Search NASASearch

SEARCH · Search NASA

Results for “Apollo Crew Module”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Apollo Operations Handbook Lunar Module (LM 11 and Subsequent) Vol. 2 Operational Procedures

The Apollo Operations Handbook (AOH) is the primary means of documenting LM descriptions and procedures. The AOH is published in two separately bound volumes. This information is useful in support of program management, engineering, test, flight simulation, and real time flight support efforts. This volume contains crew operational procedures: normal, backup, abort, malfunction, and emergency. These procedures define the sequence of actions necessary for safe and efficient subsystem operation.

Source record

Maintenance and supply options

The object of the Maintenance and Supply Option was to develop a high level operational philosophy related to maintenance and supply operations and incorporate these concepts into the Lunar Base Study. Specific products to be generated during this task were three trade studies and a conceptual design of the Logistic Supply Module. The crew size study was performed to evaluate crew sizes from the baseline size of four to a crew size of eight and determine the preferred crew size. The second trade study was to determine the impact of extending surface stay times and recommend a preferred duration of stay time as a function of crew, consumables, and equipment support capabilities. The third trade study was an evaluation of packaging and storage methods to determine the preferred logistics approach to support the lunar base. A modified scenario was developed and served as the basis of the individual trade studies. Assumptions and guidelines were also developed from experience with Apollo programs, Space Shuttle operations, and Space Station studies. With this information, the trade studies were performed and a conceptual design for the Logistic Supply Module was developed.

Source record

Metal with a memory provides useful tool for Skylab astronauts

Extendible booms used to convey film cassettes weighing 56.7 kg (125 lb) between the Airlock Module and the Apollo Telescope Mount are described along with the dispensing mechanism. Problems encountered with the mechanism during the test program are discussed. These problems were mainly associated with operation in cold temperature, lubrication, and the motor/gearhead assembly. Another set of problems which arose during crew training in the MSFC water tank is also discussed.

Smith, G. A.

Crew Exploration Vehicle Ascent Abort Trajectory Analysis and Optimization

The Orion Crew Exploration Vehicle is the first crewed capsule design to be developed by NASA since Project Apollo. Unlike Apollo, however, the CEV is being designed for service in both Lunar and International Space Station missions. Ascent aborts pose some issues that were not present for Apollo, due to its launch azimuth, nor Space Shuttle, due to its cross range capability. The requirement that a North Atlantic splashdown following an abort be avoidable, in conjunction with the requirement for overlapping abort modes to maximize crew survivability, drives the thrust level of the service module main engine. This paper summarizes 3DOF analysis conducted by NASA to aid in the determination of the appropriate propulsion system for the service module, and the appropriate propellant loading for ISS missions such that crew survivability is maximized.

Falck, Robert D.

Apollo command module land impact tests

Full-scale-model and actual spacecraft were impact tested to define the emergency land-landing capability of the Apollo command module. Structural accelerations and strains were recorded on analog instrumentation, and a summary to these data is included. The landing kinematics were obtained from high-speed photography. Photographs of the structural damage caused during the tests are included. Even though extensive damage can be expected, the crew will receive nothing more than minor injuries during the majority of the probable landing conditions.

Mccullough, J. E.

Description of the docking module ECS for the Apollo-Soyuz Test Project.

The role of the Docking Module ECS (Environmental Control System) to be used on the Apollo-Soyuz Test mission is to provide a means for crewmen to transfer safely between the Apollo and Soyuz vehicles in a shirtsleeve environment. This paper describes the Docking Module ECS and includes the philosophy and rationale used in evaluating and selecting the capabilities that are required to satisfy the Docking Module's airlock function: (1) adjusting the pressure and composition of the atmosphere to effect crew transfer and (2) providing a shirtsleeve environment during transfer operations. An analytical evaluation is given of the environmental parameters (including CO2 level, humidity, and temperature) during a normal transfer timeline.

Guy, W. W.

Ares Launch Vehicles Overview: Space Access Society

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-X, scheduled for spring 2009. The Exploration Launch Projects team conducted the Ares I System Requirements Review (SRR) at the end of 2006. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the safety, operability, reliability, and affordability goals outlined by the Constellation Program. The Ares V is in the early design stage, focusing its activities on requirements validation and ways to develop this heavy-lift system so that synergistic hardware commonality between it and the Ares I can reduce the operational footprint and foster sustained exploration across the decades ahead.

Cook, Steve

Human Space Exploration: The Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed, to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. Why the Moon? Many questions about the Moon's potential resources and how its history is linked to that of Earth were spurred by the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment for extended expeditions. The Moon also will serve as a training ground before embarking on the longer, more difficult trip to Mars. NASA plans to build a lunar outpost at one of the lunar poles, learn to live off the land, and reduce dePendence on Earth for longer missions. America needs to extend its ability to survive in hostile environments close to our home planet before astronauts will reach Mars, a planet very much like Earth. NASA has worked with scientists to define lunar exploration goals and is addressing the opportunities for a range of scientific study on Mars. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-l, scheduled for spring 2009. The U.S. Vision for Space Exploration lays out a roadmap for a long-term venture of discovery. This endeavor will inspire and attract the best and brightest students to power this nation successfully to the Moon, Mars, and beyond. If one equates the value proposition for space with simple dollars and cents, the potential of the new space economy is tremendous, from orbital space delivery services for the International Space Station to mining and solar energy collection on the Moon and asteroids. The Vision for Space Exploration is fundamentally about bringing the resources of the solar system within the economic sphere of humaind. Given the immense size of our solar system, the amount of available material and energy within it present an enormous economic opportunity.

Sexton, Jeffrey D.

Lunar escape systems feasibility study

Results are presented for a study conducted to determine the feasibility of simple lunar escape system concepts, to develop a spectrum of operational data, and to identify techniques and configurations suitable for the emergency escape mission. The study demonstrated the feasibility of the lunar emergency escape-to-orbit system (LESS) designed to provide a means for the two-man crew of a lunar module (LM) or extended-stay LM (ELM) to escape from the lunar surface in the event that the LM/ELM ascent stage becomes unsafe or is otherwise unable to take off. The LESS is to carry the two astronauts to a safe lunar orbit, where the Apollo command and service modules (CSM) are to be used for rendezvous and rescue, all within the lifetime of the backpack life support system (about 4 hr). It is concluded that simple manual control modes are sufficient, that simple boost profiles are acceptable, and that one man can deploy and set up the LESS. Initial guidance data can be calculated for the LESS by Mission Control and transmitted via the LM/ELM uplink.

Matzenauer, J. O.

Performance of the CSM RCS during the AS 506/CSM 107/LM 5 mission (Apollo 11)

The Apollo 11 service module and the command module (CM) reaction control system performed satisfactorily throughout the mission. Two anomalies which occurred were an inadvertent isolation valve closure during command and service module/Saturn S4B/lunar module separation and a failure of a CM thruster to respond to automatic commands. The isolation valves were later opened by the crew and remained open during the remainder of the mission. The cause of the closure was determined to be the shock loads generated during separation. The CM engine malfunction was caused by a faulty terminal board connector. All system parameters were normal during the mission, and all mission requirements were satisfied.

Lingle, W. N.

Apollo 11 Facts Project [Pre-Launch Activities and Launch]

The crewmembers of Apollo 11, Commander Neil A. Armstrong, Command Module Pilot Michael Collins, and Lunar Module Pilot Edwin E. Aldrin, Jr., are seen during various stages of preparation for the launch of Apollo 11, including suitup, breakfast, and boarding the spacecraft. They are also seen during mission training, including preparation for extravehicular activity on the surface of the Moon. The launch of Apollo 11 is shown. The ground support crew is also seen as they wait for the spacecraft to approach the Moon.

Source record

Blunt Body Aerodynamics for Hypersonic Low Density Flows

Numerical simulations are performed for the Apollo capsule from the hypersonic rarefied to the continuum regimes. The focus is on flow conditions similar to those experienced by the Apollo 6 Command Module during the high altitude portion of its reentry. The present focus is to highlight some of the current activities that serve as a precursor for computational tool assessments that will be used to support the development of aerodynamic data bases for future capsule flight environments, particularly those for the Crew Exploration Vehicle (CEV). Results for aerodynamic forces and moments are presented that demonstrate their sensitivity to rarefaction; that is, free molecular to continuum conditions. Also, aerodynamic data are presented that shows their sensitivity to a range of reentry velocities, encompassing conditions that include reentry from low Earth orbit, lunar return, and Mars return velocities (7.7 to 15 km/s). The rarefied results obtained with direct simulation Monte Carlo (DSMC) codes are anchored in the continuum regime with data from Navier-Stokes simulations.

Moss, James N.

Apollo-Soyuz pamphlet no. 6: Cosmic ray dosage

The radiation hazard inside spacecraft is discussed with emphasis on its effects on the crew, biological specimens, and spacecraft instruments. The problem of light flash sensations in the eyes of astronauts is addressed and experiment MA-106 is described. In this experiment, light flashes seen by blindfolded astronauts were counted and high energy cosmic ray intensity in the command module cabin were measured. The damage caused by cosmic ray hits on small living organisms was investigated in the Biostack 3 experiment (MA-107). Individual cosmic rays were tracked through layers of bacterial spores, small seeds, and eggs interleaved with layers of AgCl-crystal wafers, special plastic, and special photographic film that registered each cosmic ray particle passed.

Page, L. W.

Sextant Navigation on the International Space Station: A Human Space Exploration Demo

Astronauts on board the International Space Station (ISS) tested a hand-held sextant to demonstrate potential use on future human exploration missions such as Orion and Gateway. The investigation, designed to aid in the development of emergency navigation methods for future crewed spacecraft, took place from June-December 2018. A sextant provides manual capability to perform star/planet-limb sightings and estimate vehicle state during loss of communication or other contingencies. Its simplicity and independence from primary systems make it useful as an emergency survival backup or confirming measurement source. The concept of using a sextant has heritage in Gemini, Apollo, and Skylab. This paper discusses the instrument selection, flight certification, crew training, product development, experiment execution, and data analysis. Preflight training consisted of a hands-on session with the instrument and practice in a Cupola mock-up with star field projector dome. The experiment itself consisted of several sessions with sextant sightings in the ISS Cupola module by two crew members. Sightings were taken on star pairs, star/moon limb, and moon diameter. The sessions were designed to demonstrate star identification and acquisition, sighting stability, accuracy, and lunar sights. Results are presented which demonstrate sightings within the accuracy goal of 60 arcseconds, even in the presence of window refraction effects and minimal crew training. The crew members provided valuable feedback on sighting products and microgravity stability techniques.

Exploration

Apollo-Soyuz pamphlet no. 1: The flight

The goals of the Apollo-Soyuz Test Project are described in this first in a series of nine pamphlets designed as a curriculum supplement for teachers, supervisors, curriculum specialists, and textbook writers as well as for the general public. Aspects of the space flight covered include descriptions of the astronaut-cosmonaut meeting and of the spacecraft and landing module; spacecraft launch; control, and rendezvous; crew work schedule; and telemetry. Experiments performed are listed in tables, and their major results are summarized.

Page, L. W.

ASTP Visual Observation Debriefing

This document is the transcription of the post-flight experiments debriefing conducted by the ASTP (Apollo Soyuz Test Project) crew at the Lunar Science Institute on August 12, 1975. The companion document to this transcription is the Experiments Debriefing. Where possible, questioners have been identified by their last names. However, the attendees and questioners are too numerous to identify or list here. The astronaut participants are as follows: Thomas P. Stafford, Commander; Vance D. Brand, Command Module Pilot; Donald K. Slayton, Docking Module Pilot.

Source record

Spacecraft Charging Considerations and Design Efforts for the Orion Crew Module

The Orion Crew Module (CM) is nearing completion for the next flight, designated as Exploration Mission 1 (EM-1). For the uncrewed mission, the flight path will take the CM through a Perigee Raise Maneuver (PRM) out to an altitude of approximately 1800 km, followed by a Trans-Lunar Injection burn, a pass through the Van Allen belts then out to the moon for a lunar flyby, a Distant Retrograde Insertion (DRI) burn, a Distant Retrograde Orbit (DRO), a Distant Retrograde Departure (DRD) burn, a second lunar flyby, an Earth Insertion (EI) burn, and finally entry and landing. All of this, with the exception of the DRO associated maneuvers, is similar to the previous Apollo 8 mission in late 1968. In recent discussions, it is now possible that EM-1 will be a crewed mission, and if this happens, the orbit may be quite different from that just described. In this case, the flight path may take the CM on an out and back pass through the Van Allen belts twice, then out to the moon, again passing through the Van Allen belts twice, then finally back home. Even if the current EM-1 mission doesn't end up as a crewed mission, EM-2 and subsequent missions will undoubtedly follow orbital trajectories that offer comparable exposures to heightened vehicle charging effects. Because of this, and regardless of flight path, the CM vehicle will likely experience a wide range of exposures to energetic ions and electrons, essentially covering the gamut between low earth orbit to geosynchronous orbit and beyond. National Aeronautical and Space Administration (NASA) and Lockheed Martin (LM) engineers and scientists have been working to fully understand and characterize the vehicle's immunity level with regard to surface and deep dielectric charging, and the ramifications of that immunity level pertaining to materials and impacts to operational avionics, communications, and navigational systems. This presentation attempts to chronicle these efforts in a summary fashion, and attempts to capture the results of that work as they pertain to the electrical and avionic systems on-board the Orion CM.

Scully, Bob

Mycotecture Off Planet: Fungi as A Building Material on The Moon and Mars

A turtle carries its own habitat. While reliable, it costs energy and is not easily adapted for the environment. NASA makes the same trade-off when it transports habitats and other structures needed to lunar and planetary surfaces. Astronauts stayed on the lunar surface for up to 75 h (Apollo 17), so the lunar module (LM) could double as a habitat. An example of the “build it on Earth, launch it into space” approach is the Habitat Demonstration Unit (HDU) Deep Space Habitat, developed by the Habitat Systems Project (NASA AES). The hardware consists of a composite fiberglass resin-infused shell attached to eight steel ribs, providing living and working space for a crew of four. Even with the use of advanced materials, it weighs >14,000 kg (~ 466 kg/m2 living space), leading to high launch costs. Upmass and resupply will result in reduced surface operations, greater mission risk, loss of productivity and psychological stress.

L J Rothschild