Search NASA⌕ Search

SEARCH · Search NASA

Results for “Atlas Centaur”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

AC-67/FLTSATCOM Launch with Isolated Cam Views/ Freeze of Lightning/ Press Conference

The FLTSATCOM system provides worldwide, high-priority UHF communications between naval aircraft, ships, submarines, and ground stations and between the Strategic Air Command and the national command authority network. This videotape shows the attempted launch of the 6th member of the satellite system on an Atlas Centaur rocket. Within a minute of launch a problem developed. The initial sign of the problem was the loss of telemetry data. The videotape shows three isolated views of the launch, and then a freeze shot of a lightning strike shortly after the launch. The tape then shows a press conference, with Mr. Wolmaster, Mr. Gibbs, and Air Force Colonel Alsbrooke. Mr. Gibbs summarizes the steps that would be taken to review the launch failure. The questions from the press mostly concern the weather conditions, and the possibility that the weather might have caused the mission failure.

Source record↗

AC-67 Press Conference

On March 26, 1987, after the launch of an Atlas/Centaur rocket with a payload of a Navy Communications Satellite, a problem developed and the rocket was lost. This videotape is a press conference held to review the incident. Mr. John Gibb, the Atlas-Centaur Program Manager at Lewis Research Center, opens the press conference with a statement that reviews the situation, and what is known about the accident. He reviews the constraints to launch and explains that to the best of his knowledge there was no violation of these constraints. He further states that a review panel will investigate the circumstances and make recommendations. The press conference is then opened up to questions. Most of the questions concern the weather conditions and the existence of lightning in the area. The Air Force representative, Colonel John Albrook, is asked if the loss of the satellite would pose any problems. He answers that there were several satellites performing the role for which this satellite was slated, and that these were still healthy, and capable of continuing for a considerable length of time.

Source record↗

Atlas SOHO Booster and Centaur Erection

The launch vehicle for the Solar Heliospheric Observatory (SOHO) mission is a two stage Atlas-IIAS (Atlas/Centaur). The Atlas, consists of a solid rocket booster stage powered by four Thiokol Castor IVA solid rocket boosters (SRB) and a core vehicle stage (booster and sustainer) powered by Rocketdyne MA-5A liquid propellant engines (RP-1 fuel and liquid oxygen). The multiple firing Centaur is powered by two Pratt and Whitney (RL10A-4) liquid hydrogen and liquid oxygen engines with extendible nozzles. This video shows the erection of the Atlas booster and transportation (to 36-B launching pad) and erection of the Centaur.

Source record↗

LAUNCH VEHICLES AND LAUNCH OPERATIONS

This paper will concern our large space carrier vehicles--the ones we are now using and will use in the future to undertake inplanetary investigations and to accomplish the manned space flight programs discussed in the preceding papers. This review of our large space carrier vehicles will be limited to descriptions and capabilities and will not include operational employment.

Launch vehicle↗

Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agencywide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

Launch Vehicle↗

ADDJUST-A View of the First 25 Years

Various technologies and innovative launch operations were developed during the 50 years of the Centaur upper stage—the first launch vehicle to use high performing liquid hydrogen fuel. One innovation was “ADDJUST”, which enabled the successful negotiation of upper level winds measured only hours before launch. Initial causes for its creation, development, and operation during countdown are detailed. Problem definition, wind measuring/monitoring process, pitch and yaw steering coefficient generation, loads analysis, angle of attack, major risks/concerns, and anecdotal recollections are provided. Launch availability improved from as low as 55 to 95 percent due to ADDJUST, which is still in use.

Upper level winds↗

SURVEYOR PROJECT STATUS

Progress report on the design of the atlas/ centaur-boosted surveyor spacecraft for soft landing of scientific instruments on the moon

SPACECRAFT DESIGN↗

Candidate Technologies for the Integrated Health Management Program

The purpose of this report is to assess Vehicle Health Management (VHM) technologies for implementation as a demonstration. Extensive studies have been performed to determine technologies which could be implemented on the Atlas and Centaur vehicles as part of a bridging program. This paper discusses areas today where VHM can be implemented for benefits in reliability, performance, and cost reduction. VHM Options are identified and one demonstration is recommended for execution.

Johnson, Neal F., Jr.↗