Search NASA⌕ Search

SEARCH · Search NASA

Results for “Business Case”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Preparing Earth Data Scientists for 'The Sexiest Job of the 21st Century'

What Exactly do Earth Data Scientists do, and What do They Need to Know, to do It? There is not one simple answer, but there are many complex answers. Data Science, and data analytics, are new and nebulas, and takes on different characteristics depending on: The subject matter being analyzed, the maturity of the research, and whether the employed subject specific analytics is descriptive, diagnostic, discoveritive, predictive, or prescriptive, in nature. In addition, in a, thus far, business driven paradigm shift, university curriculums teaching data analytics pertaining to Earth science have, as a whole, lagged behind, andor have varied in approach.This presentation attempts to breakdown and identify the many activities that Earth Data Scientists, as a profession, encounter, as well as provide case studies of specific Earth Data Scientist and data analytics efforts. I will also address the educational preparation, that best equips future Earth Data Scientists, needed to further Earth science heterogeneous data research and applications analysis. The goal of this presentation is to describe the actual need for Earth Data Scientists and the practical skills to perform Earth science data analytics, thus hoping to initiate discussion addressing a baseline set of needed expertise for educating future Earth Data Scientists.

data analytics↗

Funding and Strategic Alignment Guidance for Infusing Small Business Innovation Research Technology Into Human Exploration and Operations Mission Directorate Projects at Glenn Research Center for 2015

This report is intended to help NASA program and project managers incorporate Glenn Research Center Small Business Innovation Research/Small Business Technology Transfer (SBIR)/(STTR) technologies into NASA Human Exploration and Operations Mission Directorate (HEOMD) programs and projects. Other Government and commercial project managers can also find this useful. Introduction Incorporating Small Business Innovation Research (SBIR)-developed technology into NASA projects is important, especially given the Agency's limited resources for technology development. The SBIR program's original intention was for technologies that had completed Phase II to be ready for integration into NASA programs, however, in many cases there is a gap between Technology Readiness Levels (TRLs) 5 and 6 that needs to be closed. After SBIR Phase II projects are completed, the technology is evaluated against various parameters and a TRL rating is assigned. Most programs tend to adopt more mature technologies-at least TRL 6 to reduce the risk to the mission rather than adopt TRLs between 3 and 5 because those technologies are perceived as too risky. The gap between TRLs 5 and 6 is often called the "Valley of Death" (Figure 1), and historically it has been difficult to close because of a lack of funding support from programs. Several papers have already suggested remedies on how to close the gap (Refs. 1 to 4).

infusion; space transportation;life support system↗

Jet Propulsion Laboratory: Annual Report 1999

The Jet Propulsion Laboratory, located in the foothills near Pasadena, California, is the nation's lead center for the robotic exploration of space. Intense activity in space missions was the hallmark of the Jet Propulsion Laboratory as a new generation of smaller, less expensive spacecraft were sent out from Earth. From late 1998 to mid-1999, JPL launched a craft testing a futuristic ion engine, an orbiter and lander bound for Mars, a mission to fly by a comet and return a sample of its dust to Earth, a small infrared telescope, and an Earth-circling satellite that uses radar to gauge winds over the oceans. This unprecedented schedule resulted in spectacular achievements, tempered by highly visible mission losses. Weighed together, the successes and failures dramatically underscored the difficulty and risk involved in the unique business of space science and exploration. Among the achievements, the ion-engine-powered Deep Space 1, comet-bound Stardust and Earth-orbiting SeaWinds were joined by such ongoing missions as Mars Global Surveyor, Galileo and Cassini in delivering on their promise and, in some cases, providing surprising new views of space and Earth. At the same time, mission teams were disappointed by the losses of an orbiter and lander at Mars, as well as a small infrared telescope. JPL worked closely with NASA to learn from these experiences and build successful future missions. The Laboratory also achieved a key goal by winning the International Organization of Standards' 'ISO 9001' certification - a standard shared by the world's best engineering organizations. As the year rolled to a close, clocks rolled over from 1999 to 2000. Operations teams at JPL and NASA watched with satisfaction as a major campaign of Year 2000 readiness paid off with no problems among the thousands of computer systems that support the Laboratory's missions. With that auspicious beginning, JPL was positioned to step into the 21st century and embark on even yet unimagined future explorations.

Jet Propulsion Laboratory (JPL)↗

2008 NASA Range Safety Annual Report

Welcome to the 2008 edition of the NASA Range Safety Annual Report. Funded by NASA Headquarters, this report provides a NASA Range Safety overview for current and potential range users. This year, along with full length articles concerning various subject areas, we have provided updates to standard subjects with links back to the 2007 original article. Additionally, we present summaries from the various NASA Range Safety Program activities that took place throughout the year, as well as information on several special projects that may have a profound impact on the way we will do business in the future. The sections include a program overview and 2008 highlights of Range Safety Training; Range Safety Policy; Independent Assessments and Common Risk Analysis Tools Development; Support to Program Operations at all ranges conducting NASA launch operations; a continuing overview of emerging Range Safety-related technologies; Special Interests Items that include recent changes in the ELV Payload Safety Program and the VAS explosive siting study; and status reports from all of the NASA Centers that have Range Safety responsibilities. As is the case each year, contributors to this report are too numerous to mention, but we thank individuals from the NASA Centers, the Department of Defense, and civilian organizations for their contributions. We have made a great effort to include the most current information available. We recommend that this report be used only for guidance and that the validity and accuracy of all articles be verified for updates. This is the third year we have utilized this web-based format for the annual report. We continually receive positive feedback on the web-based edition, and we hope you enjoy this year's product as well. It has been a very busy and productive year on many fronts as you will note as you review this report. Thank you to everyone who contributed to make this year a successful one, and I look forward to working with all of you in the years to come.

Lamoreaux, Richard W.↗

2013 NASA Range Safety Annual Report

Welcome to the 2013 edition of the NASA Range Safety Annual Report. Funded by NASA Headquarters, this report provides an Agency overview for current and potential range users. This report contains articles which cover a variety of subject areas, summaries of various activities performed during the past year, links to past reports, and information on several projects that may have a profound impact on the way business will be conducted in the future. Specific topics discussed in the 2013 NASA Range Safety Annual Report include a program overview and 2013 highlights, Range Safety Training, Independent Assessments, support to Program Operations at all ranges conducting NASA launch/flight operations, a continuing overview of emerging range safety-related technologies, and status reports from all of the NASA Centers that have Range Safety responsibilities. Every effort has been made to include the most current information available. We recommend this report be used only for guidance and that the validity and accuracy of all articles be verified for updates. As is the case each year, we had a wide variety of contributors to this report from across our NASA Centers and the national range safety community at large, and I wish to thank them all. On a sad note, we lost one of our close colleagues, Dr. Jim Simpson, due to his sudden passing in December. His work advancing the envelope of autonomous flight safety systems software/hardware development leaves a lasting impression on our community. Such systems are being flight tested today and may one day be considered routine in the range safety business. The NASA family has lost a pioneer in our field, and he will surely be missed. In conclusion, it has been a very busy and productive year, and I look forward to working with all of you in NASA Centers/Programs/Projects and with the national Range Safety community in making Flight/Space activities as safe as they can be in the upcoming year.

Center Status↗

Evolution and Reengineering of NASA's Flight Dynamics Facility (FDF)

The NASA Goddard Space Flight Center's Flight Dynamics Facility (FDF) is a multimission support facility that performs ground navigation and spacecraft trajectory design services for a wide range of scientific satellites. The FDF also supports the NASA Space Network by providing orbit determination and tracking data evaluation services for the Tracking Data Relay Satellite System (TDRSS). The FDF traces its history to early NASA missions in the 1960's, including navigation support to the Apollo lunar missions. Over its 40 year history, the FDF has undergone many changes in its architecture, services offered, missions supported, management approach, and business operation. As a fully reimbursable facility (users now pay 100% of all costs for FDF operations and sustaining engineering activities), the FDF has faced significant challenges in recent years in providing mission critical products and services at minimal cost while defining and implementing upgrades necessary to meet future mission demands. This paper traces the history of the FDF and discusses significant events in the past that impacted the FDF infrastructure and/or business model, and the events today that are shaping the plans for the FDF in the next decade. Today's drivers for change include new mission requirements, the availability of new technology for spacecraft navigation, and continued pressures for cost reduction from FDF users. Recently, the FDF completed an architecture study based on these drivers that defines significant changes planned for the facility. This paper discusses the results of this study and a proposed implementation plan. As a case study in how flight dynamics operations have evolved and will continue to evolve, this paper focuses on two periods of time (1992 and the present) in order to contrast the dramatic changes that have taken place in the FDF. This paper offers observations and plans for the evolution of the FDF over the next ten years. Finally, this paper defines the mission model of the future for the FDF based on NASA's current mission list and planning for the Constellation Program. As part of this discussion the following are addressed: the relevance and benefits of a multi-mission facility for NASA's navigation operations in the future; anticipated technologies affecting ground orbit determination; continued incorporation of Commercial Off-the-shelf (COTS) software into the FDF; challenges of a business model that relies entirely on user fees to fund facility upgrades; anticipated changes in flight dynamics services required; and considerations for defining architecture upgrades given a set of cost drivers.

Stengle, Thomas↗

Projecting Future Urbanization with Prescott College's Spatial Growth Model to Promote Environmental Sustainability and Smart Growth, A Case Study in Atlanta, Georgia

Planning is an integral element of good management and necessary to anticipate events not merely respond to them. Projecting the quantity and spatial distribution of urban growth is essential to effectively plan for the delivery of city services and to evaluate potential environmental impacts. The major drivers of growth in large urban areas are increasing population, employment opportunities, and quality of life attractors such as a favorable climate and recreation opportunities. The spatial distribution of urban growth is dictated by the amount and location of developable land, topography, energy and water resources, transportation network, climate change, and the existing land use configuration. The Atlanta region is growing very rapidly both in population and the consumption of forestland or low-density residential development. Air pollution and water availability are significant ongoing environmental issues. The Prescott Spatial Growth Model (SGM) was used to make growth projections for the metropolitan Atlanta region to 2010,2020 and 2030 and results used for environmental assessment in both business as usual and smart growth scenarios. The Prescott SGM is a tool that uses an ESRI ArcView extension and can be applied at the parcel level or more coarse spatial scales and can accommodate a wide range of user inputs to develop any number of growth rules each of which can be weighted depending on growth assumptions. These projections were used in conjunction with meteorological and air quality models to evaluate future environmental impacts. This presentation will focus on the application of the SGM to the 13-County Atlanta Regional Commission planning jurisdiction as a case study. The SGM will be described, including how rule sets are developed and the decision process for allocation of future development to available land use categories. Data inputs required to effectively run the model will be discussed. Spatial growth projections for ten, twenty, and thirty year planning horizons will be presented and results discussed, including regional climate and air quality impacts.

Estes, Maurice G., Jr.↗

Fault-Detection Tool Has Companies 'Mining' Own Business

A successful launching of NASA's Space Shuttle hinges heavily on the three Space Shuttle Main Engines (SSME) that power the orbiter. These critical components must be monitored in real time, with sensors, and compared against expected behaviors that could scrub a launch or, even worse, cause in- flight hazards. Since 1981, SSME faults have caused 23 scrubbed launches and 29 percent of total Space Shuttle downtime, according to a compilation of analysis reports. The most serious cases typically occur in the last few seconds before ignition; a launch scrub that late in the countdown usually means a period of investigation of a month or more. For example, during the launch attempt of STS-41D in 1984, an anomaly was detected in the number three engine, causing the mission to be scrubbed at T-4 seconds. This not only affected STS-41D, but forced the cancellation of another mission and caused a 2-month flight delay. In 2002, NASA s Kennedy Space Center, the Florida Institute of Technology, and Interface & Control Systems, Inc., worked together to attack this problem by creating a system that could automate the detection of mechanical failures in the SSMEs fuel control valves.

Source record↗

Deep Learning-Based Negotiation Strategy Selection for Cooperative Conflict Resolution in Urban Air Mobility

This paper presents a collaborative conflict resolution technique using deep neural network-based intelligent search of the solution space. This approach offers a rapid convergence to a mutually acceptable solution for real-time conflict resolution, suitable for urban air mobility operations. Furthermore, the presented technique allows operational flexibility to the urban air mobility agents where these agents can collaboratively devise the solution via integrative negotiation, based on their local utility functions, as long as such a solution does not violate the global safety thresholds. The presented machine-to-machine negotiation method is built on our prior work on holistic assessment of the airspace and potential conflict detection implemented at-the-edge, onboard the unmanned aircraft systems. This paper extends the prior work to augment decision-making at-the-edge, thereby, promising a true distributed control architecture for urban air mobility. In this approach, each agent (a) builds a potential in-flight conflict map, (b) identifies the conflicting agents, (c) dynamically prepares a list of alternatives based on its current utility functions, (d) negotiates with the conflicting agents to pick one of these alternatives, and (e) implements the negotiated alternative to mutually resolve the conflict. Note that such an approach does not require a contingency plan to be made pre-flight, as the conflict resolution strategies are decided and negotiated in real time based on the present state of the agent. The contingency plan, if available, can serve as an input to the real-time conflict resolution strategy formulation, and also can be used as a fallback plan in case the negotiation fails and the impacted agents need to switch to a rule-based/supervisory resolution mode from the discussed distributed resolution mode. The presented collaborative negotiation-based conflict resolution technique incorporates a time-dependent reward function to catalyze collaborative resolution by incentivizing the agents with local and global rewards beneficial to their business operations.

Advanced Air Mobility↗

Modern Airfoil Ice Accretions

This report presents results from the first icing tests performed in the Modem Airfoils program. Two airfoils have been subjected to icing tests in the NASA Lewis Icing Research Tunnel (IRT). Both airfoils were two dimensional airfoils; one was representative of a commercial transport airfoil while the other was representative of a business jet airfoil. The icing test conditions were selected from the FAR Appendix C envelopes. Effects on aerodynamic performance are presented including the effects of varying amounts of glaze ice as well as the effects of approximately the same amounts of glaze, mixed, and rime ice. Actual ice shapes obtained in these tests are also presented for these cases. In addition, comparisons are shown between ice shapes from the tests and ice shapes predicted by the computer code, LEWICE for similar conditions. Significant results from the tests are that relatively small amounts of ice can have nearly as much effect on airfoil lift coefficient as much greater amounts of ice and that glaze ice usually has a more detrimental effect than either rime or mixed ice. LEWICE predictions of ice shapes, in general, compared reasonably well with ice shapes obtained in the IRT, although differences in details of the ice shapes were observed.

Addy, Harold E., Jr.↗

Turbofan Volume Dynamics Model for Investigations of Aero-Propulso-Servo-Elastic Effects in a Supersonic Commercial Transport

A turbofan simulation has been developed for use in aero-propulso-servo-elastic coupling studies, on supersonic vehicles. A one-dimensional lumped volume approach is used whereby each component (fan, high-pressure compressor, combustor, etc.) is represented as a single volume using characteristic performance maps and conservation equations for continuity, momentum and energy. The simulation is developed in the MATLAB/SIMULINK (The MathWorks, Inc.) environment in order to facilitate controls development, and ease of integration with a future aero-servo-elastic vehicle model being developed at NASA Langley. The complete simulation demonstrated steady state results that closely match a proposed engine suitable for a supersonic business jet at the cruise condition. Preliminary investigation of the transient simulation revealed expected trends for fuel flow disturbances as well as upstream pressure disturbances. A framework for system identification enables development of linear models for controller design. Utilizing this framework, a transfer function modeling an upstream pressure disturbance s impacts on the engine speed is developed as an illustrative case of the system identification. This work will eventually enable an overall vehicle aero-propulso-servo-elastic model

Connolly, Joseph W.↗

A Case Study Using Modeling and Simulation to Predict Logistics Supply Chain Issues

Optimization of critical supply chains to deliver thousands of parts, materials, sub-assemblies, and vehicle structures as needed is vital to the success of the Constellation Program. Thorough analysis needs to be performed on the integrated supply chain processes to plan, source, make, deliver, and return critical items efficiently. Process modeling provides simulation technology-based, predictive solutions for supply chain problems which enable decision makers to reduce costs, accelerate cycle time and improve business performance. For example, United Space Alliance, LLC utilized this approach in late 2006 to build simulation models that recreated shuttle orbiter thruster failures and predicted the potential impact of thruster removals on logistics spare assets. The main objective was the early identification of possible problems in providing thruster spares for the remainder of the Shuttle Flight Manifest. After extensive analysis the model results were used to quantify potential problems and led to improvement actions in the supply chain. Similarly the proper modeling and analysis of Constellation parts, materials, operations, and information flows will help ensure the efficiency of the critical logistics supply chains and the overall success of the program.

Tucker, David A.↗

Implications of Pb-free microelectronics assembly in aerospace applications

The commercial microelectronics industry is rapidly moving to completely Pb-free assembly strategies within the next decade. This trend is being driven by existing and proposed legislation in Europe and in Japan. The microelectronics industry has become truly global, as indicated by major U .S. firms who already adopted Pb-free implementation programs. Among these forward-looking firms are AT&T, IBM, Motorola, HP and Intel to name a few.Following Moore's law, advances in microelectronics are happening very rapidly. In many cases, commercial industry is ahead of the aerospace sector in technology. Progress by commercial industry, along with cost, drives the use of Commercial Off-The-Shelf (COTS) parts for military and space applications. We can thus anticipate that the aerospace industry will, at some point, be forced to use Pb-free components and subsystems as part of their standard business practices. In this paper we attempt to provide a snapshot of the commercial industry trends and how they may impact electronics in the aerospace environment. In addition, we also look at different strategies for implementation. Finally we present data collected on a recent NASA project to focus on finding suitable alternatives to eutectic tin-lead solders and solder pastes. The world is moving toward implementation of environmentally friendly manufacturing techniques. The aerospace industry will be forced to deal with issues related with Pb free assembly, either by availability or legislation. This paper provides some insight into some of the tradeoffs that should be considered.

Pb-free electronics manufacturing↗

Applying Formal Methods to NASA Projects: Transition from Research to Practice

NASA project managers attempt to manage risk by relying on mature, well-understood process and technology when designing spacecraft. In the case of crewed systems, the margin for error is even tighter and leads to risk aversion. But as we look to future missions to the Moon and Mars, the complexity of the systems will increase as the spacecraft and crew work together with less reliance on Earth-based support. NASA will be forced to look for new ways to do business. Formal methods technologies can help NASA develop complex but cost effective spacecraft in many domains, including requirements and design, software development and inspection, and verification and validation of vehicle subsystems. To realize these gains, the technologies must be matured and field-tested so that they are proven when needed. During this discussion, current activities used to evaluate FM technologies for Orion spacecraft design will be reviewed. Also, suggestions will be made to demonstrate value to current designers, and mature the technology for eventual use in safety-critical NASA missions.

Othon, Bill↗

Space Technology: A study of the significance of recognition for innovators of spinoff technologies. A case study on the impact of the space technology hall of fame award

This report represents the preliminary effort in studying the significance of recognition for innovators of spinoff technologies. The purpose of this initial year's effort in this area was to gather preliminary data and define the direction for the remainder of the research. This report focuses on the most recent recipients of the Hall of Fame Award, the developers of liquid-cooled garments. Liquid-cooled garments technology and its spinoffs were used as a case study to define and explore the factors involved in technology transfer and to consider the possible incentives in developing commercial applications including the Hall of Fame Award. Through interviews, views of award recipients were obtained on factors encouraging spinoffs as well as impediments to spinoffs. The researchers observed complex inter-relationships among the significant entities (government, individuals, large and small business), the importance of people, the importance of resource availability, and the significance of intrinsic motivation; drew preliminary conclusions pertaining to the direct and indirect influence of recognition like the Hall of Fame Award; and planned the direction for next year's follow-on research.

Source record↗

On-Orbit Manufacturing From Orbital Factories to In Situ Resource Utilization

This webinar will review commercial prospects for manufacturing in orbit. Doing business in space is rapidly becoming more reliable, affordable and accessible. From 2010 to 2015 launch prices went down by a factor of 10 or more, to about $5,000kg while investments into Space 2.0 companies and technologies are closing in on $2.5 Billion (New Space Global). With three commercial suppliers (SpaceX, Orbital ATK and Sierra Nevada Corp) to Earths orbits, mission frequency is improving dramatically. Moreover, private space companies (SpaceX Reusable Dragon Lab; Bigelows B330) are also scouting the opportunities of renting or selling modules as platforms for orbital free-flying facilities; modules that can be used for automated fabrication to manned experiments.Topics addressed in the webinar include: 1. Case studies of unique competitive advantages that can be gained from microgravity and space vacuum: wafer reprocessing, fiber optics, crystal growth;2. Prospective solar power orbital data centers;3. Reuse and recycling of orbital debris as a possible feedstock for robotic 3D fabrication potentially in the vacuum as well as inside facilities;4. The story behind the original WakeShield wafer fabrication facility and its relevance to todays activities;5. Energy needs for on-orbit manufacturing6. Environmental value proposition of on-orbit manufacturing for products with toxic byproducts or excessively large green house gases footprints;7. Longer term scenario of flexible, connected, automated, intelligent and sustainable orbital factories of the future.Opening up a less-appreciated aspect of NewSpace, this webinar will be of high interest to CTOs, Directors and Managers from product development to RD, Innovation Strategy leaders, and investors, across many different industrial verticals (materials, electronics, pharmaceuticals, advanced sustainable manufacturing, bioengineering, etc.)and anyone trying to understand what value space can have for their business in the near and far future.

Cozmuta, Ioana↗

Manufacturing Bms/Iso System Review

The Quality Management System (QMS) is one that recognizes the need to continuously change and improve an organization s products and services as determined by system feedback, and corresponding management decisions. The purpose of a Quality Management System is to minimize quality variability of an organization's products and services. The optimal Quality Management System balances the need for an organization to maintain flexibility in the products and services it provides with the need for providing the appropriate level of discipline and control over the processes used to provide them. The goal of a Quality Management System is to ensure the quality of the products and services while consistently (through minimizing quality variability) meeting or exceeding customer expectations. The GRC Business Management System (BMS) is the foundation of the Center's ISO 9001:2000 registered quality system. ISO 9001 is a quality system model developed by the International Organization for Standardization. BMS supports and promote the Glenn Research Center Quality Policy and wants to ensure the customer satisfaction while also meeting quality standards. My assignment during this summer is to examine the manufacturing processes used to develop research hardware, which in most cases are one of a kind hardware, made with non conventional equipment and materials. During this process of observation I will make a determination, based on my observations of the hardware development processes the best way to meet customer requirements and at the same time achieve the GRC quality standards. The purpose of my task is to review the manufacturing processes identifying opportunities in which to optimize the efficiency of the processes and establish a plan for implementation and continuous improvement.

Gomez, Yazmin↗

Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

This paper will present a model that uses the Supply-Chain Operations Reference (SCOR) model as a foundation for a framework to illustrate the information needed throughout a product lifecycle to support a healthy supply chain management function and the subsequent contract requirements to enable it. It will also show where in the supply chain the information must be extracted. The ongoing case study used to exemplify the model is NASA's (National Aeronautics and Space Administration) Ares I program for human spaceflight. Effective supply chain management and contract requirements are ongoing opportunities for continuous improvement within government agencies, specifically development of systems for human spaceflight operations. Multiple reports from the Government Accountability Office (GAO) reinforce this importance. The SCOR model is a framework for describing a supply chain with process building blocks and business activities. It provides a set of metrics for measuring supply chain performance and best practices for continuously improving. This paper expands the application of the SCOR to also provide the framework for defining information needed from different levels of the supply chain and at different phases of the lifecycle. These needs can be incorporated into contracts to enable more effective supply chain management. Depending on the phase of the lifecycle, effective supply chain management will require involvement from different levels of the organization and different levels of the supply chain.

Paxton, Joseph↗