Bottom Visual Inspection Results - 20025
A pressing need for the Double-Shell Tank Integrity Program at Hanford is of the ability to inspect the bottom of the tanks. Though the DSTs' annulus spaces (the space between the internal and external tank walls) have been inspected visually since 1992 and with Ultrasonic Testing (UT) since 1996, inspections of the tank bottoms have been able to be conducted due to limitations of available technology, omitting about 40 percent of the tank surface below the maximum fill level from routine inspection. Visual inspections of the tank annulus have been conducted up to five times in some DSTs and portions of the annulus space for all of the DSTs has been inspected twice with UT. This region includes the walls of the primary tank and secondary liner along with accessible portions of the secondary liner bottom. Due to this lack of technology, the degradation of the primary tank bottom in Tank AY-102 was undetected until the tank leaked into its annulus space, confirmed in 2012. Since that time, WRPS has been working with the nondestructive examination community and the Pacific Northwest National Laboratory, to evaluate potential technologies to conduct these challenging remote inspections. Recent work has included the development, testing, and deployment of several remote visual inspection technologies to observe the condition of the primary tank bottom of the DSTs by leveraging air distribution slots in the refractory pad on which it rests. Robotic solutions to conduct this inspection were developed with a detailed understanding of the physical configuration and operational logistics. Understanding and subsequent communication of these details to vendors within the robotics and nondestructive examination community was a critical component to the successful production of these new tools. Throughout the FY16-FY18 years, vendors from nondestructive examination community were solicited for ideas to meet the tank bottom inspection challenge. Two tank bottom visual inspection solutions were then pursued to meet that challenge. Both tools were successfully deployed at Tank AP-107, and provided valuable visuals, never before obtained from the under tank environment of a double-shell tank. While there are minor opportunities for improvement identified with each system, general outcomes were overwhelmingly positive. Both systems were successfully able to navigate the refractory air slot pattern from the outer edge to the tank center and record video footage. The micro-crawler provided high quality and very stable footage through the air slot pattern, but took longer to deploy into the slots and traverse through them than the alternative system. The push-pull tethered camera was able to navigate all seven of its target air slots in a matter of a few hours, which included deployment, movement between slot entrances, and complete removal of the system from the annulus environment. Through these air slots, new information was gained about the tank bottom and refractory pad condition of tank AP-107, AP-106, AP-108, and AN-102. While some debris was noted in the air slots, including sand, chipped refractory, and construction materials, the refractory was found to be structurally stable and adequately supporting the primary tank bottom through the full diameter of the tank. Primary tank bottom steel exterior was found to be in good condition, free of ongoing or aggressive corrosion conditions. Looking toward the future, robotic access to and visual inspection of refractory air slots and the primary tank bottom steel has now proven viable. Incorporating periodic air slot inspections as a regular practice within the Double-Shell Tank Integrity Program is the next step, allowing trending of any changes in condition. As ultrasonic testing infrastructure was leveraged to complete the initial system deployments described in this report, it makes sense to adopt that same strategy for ongoing periodic examinations and deploy these primary tank bottom inspection tools alongside ultrasonic testing operations. Development of visual inspection tools to evaluate the primary tank bottom region of the double-shell tanks was planned as the first stage of inspection. Continued development of volumetric sensors and incorporation of these inspection tools into Hanford's ongoing Double-Shell Tank Integrity Program are the next steps, seeking to continuously expand understanding of asset integrity and remaining useful life. (authors)
Loss of relativistic electrons when magnetic surfaces are broken
Relativistic runaway electrons in ITER could be confined in a broad annulus of stochastic magnetic field lines bounded by an annulus of magnetic surfaces. The outer confining annulus can be broken by either an evolution of the magnetic field or by the drift of the plasma into the walls. Both possibilities are studied, and in both cases, the relativistic electrons in the stochastic region are lost to the walls in a short pulse of length $\tau$ ℓ along a narrow tube, which carries a flux f ψ st , where f ~ 10 -3 and ψ st is the toroidal flux in stochastic annulus. Both $\tau$ ℓ and f are determined by two parameters: the time it takes for a toroidal transit of a relativistic electron $\tau$ t = 2πR/c, which is approximately 0.1 μs in ITER, and the evolution time $\tau$ ev , which is of order 100 ms in most conditions of interest for ITER. The concept of turnstiles in Hamiltonian mechanics is then used to obtain the relation between $\tau$ ℓ and f and $\tau$ t and $\tau$ ev . The turnstile concept is also important in the theory of divertors for stellarators.
Rotating superfluids in anharmonic traps: From vortex lattices to giant vortices
We study a superfluid in a rotating anharmonic trap and explicate a rigorous proof of a transition from a vortex lattice to a giant vortex state as the rotation is increased beyond a limiting speed determined by the interaction strength. The transition is characterized by the disappearance of the vortices from the annulus where the bulk of the superfluid is concentrated due to centrifugal forces while a macroscopic phase circulation remains. The analysis is carried out within two-dimensional Gross-Pitaevskii theory at large coupling constant and reveals significant differences between ''soft'' anharmonic traps (like a quartic plus quadratic trapping potential) and traps with a fixed boundary: in the latter case the transition takes place in a parameter regime where the size of vortices is very small relative to the width of the annulus, whereas in soft traps the vortex lattice persists until the width of the annulus becomes comparable to the vortex cores. Moreover, the density profile in the annulus where the bulk is concentrated is, in the soft case, approximately Gaussian with long tails and not of the Thomas-Fermi type like in a trap with a fixed boundary.