Search NASA⌕ Search

SEARCH · Search NASA

Results for “Battery system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Hydrogen/bromine flow battery in which hydrogen is freely exchanged between two cell compartments

A flow battery system includes a first tank including a hydrogen reactant, a second tank including a bromine electrolyte, and at least one cell including a first electrolyte side operably connected to the first tank and a second electrolyte side operably connected to the second tank. The battery system further includes a direct connection line directly connecting the first tank and the second tank and configured such that the hydrogen reactant passes between the first tank and the second tank.

Albertus, Paul↗

An experimental database of cell performance for vanadium redox flow battery

The continual growth in energy demand has resulted in the deployment of renewable energy generators to reduce the impact of fossil fuel dependence. However, these generators often suffer from intermittency and require energy storage when there is over-generation and the subsequent release of this stored energy at high demand. One promising energy storage technology which can provide a solution to improve energy management and grid stability, is the redox flow battery. Among the numerous flow battery systems, vanadium redox flow battery is the most iconic solution to large scale energy storage, giving a more efficient link between energy production, especially from renewables, and energy demand. The aim of the current database is to characterize the performance of the cell design and to provide training/validation data for physical model or data-driven model. The database includes hundreds of experimental cell performance data of vanadium redox flow battery with various current densities for multiple charge-discharge cycles. All the cell parameters, chemical parameters, material parameters, operation parameters and thermodynamic parameters of the cell system are listed. Coulomb, voltaic and energy efficiencies are also provided. The database will be helpful for researchers in the field of redox flow batteries.

Gao, Peiyuan↗

System for an ionic liquid-based electrolyte for high energy battery

A system for electrical energy production from chemical reagents in a compartmentalized cell includes: at least two electrodes, comprising at least one anode and at least one cathode; at least one separator, that separates the anodes and the cathodes; and an ionic liquid electrolyte system. The system can be a battery or one or more cells of a battery system. The ionic liquid electrolyte system comprises an ionic liquid solvent; an ether co-solvent, comprising a minority fraction, by weight, of the electrolyte; and a lithium salt. In preferred variations, the anode is a lithium metal anode and the cathode is a metal oxide cathode and the separator is a polyolefin separator.

Wang, Richard Y.↗

System for an ionic liquid-based electrolyte for high energy battery

A system for electrical energy production from chemical reagents in a compartmentalized cell includes: at least two electrodes, comprising at least one anode and at least one cathode; at least one separator, that separates the anodes and the cathodes; and an ionic liquid electrolyte system. The system can be a battery or one or more cells of a battery system. The ionic liquid electrolyte system comprises an ionic liquid solvent; an ether co-solvent, comprising a minority fraction, by weight, of the electrolyte; and a lithium salt. In preferred variations, the anode is a lithium metal anode and the cathode is a metal oxide cathode and the separator is a polyolefin separator.

Wang, Richard Y.↗

Co-simulation Framework for Community-scale Building-grid Integration [SWR-21-75]

Distributed energy resources (DERs), including rooftop solar, energy storage, and flexible loads, are gaining popularity as costs decline and as building owners and utilities realize their benefits. DERs can improve distribution system efficiency, help prevent the need for expensive grid upgrades, and increase the resilience of local communities. However, they can also cause difficulties in grid operations and can require controls to achieve their benefits. To address this challenge, NREL researchers have developed a community-scale solution that assesses the impacts of DERs and their control strategies on a distribution system. The framework has been shown to reduce solar photovoltaic (PV) curtailment to 0%, mitigate the adverse impact of solar variability on the distribution voltage, and provide up to 5-day critical load support during emergency events. Utilizing 5 different modules representing the feeder, buildings, home energy management systems, an aggregator, and a utility controller, NREL expects this simulation technology to play a critical role in the continued integration of DERs. According to the Energy Information Administration (EIA), solar curtailments accounted for 94% of the total energy curtailed in the California Independent System Operator (CAISO) in 2020. By enabling Independent System Operators (ISOs) and utility operators to bring solar curtailments to 0%, the electrical grid can become less dependent on fossil-fueled power generation sources. NREL's co-simulation framework contains five major components: Distribution Feeder Model: describes the distribution feeder topology using OpenDSS, including the locations of all DERs. Residential Building Model: simulates a large number of buildings at a high resolution using OCHRETM. The model is equipped to control equipment based on signals from an external module. The model includes major household appliances such as HVAC and a water heater, non-dispatchable load models, a distributed PV system, and a home battery system. Home Energy Management System: optimizes the controls for the devices in a home using foreseeTM. The control can adjust based on the user preferences including cost, comfort, and convenience. In hierarchical control scenarios, where the houses follow signals from an aggregator, the home energy management system provides a flexibility band with a range of power and follows the dispatch signals received from aggregator. Community-Level Aggregator: solves for optimal energy dispatch based on the flexibility bands received from each home and the grid service signal received from the utility controller. Utility-Level Controller: provides grid signals for voltage control using Distributed Energy Resources (DERs), such as solar systems, in the community.

Balamurugan, Sivasathya Pradha↗

Optimal Electrification Using Renewable Energies: Microgrid Installation Model with Combined Mixture k-Means Clustering Algorithm, Mixed Integer Linear Programming, and Onsset Method

Optimal planning and design of microgrids are priorities in the electrification of off-grid areas. Indeed, in one of the Sustainable Development Goals (SDG 7), the UN recommends universal access to electricity for all at the lowest cost. Several optimization methods with different strategies have been proposed in the literature as ways to achieve this goal. This paper proposes a microgrid installation and planning model based on a combination of several techniques. The programming language Python 3.10 was used in conjunction with machine learning techniques such as unsupervised learning based on K-means clustering and deterministic optimization methods based on mixed linear programming. These methods were complemented by the open-source spatial method for optimal electrification planning: onsset. Four levels of study were carried out. The first level consisted of simulating the model obtained with a cluster, which is considered based on the elbow and k-means clustering method as a case study. The second level involved sizing the microgrid with a capacity of 40 kW and optimizing all the resources available on site. The example of the different resources in the Togo case was considered. At the third level, the work consisted of proposing an optimal connection model for the microgrid based on voltage stability constraints and considering, above all, the capacity limit of the source substation. Finally, the fourth level involved a planning study of electrification strategies based mainly on microgrids according to the study scenario. The results of the first level of study enabled us to obtain an optimal location for the centroid of the cluster under consideration, according to the different load positions of this cluster. Then, the results of the second level of study were used to highlight the optimal resources obtained and proposed by the optimization model formulated based on the various technology costs, such as investment, maintenance, and operating costs, which were based on the technical limits of the various technologies. In these results, solar systems account for 80% of the maximum load considered, compared to 7.5% for wind systems and 12.5% for battery systems. Next, an optimal microgrid connection model was proposed based on the constraints of a voltage stability limit estimated to be 10% of the maximum voltage drop. The results obtained for the third level of study enabled us to present selective results for load nodes in relation to the source station node. Finally, the last results made it possible to plan electrification using different network technologies and systems in the short and long term. The case study of Togo was taken into account. The various results obtained from the different techniques provide the necessary leads for a feasibility study for optimal electrification of off-grid areas using microgrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-fluid, earth battery energy systems and methods

The present disclosure relates to a method for storing excess energy from at least one energy producing source, as thermal energy, using an existing geologic formation. First and second storage zones formed in a geologic region may be used to store high temperature and medium high temperature brine. When excess energy is available from the energy producing source, a quantity of the medium high temperature brine is withdrawn and heated using the energy supplied by the energy source to form a first new quantity of high temperature brine, which is then injected back into the first storage zone. This forces a quantity of medium high temperature brine present in the first storage zone into the second storage zone, to maintain a desired quantity of high temperature brine in the first storage zone and a desired quantity of medium high temperature brine in the second storage zone.

Buscheck, Thomas A.↗