Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

HANFORDS PUBLIC TOUR PROGRAM - AN EXCELLENT EDUCATIONAL TOOL

Prior to 2001, the Department of Energy (DOE) sponsored limited tours of the Hanford Site for the public, but discontinued the program after the 9/11 terrorist attacks on the U.S. In 2003, DOE's Richland Operations Office (DOE-RL) requested the site's prime contractor to reinstate the public tour program starting in 2004 under strict controls and security requirements. The planning involved a collaborative effort among the security, safety and communications departments of DOE-RL and the site's contracting companies. This paper describes the evolution of, and enhancements to, Hanford's public tours, including the addition of a separate tour program for the B Reactor, the first full-scale nuclear reactor in the world. Topics included in the discussion include the history and growth of the tour program, associated costs, and visitor surveys and assessments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Program for Optimizing SRF Linac Costs

Every well-designed machine goes through the process of cost optimization several times during its design, production and operation. The initial optimizations are done during the early proposal stage of the project when none of the systems have been engineered. When a superconducting radio frequency (SRF) linac is implemented as part of the design, it is often a difficult decision as to the frequency and gradient that will be used. Frequently, such choices are made based on existing designs, which invariably necessitate moderate to substantial modifications so that they can be used in the new accelerator. Thus the fallacy of using existing designs is that they will frequently provide a higher cost machine or a machine with sub-optimal beam physics parameters. This paper describes preliminary results of a new software tool that allows one to vary parameters and understand the effects on the optimized costs of construction plus 10 year operations of an SRF linac, the associated cryogenic facility, and controls, where operations includes the cost of the electrical utilities but not the labor or other costs. It derives from collaborative work done with staff from Accelerator Science and Technology Centre, Daresbury, UK [1] several years ago while they were in the process of developing a conceptual design for the New Light Source project. The initial goal was to convert a spread sheet format to a graphical interface to allow the ability to sweep different parameter sets. The tools also allow one to compare the cost of the different facets of the machine design and operations so as to better understand the tradeoffs.

43 PARTICLE ACCELERATORS↗

DELSOL v. 3

DELSOL calculates collector field performance and layout and optimal system design for solar thermal central receiver plants. The code consists of a detailed model of the optical performance, a simpler model of the non-optical performance, an algorithm for field layout, and a searching algorithm to find the best system design based on energy cost. The latter two features are coupled to a cost model of central receiver components and an economic model for calculating energy costs. The program optimizes the tower height, receiver size, field layout, heliostat spacings, and tower position at user specified power levels.

KISTLER, BRUCE↗

Working Group Report: New Light Weakly Coupled Particles

Dark sectors, consisting of new, light, weakly-coupled particles that do not interact with the known strong, weak, or electromagnetic forces, are a particularly compelling possibility for new physics. Nature may contain numerous dark sectors, each with their own beautiful structure, distinct particles, and forces. This review summarizes the physics motivation for dark sectors and the exciting opportunities for experimental exploration. It is the summary of the Intensity Frontier subgroup "New, Light, Weakly-coupled Particles" of the Community Summer Study 2013 (Snowmass). We discuss axions, which solve the strong CP problem and are an excellent dark matter candidate, and their generalization to axion-like particles. We also review dark photons and other dark-sector particles, including sub-GeV dark matter, which are theoretically natural, provide for dark matter candidates or new dark matter interactions, and could resolve outstanding puzzles in particle and astro-particle physics. In many cases, the exploration of dark sectors can proceed with existing facilities and comparatively modest experiments. A rich, diverse, and low-cost experimental program has been identified that has the potential for one or more game-changing discoveries. These physics opportunities should be vigorously pursued in the US and elsewhere.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Risk to Ecological Resources on Burial Waste Sites on the Hanford Site, Washington - 20248

The US and other nations have a large nuclear and chemical waste remediation task remaining from World War II, the Cold War, and industrial activities. The US Department of Energy (DOE) has the largest task in the U.S., with Hanford (Washington State) being the most contaminated site, with the longest and most costly cleanup program projected to extend to the end of the century. One of the greatest remediation problems at Hanford are the burial waste facilities, some of which are inside the 200 Areas on the Central Plateau, while others are outside the 200 Areas. These areas are associated with waste sites, pipes, and contaminated trenches, posing technical cleanup challenges to meet DoE's remediation goals, including protection of human health and the environment commensurate with Tri- Party Agreement and current regulatory requirements. In this paper we select one of the legacy waste sites (the BC Cribs and Trenches) as a case study to explore how risk to ecological resources varies during and as a consequence of remediation on sites primarily considered legacy waste sites. We used the risk methodology developed by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) during the Hanford Site-wide Risk Review. The CRESP methodology included evaluating the risk to receptors, including human health, the Columbia River, groundwater, and ecological and cultural resources. The risk evaluation process for ecological receptors included defining the boundaries of each evaluation unit (EU) to be remediated, definition of a suitable buffer area that might be affected, and consideration of the known resource value based on field work. This information, coupled with known remediation options or strategies, allowed us to develop a risk rating for ecological resources. Site risks were evaluated on a scale of 'not discernible' to 'very high' risk. Consideration of the risks at the buried waste sites was complicated by uncertainties in remediation methods and the degree of restoration that would occur as part of the remediation process. We use the BC Cribs and Trenches as a case study to explore why the risks are low currently but increase during remediation. The current 'not discernible to low' risk rating is due to the lack of high quality ecological resources on the BC Cribs and Trenches EU, except for edge areas (with some state-listed species). During remediation the risks increase to 'medium', mainly due to high quality resources on adjacent buffer lands, which could be disrupted during active remediation. Medium and high quality resources on the edge of the site are continuous with higher quality native shrub-steppe habitat on the buffer. Ecological resources on some of the areas surrounding the 200 East and West Areas are some of the highest quality shrub-steppe areas on the Hanford Site, and risk to these resources could be prevented by planning before and during remediation to minimize disruption. For example, lay down areas for the BC Cribs and Trenches can be minimized by careful planning. Heavy truck and other vehicular traffic can be minimized. Spread of the noxious weeds now on some of the site can be prevented, and the spread of invasive species into the site (particularly near undisturbed shrub-steppe habitat) can be reduced. Further, the areas around and between the 200 East and West Areas have been largely undisturbed and can serve as a source of seeds and propagules for any revegetation that occurs as part of the remediation process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implications of Cost Effectiveness Screening Practices in a Low Natural Gas Price Environment: Case Study of a Midwestern Residential Energy Upgrade Program

With the proliferation of statewide energy savings targets and other policies favorable to energy efficiency, savings from utility customer-funded energy efficiency programs could rise to offset much of annual load growth by 2025 (Barbose et al 2013). For these increased savings to occur, however, nearly all of these programs must pass screening for cost effectiveness. Some program administrators and state regulators are finding that conventional analyses, which only consider a narrow set of energy-savings related efficiency program benefits, are now resulting in some natural gas efficiency programs failing their cost-effectiveness criteria in the new low natural gas price environment. Regulators are considering whether to scale back or terminate gas portfolios in at least four states (WA, OR, ID, NM) because of cost-effectiveness concerns. Stakeholders in several regions of the country have asked LBNL to help assess alternatives to reducing the pursuit of energy savings in their regions. We address these requests by producing two working papers: one exploring cost-effectiveness screening policy implications of low to moderate natural gas prices, and a second assessing some of the values that policymakers may take into account in weighing the pros and cons of ending natural gas efficiency programs. In this policy brief, we lay out the challenges that low gas prices pose for cost effectiveness of an electric-gas efficiency program and portfolio. We then quantify options available to regulators and administrators who want to evaluate the tradeoffs among multiple policy objectives. A multi-measure, residential energy upgrade program in the Midwest is used as a lens to explore the implications of common and emerging cost-effectiveness policies in the context of low prices for natural gas. We illustrate the results across a range of cost-effectiveness screening options, including different discount rates, levels of test application, various benefit-cost tests, and the inclusion of non-energy resource benefits.

03 NATURAL GAS↗

A random onset model for degradation of high-reliability systems

Both the U. S. Department of Defense (DoD) and Department of Energy (DOE) maintain weapons stockpiles: items like bullets, missiles and bombs that have already been produced and are being stored until needed. Ideally, these stockpiles maintain high reliability over time. To assess reliability, a surveillance program is implemented, where units are periodically removed from the stockpile and tested. The most definitive tests typically destroy the weapons so a given unit is tested only once. Surveillance managers need to decide how many units should be tested, how often they should be tested, what tests should be done, and how the resulting data are used to estimate the stockpile's current and future reliability. These issues are particularly critical from a planning perspective: given what has already been observed and our understanding of the mechanisms of stockpile aging, what is an appropriate and cost-effective surveillance program? Surveillance programs are costly, broad, and deep, especially in the DOE, where the US nuclear weapons surveillance program must 'ensure, through various tests, that the reliability of nuclear weapons is maintained' in the absence of full-system testing (General Accounting Office, 1996). The DOE program consists primarily of three types of tests: nonnuclear flight tests, that involve the actual dropping or launching of a weapon from which the nuclear components have been removed; and nonnuclear and nuclear systems laboratory tests, which detect defects due to aging, manufacturing, and design of the nonnuclear and nuclear portions of the weapons. Fully integrated analysis of the suite of nuclear weapons surveillance data is an ongoing area of research (Wilson et al., 2007). This paper introduces a simple model that captures high-level features of stockpile reliability over time and can be used to answer broad policy questions about surveillance programs. Our intention is to provide a framework that generates tractable answers that integrate expert knowledge and high-level summaries of surveillance data to allow decision-making about appropriate trade-offs between the cost of data and the precision of stockpile reliability estimates.

97 MATHEMATICS AND COMPUTING↗

Assessing the Costs and Benefits of the Superior Energy Performance Program

Industrial companies are seeking to manage energy consumption and costs, mitigate risks associated with energy, and introduce transparency into reports of their energy performance achievements. Forty industrial facilities are participating in the U.S. DOE supported Superior Energy Performance (SEP) program in which facilities implement an energy management system based on the ISO 50001 standard, and pursue third-party verification of their energy performance improvements. SEP certification provides industrial facilities recognition for implementing a consistent, rigorous, internationally recognized business process for continually improving energy performance and achievement of established energy performance improvement targets. This paper focuses on the business value of SEP and ISO 50001, providing an assessment of the costs and benefits associated with SEP implementation at nine SEP-certified facilities across a variety of industrial sectors. These cost-benefit analyses are part of the U.S. DOE?s contribution to the Global Superior Energy Performance (GSEP) partnership, a multi-country effort to demonstrate, using facility data, that energy management system implementation enables companies to improve their energy performance with a greater return on investment than business-as-usual (BAU) activity. To examine the business value of SEP certification, interviews were conducted with SEP-certified facilities. The costs of implementing the SEP program, including internal facility staff time, are described and a marginal payback of SEP certification has been determined. Additionally, more qualitative factors with regard to the business value and challenges related to SEP and ISO 50001 implementation are summarized.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Solar Influencer Next Door: Predicting Low-Income Solar Referrals and Leads

Increasing the adoption of solar among low-to-moderate income (LMI) households remains an important policy goal because of its promise to simultaneously reduce energy burden and support the just distribution of benefits of renewable energy. However, scaling LMI solar remains challenging due to affordability and access issues. Most existing LMI adoption has occurred under public-funded programs, highlighting the importance of increasing the cost-effectiveness of these programs at scale. We develop a new household-level data set on LMI solar lead acquisition, referrals, and adoption to understand the processes through which LMI solar uptake has occurred in California. Then, we develop models to predict two sub-mechanisms in the solar adoption process: whether an otherwise qualified lead becomes "lost" i.e. non-responsive to outreach and, for existing clients, whether they refer solar to others. For the program analyzed, participants received their solar system at no cost, which deemphasizes economic drivers of solar adoption and could differ from other program experiences. Both models substantially improved the accuracy of prediction relative to a baseline. Overall, we find that peer effects and solar economics are important to predicting referrals, and household demographic factors in lead loss prediction. Finally, we find that referrals are both the highest quality and largest source of LMI solar leads, providing a promising mechanism to expand LMI programs further.

customer acquisition costs↗

New benefit-cost studies of renewable and energy efficiency programs of the U.S. Department of Energy : methodology and findings.

Objectives of the Office of Energy Efficiency and Renewable Energy (EERE) 2009-2010 Studies (Solar, Wind, Geothermal, & Combustion Engine R&D) are to: (1) Demonstrate to investors that EERE research and technology development (R&D) programs & subprograms are 'Worth It'; (2) Develop an improved Benefit-Cost methodology for determining realized economic and other benefits of EERE R&D programs - (a) Model government additionality more thoroughly and on a case-by-case basis; (b) Move beyond economic benefits; and (c) Have each study calculate returns to a whole EERE program/subprogram; and (3) Develop a consistent, workable Methods Guide for independent contractors who will perform the evaluation studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sustainable Energy Solutions for Rural Alaska

The state of Alaska recognizes the challenges these rural communities face and provides financial support via the Power Cost Equalization (PCE) program. The PCE subsidizes the electricity prices paid by customers of these high-cost utilities. The PCE program is designed to spread the benefits of Alaska’s natural resources more evenly throughout the state. Yet even with this subsidy, electricity is still much more expensive for these rural customers. And beyond the PCE, other forms of assistance to rural utilities are becoming scarce given the state’s current fiscal environment. Nearly 90 percent of Alaska’s unrestricted budget funds in recent years have been tied to oil royalties—a sector experiencing significant declines in production and oil prices. Consequently, as Alaska looks to tighten budgets, the challenge of lowering rural utility costs, while encouraging self-sufficiency, has become more urgent.This study examines reliability, capital and strategic planning, management, workforce development, governance, financial performance and system efficiency in the various communities visited by the research team. Using those attributes, a tier system was developed to categorize rural Alaska utilities into Leading and Innovating Systems (Tier I), Advanced Diesel Systems (Tier II), Basic Systems (Tier III), and Underperforming Systems (Tier IV). The tier approach is not meant to label specific utilities, but rather to provide a general set of benchmarks and guideposts for improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY2021

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 193 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2020 and September 30, 2021, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2022

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 190 measurement and verification (M&V) reports covering 182 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2021 and September 30, 2022, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2020

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 195 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗