Search NASA⌕ Search

SEARCH · Search NASA

Results for “Canadian Space Agency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

The James Webb Space Telescope: Mission Overview and Status

The James Webb Space Telescope (JWST) is the scientific successor to the Hubble Space Telescope. It is a cryogenic infrared space observatory with a 25 m2 aperture (6 m class) telescope that will achieve diffraction limited angular resolution at a wavelength of 2 um. The science instrument payload includes four passively cooled near-infrared instruments providing broad- and narrow-band imagery, coronography, as well as multi-object and integral-field spectroscopy over the 0.6 < λ < 5.0 µm spectrum. An actively cooled mid-infrared instrument provides broad-band imagery, coronography, and integral-field spectroscopy over the 5.0 < λ < 29 µm spectrum. The JWST is being developed by NASA, in partnership with the European and Canadian Space Agencies, as a general user facility with science observations proposed by the international astronomical community in a manner similar to the Hubble Space Telescope. Technology development and mission design are complete. Construction, integration and verification testing is underway in all areas of the program. The JWST is on schedule for launch during 2021.

Greenhouse, Matthew↗

NASA Centennial Challenges Deep Space Food Challenge Competition to Incentivize Innovation in Food Systems for Long-Duration Space Exploration Missions

The Centennial Challenges (CC) program, currently part of NASA’s Space Technology Mission Directorate (STMD), is one of the vehicles NASA uses to develop and execute public prize competitions. Since opening its first challenge in 2005, the CC program has initiated more than 20 challenges in a variety of technology areas. This paper provides the background, development and execution of the Deep Space Food Challenge as one approach to fulfilling NASA’s Space Policy Directive 1 (“To the Moon, then Mars”). Specifics about the CC program’s accomplishments will also be discussed. The Deep Space Food Challenge (DSF) was developed in collaboration with the Canadian Space Agency (CSA) to create novel food production technologies with minimal inputs, and maximum safe, nutritious, palatable food outputs for long-duration space missions, which have potential to benefit people on Earth. When humans return to the lunar surface in the mid-2020s, the early missions will use prepackaged foods similar to those in use on the International Space Station (ISS) today. However, extending the duration of lunar missions requires reducing resupply dependency on Earth. Testing a sustainable system on the Moon that meets lunar crews’ needs is a fundamental step for lunar sustainability and future Mars exploration. NASA and CSA are focused on how to furnish crew members with a viable food system for long duration space missions that provides all daily nutritional needs through a variety of palatable, safe food with limited resource requirements and no dependency on resupply from Earth; and enables acceptable, safe and quick preparation methods. On Earth, technology solutions for food systems could also be used to produce nutritional sources for urban and rural environments; potentially leading to a reduced impact on our Earth’s resources. Challenges, such as the DSF, are an embodiment of NASA’s continuing commitment to technological advancement and innovation through non-traditional programs.

Centennial Challenges↗

Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES): A Small External Payload for the Lunar Gateway with Big Challenges

Currently scheduled for liftoff in 2024, Gateway will be an outpost orbiting the moon for astronauts headed to and from the lunar surface and serve as a staging point for deep space exploration. In January of 2020 NASA headquarters contacted Goddard Space Flight Center to request that they develop a Heliophysics instrumentation package for Gateway. This package would later become known as HERMES-Heliophysics Environmental & Radiation Measurement Experiment Suite. HERMES consists of a Miniaturized Electron pRoton Telescope (MERIT), an Electron Electrostatic Analyzer (EEA), Solar Probe Analyzers (SPAN)-A-ions, and Noise Eliminating Magnetometer Instrument in a Small Integrated System (NEMISIS), which consists of one fluxgate and two Magneto-Inductive Magnetometers. From the beginning the HERMES mission faced a number of Challenges. It was constrained to fit in a small, half meter, cube and it was required to weigh no more than 25kg. A new boom design for the magnetometer would be required and for safety reasons it must be able to retract autonomously with power removed. To complicate matters the location of the SORI-Small ORU- (Orbital Replacement Unit) Robotics Interface, the primary interface for the HERMES platform to the Gateway elements, was undetermined. Also, the mechanical, thermal and electrical interfaces are not fully defined. The Canadian Space Agency is still in process of designing the version of the SORI that will be flown on the Power and Propulsion Element (PPE) and Habitation and Logistics Outpost (HALO) elements, each of which are being developed by different contractors. At the time of initiating the HERMES project, neither of the Gateway module providers were under contract. Additionally, we would later learn the ISS heritage SORI modules were not originally designed for launching on the Gateway elements with a payload directly attached but rather were intended to be brought up on a separate carrier outfitted with launch locks and specialized launch structures from which the robotic arm on Gateway would then be used to detach the payload and install it on the SORI adapters while on orbit. Launching the integrated Payload/SORI on the PPE and HALO elements complicates the stiffness requirements and coupled loads analysis. Adding to this are serious constraints on Field-Of-View (FOV) for solar viewing and severe radiation exposure considerations brought on by slowly raising the orbit through the Van Allen Belts. Just to make things a little more challenging the budget for the entire project was intended to be a low-cost tailored Class-D mission approach. Plus, the effects of Corona VIrus Disease 2019 (COVID-19) were not factored in from the beginning. This paper will discuss what’s being done to overcome these challenges and put HERMES on track for a 2024 Launch Readiness Date (LRD).

Irving Joseph Burt↗

Preparing the JWST Observatory for Science Observations

The James Webb Space Telescope (JWST) is a large (6.5 m) near-and mid-infrared telescope scheduled for launch in 2021. JWST will be used to explore fundamental questions in astrophysics and planetary science, including the evolution of galaxies, the first light of stars, the formation of stars and planets as well as the characterization of exoplanets. To achieve these scientific goals, NASA and its international partners, the Canadian Space Agency (CSA) and the European Space Agency (ESA), have developed four science instruments for JWST and have prepared detailed commissioning plans for each. The NASA Project Science team has also outlined activities to characterize the performance of the Observatory as a whole. These activities include: 1) monitoring of the instrument and telescope cooldown for contamination mitigation; 2) measurements of straylight and other backgrounds for validation of the JWST stray light models as well as instrument background subtraction algorithms; 3) characterization of optical thermal distortion between its hot and cold telescope pointings within the observable field of regard and 4) trending of observatory performance parameters. Each of these activities has been planned in close collaboration with the observatory wavefront, commissioning planning, and science instrument teams. Here we present the plans for these activities, the expected results and how they will impact future guest observer (GO) proposals and JWST science community

Erin C Smith↗

Countermeasures for Mitigation of Sensorimotor Decrements Following Head-Down Bed Rest

BACKGROUND Astronauts experience postflight disturbances in postural and locomotor control due to sensorimotor adaptations during spaceflight. These alterations may have adverse consequences if a rapid egress is required after landing. Although exercise is partially effective for mitigating cardiovascular and muscular deconditioning, additional countermeasures are needed to further preserve sensorimotor function for exploration missions. We have identified proprioceptive training and electrical muscle stimulation (EMS) as promising in-flight countermeasures. Since prolonged head down bed rest (HDBR) is a spaceflight analog for body unloading and causes postural and locomotor control decrements that parallel those observed after spaceflight, it can be used to facilitate the development of these countermeasures. METHODS This study will determine the effects of proprioceptive training and EMS on functional task performance and sensorimotor function following 60 days of 6° HDBR. Subjects will be randomly assigned to one of four groups: 1)an EMS arm, 2) a proprioceptive training arm, 3) an exercise plus proprioceptive training arm, and 4) a control arm. The EMS countermeasure will include daily bilateral stimulation of selected bilateral lower extremity muscles (30 minutes per session). Proprioceptive training will be performed three days per week (20 minutes per session) consisting of body-loaded postural tasks in the horizontal position on an air bearing sled. Exercise training will mimic current protocols used on the International Space Station, but treadmill aerobic exercise will be replaced with additional cycling aerobic exercise. Primary outcome measures will include pre and post HDBR functional tests that are representative of high priority exploration mission tasks and require high demand for dynamic control of postural stability. Additional measures will be used to identify the key physiological factors contributing to countermeasure benefits. Given the constrained samples size, a Bayesian modelling approach will be used to quantify the probability that there is an effect of a given magnitude. HARDWARE AND PROTOCOL DEVELOPMENT Proprioceptive countermeasure design enhancements continued as part of the Mars Campaign Office (MCO) Crew Health and Performance (CHP) Crew Health Countermeasures (CHC). The primary goals of this work were to assemble a portable version of the countermeasure system that can be used at the :envihab facility, expand the software feedback system’s capabilities, and develop an actuator loading system that mimics what could be used on the International Space Station. In addition, one major piece of exercise hardware used in previous HDBR studies, the Horizontal Squat Device, was reassembled and restored to full functionality. Human-in-the-loop pilot testing is ongoing, prior to shipping both devices to the :envihab HDBR facility. Evaluations are also underway for the best EMS device technologies and specific methods. Finally, assessment techniques are being translated for administration in the horizontal position (e.g., leg dexterity and foot sole skin sensitivity). Our current goals are to refine the countermeasure training and assessment techniques and integrate protocols across multiple modalities. RELEVANCE The deliverable from this project will be proof-of-concept sensorimotor countermeasure designs for functional task performance with full assessment of efficacy in a spaceflight analog. If one or more countermeasures are effective, they will be translated for validation with the suite of operationally implemented in-flight countermeasures. ACKNOWLEDGEMENT This work is supported by NASA’s Human Research Program Human Health Countermeasures Element and by the Canadian Space Agency (L. Bent).

T R Macaulay↗

Earth Independent Medical Operations (EIMO) Training Technical Interchange Meeting, 26th October 2023: Background and Summary of Discussion

On 26th October 2023, ExMC convened a panel of Subject Matter Experts (SMEs) from NASA, broadly representing Headquarters, the Human Research Program, Medical Operations, the Human Health and Performance Directorate at JSC, the Health and Medical Technical Authority, the Flight Operations Directorate, and representation from other Centers including: Ames Research Center (ARC), and Glenn Research Center (GRC). Representatives from the Canadian Space Agency also participated in this TIM. In addition, SMEs from industry included representation from the following entities: Axiom Space, Space Exploration Technologies Corporation, Level Ex, Shiny Box Interactive. Additional SMEs from academia included: University of Houston, Touro University, Weill Cornell Medical College and the Translational Research Institute for Space Health at Baylor College of Medicine. This group of stakeholders discussed the training issues related to facilitating EIMO. Sub-topics for this discussion included the following: - Pre-launch medical curriculum development - Ground-based training on medical hardware - Dental health - Behavioral health - Telemedicine - Just-in-time training - Simulation-based training (extended reality)

CMO Training↗

Summary of NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The Technology Demonstration Missions (TDM) Program Office provides programmatic oversight of SEP with the project being led by Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by Aerojet Rocketdyne (AR). This technology was pursued as the propulsion system for the Asteroid Redirect and Robotic Mission (ARRM). While the concept was originally slated for ARRM, it was realigned to Gateway to support future Moon to Mars objectives. The Gateway lunar station was established and will play a key role in NASA’s Artemis Program which utilizes collaboration with the Canadian Space Agency (CSA), the European Space Agency (ESA) and the Japanese Space Agency (JAXA). The 12-kW hardware will be the primary propulsion for the Gateway element, Power & Propulsion Element (PPE), from Low Earth Orbit to a Near Rectilinear Halo Orbit around the Moon. Initial efforts began with utilizing Technology Development Units (TDU) built by NASA as the predecessor to the contract activity with AR. Over the past few years, AR has built Engineering Test Units (ETU), Engineering Development Units (EDU) and qualification & flight models (QM and FM, respectively). With requirement changes from the AARM mission to PPE, the joint team has modified the design and has started qualification activities for environment testing (shock, vibe) at multiple facilities in the US leading to eventual life testing. This paper will explore the various design changes, system modeling and the latest status for qualification testing.

Joel Robinson↗

Summary of NASA Progress on the Development and Qualification of a 12 kW Hall Effect, Solar Electric Propulsion Thruster

Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The Technology Demonstration Missions (TDM) Program Office provides programmatic oversight of SEP with the project being led by Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by Aerojet Rocketdyne (AR). This technology was pursued as the propulsion system for the Asteroid Redirect and Robotic Mission (ARRM). While the concept was originally slated for ARRM, it was realigned to Gateway to support future Moon to Mars objectives. The Gateway lunar station was established and will play a key role in NASA’s Artemis Program which utilizes collaboration with the Canadian Space Agency (CSA), the European Space Agency (ESA) and the Japanese Space Agency (JAXA). The 12-kW hardware will be the primary propulsion for the Gateway element, Power & Propulsion Element (PPE), from Low Earth Orbit to a Near Rectilinear Halo Orbit around the Moon. Initial efforts began with utilizing Technology Development Units (TDU) built by NASA as the predecessor to the contract activity with AR. Over the past few years, AR has built Engineering Test Units (ETU), Engineering Development Units (EDU) and qualification & flight models (QM and FM, respectively). With requirement changes from the AARM mission to PPE, the joint team has modified the design and has started qualification activities for environment testing (shock, vibe) at multiple facilities in the US leading to eventual life testing. This paper will explore the various design changes, system modeling and the latest status for qualification testing.

Joel W Robinson↗

The Webb Space Telescope - An Engineering Marvel Story

This presentation will provide an overview of the James Webb Space Telescope (JWST) and its engineering development process. JWST has succeeded the Hubble Space Telescope in our quest for the first galaxies formed out of the darkness of the early universe. Since its launch in December 2021, JWST has helped us understand how these galaxies evolved over billions of years, how stars and planetary systems form, what exoplanets look like and if they can harbor life. JWST uses a ~6.5-m-diameter primary mirror to collect infrared light, which is sent to four scientific instruments. It operates at the second Sun-Earth Lagrange point and has a five-layer sunshield to be able to operate at cryogenic temperatures. JWST is an international effort of NASA and the European and Canadian Space Agencies.

James Webb Space Telescope↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins↗

RADARSAT Navigation

Explore the source record for details and available documents.

CSA canadian space agency flight dynamics↗

Integrated Simulation Design Challenges to Support TPS Repair Operations

During the Orbiter Repair Maneuver (ORM) operations planned for Return to Flight (RTF), the Shuttle Remote Manipulator System (SRMS) must grapple the International Space Station (ISS), undock the Orbiter, maneuver it through a long duration trajectory, and orient it to an EVA crewman poised at the end of the Space Station Remote Manipulator System (SSRMS) to facilitate the repair of the Thermal Protection System (TPS). Once repair has been completed and confirmed, then the SRMS proceeds back through the trajectory to dock the Orbiter to the Orbiter Docking System. In order to support analysis of the complex dynamic interactions of the integrated system formed by the Orbiter, ISS, SRMS, and SSMS during the ORM, simulation tools used for previous ‘nominal’ mission support required substantial enhancements. These upgrades were necessary to provide analysts with the capabilities needed to study integrated system performance. Prevalent throughout this ORM operation is a dynamically varying topology. In other words, the ORM starts with the SRMS grappled to the mated Shuttle/ISS stack (closed loop topology), moves to an open loop chain topology consisting of the Shuttle, SRMS, and ISS, and then, at the repair configuration, extends the chain topology to one consisting of the Shuttle, SMS, ISS, and SSRMS/EVA crewman. The resulting long dynamic chain of vehicles and manipulators may exhibit significant motion between the Shuttle worksite and the EVA crewman due to the system flexibility throughout the topology (particularly within the SRMS/SSRMS joints and links). Since the attachment points of both manipulators span the flexible structure of the ISS, simulation analysis may also need to take that into consideration. Moreover, due to the lengthy time duration associated with the maneuver and repair, orbital effects become a factor and require the ISS vehicle control system to maintain active attitude control. Several facets of the ORM operation make the associated analytical efforts different from previous mission support, including: (1) the magnitude of the SRMS handled payload (Le., Orbiter class), (2) the orbital effects induced on the integrated system consisting of the large Shuttle and ISS masses connected by a light flexible SRMS, (3) long duration environmental consequences due to the lengthy operational times associated with the maneuver and repair of the TPS, (4) active attitude control (as opposed to free drift) interacting with the SRMS and SSRMS manipulators (also due to the length of the maneuver and repair), (5) relative dynamics between the EVA crewman and thc worksite influenced by the extended flexible topology. In order to meet these analysis challenges, an ORM simulation architecture was developed leveraging upon numerous pre-existing simulation elements to analyze the various subsystems individually. For example, core manipulator subsystem simulations for both the SRMS and SSRMS were originally combined to provide the dual-arm dynamics topology simulation (in the absence of orbital dynamics and vehicle control). This capability was later merged with the simulation used to analyze SRMS loading with a heavy payload in the orbital environment with an active payload control system (in this case, the ISS Attitude Control System (ACS)), configured for the ORM. The resulting worksite dynamics simulation, based off of the modified ORM simulation, provided the extended topological chain of vehicles and manipulators, while taking into account the orbital effects of both the Shuttle and ISS (as well as its ACS). Verification and validation (V&V) of these integrated simulations became a challenge in itself. A systematic approach needed to be developed such that integration simulation results could be tested against previous constituent simulations upon which these simulations were built. General V&V categories included: (1) core orbital state propagation, (2), stand-alone SRMS, (3) stand-alone SSRMS, (4) stand-alone ISS ACS, (5) integrated Shuttle, SRMS, ISS (with active ACS) in the orbital environment, and (5) dual-arm SRMS/SSRMS dynamics topology. Integrated simulation V&V run suites were created and correlated to verification runs from subsystem simulations, in order to establish the validity of the results. This paper discusses the simulation design challenges encountered while developing simulation capabilities to mirror the ORM operations. The paper also describes the incremental build approach that was utilized, starting with the subsystem simulation elements and integration into increasing more complex simulations until the resulting ORM worksite dynamics simulation had been assembled. Furthermore, the paper presents an overall integrated simulation V&V methodology based upon a subsystem level testing, integrated comparisons, and phased checkout.

Thermal Protection System↗

Gully Formation at the Haughton Impact Structure (Arctic Canada) Through the Melting of Snow and Ground Ice, with Implications for Gully Formation on Mars

The formation of gullies on Mars has been the topic of active debate and scientific study since their first discovery by Malin and Edgett in 2000. Several mechanisms have been proposed to account for gully formation on Mars, from “dry” mass movement processes, release of water or brine from subsurface aquifers, and the melting of near-surface ground ice or snowpacks. In their global documentation of martian gullies, report that gullies are confined to ~27–83°S and ~28–72°N latitudes and span all longitudes. Gullies on Mars have been documented on impact crater walls and central uplifts, isolated massifs, and on canyon walls, with crater walls being the most common situation. In order to better understand gully formation on Mars, we have been conducting field studies in the Canadian High Arctic over the past several summers, most recently in summer 2018 and 2019 under the auspices of the Canadian Space Agency-funded Icy Mars Analogue Program. It is notable that the majority of previous studies in the Arctic and Antarctica, including our recent work on Devon Island, have focused on gullies formed on slopes generated by regular endogenic geological processes and in “regular” bedrock. How-ever, as noted above, meteorite impact craters are the most dominant setting for gullies on Mars. Impact craters provide an environment with diverse lithologies – including impact-generated and impact-modified rocks – and slope angle, and thus greatly variable hill slope processes could occur within a localized area. Here, we investigate the formation of gullies within the Haughton impact structure and compare them to gullies formed in unimpacted target rock in the nearby Thomas Lee Inlet

Osinski, G. R.↗

Assessment of international payload requirements on the dual keel space station - A systems analysis capabilities example

In the early stages of spacecraft conceptual design, an investigation of subsystem requirements and their impacts on the total system provides insight into many aspects of the spacecraft design. Such an analysis has been performed on the dual keel space station to examine the system effects contributed by three international payloads provided by the Canadian, Japanese, and European Space Agencies. This example is used to illustrate some capabilities of available computer-driven tools and methods for a system analysis. Two space station configurations were examined, one without international payloads (the baseline configuration for the study) and one with the three international payloads. Each configuration was evaluated to define viewing limitations, rigid body dynamics and controls, structural dynamics, orbit lifetime, environmental control and life support, and thermal management effects. The performance, based on each subsystem evaluation, was then compared for the two configurations, and the results and recommendations are presented.

Allen, C. L.↗

Government-Industry Data Exchange Program (GIDEP)

The Government-Industry Data Exchange Program (GIDEP) was originated in 1959 by the Army, Navy, and Air Force Ballistic Missile Agencies. Known at that time as IDEP--Interservice Data Exchange Program--its intent was to eliminate duplicate testing of parts and components by disseminating pertinent test data among Department of Defense contractors and various government agencies. In 1966 both the National Aeronautics and Space Administration and the Canadian Military Electronics Standards Agency (CAMESA) recognized the value of the data provided by the program and became participants. Today, GIDEP provides the interchange of specialized technical data to all the military services, participating government contractors and numerous government agencies such as the Atomic Energy Commission, Federal Aviation Administration, Defense Supply Agency, and the Small Business Administration.

Richards, E. T.↗

STS-100 Crew Activity Report: Flight Day 7 Highlights

On this seventh day of the STS-100 mission, the crewmembers of Endeavour, Commander Kent Rominger, Pilot Jeffrey Ashby, and Mission Specialists Chris Hadfield, Scott Parazynski, John Phillips, Umberto Guidoni, and Yuri Valentinovich Lonchakov, are seen as they unload equipment from the Rafaello Logistics Module. Guidoni and Rominger answer questions from the Italian and European Space Agencies in an on-orbit press conference. The computer glitch that delayed tests on the Canadian Robotic Arm and another boost to the International Space Station (ISS) is described.

Source record↗

ERS-1 SAR data processing

To take full advantage of the synthetic aperature radar (SAR) to be flown on board the European Space Agency's Remote Sensing Satellite (ERS-1) (1989) and the Canadian Radarsat (1990), the implementation of a receiving station in Alaska is being studied to gather and process SAR data pertaining in particular to regions within the station's range of reception. The current SAR data processing requirement is estimated to be on the order of 5 minutes per day. The Interim Digital Sar Processor (IDP) which was under continual development through Seasat (1978) and SIR-B (1984) can process slightly more than 2 minutes of ERS-1 data per day. On the other hand, the Advanced Digital SAR Processore (ADSP), currently under development for the Shuttle Imaging Radar C (SIR-C, 1988) and the Venus Radar Mapper, (VMR, 1988), is capable of processing ERS-1 SAR data at a real time rate. To better suit the anticipated ERS-1 SAR data processing requirement, both a modified IDP and an ADSP derivative are being examined. For the modified IDP, a pipelined architecture is proposed for the mini-computer plus array processor arrangement to improve throughout. For the ADSP derivative, a simplified version is proposed to enhance ease of implementation and maintainability while maintaing real time throughput rates. These processing systems are discussed and evaluated.

Leung, K.↗