Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPACITY PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Follow-on Report of Analysis of Approaches to Supplemental Treatment of Low-Activity Waste at the Hanford Nuclear Reservation (Vol. I)

The Hanford Site, in southeast Washington State, is preparing to disposition approximately 56,000,000 gallons (56 Mgal) of radioactive and chemically hazardous wastes currently stored in underground tanks at the site. Tank wastes will be divided into a high-activity fraction and a low-activity fraction for subsequent treatment and disposition. A waste processing and treatment facility, the Waste Treatment and Immobilization Plant (WTP), will include the high-level waste (HLW) vitrification facility (WTP HLW Vitrification Facility) for immobilizing the high-activity fraction and a low-activity waste (LAW) vitrification facility (WTP LAW Vitrification Facility) for immobilizing the low-activity fraction. Both facilities will use vitrification technology to immobilize the Hanford tank wastes in a glass waste form. The volume of LAW to be treated and disposed of following waste retrieval and WTP operations will exceed the planned processing capacity of the WTP LAW Vitrification Facility. ORP-11242,-River Protection Project System Plan, estimates a shortfall in LAW treatment capacity of approximately 56 Mgal, approximately 50% of the projected LAW volume. To maintain the planned tank waste processing mission schedule, the U.S. Department of Energy (DOE) will require additional LAW treatment capacity (termed “supplemental LAW”) external to the WTP process. LAW must be solidified by a treatment technology before the waste can be permanently disposed of in an approved DOE on-site disposal facility or a commercial (state or U.S. Nuclear Regulatory Commission [NRC-licensed]) off-site mixed low-level waste disposal facility. A decision on the approach to supplemental LAW treatment, processing, and disposal has not yet been made

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy storage planning for enhanced resilience of power systems against wildfires and heatwaves

Extreme weather events pose significant risks to power grid stability due to their severe consequences and potential for widespread failures. Energy storage systems hold great potential for enhancing grid resilience against such events by providing reliable power during peak demand periods. However, accurately quantifying the size, location, and investment costs of new energy storage assets is a complex task, as energy storage planning decisions depend on the investment choices of other generation technologies and the integration of new transmission projects. Here, this paper presents a novel capacity expansion planning framework that simultaneously optimizes investments in energy storage, generation, and transmission, determining their optimal size, location, and type, while incorporating extreme weather events into long-term planning. More specifically, our stress-event-informed planning framework integrates the impact of heatwaves and wildfires into the planning process, identifying least-cost investment solutions that comply with policy goals and enhance grid resilience. The proposed framework employs machine-learning-based modeling to project heatwave-induced loads and performance-based risk assessment to evaluate wildfire-driven transmission line derates. Using industry-standard datasets to accurately represent the transmission topology of the Western Interconnection (WI) system, the proposed framework is applied to the WI 40-zone system, with investment decisions reported for the years 2030, 2035, and 2040. Simulation results reveal that with just a 10% increase in investment costs, resilience against extreme events can be significantly improved, with investment decisions heavily favoring energy storage, particularly 4-hour energy storage systems.

25 ENERGY STORAGE↗

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

Endogenous Assessment of the Capacity Value of Solar PV in Generation Investment Planning Studies

There exist several different reliability-and approximation-based methods to determine the contribution of solar resources toward resource adequacy. However, most of these approaches require knowing in advance the installed capacities of both conventional and solar generators. This is a complication since generator capacities are actually decision variables in capacity planning studies. In this paper, we study the effect of time resolution and solar PV penetration using a planning model that accounts for the full distribution of generator outages and solar resource variability. We also describe a modification of a standard deterministic planning model that enforces a resource adequacy target through a reserve margin constraint. Our numerical experiments show that at least 50 days worth of data are necessary to approximate the results of the full-resolution model with a maximum error of 2.5% on costs and capacity. We also show that the amount of displaced capacity of conventional generation decreases rapidly as the penetration of solar PV increases. We find that using an exogenously defined and constant capacity value based on time-series data can yield relatively accurate results for small penetration levels. For higher penetration levels, the modified deterministic planning model better captures avoided costs and the decreasing value of solar PV.

14 SOLAR ENERGY↗

Economic Data and Modeling Support for the Two Regional Case Studies: Nuclear-Renewable Hybrid Energy Systems: Analysis of Technical & Economic Issues

This report includes cost inputs for the simulation framework developed for the Nuclear-Renewable Hybrid Energy Systems (N-R HES) project, including capital and O&M cost data for solar photovoltaic and wind turbines, in Section 2. Section 3 focuses on the costs of hydrogen storage and transportation, while Section 4 includes the initial results of a study of the optimal penetration of renewables in the N-R-HES system, under various conditions. This latter study also provided the opportunity to gain familiarity with the HYBRID framework, while initiating the generation of a useful set of cases that highlight the value of hybrid energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Comparing Resource Adequacy Metrics: Preprint

As the penetration of variable generation (wind and solar) increases around the world, there is an accompanying growing interest and importance in accurately assessing the contribution that these resources can make toward planning reserve. This contribution, also known as the capacity credit or capacity value of the resource, is best quantified by using a probabilistic measure of overall resource adequacy. In recognizing the variable nature of these renewable resources, there has been interest in exploring the use of reliability metrics other than loss of load expectation. In this paper, we undertake some comparisons using data from the Western Electricity Coordinating Council in the western United States.

14 SOLAR ENERGY↗

Comparing Resource Adequacy Metrics

As the penetration of variable generation (wind and solar) increases around the world, there is an accompanying growing interest and importance in accurately assessing the contribution that these resources can make toward planning reserve. This contribution, also known as the capacity credit or capacity value of the resource, is best quantified by using a probabilistic measure of overall resource adequacy. In recognizing the variable nature of these renewable resources, there has been interest in exploring the use of reliability metrics other than loss of load expectation. In this paper, we undertake some comparisons using data from the Western Electricity Coordinating Council in the western United States.

14 SOLAR ENERGY↗

South Africa’s Appliance Energy Efficiency Standards and Labeling Program

Electricity consumption in South Africa comes with a hefty environmental cost to the society. For every kilowatt-hour (kWh) produced, 1 kilogram (kg) of carbon dioxide (CO 2 ) is emitted, 1.4 liters of water are used, and 0.37 grams of particulate emissions are released in the atmosphere. These environmental implications result from the large share of electricity produced from coal (91 percent in 2015). While planned new capacity will ramp up renewable energy, the integrated resource plan for the country still projects the share of col to be 64 percent in 2030. Energy savings provide environmental benefits as well as economic benefits. Energy efficiency standards and labeling (S&L) programs are a policy measure proven to save energy. Such programs have been implemented in many countries to remove inefficient technologies and transform markets to more efficient technologies. In this study, we describe the methodology, assumptions and results of a stock turnover modeling tool that estimates the energy savings achievable by South Africa’s S&L program in the residential sector. We show that if regulations are passed in 2020 and effective in 2021 for 10 major end-use adopting international standards best practices, 6 terawatt-hours (TWh) will be saved in 2030 and 9.5 TWh will be saved in 2040, representing a CO 2 mitigation of 3.7 megatonnes (Mt) in 2030 and 5.8 Mt in 2040, which will contribute to the South African government’s international engagement in fighting against climate change through its National Determined Contribution (NDC). Additional environmental benefits include saving of 6.5 billion liters of water in 2030, representing approximately 100 liters per capita in 2030. Air quality will also improve, as 4 kilotons (kt) of particulate emissions will be avoided, as well as 4.3 Mt of sulfur oxides (SOx) and 23 kt of nitrogen oxides (NOx) in 2030.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Distribution System Plan Template and Guide for Electric Utilities for Adaptation by States and Utilities [Slides]

LBNL researchers developed a template and companion guide for structuring distribution system plans. The template covers 10 key sections in utility distribution system plans and underlying topics: -Executive Summary -Planning Objectives -Current Distribution System -Planning Approach -Asst Management, Reliability and Resilience -O&M Expenses -Capacity Expansion Planning -Solution Identification -Cost-effectiveness -Implementation For each section in the template, the companion guide provides: a description of the topics covered and their importance; the type of content to include in the plan; an example utility approach; and references to other utility plans that serve as models for the topic.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comparing Power Flow Approximations for Electricity Infrastructure Capacity Expansion Models with High Spatial Resolution

Future electricity system portfolios will require strategic transmission expansions for economically integrating regionally dependent, high-quality renewable resources. In this context, accurate representation of transmission flows in large-scale electricity infrastructure capacity expansion planning problems is important. This paper describes an approximate linearized power flow transmission modeling method for such expansion problems and demonstrates the impact on planning solutions using the National Renewable Energy Laboratory's Regional Energy Deployment System (ReEDS) model. Results are compared against a pipe flow transmission representation, which is used in a number of large-scale planning models. We show that national-scale generation and transmission expansion is not substantially influenced by the power flow methodology but that the pipe flow representation does underestimate required transmission capacity and total system costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

More land is needed for solar and wind infrastructure under a high renewables scenario in the Western US by 2050

Expanding United States electricity infrastructure to meet growing demand could require extensive power plant development footprints and land use conversion, depending on the mix of generation types chosen. Understanding where future power plant sitings are likely to take place and identifying potential conflicts and land-use tradeoffs will be key to identifying feasible and affordable investments and evaluating regional planning coordination needs. Here we use an integrated modeling framework that combines capacity expansion planning, hourly grid operations, and geospatial techno-economic analysis to develop projections (2025-2050) of power plant sitings in the Western United States (US) at a 1 km 2 resolution for a business-as-usual scenario and a high renewables penetration scenario. We find that 30% more land will be needed in the high renewables scenario as compared to business-as-usual, and that 75% of that development is projected to be located within 10 km of natural areas.

Mongird, Kendall [Pacific Northwest National Labor↗

Managing Demand and Capacity Using Multi-Sector Planning and Flexible Airspace: Human-in-the-Loop Evaluation of NextGen

When demand for an airspace sector exceeds capacity, the balance can be re-established by reducing the demand, increasing the capacity, or both. The Multi-Sector Planner (MSP) concept has been proposed to better manage traffic demand by modifying trajectories across multiple sectors. A complementary approach to MSP, called Flexible Airspace Management (FAM), reconfigures the airspace such that capacity can be reallocated dynamically to balance the traffic demand across multiple sectors, resulting in fewer traffic management initiatives. The two concepts have been evaluated with a series of human-in-the-loop simulations at the Airspace Operations Laboratory to examine and refine the roles of the human operators in these concepts, as well as their tools and procedural requirements. So far MSP and FAM functions have been evaluated individually but the integration of the two functions is desirable since there are significant overlaps in their goals, geographic/temporal scope of the problem space, and the implementation timeframe. Ongoing research is planned to refine the humans roles in the integrated concept.

Lee, Paul U.↗

Transmission Planning for Wind Energy: Status and Prospects

This paper provides an overview of major transmission planning activities related to wind integration studies in the US and Europe. Transmission planning for energy resources is different from planning for capacity resources. Those differences are explained, and illustrated with examples from several regions of the US and Europe. Transmission planning for wind is becoming an iterative process consisting of generation expansion planning, economic-based transmission planning, system reliability analysis, and wind integration studies. A brief look at the policy environment in which this activity is taking place is provided.

17 WIND ENERGY↗

IDAES Enterprise: Generation Expansion Planning with Enhanced Requirements for Capacity Adequacy Under Renewable Intermittency

Achieving net zero carbon emissions likely requires future power systems to integrate new, flexible energy technologies to accommodate higher levels of capacity from variable renewable energy sources. To determine the optimal deployment of new electricity capacity and to study the likelihood of deployments of new energy technologies, an expansion planning model has been developed as part of the IDAES-Enterprise suite of grid models. The Generation Expansion Planning (GEP) model is a multi-period model in which investment decisions occur yearly, and a Unit Commitment (UC) problem is examined on an hourly timescale. To reduce computational complexity of the GEP model, the UC problem is solved for average “representative days” which leaves out extreme, but relatively common, scenarios in which low renewable generation occurs, leaving the system with inadequacy in capacity. The IDAES-Enterprise GEP model has been modified to include these extreme scenarios while keeping the model reasonably tractable. Specifically, a lazy constraint technique was implemented to check for capacity adequacy on an hourly basis over a large data set of aligned load-wind-solar profiles. As a vast majority of the capacity constraints will not be violated, the technique lowers computational expense by searching for violated capacity constraints over an “iterative manner,” adding those infeasible constraints back into the model. Results on a test case of the Southwest Power Pool shows that the lazy constraint technique significantly reduces retirements and increases installments of natural gas combined cycles and flexible natural gas units. It also reduces some retirements of coal units. These modifications provide a more reasonable estimation of required dispatchable power generation capacity to ensure feasibility during peak net load.

Liu, Peng↗

High Resolution Siting Suitability of Various Power Plant Technologies

Energy sector planning models determine the aggregate need for new generation, but these models are typically at the state or regional scale and are not equipped to address the wide range of location- and technology-specific issues that are increasingly a factor in power plant siting. These animations demonstrate the aggregate siting suitability of various power plant technology configurations, considering technology-specific factors that can prohibit development. The data presented is from the GRIDCERF (Geospatial Raster Input Data for Capacity Expansion Regional Feasibility) data package. GRIDCERF is a harmonized, open-source geospatial product that can be used to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. The animations presented here demonstrate a curated selection of the full suite of technology configurations available. GRIDCERF provides the necessary inputs for models that simulate power plant siting for regional capacity expansion planning such as the Capacity Expansion Regional Feasibility (CERF) model.

Mongird, Kendall [Pacific Northwest National Labor↗

Vulnerability of existing and planned coal-fired power plants in Developing Asia to changes in climate and water resources

Coal power generation dominates electricity supply in Developing Asia, and more than 400 gigawatts (GW) of new coal-fired capacity is planned for operation by 2030. Past studies on thermal electricity-water nexus have not accounted for this new capacity, and use coarse spatial and temporal resolutions in the assessment of long-term power system reliability. Here, high-resolution hydro-climatic simulations and asset-level power plant water use models are integrated to quantify water constraints on coal-fired power plants in Developing Asia, for different scenarios of future climate change, cooling system choice, and capacity expansion. Future climate change and capacity expansion decrease the annual usable capacity factor (UF) of coal power generation in Mongolia, Southeast Asia, and parts of India and China. The negative impacts are lessened by widening the geographic areas of aggregation. Under near-term mitigation scenarios with high penetrations of CO 2 capture technology, the regional average water withdrawal intensity of coal power generation is 50–80% higher than current conditions. With careful siting, the increased water withdrawal intensity does not necessarily constrain future electricity production on annual or monthly time scales, but decreases system reliability by increasing the probability of low UF at daily time scale. Our findings highlight the unaccounted-for-risk in Developing Asia's long-term power plan featuring coal power generation. Regional capacity expansion should consider the reliability of future thermal power assets under long-term hydroclimate change using high-resolution models and multiple scenarios.

01 COAL, LIGNITE, AND PEAT↗

The Regional Energy Deployment System (ReEDS): An Open-Access Model for the North American Electricity System

The Regional Energy Deployment System (ReEDS) model is NREL’s flagship capacity expansion planning tool for the electric power sector in North America. Originally developed in 2001, ReEDS has been used primarily by NREL researchers to conduct high-profile analysis of the potential evolution of the electricity system. In September 2019, the core model is being released for public use. In this presentation, we provide an overview of the model architecture, key model features, data sources, lessons learned, and sample model results for the North American electric power system.

42 ENGINEERING↗

Climate-Water Adaptation for Future US Electricity Infrastructure

Future climate-water conditions are anticipated to increase electricity demand, reduce transmission capacity, and limit power production. Yet, typical electricity capacity expansion planning does not consider climate-water constraints. We project four alternative U.S. power system configurations using an iterative modeling and data exchange platform that integrates climate-driven hydrological, thermal power plant, and capacity expansion models. Through a comparison with traditional modeling approaches, we show that this novel approach provides greater confidence in electricity capacity projections by incorporating feasibility checks that adjust infrastructure development to reach grid reliability thresholds under climate-water constraints. Initial projections without climate-water impacts on electricity generation show future power systems become less vulnerable, independent of climate-water adaptation, as economic drivers increase renewable and natural gas-based capacity, while water-intensive coal and nuclear plants retire. However, power systems may face reliability challenges without climate-water adaptation, revealing the significance of incorporating climate-water impacts into power system planning. Climate-adjusted (Iterative approach) projections require a 5.3-12.0% increase in national-level capacity, relative to Initial projections, leading to an additional $125-143 billion (5.0-7.0%) in infrastructure costs. Variable renewable and natural gas technologies account for nearly all the additional capacity and, together with regional trade-offs in electricity generation, enhance grid performance to reach reliability thresholds. These adaptation transitions also lower water use and emissions, contributing to climate change mitigation, and highlight the trade-offs and impacts of both near and long-term electricity generation planning decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗