Search NASA⌕ Search

SEARCH · Search NASA

Results for “Buildings Regulatory Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Stability-driven nonnegative matrix factorization to interpret spatial gene expression and build local gene networks

Spatial gene expression patterns enable the detection of local covariability and are extremely useful for identifying local gene interactions during normal development. The abundance of spatial expression data in recent years has led to the modeling and analysis of regulatory networks. The inherent complexity of such data makes it a challenge to extract biological information. We developed staNMF, a method that combines a scalable implementation of nonnegative matrix factorization (NMF) with a new stability-driven model selection criterion. When applied to a set of Drosophila early embryonic spatial gene expression images, one of the largest datasets of its kind, staNMF identified 21 principal patterns (PP). Providing a compact yet biologically interpretable representation of Drosophila expression patterns, PP are comparable to a fate map generated experimentally by laser ablation and show exceptional promise as a data-driven alternative to manual annotations. Our analysis mapped genes to cell-fate programs and assigned putative biological roles to uncharacterized genes. Finally, we used the PP to generate local transcription factor regulatory networks. Spatially local correlation networks were constructed for six PP that span along the embryonic anterior-posterior axis. Using a two-tail 5% cutoff on correlation, we reproduced 10 of the 11 links in the well-studied gap gene network. In conclusion, the performance of PP with the Drosophila data suggests that staNMF provides informative decompositions and constitutes a useful computational lens through which to extract biological insight from complex and often noisy gene expression data.

59 BASIC BIOLOGICAL SCIENCES↗

Equity Considerations in Siting Consolidated Interim Storage Facilities for Commercial Spent Nuclear Fuel

Questions of equity and fairness are often raised by representatives from State, Tribal and local governments and members of the public when resolving conflicts over siting of nuclear facilities. However, the two terms are not synonymous: equity can be quantified while fairness is much more subjective. The Department of Energy's (DOE) December 2021 Request for Information sought input on how to site federal facilities for the temporary, consolidated storage of spent nuclear fuel (SNF) using a consent-based approach. It is anticipated that just such questions about equity and fairness associated with the potential emergence of more than one host site may be raised by the twelve groups of university, nonprofit and private sector partners (Consortia) working to support community engagement, inclusively involve stakeholders, build relationships, and develop innovative forms of mutual learning and public capacity to participate in the consent-based siting process for a federal consolidated interim storage facility during the current Planning & Capacity Building stage of the consent-based siting process. In terms of DOE's Integrated Waste Management System (IWMS), sociopolitical equity concepts are a factor in all aspects of IWMS development and operations and will be particularly applicable should two or more host sites become a possibility, either by the emergence of multiple volunteer hosts or by pursuit as a IWMS program strategy. This paper summarizes recent analyses that explore how four equity metrics - number of states, division of the projected SNF total by the year 2083, current population and land area - might be perceived by host communities, states and regions if two, three or four sites for hosting federal consolidated interim storage facilities were to be contemporaneously realized. Existing institutional arrangements, including Nuclear Regulatory Commission regions, Federal Energy Regulatory Commission regions and Low-Level Radioactive Waste Disposal Compacts, were selected to create hypothetically merged two, three and four-region scenarios to calculate how the four metrics balance out. Projected SNF burden was prioritized with regional contiguity of the consolidated regions a requirement for a functional scenario. The intent was not to promote or suggest any construct as a program objective; the configurations are geopolitical abstractions only to explore potential perceptions of equity. Understanding the possible issues of equity that could arise may benefit program efforts toward achieving a cooperative federalism wherein both the federal and multiple State governments share the goal of manifesting more than one federal consolidated interim storage facility. The main finding is that it is not possible to optimize for all four metrics simultaneously. The analyses demonstrate that trying to create a sense of equity by backfitting a solution to a random population and land distribution will always contain a degree of artificiality.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Developing State and National Evaluation Infrastructures- Guidance for the Challenges and Opportunities of EM&V

Evaluating the impacts and effectiveness of energy efficiency programs is likely to become increasingly important for state policymakers and program administrators given legislative mandates and regulatory goals and increasing reliance on energy efficiency as a resource. In this paper, we summarize three activities that the authors have conducted that highlight the expanded role of evaluation, measurement and verification (EM&V): a study that identified and analyzed challenges in improving and scaling up EM&V activities; a scoping study that identified issues involved in developing a national efficiency EM&V standard; and lessons learned from providing technical assistance on EM&V issues to states that are ramping up energy efficiency programs. The lessons learned are summarized in 13 EM&V issues that policy makers should address in each jurisdiction and which are listed and briefly described. The paper also discusses how improving the effectiveness and reliability of EM&V will require additional capacity building, better access to existing EM&V resources, new methods to address emerging issues and technologies, and perhaps foundational documents and approaches to improving the credibility and cross jurisdictional comparability of efficiency investments. Two of the potential foundational documents discussed are a national EM&V standard or resource guide and regional deemed savings and algorithm databases.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

On the Formalization of Development and Assessment Process for Digital Twins in the Nearly Autonomous Management and Control System

In recent years, the autonomous control system has been encouraged in advanced reactors for restoring economic viability, simplifying the operation and maintenance, and enabling remote-site power generations [1]. Since the reactor is expected to be operated for a long period of time with a limited number of individuals onsite, it is recommended that the autonomous control system should have access to very realistic models of the state of processes in the whole lifecycle, together with these process behaviors in interaction with their environment in the real world. As a result, digital twin (DT) technology is suggested in autonomous control systems. DT is defined as a digital representation of a physical object or system, which contains a record for the histories of loads, operation and maintenance status, predictions for the near-term transient of important state variables, and decision-making process [2]. Since machine learning (ML) can recognize patterns within a complex system in real-time applications, it has been used to build DTs in the autonomous control systems for advanced reactors. Meanwhile, due to the rareness of operation data in accident scenarios, the development and assessment of DTs is expected to be mainly driven by simulations. Although the capability and feasibility of ML-based DTs are recognized in improving the safety and efficiency of reactor control, a major concern from the regulatory commission and the nuclear industry is whether the information from a DT is developed and assessed in accordance with expectation and requirements by the target decision. Such concerns not only affect the acceptance criteria for DTs, but also values that can be extracted from DTs and autonomous control system during operations. Inspired by the success of formal methods in improving the reliability and robustness of computer programming and software development, it is suggested that the development and assessment process (DAP) for both separate DTs and integral control system should be formalized in a transparent, consistent, and improvable manner. In this study, a digital-twin development and assessment process (DT-DAP) is proposed by adapting the evaluation model development and assessment process (EMDAP) [3] to requirements by the autonomous control system, ML algorithms, and DT technology. To demonstrate the framework, a baseline nearly autonomous management and control (NAMAC) system with ML-based DTs for diagnosis and prognosis is developed and assessed based on the framework. It is found that with selected testing methods and techniques, the DT-DAP can help identify errors in DTs and NAMAC which would otherwise be left unverified. Meanwhile, it is found that the DT-DAP can improve the DTs and NAMAC by continuously learning and iterating through different elements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development, analysis, and evaluation of a commercial software framework for the study of Extremely Low Probability of Rupture (xLPR) events at nuclear power plants.

Sandia National Laboratories (SNL) participated in a Pilot Study to examine the process and requirements to create a software system to assess the extremely low probability of pipe rupture (xLPR) in nuclear power plants. This project was tasked to develop a prototype xLPR model leveraging existing fracture mechanics models and codes coupled with a commercial software framework to determine the framework, model, and architecture requirements appropriate for building a modular-based code. The xLPR pilot study was conducted to demonstrate the feasibility of the proposed developmental process and framework for a probabilistic code to address degradation mechanisms in piping system safety assessments. The pilot study includes a demonstration problem to assess the probability of rupture of DM pressurizer surge nozzle welds degraded by primary water stress-corrosion cracking (PWSCC). The pilot study was designed to define and develop the framework and model; then construct a prototype software system based on the proposed model. The second phase of the project will be a longer term program and code development effort focusing on the generic, primary piping integrity issues (xLPR code). The results and recommendations presented in this report will be used to help the U.S. Nuclear Regulatory Commission (NRC) define the requirements for the longer term program.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Port Hope Area Initiative - Community Based Concepts Become Reality - 16538

The Port Hope Area Initiative (PHAI) involves the cleanup of historic low-level radioactive waste (LLRW) resulting from radium and uranium processing by the former Crown Corporation, Eldorado Nuclear Limited, and its predecessor companies, during the period between 1932 and 1988. The PHAI, which is based on a legal agreement between the Government of Canada and the adjacent municipalities of Port Hope and Clarington in Ontario, Canada, comprises two separate community-initiated projects for the long-term management of the historic LLRW located in each of these municipalities. The Port Hope Project involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from various sites within the urban area of Port Hope, the construction and operation of an engineered aboveground mound where the waste will be safely contained, and the long-term maintenance and monitoring of the new waste management facility. The waste is currently located in 13 large-scale sites and an estimated 375 small-scale sites within the community. In contrast, the Port Granby Project involves the relocation of approximately 450,000 cubic metres of historic LLRW from the existing waste site on the north shore of Lake Ontario in rural Clarington, to a new engineered aboveground mound to be built 700 metres north of the shoreline. The work also involves the restoration of the existing site and long-term maintenance and monitoring the new facility. The PHAI entered Phase 2 (construction) of a three-phase program in early 2012, when $1.28 billion (Canadian) in federal funding was announced by the Minister of Natural Resources Canada. The funding, together with regulatory approval from the Canadian Nuclear Safety Commission (CNSC), which granted 10-year waste management licences to both projects, have permitted the PHAI to move forward with construction and remediation. Waste water treatment plants based on best-available technologies have been constructed for each project to remove a wide range of contaminants from groundwater, surface water and leachate collected during construction and operation of the aboveground mounds. Each treatment process has been designed to ensure the quality of treated water being discharged into Lake Ontario meets or exceeds stringent regulatory requirements, resulting in the enhanced protection of the Great Lakes Basin ecosystem. In 2015, the contract to build the Port Granby long-term waste management facility and remediate the existing waste site was awarded, and the long-awaited facility development will soon begin. The use of a dedicated internal waste transportation route along, which the LLRW will be trucked from the existing site to the new facility, is a key component of the design to minimize the impact on the local, rural community. In Port Hope, the removal of contaminated soil within the site for the new long-term management facility commenced in the fall of 2015. Over the next several years, multiple contracts will be awarded for construction and operation of the new waste management facility and remediation of the large and small-scale sites. In short, the Port Hope and Port Granby community-based concepts have matured into tangible projects with appropriate regulatory approvals and federal funding in place. Ongoing communications with the two communities have resulted in a well-informed public that understands the work to be done and is eager to see their projects take shape and become reality. As Canada's largest environmental remediation and restoration undertaking, the PHAI has never been closer to fulfilling its vision - working with the local communities to fulfil Canada's commitment for the cleanup of historic waste in Port Hope and Port Granby to leave an honourable legacy for future generations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building a Collaborative Relationship between Contractor and Oversight at SRPPF

The success of Department of Energy (DOE) projects is dependent on a functional, healthy, and collaborative relationship between the contractor and the federal oversight. A healthy relationship marked by a collaborative mindset between these two groups, can facilitate better operational safety, operational efficiency, and regulatory compliance. This paper will explore aspects of such a relationship, the roles and responsibilities of the contractor and federal oversight, the present and historical relationships in the DOE complex, and best practices considered by the contractor and federal oversight used at the Savannah River Plutonium Processing Facility (SRPPF) at the Savannah River Site (SRS). Due to the current design phase of the SRPPF, the contractor and federal oversight have a unique opportunity to begin establishing a strong relationship early in the project’s life. As a result of this dynamic, the two groups have already demonstrated their ability to successfully respond to ongoing design issues. In general, a strong criticality safety program is beginning to mature for the SRPPF alongside a developing criticality safety federal oversight group. This paper will discuss the various factors that have brought about this collaborative relationship. Lastly, a case study will be incorporated into this paper demonstrating the ability of the SRPPF contractor and federal oversight to overcome challenges relating to the SRPPF project. This case study may guide groups around the DOE Complex to create better, more functional relationships between the two parties. The case study will provide a detailed description of the issue and parties involved, highlight the factors that allowed the group to overcome the challenge via effective collaboration, and the outcome of the event. Increasing collaboration may benefit the complex, as a whole, in order to meet the mission demands of the DOE.

collaboration↗

Spent Nuclear Fuel Storage and Radioactive Waste Disposal in the United States: A Law and Policy Analysis - 20302

While Congress plays political football, spent nuclear fuel continues to sit in de facto interim nuclear waste storage sites throughout the country. This ad hoc approach - if it can even be called an approach - to nuclear waste management is in no one's best interests, because of financial, safety, environmental, and national security concerns with the status quo. Senate leadership had asserted that an up-or-down vote on the Yucca Mountain Project would take place in September or October 2019, but that did not occur. Rather, a conference bill was agreed to, and it provided that, although the nuclear program should receive some funding, funding was not made available for centralized interim storage ('CIS') or the Yucca Mountain Project. The President's FY2021 Budget Request does not contain any proposed funding for the Yucca Mountain Project ('the Project'). This paper will discuss the implications of that process, both for the Project itself and for the U.S. nuclear waste program more generally. In order to provide context for the current situation, this paper will begin by chronicling the history of U.S. nuclear waste management, from the passage of the Nuclear Waste Policy Act of 1982 and to the present day. It will discuss the roles of the U.S. Department of Energy, the Nuclear Regulatory Commission, federal and state political delegations, and the nuclear energy industry. The paper will then identify key themes that can be expected to affect the future of nuclear waste management in the United States. For example, it will consider whether development of additional CIS facilities is a viable short- to medium-term solution. CIS facilities may relieve immediate pressure at decommissioned or soon-to-be-decommissioned nuclear power plants; but with that pressure partially alleviated, support for building a long-term repository may be reduced. It will also discuss opposition by the State of New Mexico and others to the proposed New Mexico CIS project, based not only on siting concerns but also whether it might become a de facto repository, and whether the State of Texas and others may also be opposed, for similar reasons, to the proposed CIS facility in Texas. Additionally, the paper will examine consent-based siting and its implications for Nevada and other states that are potential hosts for spent nuclear fuel storage and disposal facilities. Further, if the Project is not a politically viable solution, the paper will examine whether it is now time for serious consideration of an alternate location for a permanent repository, as well as consideration of other options entirely, such as deep geologic disposal. The paper will conclude by looking ahead to the 2020 elections. It will describe the positions of candidates (particularly Presidential candidates) on spent nuclear fuel storage and disposal options, without advocating for any particular candidate or political party. Perhaps in 2020, we will at least see a start to a solution to the seemingly intractable problem of nuclear waste management in the United States. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Site Environmental Report: 2010 (ASER)

This report provides information about environmental programs during the calendar year of 2010 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that overlap the calendar year - i.e., stormwater monitoring covering the winter season of 2010/2011 (October 2010 through May 2011) are also included. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2010, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423, EO 13514, and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. During 2010, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued. The following are among SLAC's environmental accomplishments for 2010. To facilitate management and identification of future potential greenhouse gases (GHG) reduction opportunities, SLAC voluntarily completed GHG inventories for calendar year (CY) 2008 and CY 2009 and submitted the results to The Climate Registry. A Lead Management Plan was completed to reduce the potential of lead impacting the environment, and two large legacy tube-trailer modules, each containing 38 tubes of compressed ethane, were reused or recycled by an outside contractor, resulting in hazardous waste avoidance and cost savings of approximately $100,000 in transportation and disposal costs. SLAC continues to make progress on achieving the sustainability goals of EOs 13423 and 13514, which include, but are not limited to reductions in the use of water, energy, and fuel, building to green standards and reductions in GHG emissions. Phase I of the SLAC Advanced Metering project for electrical and natural gas systems was completed. Phase I included the design of the metering system and purchase of the enterprise software. The planning, design, and installation of an advanced water metering system for select buildings, landscape, and process systems were completed. In addition, the last major onsite chiller containing a Class I ozone-depleting substance was taken out of service, and SLAC continued to replace conventional vehicles with electric vehicles. In 2010, there were no radiological impacts to the public or the environment from SLAC operations. The potential doses to the public were negligible and far below the regulatory and SLAC administrative limits. No radiological incidents occurred that increased radiation levels to the public or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC shipped 2,891 cubic feet of low-level radioactive waste, half of which was legacy waste, to appropriate treatment and disposal facilities for low-level radioactive waste. SLAC also continued its efforts to reduce the inventory of materials no longer needed for its mission by permanently removing 125 sealed radioactive sources from the inventory. Ninety-seven of the sealed sources were returned to the manufacturer, and 28 were sent to Energy Solutions for processing before being sent to the Nevada Test Site for burial. In addition, 87 concrete blocks which had been stored in an area known as the Bone Yard were surveyed for potential surface contamination and volumetric activation prior to off-site release. Based on the comprehensive measurements, all 87 blocks were qualified for release and were disposed of as ordinary materials at a landfill. In 2010, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Burnup BWR LOCA Burst Analysis Using High-Fidelity Multiphysics Simulations

The US nuclear industry is looking to improve on the operating economics of the current fleet of light-water reactors (LWRs). One way of achieving this is by operating fuel to higher burnup. In pressurized water reactors (PWRs), relaxing the current burnup limit will allow for cycle length extensions and power uprates; in boiling water reactors (BWRs) it may allow for improved fuel utilization and reduced feed assemblies, as well as more efficient power uprates and increased capacity factors that will support the Administration’s Executive Order to facilitate 5 GW of power uprates at existing nuclear facilities. However, one of the key limitations to operating fuel to higher burnup is the risk of fuel fragmentation, relocation, and dispersal (FFRD). Recognizing the high interest in extending burnup limits, the US Nuclear Regulatory Commission (NRC) has issued Draft Regulatory Guide DG-1434, which defines an approach that would be acceptable to the NRC for addressing FFRD risk. The approach defined will require better understanding of the phenomena leading to FFRD as well as best-estimate simulation methods to understand FFRD risk in high-burnup cores. The Nuclear Energy Advanced Modeling and Simulation program is supporting the FFRD industry challenge problem through development of state-of-the-art, high-fidelity modeling and simulation LWR analysis capabilities; namely, the BISON fuel performance code and the VERA core simulator software. These tools, along with the US NRC TRACE system analysis code, have been utilized for analysis of FFRD risk in both PWR and BWR cores in recent years. The work documented in this report addresses the lack of high-fidelity research for BWRs and builds on a previous activity where the framework has been applied to Cycles 16 through 18 of Limerick Unit 1, a BWR/4, with introduction of 8 high-burnup lead use assemblies (HBLUAs) that were representative of the 8 HBLUAs loaded into Limerick Unit 2 in 2021. VERA was used in this previous activity to model rod-by-rod depletion in these cycles, and its solution was used to initialize a TRACE simulation of a large-break loss-of-coolant accident (LBLOCA) at the end of Cycle 18. In the work documented in this report, the TRACE model was improved by refining the core mesh and utilizing a new feature that allows for capturing the full 3D VERA power distribution in the model. This allows for a more detailed solution for setting BISON boundary conditions. Furthermore, the solutions from VERA and TRACE were used to set up and perform BISON simulations of about 1,000 rods sampled from the core, including all burnup levels. Utilizing two cladding burst models, it was shown that no fuel rods were predicted to burst during the postulated LBLOCA transient. Additionally, a sensitivity study was performed by artificially increasing linear heat rate during the postulated LBLOCA to identify parameters that correlate with rod burst susceptibility. Burnup, fission gas release, and hoop strain were all found to be positively correlated with rod burst susceptibility. Small-break loss-of-coolant accident (SBLOCA) analyses were also performed; these analyses predicted cladding temperature increases that were bounded by the LBLOCA cladding temperatures for all small break sizes studied for this plant. However, future refinements to the plant response assumptions during the SBLOCA could impact the predicted cladding response. Finally, a benchmark study was performed between CTF and TRACE for LOCA conditions to better qualify CTF for BWR LOCA modeling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Site Environmental Report for 2018

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences, with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2018. The format and content of this report satisfy the requirements of both DOE Order 231.1B, Administrative Change 1 (Environment, Safety, and Health Reporting) and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). LBNL activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. As presented in Chapter 2, Berkeley Lab implements an Environmental Management System (EMS) to oversee environmental compliance activities and continually improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the performance evaluation process of Contract 31. For fiscal year (FY) 2018, which began October 1, 2017, and ended September 30, 2018, the EMS was given a performance rating of B plus for its management of environmental activities (on a scale from A plus as the highest grade, to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2018 rating was based on how Berkeley Lab met the objective in DOE’s FY 2018 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. Six significant accomplishments, which ranged from effective teaming on projects and with regulatory agencies to improved program assessment approaches, were factors in the rating. The EMS was also graded through the federal Office of Management and Budget’s annual EMS performance metrics, in which a reporting scorecard rates elements of the International Organization for Standardization (ISO) 14001 standard and the degree of integration between the EMS and Berkeley Lab’s sustainable practices. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2018, Berkeley Lab received a score of green. A week-long formal conformity audit of the EMS was conducted at the end of July by a qualified external party, as is required every three years. The audit team found that Berkeley Lab’s EMS continues to conform to the ISO standard with no major nonconformance. An overview of environmental protection and restoration programs is provided in Chapter 3, including information about compliance activities, operating permits, and regulatory agency inspections and audits that occurred during 2018. Twenty-one minor violations and two Class II violations were issued during agency inspections of programs governing aboveground and underground storage tanks, hazardous waste treatment units, hazardous waste storage areas, hazardous materials management, and wastewater, stormwater, and air emission sources. This report also includes information on environmental monitoring performed in 2018 (Chapter 4). The results of these monitoring activities confirmed that groundwater cleanup actions have been effective in reducing concentrations of volatile organic compounds (VOCs) in the groundwater, although concentrations appear to be reaching asymptotic levels in some areas. Site groundwater plumes are stable or are attenuating, and VOCs are not migrating off site. All emissions and discharges from LBNL operations were within environmental compliance release limits except oxides of nitrogen and carbon monoxide from boilers (under 5 million BTUs) from Buildings 2, 66, and 88. The radiological dose assessments (Chapter 5) performed in 2018 concluded that the maximum potential dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.04% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/yr); the potential dose from all radiation sources at Berkeley Lab was approximately 0.15% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.5% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Smart Grid Integration Laboratory

The initial federal funding for the Colorado State University Smart Grid Integration Laboratory is through a Congressionally Directed Project (CDP), DE-OE0000070 Smart Grid Integration Laboratory. The original program requested in three one-year increments for staff acquisition, curriculum development, and instrumentation all which will benefit the Laboratory. This report focuses on the initial phase of staff acquisition which was directed and administered by DOE NETL/ West Virginia under Project Officer Tom George. Using this CDP funding, we have developed the leadership and intellectual capacity for the SGIC. This was accomplished by investing (hiring) a core team of Smart Grid Systems engineering faculty focused on education, research, and innovation of a secure and smart grid infrastructure. The Smart Grid Integration Laboratory will be housed with the separately funded Integrid Laboratory as part of CSU's overall Smart Grid Integration Center (SGIC). The period of performance of this grant was 10/1/2009 to 9/30/2011 which included one no cost extension due to time delays in faculty hiring. The Smart Grid Integration Laboratory's focus is to build foundations to help graduate and undergraduates acquire systems engineering knowledge; conduct innovative research; and team externally with grid smart organizations. Using the results of the separately funded Smart Grid Workforce Education Workshop (May 2009) sponsored by the City of Fort Collins, Northern Colorado Clean Energy Cluster, Colorado State University Continuing Education, Spirae, and Siemens has been used to guide the hiring of faculty, program curriculum and education plan. This project develops faculty leaders with the intellectual capacity to inspire its students to become leaders that substantially contribute to the development and maintenance of Smart Grid infrastructure through topics such as: (1) Distributed energy systems modeling and control; (2) Energy and power conversion; (3) Simulation of electrical power distribution system that integrates significant quantities of renewable and distributed energy resources; (4) System dynamic modeling that considers end-user behavior, economics, security and regulatory frameworks; (5) Best practices for energy management IT control solutions for effective distributed energy integration (including security with the underlying physical power systems); (6) Experimental verification of effects of various arrangements of renewable generation, distributed generation and user load types along with conventional generation and transmission. Understanding the core technologies for enabling them to be used in an integrated fashion within a distribution network remains is a benefit to the future energy paradigm and future and present energy engineers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ford Plug-In Project: Bringing PHEVs to Market Demonstration and Validation Project

This project is in support of our national goal to reduce our dependence on fossil fuels. By supporting efforts that contribute toward the successful mass production of plug-in hybrid electric vehicles, our nation’s transportation-related fuel consumption can be offset with energy from the grid. Over four and a half years ago, when this project was originally initiated, plug-in electric vehicles were not readily available in the mass marketplace. Through the creation of a 21 unit plug-in hybrid vehicle fleet, this program was designed to demonstrate the feasibility of the technology and to help build cross-industry familiarity with the technology and interface of this technology with the grid. Ford Escape PHEV Demonstration Fleet 3 March 26, 2014 Since then, however, plug-in vehicles have become increasingly more commonplace in the market. Ford, itself, now offers an all-electric vehicle and two plug-in hybrid vehicles in North America and has announced a third plug-in vehicle offering for Europe. Lessons learned from this project have helped in these production vehicle launches and are mentioned throughout this report. While the technology of plugging in a vehicle to charge a high voltage battery with energy from the grid is now in production, the ability for vehicle-to-grid or bi-directional energy flow was farther away than originally expected. Several technical, regulatory and potential safety issues prevented progressing the vehicle-to-grid energy flow (V2G) demonstration and, after a review with the DOE, V2G was removed from this demonstration project. Also proving challenging were communications between a plug-in vehicle and the grid or smart meter. While this project successfully demonstrated the vehicle to smart meter interface, cross-industry and regulatory work is still needed to define the vehicle-to-grid communication interface.

33 ADVANCED PROPULSION SYSTEMS↗

Microbial spies and bloggers: programming cells to convert environmental information into discernible signals

Microbes regulate their dynamic behaviors using the chemical and physical characteristics of their environment. The ability of microbes to continuously convert this physicochemical information into biochemical information and to use organic matter in the environment as a power source makes these organisms attractive as chassis for building sensors. However, most biosensors have severe limitations when considering applications in hard-to-image settings like soils, sediments, and wastewater. Emerging technologies at the interface of biomolecular design, microbiome engineering, and synthetic biology offer new tools to program cells and communities as biosensors for these settings. Here, in this review, we describe innovations in biosensor outputs that are enabling new applications in complex environments, including reporters that are read out using electrochemical, gas chromatography, hyperspectral imaging, and next-generation sequencing methods. We also discuss computational advances that are accelerating the diversification of sensing components by mining metagenomics data for new transcriptional regulators and by designing allosteric protein switches that directly regulate reporter outputs using analytes. We highlight emerging opportunities for programming undomesticated microbes in communities to function as distributed sensors in the environment. Finally, we discuss the need for responsible biosensor development and to modernize regulatory frameworks to support evidence-based assessment of environmental biosensors.

analyte↗

Bench Scale Process for Low Cost CO2 Capture Using a Phase-Changing Absorbent: Topical Report EH&S Risk Assessment

GE Global Research was contracted by the Department of Energy to design and build a bench-scale process for a novel phase-changing aminosilicone-based CO2 capture solvent (award number DEFE0013687). As part of this program, a technology EH&S assessment (Subtask 5.1) has been completed for a CO2 capture system for a 550 MW coal-fired power plant. The assessment focuses on two chemicals used in the process, the aminosilicone solvent, GAP-0, and dodecylbenzenesulfonic acid (DDBSA), the GAP-0 carbamate formed upon reaction of the GAP-0 with CO2, and two potential byproducts formed in the process, GAP-0/SOx salts and amine-terminated, urea-containing silicone (also referred to as “ureas” in this report). The EH&S assessment identifies and estimates the magnitude of the potential air and water emissions and solid waste generated by the process and reviews the toxicological profiles of the chemicals associated with the process. Details regarding regulatory requirements, engineering controls, and storage and handling procedures are also provided in the following sections.

20 FOSSIL-FUELED POWER PLANTS↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 19217

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗