Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEBAF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

CEBAF FFA Energy Upgrade

Encouraged by recent success of CBETA, a proposal was formulated to increase the CEBAF energy from the present 12 GeV to 20-24 GeV by replacing the highest-energy arcs with Fixed Field Alternating Gradient (FFA) arcs. The new pair of arcs would provide six or seven new beam passes, going through this magnet array, allowing the energy to be nearly doubled using the existing CEBAF SRF cavity system. One of the immediate accelerator design tasks is to develop a proof-of-principle FFA arc magnet lattice that would support simultaneous transport of 6-7 passes, with energies spanning a factor of two. We also examine a possibility of using combined function magnets to configure a cascade, six-way beam split switchyard. Finally, a novel, multi-pass linac optics based on a triplet focusing lattice is being explored.

Bogacz, S.↗

Copper plating qualification process for the fundamental power coupler waveguides for CEBAF cryomodules

To provide sufficient energy for CEBAF operation, cryomodules and components are being refurbished yearly as necessary. Copper plated fundamental power coupler waveguides are important components of the cryomodules. The integrity and quality of copper plating is critical to reduce the heat load from the waveguides into the He bath at 2.07 K. A search of copper plating resources is underway for plating or re-plating CEBAF-style waveguides. This effort ensures a continuous capability of copper plating on cryomodule components, especially on waveguides. To qualify plating vendors, the waveguide copper plating specifications were revisited, and a thorough plating evaluation process is being developed. The evaluation process ranges from coupon testing to sample waveguide qualification. Recent results are summarized and future work is planned.

Zhao, Liang↗

High Power Solid Target for Positron Source at CEBAF

The progress in the development of a polarized positron injector for the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory is presented. The polarized positron beam is generated by a high current polarized electron beam (>1 mA @ 120 MeV) via bremsstrahlung radiation and e+e- pair production in the tungsten target. The simulations show that using an optimized target and positron beamline, the positron injector can provide a cw positron beam with a current larger than 50 nA and a polarization as large as 60%. Injected into the North Linac of CEBAF at an energy of 123 MeV, the positron beam can reach a maximum energy of 12 GeV to perform a rich experimental program. The results of the thermal and structural FEA analysis of the heat load in the target are presented, as well as the simulation results of radiation damage in the target. The performed and planned target material fatigue and radiation damage tests are discussed. This work is supported by the U.S. DOE, Office of Science, Office of Nuclear Physics, Contract No. DE-AC05-06OR23177 and the European Union?s Horizon 2020 research and innovation program under grant agreement No. 824093.

Ushakov, Andriy↗

SRF Cavity Instability Detection with Machine Learning at CEBAF

During the operation of the Continuous Electron Beam Accelerator Facility (CEBAF), one or more unstable superconducting radio-frequency (SRF) cavities often cause beam loss trips while the unstable cavities themselves do not necessarily trip off. The present RF controls for the legacy cavities report at only 1 Hz, which is too slow to detect fast transient instabilities during these trip events. These challenges make the identification of an unstable cavity out of the hundreds installed at CEBAF a difficult and time-consuming task. To tackle these issues, a fast data acquisition system (DAQ) for the legacy SRF cavities has been developed, which records the sample at 5 kHz. A Principal Component Analysis (PCA) approach is being developed to identify anomalous SRF cavity behavior. We will discuss the present status of the DAQ system and PCA model, along with initial performance metrics. Overall, our method offers a practical solution for identifying unstable SRF cavities, contributing to increased beam availability and machine reliability.

Carpenter, A.↗

An OVERVIEW of MICROPHONICS in CEBAF and CURRENT MODERATION TECHNIQUES

Superconducting RF (SRF) structures are susceptible to frequency detuning from external vibrations and modal mechanical resonances in the structure. These small disturbances, known as microphonics, require additional RF power in CW accelerating structures since the frequency is constantly shifting. In the Jefferson Lab CEBAF accelerator, time and frequency data of this frequency shift have been recorded for many years, allowing a retrospective analysis of different microphonics-mitigation techniques. Some of these techniques are specific to the design of each CEBAF cryomodule, for example implementing BNNT damping material on the cavity string. Other techniques are universal such as affixing vacuum lines and reinforcing waveguide structures.

Powers, Tom↗

Extraction scheme for future CEBAF FFA based energy upgrade

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

Kazimi, Reza↗

PARTICULATE STUDY OF NEG PUMPS IRRADIATED IN THE CEBAF TUNNEL

Non-evaporable getter (NEG) pumps are being used to maintain ultra-high vacuum in the beamline of superconducting radio-frequency (SRF) accelerators, such as the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. Because of the sensitivity of the performance of SRF cavities to particulate contamination, it is important to evaluate the integrity of the NEG material after exposure to high radiation during beam operation. The particulate from two NEG pumps based on ZAO® getter alloy was measured with a particle counter in a clean-room. The pumps were assembled onto a hermetically sealed setup which was placed in the CEBAF tunnel. The setup was exposed to 24 h beam operation for ~ 230 days. The total gamma-rays dose measured on the test setup was ~ 1.6 Mrad. The total neutron dose measured at ~ 75 cm of the test setup was ~ 11 krad. The particulate count from the two pumps was measured again in the clean-room after irradiation. Whereas an increase of particulate counts was measured, compared to before irradiation, subsequent measurements indicate the absence of systematically loose particulate. The pumping speed of one of the irradiated pumps was also measured to be consistent with that of a non-irradiated one, corroborating the absence of significant damage to the ZAO® NEG material due to irradiation.

Ciovati, Gianluigi [Thomas Jefferson National Acce↗

SRF cavity instability detection with machine learning at CEBAF

During the operation of the Continuous Electron Beam Accelerator Facility (CEBAF), one or more unstable superconducting radio-frequency (SRF) cavities often cause beam loss trips while the unstable cavities themselves do not necessarily trip off. The present RF controls for the legacy cavities report at only 1 Hz, which is too slow to detectfast transient instabilities during these trip events. These challenges make the identification of an unstable cavity out of the hundreds installed at CEBAF a difficult and time-consuming task. To tackle these issues, a fast data acquisition system (DAQ) for the legacy SRF cavities has been developed, which records the sample at 5 kHz. An unsupervised learning framework has been developed to identify anomalous SRF cavity behavior. We will discuss the present status of the DAQ system and our framework, along with recent successes in detecting anomalous cavity behavior. Overall, our method offers a practical solution for identifying unstable SRF cavities, contributing to increased beam availability and machine reliability.

Accelerator Physics↗

Future Plans at Jefferson Lab: 12 GeV CEBAF Upgrade and Electron-Ion Collider (ELIC)

The 12 GeV CEBAF Upgrade at Jefferson Lab will greatly expand the scientific capabilities for nuclear physics. The scope and status of the construction project as well as the key science motivations are presented. Beyond 12 GeV, a compelling scientific case is developing for an electron ion collider to address fundamental questions in hadronic physics which complement the definitive study of the valence region possible at the 12 GeV facility. A CEBAF-based collider of 9 GeV electrons/positrons and 225 GeV ions, known as ELIC, is envisioned to meet this science need.

Lung, Allison↗

Production and Testing Experience with the SRF Cavities for the CEBAF 12 GeV Upgrade

The CEBAF recirculating CW electron linear accelerator at Jefferson Lab is presently undergoing a major upgrade to 12 GeV. This project includes the fabrication, preparation, and testing of 80 new 7-cell SRF cavities, followed by their incorporation into ten new cryomodules for subsequent testing and installation. In order to maximize the cavity Q over the full operable dynamic range in CEBAF (as high as 25 MV/m), the decision was taken to apply a streamlined preparation process that includes a final light temperature-controlled electropolish of the rf surface over the vendor-provided bulk BCP etch. Cavity processing work began at JLab in September 2010 and will continue through December 2011. The excellent performance results are exceeding project requirements and indicate a fabrication and preparation process that is stable and well controlled. The cavity production and performance experience to date will be summarized and lessons learned reported to the community.

43 PARTICLE ACCELERATORS↗

STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING

CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

43 PARTICLE ACCELERATORS↗

Preparation and Testing of the SRF Cavities for the CEBAF 12 GeV Upgrade

Eighty new 7-cell, low-loss cell-shaped cavities are required for the CEBAF 12 GeV Upgrade project. In addition to ten pre-production units fabricated at JLab, the full set of commercially-produced cavities have been delivered. An efficient processing routine, which includes a controlled 30 micron electropolish, has been established to transform these cavities into qualified 8-cavity strings. This work began in 2010 and will run through the end of 2011. The realized cavity performance consistently exceeds project requirements and also the maximum useful gradient in CEBAF: 25 MV/m. We will describe the cavity processing and preparation protocols and summarize test results obtained to date.

43 PARTICLE ACCELERATORS↗

RF Design Optimization for New Injector Cryounit at CEBAF

A new injector superconducting RF (SRF) cryounit with one new 2-cell, B=0.6 cavity plus one refurbished 7-cell, B=0.97, C100 style cavity has been re-designed and optimized for the engineering compatibility of existing module for CEBAF operation. The optimization of 2-cell cavity shape for longitudinal beam dynamic of acceleration from 200keV to 533keV and the minimization of transverse kick due to the waveguide couplers to less than 1 mrad have been considered. Operating at 1497MHz, two cavities has been designed into a same footprint of CEBAF original quarter cryomodule to deliver an injection beam energy of 5MeV in less than 0.27{degree} rms bunch length and a maximum energy spread of 5keV.

43 PARTICLE ACCELERATORS↗

Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab is nearing completion of an energy upgrade from 6 to 12 GeV. An integral part of the upgrade is the addition of ten new cryomodules, each consisting of eight seven-cell superconducting radio-frequency (SRF) cavities. An average performance of 100+MV of acceleration per cryomodule is needed to achieve the 12 GeV beam energy goal. The production methodology was for industry to provide and deliver the major components to Jefferson Lab, where they were tested and assembled into cryomodules. The production process begins with an inspection upon receiving of all major components followed by individual performance qualification testing. The SRF cavities received their final chemical processing and cleaning at Jefferson Lab. The qualified components along with all associated hardware and instrumentation are assembled, tested, installed into CEBAF and run through an integrated system checkout in preparation for beam operations. The production process is complete and one of the first completed cryomodules has successfully produced 108 MV of acceleration with a linac beam current of 465 {micro}A.

43 PARTICLE ACCELERATORS↗

CEBAF Upgrade: Cryomodule Performance And Lessons Learned

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

43 PARTICLE ACCELERATORS↗

Using Polarimetry to Determine the CEBAF Beam Energy

As Jefferson Lab begins operations with its upgraded CEBAF a ccelerator, the lab once again needs to experimentally determine the absolute beam energy of the machine. Previously, the CE- BAF beam energy was determined using precision measurement s of the bending magnet integral fields along with beam position information. The result obta ined from this technique was cross- checked with elastic scattering from hydrogen where knowle dge of the scattering angles of the electron and proton allow the beam energy to be determined. Wh ile the field integral method will still work with the upgraded machine, the elastic cross sect ion becomes too small to make preci- sion measurements at angles that are large enough to be easil y accessible; thus a new technique for energy determination has been sought. It will be shown th at by making use of polarimetry, one can use CEBAF’s polarized electrons’ g-2 spin precessio n to determine the absolute beam energy. This can be done in a single hall if the parameters of t he machine, such as the injector energy and linac imbalance, are known or with two halls witho ut any knowledge of the machine parameters

Higinbotham, Douglas W.↗

Cavity Design, Fabrication and Commission Performance of a 750MHz, 4-rod Separator for CEBAF 4-Hall Beam Delivery System

A short version of the original CEBAF normal conducting 4-rod separator cavity has been developed into a 750MHz one * since the concept of simultaneous 4-hall operation for CEBAF is introduced **. This work has been advanced further based on the EM design optimization, bench measurement and by conducting RF-thermal coupled simulation using CST and ANSYS to confirm the cavity tuning and thermal performance. The cavity fabrication used matured technology like copper plating and machining. The cavity flanges, couplers, tuners and cooling channels adopted consistent/compatible hardware with the existing 500MHz cavities. The electromagnetic and thermal design simulations have greatly reduced the prototyping and bench tuning time of the first prototype. Four production cavities have reached a typical 1.94MV kick voltage or 3.0kW wall loss on each cavity after a minor multipactoring or no processing, 7.5% overhead power than the design specification.

Wang, Haipeng↗

Insights into Nb3Sn coating of CEBAF cavities from witness sample analysis

With the progress made in the Nb3Sn coatings on single-cell SRF cavities, development is ongoing to reproduce single-cell cavity results on practical structures such as CEBAF 5-cell cavities. During CEBAF cavity coating development, several changes from the single-cell procedure to the coating setup and the heating profile were introduced to improve the quality of Nb3Sn films. To witness the properties of grown Nb3Sn films in different cavity locations, 10 mm x 10 mm samples were positioned in strategic places within the coating chamber. Composition and structure of the samples were analyzed with surface analytic techniques and correlated with sample location during coatings. Implications from sample analysis to Nb3Sn coatings on different geometries are discussed in this contribution.

Eremeev, G. V.↗