Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMPACT COMMISSIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Justification Of The Use Of Boreholes For Disposal Of Sealed Radiological Sources

Soon there will be only 14 states in two compacts that are able to dispose of Low Level Waste (LLW): the Northwest and Rocky Mountain compact with disposal options in Richland, Washington, and the Atlantic compact with disposal options in Barnwell, South Carolina. How do states not in one of the two compacts dispose of their LLW? The Off-Site Source Recovery Project can take possession and dispose of some of the unwanted transuranic sources at the Waste Isolation Pilot Plant (WIPP). However, there will be no path forward for states outside of the two compacts for disposal of their non-transuranic LLW. A solution that has been much discussed, debated and researched, but has not been put into wide scale practice, is the borehole disposal concept. It is the author's position that companies that drill and explore for oil have been disposing of sources in borehole-like structures for years. It should be noted that these companies are not purposely disposing of these sources, but the sources are irretrievable and must be abandoned. Additionally, there are Nuclear Regulatory Commission (NRC) regulations that must be followed to seal the well that contains the lost and abandoned source. According to the NRC Event Notification Reports database, there were a minimum of 29 reports of lost and abandoned sources in oil wells between December 1999 and October 2006. The sources were lost at depths between 2,018-18,887 feet, or 600-5,750 meters. The companies that are performing explorations with the aid of sealed radiological sources must follow regulation 10 CFR Part 39. Subsection 15 outlines the procedures that must be followed if sources are determined to be irretrievable and abandoned in place. If the NRC allows and has regulations in place for oil companies, why can't states and/or companies be allowed to dispose of LLW in a similar fashion?

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Mini Linac Based Positron Source at CEA-Saclay

We are installing at CEA-Saclay a demonstration setup for an intense positron source. It is based on a compact 5.5 MeV electron linac used to produce positrons via pair production on a tungsten target. A relatively high current of 0.15 mA compensates for low positron efficiencies at low energy, which is below the neutron activation threshold. The expected production rate is 5centre dot10{sup 11} fast positrons per second. A set of coils is arranged to select the fast positrons from the diffracted electron beam in order to study the possibility of using a rare gas cryogenic moderator away from the main flux of particles. The commissioning of the linac is under way. This setup is part of a project to demonstrate the feasibility of an experiment to produce the H{sup +} ions for a free fall measurement of neutral antihydrogen (H). Its small size and cost could be of interest for material science applications, after adaptation of the time structure.

43 PARTICLE ACCELERATORS↗

Evaluation of the Feasibility and Viability of Modular Pumped Storage Hydro (m-PSH) in the United States

The viability of modular pumped storage hydro (m-PSH) is examined in detail through the conceptual design, cost scoping, and economic analysis of three case studies. Modular PSH refers to both the compactness of the project design and the proposed nature of product fabrication and performance. A modular project is assumed to consist of pre-fabricated standardized components and equipment, tested and assembled into modules before arrival on site. This technology strategy could enable m-PSH projects to deploy with less substantial civil construction and equipment component costs. The concept of m-PSH is technically feasible using currently available conventional pumping and turbine equipment, and may offer a path to reducing the project development cycle from inception to commissioning.

13 HYDRO ENERGY↗

Transitional cores and fuel cycle analyses in support of MIT reactor low enriched uranium fuel conversion

The Massachusetts Institute of Technology Reactor (MITR) is a research reactor in Cambridge, Massachusetts designed primarily for experiments using neutron beam and in-core irradiation facilities. At 6 MW, it delivers neutron flux and energy spectrum comparable to power light water reactors (LWRs) in a compact core using highly enriched uranium (HEU) fuel. In the framework of non-proliferation policy, research and test reactors have started a program to convert HEU fuel to low enriched uranium (LEU) fuel. A new type of LEU fuel based on a high density alloy of uranium and molybdenum (U-10Mo) is expected to allow conversion of U.S. high performance research reactors (USHPRRs) like the MITR. The Preliminary Safety Analysis Report (PSAR) for the MITR LEU conversion has been submitted and currently under review by the U.S. Nuclear Regulatory Commission (NRC). A transition core plan, from 22 fresh LEU fuel elements (i.e., beginning-of-life) gradually to 24 of them arranged in an equilibrium configuration, is expected to serve as an appendix chapter in the final SAR. The current study reported here presents the fuel cycle development, which eventually leads to the transition core plan. The results confirm the equilibrium state, where both the shim bank movement (i.e., core reactivity) as well as the content of fissile materials stabilize, can be achieved by fixed-pattern fuel management. Fission density has been evaluated for a number of fully discharged LEU fuel elements, using a best-estimate approach. The fuel cycle calculations also generate power profiles at each core state. A steady-state thermal-hydraulic safety analysis has thus been performed, where onset of nucleate boiling (ONB) is considered as the safety criterion. The results confirm significant margin to ONB at all analyzed transition and equilibrium fuel cycle states.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical Free Surface Processing for High Gradient Superconducting RF Cavities

Chemical treatment such as buffered chemical polishing (BCP) or electro polishing (EP) followed by high pressure rinsing (HPR) of niobium (Nb) superconducting RF (SRF) cavities is expensive and complex multistep process. Furthermore, the cavity RF surfaces after the treatment still have numerous bubbles and pits that result from welding. These quench-producing weld defects together with the particulate contamination, result in significant scatter of the multi-cell Nb SRF cavities performance characteristics. This scatter is the major problem in the current manufacturing of the Nb SRF cavities. When developed the chemical free surafce processing using IEB will benefit first J-lab's CEBAF and Fermilab's Project X. Also, light sources, require 1.3 - 1.5 GHz SRF structures. Furthermore, IEB will produce much broader impact because it can be implemented into manufacturing of many other types of RF devices including both superconducting as well as normal conducting RF cavities. This program will develop a new process that will enhance quality of the superconducing radio-frequency cavities and allow acceleration of charged particles to much higher energies. The process also will improve the cavity manufacturing and result in substantial cost reduction of superconducting radio-frequency high-energy particle accelerators. Niobium samples were successfully processed by a DC electron beam to a degree that is suitable for the interior surface of an SRF cavity. To accomplish this, a complete system was developed from the ground up. A vacuum chamber system was acquired and adapted to act as the vessel for performing the Nb processing experiments. An extremely robust high voltage power supply was developed and manufactured to provide the power necessary to drive the multi-kW DC electron gun. A high voltage isolation filament transformer was also designed and manufactured to provide the necessary current to drive the filament within the electron gun. Finally, a beam melt characterization DC electron gun was created. This gun was used to explore the parameter space of interest for processing Nb SRF cavities. The beam melt characterization tests concluded that multiple quick passes at moderate beam power provided the most ideal melt zone characteristics Nb surfaces. It was also found that excellent melt and polish results could be achieved at lower voltages than originally conceived, getting the great results at a beam voltage of 20kV versus the 50kV used in the initial Phase I testing at Jefferson Laboratory. Operating at 20kV will also greatly reduce the challenges of designing a compact DC electron gun for processing of complete Nb SRF cavities, which will be done in Phase III. This final report is divided in eight parts which cover the major investigation work and results which have been performed and achieved. The first part addresses the design, fabrication and testing of the vacuum chamber. In the second part, the DC power supply output circuit design is presented for providing an operating space of 50-60kV with currents from 20-160mA and short and open circuit fault modes are considered and resolved. The third section covers testing and commissioning of the high voltage step up transformer and 150kV isolation transformer. Section four covers the design, construction and performance for a 100kV high voltage bushing. Section number five treats the filament design and load testing. Section number six covers electron gun design and simulation of electron beam melting. Section seven presents the beam target design, assembly and testing and test gun with solenoid magnet, design, fabrication and testing. Finally, section eight demonstrates electron beam melting and polishing of Nb, Cu and SS samples.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Ultracompact Accelerator Technology for a Next-Generation Gamma-Ray Source

This presentation reported on the technology choices and progress manufacturing and testing the injector and accelerator of the 250 MeV ultra-compact Compton Scattering gamma-ray Source under development at LLNL for homeland security applications. This paper summarizes the status of various facets of current accelerator activities at LLNL. The major components for the X-band test station have been designed, fabricated, and await installation. The XL-4 klystron has been delivered, and will shortly be dressed and installed in the ScandiNova modulator. High power testing of the klystron into RF loads will follow, including adjustment of the modulator for the klystron load as necessary. Assembly of RF transport, test station supports, and accelerator components will follow. Commissioning will focus on processing the RF gun to full operating power, which corresponds to 200 MV/m peak electric field on the cathode surface. Single bunch benchmarking of the Mark 1 design will provide confidence that this first structure operates as designed, and will serve as a solid starting point for subsequent changes, such as a removable photocathode, and the use of various cathode materials for enhanced quantum efficiency. Charge scaling experiments will follow, partly to confirm predictions, as well as to identify important causes of emittance growth, and their scaling with charge. Multi-bunch operation will conclude testing of the Mark 1 RF gun, and allow verification of code predictions, direct measurement of bunch-to-bunch effects, and initial implementation compensation mechanisms. Modeling will continue and focus on supporting the commissioning and experimental program, as well as seeking to improve all facets of linac produced Compton gamma-rays.

42 ENGINEERING↗

SCINTILLATION ARCS IN LOW-FREQUENCY OBSERVATIONS OF THE TIMING-ARRAY MILLISECOND PULSAR PSR J0437–4715

Low-frequency observations of pulsars provide a powerful means for probing the microstructure in the turbulent interstellar medium (ISM). Here we report on high-resolution dynamic spectral analysis of our observations of the timing-array millisecond pulsar PSR J0437–4715 with the Murchison Widefield Array (MWA), enabled by our recently commissioned tied-array beam processing pipeline for voltage data recorded from the high time resolution mode of the MWA. A secondary spectral analysis reveals faint parabolic arcs akin to those seen in high-frequency observations of pulsars with the Green Bank and Arecibo telescopes. Data from Parkes observations at a higher frequency of 732 MHz reveal a similar parabolic feature with a curvature that scales approximately as the square of the observing wavelength (λ{sup 2}) to the MWA's frequency of 192 MHz. Our analysis suggests that scattering toward PSR J0437–4715 predominantly arises from a compact region about 115 pc from the Earth, which matches well with the expected location of the edge of the Local Bubble that envelopes the local Solar neighborhood. As well as demonstrating new and improved pulsar science capabilities of the MWA, our analysis underscores the potential of low-frequency pulsar observations for gaining valuable insights into the local ISM and for characterizing the ISM toward timing-array pulsars.

79 ASTRONOMY AND ASTROPHYSICS↗

An Update On Waste Control Specialists' 2004 License Application For Safe Disposal Of Class A, B, and C Low-Level Radioactive Waste In Texas

On December 10, 2007, Waste Control Specialists LLC (WCS) received notification that the Executive Director of the Texas Commission on Environmental Quality (TCEQ) had prepared an interim draft license and made a preliminary decision that it met all statutory and regulatory requirements for safe disposal of low-level radioactive waste (LLW) at the WCS' site in Texas. Pursuant to this interim draft license, WCS will be authorized to dispose Class A, B, and C LLW in two enhanced near-surface landfills at WCS' 5.4-square-kilometer (1,338-acre) treatment, storage, and disposal (TSD) site in Andrews County, Texas (Fig. 1). One landfill will be dedicated to LLW generated within the member/party states of the Texas Compact (Texas and Vermont), while the other will be dedicated to LLW generated by the federal government. The calculated annual peak dose to the maximally exposed member of the general public, i.e., an adjacent resident, from any of the proposed LLW-disposal landfills occurs approximately 36,400 years after closure and is 0.034 milli-sievert (mSv) (3.4 milli-rem (mrem)), which is less than 14 percent of the applicable regulatory limit of 25 mSv (25 mrem). The draft license will be published in February 2008, which will be followed by 12 months of public hearings, and three months for preparation of the final license. Based on this schedule, the final license is due in May 2009. When opened, the WCS site will achieve a national milestone; it will be the first new Compact LLW-disposal site in the USA to open under the Low-Level Radioactive Waste Policy Act of 1980, as amended in 1985. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience with dynamic resource provisioning of the CMS online cluster using a cloud overlay

The primary goal of the online cluster of the Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) is to build event data from the detector and to select interesting collisions in the High Level Trigger (HLT) farm for offline storage. With more than 1500 nodes and a capacity of about 850 kHEPSpecInt06, the HLT machines represent similar computing capacity of all the CMS Tier1 Grid sites together. Moreover, it is currently connected to the CERN IT datacenter via a dedicated 160 Gbps network connection and hence can access the remote EOS based storage with a high bandwidth. In the last few years, a cloud overlay based on OpenStack has been commissioned to use these resources for the WLCG when they are not needed for data taking. This online cloud facility was designed for parasitic use of the HLT, which must never interfere with its primary function as part of the DAQ system. It also allows to abstract from the different types of machines and their underlying segmented networks. During the LHC technical stop periods, the HLT cloud is set to its static mode of operation where it acts like other grid facilities. The online cloud was also extended to make dynamic use of resources during periods between LHC fills. These periods are a-priori unscheduled and of undetermined length, typically of several hours, once or more a day. For that, it dynamically follows LHC beam states and hibernates Virtual Machines (VM) accordingly. Finally, this work presents the design and implementation of a mechanism to dynamically ramp up VMs when the DAQ load on the HLT reduces towards the end of the fill.

97 MATHEMATICS AND COMPUTING↗

The CBETA Fractional Arc Test

As part of this development effort, the Cornell-BNL Energy recovery linac Test Accelerator (CBETA) [3], a 4-pass, 150 MeV energy recovery linac (ERL), utilizing a Non-scaling Fixed Field Alternating-gradient (NS-FFA) permanent magnet return loop, is currently under design and construction at Cornell University through the joint collaboration of Brookhaven National Lab (BNL) and the Cornell Laboratory for Accelerator based Sciences and Education (CLASSE). Building on the significant advancements in high-brightness photoelectron sources and SRF technology at Cornell, as well as the FFA magnet and lattice design expertise from BNL, CBETA will establish the operation of a multi-turn SRF based ERL utilizing a compact FFA return loop with large energy acceptance (a factor of roughly 3.6 in energy), and thus demonstrate one possible cost-reduction technology under consideration for the eRHIC design. Moreover, successful completion of the CBETA project requires the study and measurement of many critical phenomena relevant to designing the EIC: the Beam-Breakup (BBU) instability, halo-development and collimation, growth in energy spread from Coherent Synchrotron Radiation (CSR), and CSR micro bunching, and thus should provide valuable insight to the EIC and ERL communities. In order to demonstrate the viability of the CBETA design, the Fractional Arc Test (FAT) was added to the CBETA commissioning sequence.

43 PARTICLE ACCELERATORS↗

Commissioning of an MPGD-based Drift Chamber for Heavy-ion Tracking in FRIB's Sweeper magnet system

A newly developed drift chamber equipped with an innovative hybrid Micro-Pattern Gaseous Detector based readout was commissioned at FRIB. The detector consists of a Multi-layer Thick Gas Electron Multiplier (M-THGEM) mounted over a high-granularity, position-sensitive readout board. Denoted as the Micro-Pattern Drift Chamber (MPDC), the new device is used to provide tracking capability as part of the detectors of the Sweeper magnet system for neutron-invariant-mass spectrometry at the Facility for Rare Isotope Beams (FRIB). The localization of impinging ions in a 30 × 30 cm 2 drift area is derived by processing the charge-avalanche distribution induced on the segmented readout board. The signals induced on the readout pads are processed by a compact, multi-channel Data Acquisition System (DAQ) based on the Scalable Readout System (SRS). To facilitate synchronization with other detector systems of the Sweeper magnet system, the SRS has been configured to accept an external trigger.

Gaseous detectors↗

Participation in and Assessment of the Third DNCSH Public Workshop

Advanced reactor development and deployment is introducing fuel forms, materials, and configurations that differ from those used in traditional light-water reactors (LWRs), including tristructural-isotropic (TRISO)-based fuels, moderators, high-temperature materials, and compact core designs. These attributes can fall outside the range of applicability of existing criticality safety validation bases and may require additional work in code validation and benchmark applicability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Experimental Investigation of Students’ Learning Effects When Using a Simplified Nuclear Simulator

Securing enough data has been a main challenge in human reliability analysis (HRA). Many researchers and institutes have made a lot of efforts for collecting HRA data to produce reasonable human error probabilities (HEPs) as well as reduce the uncertainty of HRA quantification. Representatively, U.S. Nuclear Regulatory Commission (U.S. NRC), Korea Atomic Energy Research Institute (KAERI) and Idaho National Laboratory (INL) have led lots of empirical research regarding the HRA data collection. The U.S. NRC and KAERI have mainly carried out full-scope simulator research collecting HRA data through experiments using full-scope simulators with actual operators. In contrast, INL has experimentally collected the data using simplified simulators and student operators. INL has proposed the Simplified Human Error Experimental Program (SHEEP) framework to complement full-scope data collection efforts by suggesting a way to infer full-scope data based on experimental data collected from students operating simplified simulators, specifically the Rancor Microworld Simulator (Rancor) and the Compact Nuclear Simulator (CNS). The aim of the SHEEP framework is to lower the entry point for collecting useful HRA data by securing large sample sizes at a reasonable amount of cost and labor while also guaranteeing a high degree of freedom when designing experiments. The authors’ previous research investigated whether data collected from the SHEEP framework could support a representative full-scope study. Besides, human performance differences between professional and student operators when using Rancor and CNS have been analyzed to understand the lack of fidelity of the simplified simulators and student operators within the SHEEP study. As a follow up research, this study experimentally investigates students’ learning effects and the performance trends over a certain period when using Rancor. This study aims to find out 1) how much training or education is required to collect HRA data from non-experts (i.e., students) when using Rancor and 2) how much differences there are in human performance measures between students and professional operators. In this study, a longitudinal experiment is developed. The four experiment trials with two weeks interval are carried out for sixteen undergraduate students majoring nuclear engineering at Chosun University. Totally four scenarios randomly selected from ten Rancor scenarios are used in each experiment trial. Four human performance measurements (i.e., workload, situation awareness, time and error) are considered in the experiment. Lastly, the trend of students’ performance is compared with operator data having been collected from the previous experiment.

99 GENERAL AND MISCELLANEOUS↗

Development of a Laser-Electron-Interaction Region for Compact High Repetition-Rate Mono-Energetic Laser Based Gamma Sources

Inverse-Compton scattering (ICS) is a well-established technique capable of producing monochromatic radiation over a large range of the electromagnetic spectrum. Most recently, ICS has attracted attention, owing to its compactness and possible coupling with novel acceleration methods to yield compact X- and 𝛄-ray sources. Under this award, we carried out a systematic optimization of the ICS and demonstrate via numerical simulation that combining ICS with a conventional superconducting linac could produce Watt-level average-power 𝛄 rays with high spectral brightness. The study is performed with idealized laser and electron-beam distributions and confirmed with the realistic distributions simulated from start-to-end numerical modeling of the electron accelerator. The studies led to the design and engineering design of an ICS interaction point for the FAST facility along with some beam measurement. Due to the cancellation of the program in Year 3 long with delay in the commissioning of the FAST facility, we were not able to demonstrate the generation of 𝛄 rays, we, however, procured some of the hardware, installed some of the required infrastructures and plan to eventually generate 𝛄 ray pending future interest on the topics and availability of funding.

43 PARTICLE ACCELERATORS↗

A compact and low-weight sputtering unit for in situ investigations of thin film growth at synchrotron radiation beamlines

In this work, we report on a highly variable, compact, and light high-vacuum sputter deposition unit designed for in situ experiments using synchrotron radiation facilities. The chamber can be mounted at various synchrotron beamlines for scattering experiments in grazing incidence geometry. The sample position and the large exit window allow to perform x-ray experiments up to large q values. The sputtering unit is easy to mount on existing experimental setups and can be remote-controlled. In this paper, we describe in detail the design and the performance of the new sputtering chamber and present the installation of the apparatus at different 3rd generation light sources. Furthermore, we describe the different measurement options and present some selected results. The unit has been successfully commissioned and is now available for users at PETRA III at DESY.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Ultra-High Gradient Compact S-Band Linac for Laboratory and Industrial Applications

There is growing demand from the industrial and research communities for high gradient, compact RF accelerating structures. The commonly used S-band SLAC-type structure has an operating gradient of only about 20 MV/m; while much higher operating gradients (up to 70 MV/m) have been recently achieved in X-band, as a consequence of the substantial efforts by the Next Linear Collider (NLC) collaboration to push the performance envelope of RF structures towards higher accelerating gradients. Currently however, high power X-band RF sources are not readily available for industrial applications. Therefore, RadiaBeam Technologies is developing a short, standing wave S-band structure which uses frequency scaled NLC design concepts to achieve up to a 50 MV/m operating gradient at 2856 MHz. The design and prototype commissioning plans are presented.

43 PARTICLE ACCELERATORS↗

AP1000{sup R} design robustness against extreme external events - Seismic, flooding, and aircraft crash

Both the International Atomic Energy Agency (IAEA) and the U.S. Nuclear Regulatory Commission (NRC) require existing and new nuclear power plants to conduct plant assessments to demonstrate the unit's ability to withstand external hazards. The events that occurred at the Fukushima-Dai-ichi nuclear power station demonstrated the importance of designing a nuclear power plant with the ability to protect the plant against extreme external hazards. The innovative design of the AP1000{sup R} nuclear power plant provides unparalleled protection against catastrophic external events which can lead to extensive infrastructure damage and place the plant in an extended abnormal situation. The AP1000 plant is an 1100-MWe pressurized water reactor with passive safety features and extensive plant simplifications that enhance construction, operation, maintenance and safety. The plant's compact safety related footprint and protection provided by its robust nuclear island structures prevent significant damage to systems, structures, and components required to safely shutdown the plant and maintain core and spent fuel pool cooling and containment integrity following extreme external events. The AP1000 nuclear power plant has been extensively analyzed and reviewed to demonstrate that it's nuclear island design and plant layout provide protection against both design basis and extreme beyond design basis external hazards such as extreme seismic events, external flooding that exceeds the maximum probable flood limit, and malicious aircraft impact. The AP1000 nuclear power plant uses fail safe passive features to mitigate design basis accidents. The passive safety systems are designed to function without safety-grade support systems (such as AC power, component cooling water, service water, compressed air or HVAC). The plant has been designed to protect systems, structures, and components critical to placing the reactor in a safe shutdown condition within the steel containment vessel which is further surrounded by a substantial 'steel concrete' composite shield building. The containment vessel is not affected by external flooding, and the shield building design provides hazard protection beyond that provided by a comparable reinforced concrete structure. The intent of this paper is to demonstrate the robustness of the AP1000 design against extreme events. The paper will focus on the plants ability to withstand extreme external events such as beyond design basis flooding, seismic events, and malicious aircraft impact. The paper will highlight the robustness of the AP1000 nuclear island design including the protection provided by the unique AP1000 composite shield building. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗