Search NASA⌕ Search

SEARCH · Search NASA

Results for “Configuration Items”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

The MSAT spacecraft of Telesat Mobile Inc.

The MSAT spacecraft of the Canadian mobile satellite operator, Telesat Mobile Inc. (TMI) is described. When launched in 1994, the large geostationary MSAT spacecraft which is currently under construction by Hughes Aircraft Co. and Spar Aerospace Ltd. will enable TMI to provide mobile and transportable communications services to its customers even in the most remote parts of the North American continent. The main elements of TMI's mobile satellite system (described in a companion paper) are the space segment and the ground segment. TMI's space segment will employ one of two nearly identical satellites, one of which will be owned and operated by TMI, the other by the U.S. mobile satellite operator, American Mobile Satellite Corporation (AMSC). The two companies are participating in a joint spacecraft procurement in order to reduce the nonrecurring costs and to ensure system compatibility between the two systems; and they have also agreed to provide in-orbit backup to each other in the event of a catastrophic satellite failure. The program status, performance requirements, main parameters, and configuration of the MSAT spacecraft are reviewed. The major features of the communications subsystem are discussed in some detail, and a brief summary is presented of the spacecraft service module. Key technology items include the L-band RF power amplifier, which must operate with a high DC to RF power efficiency and generate low intermodulation when loaded with multi-carrier signals; and the large diameter deployable L-band antenna. The development status and expected performance of these spacecraft components is examined.

Bertenyi, E.↗

Geometric Reasoning for Automated Planning

An important aspect of mission planning for NASA s operation of the International Space Station is the allocation and management of space for supplies and equipment. The Stowage, Configuration Analysis, and Operations Planning teams collaborate to perform the bulk of that planning. A Geometric Reasoning Engine is developed in a way that can be shared by the teams to optimize item placement in the context of crew planning. The ISS crew spends (at the time of this writing) a third or more of their time moving supplies and equipment around. Better logistical support and optimized packing could make a significant impact on operational efficiency of the ISS. Currently, computational geometry and motion planning do not focus specifically on the optimized orientation and placement of 3D objects based on multiple distance and containment preferences and constraints. The software performs reasoning about the manipulation of 3D solid models in order to maximize an objective function based on distance. It optimizes for 3D orientation and placement. Spatial placement optimization is a general problem and can be applied to object packing or asset relocation.

Clement, Bradley J.↗

Skylab food system

A review of the Skylab food system requirements, package designs, and launch configurations was presented. In-flight anomalies were discussed, and between-mission changes in design were described. A discussion of support for Skylab 3 and Skylab 4 mission extensions and of new items launched on these missions is included.

Turner, T. R.↗

Terrestrial central station array life-cycle analysis support study

Plant elements evaluated included designs for module, panel and array structures, as well as balance-of-plant systems. Installation and maintenance procedures and the impact of site environment were also evaluated. In terms of the cost of energy produced, the horizontal array configuration was found to be less expensive than the tandem array at latitudes less than 40 deg. Both of these configurations are less expensive than the rack design. However, the costs of energy for all three configurations are within approximately ?10 percent of each other. For flat plate panels, the seasonally adjusted and tracking array configurations are not economically attractive when compared to the three other designs. Balance-of-plant costs are approximately equal to (goal) module costs. The array structures and foundations are the most expensive items in the balance-of-plant costs.

Source record↗

Delayed Gamma-ray Assay for Nuclear Materials Safeguards. Comprehensive Technology Readiness Assessment

Spectroscopic analysis of beta-delayed gamma-rays emitted from fission products following active interrogation was investigated as a non-destructive assay technique for detection and characterization of nuclear materials in shielded and complex configurations. This measurement technique is expected to be applicable to a variety of applications within the nuclear material safeguards, arms control, and emergency response areas, where active neutron interrogation is acceptable. Potential applications of the delayed gamma-ray assay in the nuclear material safeguards area include characterization of U and Pu isotopic content in spent and unirradiated nuclear fuel, enrichment measurements, verification of bulk material in containers, and the characterization of nuclear wastes. In the arms control area, this method can be used as a part of warhead dismantlement measurements to confirm separation of components, and may be applicable in warhead confirmation. In the context of emergency response, it can be used for detailed diagnostics of an unknown item. At present, the delayed gamma-ray assay technology reliably qualifies for the Technical Readiness Level 3 (TRL 3). The R&D work completed under this project has successfully demonstrated the empirical proof-of-concept for this active interrogation technology for a variety of measurement configurations, neutron sources, and nuclear material samples. A robust first-principles analytical signature modeling methodology was developed, experimentally validated, and can be easily extrapolated to a range of realistic measurement scenarios. Several response analysis methodologies have been implemented and deemed reliable for a variety of active interrogation applications in the areas of nuclear material safeguards, arms control, and emergency response. The initial readiness level before the start of this project was assessed at TRL 0, since only fragmentary records of the signature observations and speculative statements of the relevant non-destructive assay applications existed at that time. The delayed gamma-ray technology readiness can be easily advanced to TRL 4 in a short period, if a certain measurement application is specified and set for a demonstration in a laboratory environment. The critical hardware components of the delayed gamma-ray measurement technology (neutron generators, gamma-ray spectrometers) are readily available as COTS and can be configured for a specific deployment configuration. The primary risk of the delayed gamma-ray assay methodology is defined by the applicationspecific uncertainties. Evaluation of the system performance can be effectively completed once the expected measurement purpose, nuclear material characteristics, dimensions, and radiation exposure constraints are specified. A minor risk can be associated with the delayed gamma-ray response analysis techniques. Several approaches were proposed and demonstrated primarily using the modeled signatures. The observed performance may not be easily transferrable to the conditions of a real measurement setup, and some additional R&D may be required. Overall, the delayed gamma-ray assay technology can be recommended for follow-up demonstrations addressing relevant measurement applications in the areas of nuclear material safeguards, arms control, and emergency response.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Advanced Hybrid Spacesuit Concept Featuring Integrated Open Loop and Closed Loop Ventilation Systems

A document discusses the design and prototype of an advanced spacesuit concept that integrates the capability to function seamlessly with multiple ventilation system approaches. Traditionally, spacesuits are designed to operate both dependently and independently of a host vehicle environment control and life support system (ECLSS). Spacesuits that operate independent of vehicle-provided ECLSS services must do so with equipment selfcontained within or on the spacesuit. Suits that are dependent on vehicle-provided consumables must remain physically connected to and integrated with the vehicle to operate properly. This innovation is the design and prototype of a hybrid spacesuit approach that configures the spacesuit to seamlessly interface and integrate with either type of vehicular systems, while still maintaining the ability to function completely independent of the vehicle. An existing Advanced Crew Escape Suit (ACES) was utilized as the platform from which to develop the innovation. The ACES was retrofitted with selected components and one-off items to achieve the objective. The ventilation system concept was developed and prototyped/retrofitted to an existing ACES. Components were selected to provide suit connectors, hoses/umbilicals, internal breathing system ducting/ conduits, etc. The concept utilizes a lowpressure- drop, high-flow ventilation system that serves as a conduit from the vehicle supply into the suit, up through a neck seal, into the breathing helmet cavity, back down through the neck seal, out of the suit, and returned to the vehicle. The concept also utilizes a modified demand-based breathing system configured to function seamlessly with the low-pressure-drop closed-loop ventilation system.

Daniel, Brian A.↗

Enabling Staged Pressurized Oxy-Combustion: Improving Flexibility and Performance at Reduced Cost

Introduction: The staged pressurized oxy-combustion (SPOC) process, developed by Washington University in St. Louis (WUSTL), is an oxy-combustion carbon capture technology that employs a steam power cycle to generate electricity. As with atmospheric-pressure oxy-combustion processes, carbon dioxide (CO 2 ) capture rates of 90% or higher can be achieved. The staged-combustion approach of the SPOC process, when operated at elevated gas pressure, allows for near elimination of flue gas recycle (FGR) and leads to significant improvements in efficiency and reduced costs. The primary goal of this project was to investigate the potential for SPOC for flexible operation beyond the capabilities of conventional coal-fired power plants, particularly those employing carbon capture and storage (CCS). Oxy-combustion differs from conventional coal combustion in that the combustion of coal is carried out using oxygen as opposed to air. The resultant flue gas is a mixture of primarily CO 2 and water, greatly simplifying CO 2 capture. As SPOC does the oxy-combustion process under pressure, it is higher efficiency and lower cost than atmospheric oxy-combustion. The project was led by the Electric Power Research Institute, Inc., with the assistance of WUSTL, Doosan Babcock (DBL – boiler plant original equipment manufacturer), and Air Liquide (AL – air separation experts). The specific objectives of the project were to: (1) Evaluate the SPOC concept and develop a risk-based approach to the heating surface layout ensuring that performance (gas and steam side), manufacturing, transportation, and plant erection considerations were fully accounted for in the system design. (2) Improve the technology to ensure its performance and cost potential are substantially better than today’s baseline pulverized coal power plant with post-combustion capture (PCC) or atmospheric oxy-combustion, and show progress toward performance commensurate with projected commercial operation, including 90% or more CO 2 capture. (3) Address critical technology gaps and improving overall system performance for the technology. (4) Perform combustion tests at scale under commensurate pressure to the commercial operating system validate combustor and advance the SPOC combustion modeling tools that will facilitate full-scale design. Combustion Testing: Testing was initially carried out at atmospheric pressure with methane to ensure that all systems were correctly operating. Following this, the testing then proceeded to moderate pressure operation at 4 bara, where different stoichiometric conditions were used across an extended heat input range, showing that a stable flame could be maintained. Testing then proceeded at 10 and 15 bara where it was shown that the ignition system needed to be replaced at these operating conditions. When testing recommenced, a similar stable flame shape was achieved, without any methane support, and the full 100 kWth coal oxy-combustion was demonstrated. Heat flux measurements showed 400 kW/m 2 (0.126 MMBtu/hr-ft 2 ) from the flame, within the 450 kW/m 2 (0.142 MMBtu/hr-ft 2 ) preferred limit defined by DBL for the full-scale design case. Carbon monoxide and carbon-in-ash measurements showed that complete combustion was possible with ultra-low excess oxygen at 1 vol % in the product flue gas. This allowed the full-scale models to be calculated based on this level of excess oxygen, improving the performance of the system as lower feed oxygen is produced in the air separation unit (ASU), saving auxiliary power. Full-Scale Design: The full-scale design is sized to deliver 550 MWe net electrical power output to allow direct comparison with the National Energy Technology Laboratory (NETL) baseline cases using the same Montana Powder River Basin (PRB) fuel. The cases used for direct comparison are: Case S12A (supercritical [SC] coal without CO 2 capture), Case S12B (SC coal with PCC at 90% CO 2 capture, and Case S12F (atmospheric oxy-combustion SC coal with 90% CO 2 capture). The SPOC stages were configured to be identical arrangements, allowing for a more straightforward design, construction, and control strategy. Each stage consists of two PVs, the first being the combustor PV module and the second being the convective PV module. The combustor module is the tallest vessel, with local coal feeding equipment and the burner FGR and oxygen plenums at the top and ash management at the bottom. The combustor module is effectively an open cross section with membrane tubes around the circumference – this unobstructed slender profile ensures that the relatively slower burnout mechanism needed for the low-speed turbulent mixing burner can proceed unimpeded and that molten ash will not attach to any surfaces at an angle to the predominant flue gas flow. The steam turbine used in the SPOC design is essentially the same unit utilized in the atmospheric oxy-combustion case except the degree of heat recovery possible allows the low-pressure (LP) feedwater heater train to be eliminated. This is a result of being able to capture the latent heat of evaporation of the moisture produced in the combustion (normally lost to the stack). The SPOC system outperforms the NETL atmospheric oxy-combustion baseline case by 3.3% points and the PCC case by 7.5% points. This performance increase is mainly a result of the improved heat recovery possible from the product flue gas and from the reduced auxiliary power consumption from the ASU and the CO 2 compression and purification unit over the atmospheric equivalent. The combined improvement in boiler efficiency and reduction in the steam turbine heat rate resulted in a net improvement in the overall plant efficiency by 0.61%, to 35.6% on a HHV basis. This relatively small improvement in plant efficiency between sub-bituminous and bituminous coals shows the value of useful moisture latent heat recovery offered by the SPOC system when using low rank fuels. Flexibility and Turndown: The SPOC system has inherent high turndown capabilities because of a demonstrated high range of combustion stability and the ability to bypass stages, thereby reducing steam generation rates proportionally without altering firing rates in operating stages. ASU units do not generally offer significant turndown opportunities as they are limited by the performance of the compression plant. The baseline SPOC design has a 2-train ASU configuration, needed to be able to meet the 10,500 tonnes per day duty, that can deliver efficient turndown points between 85–100% load with both trains operating, and at 45–50% load with a single train operating. Outside these operating points, the flexibility and efficiency are limited and may be uncompetitive at loads below 45% as the ASU systems are unable to turndown beyond 85% for the base case and 70% for the flexible case. The ASU cold box for the flexible case was designed to operate at loads between 40-100%, below this operating range the purity of the produced oxygen cannot be guaranteed, resulting in additional load for the CPU equipment. The additional power consumption of these cases yields an uneconomic operating condition with poor efficiency when operating at low loads such as 25% and 12%. To address this flexibility constraint, AL evaluated how the ASU configuration could be altered to deliver efficient oxygen supply over the load range. This involved integrating the compressor duties across both ASU trains into a shared duty arrangement with multiple compressors, strategically sized to deliver the duty required across all load ranges between 40–100% by enabling different combinations of the main air compressors and the booster air compressors. The oxygen purity cannot be guaranteed below 40% load for each train – the power consumption at 25% and 12% loads were estimated based on the multi-compressor configuration at maximum turndown as these load cases were not considered in the flexible ASU design. With a different cold box configuration, i.e. number of trains, the entire load range could be delivered within oxygen purity specifications. Although there is a small efficiency reduction at full load, there are significant improvements in overall plant performance during low-load operation. The exact ASU configuration needed will therefore be dependent on the expected operating profile of the unit. Economic Analysis: Cost estimates for the baseline and the flexible cases were developed using NETL baseline case data for common BOP items and an Association for the Advancement of Cost Engineering International Class 5 (conceptual/screening study) assessment of key components unique to the SPOC system. The capital, operating, and maintenance costs were assessed along with the first-year power cost, levelized cost of electricity, and CO 2 captured and avoided cost for the SPOC cases were compared against the relevant NETL baseline cases in January 2019 dollars. Both SPOC cases achieve a lower cost that the alternative NETL baseline cases (with the flexible SPOC case being slightly higher than the baseline SPOC case due to the compounded impact of higher capital costs and lower efficiency at full load). The SPOC cases deliver a lower cost of CO 2 avoided than the NETL baseline cases due to greater efficiency in generating low-carbon power. However, the cost of CO 2 captured is higher because the higher efficiency of the SPOC process generates less CO 2 , hence less needs to be captured, resulting in a high capital cost being shared over a reduced CO 2 quantity. The flexible ASU adds 1.6% overall to the plant cost in comparison to the baseline case, but the efficiency improvements at loads below 50% are significant. Subsequently, depending on the plant load-profile expectation, the flexible ASU would be beneficial if the plant spends a significant portion of its operating life below 50% load. This kind of operating profile is likely to be required for all fossil plants when more renewable electricity generators are installed on the local grid, particularly solar power that can be predicted ahead of time, allowing for appropriate pricing signals to be incorporated into the diurnal cycle. R&D Recommendations: SPOC, while a promising technology, is a relatively recent concept and, as such, operability issues of combustor design and steam-side integration for such systems at a scale relevant to commercial deployment have not been evaluated. WUSTL has conducted extensive small pilot-scale (100 kWth) research to understand and advance pressurized oxy-combustion processes, including investigation of combustion and flame characteristics, radiative heat flux, burner operability, turn down, char burnout, ash characteristics, water-wash column operation, etc. for pressurized oxy-combustion systems. Nonetheless, at this stage in the development of the SPOC process, what is needed is a large-scale pilot plant that can serve to study pressurized oxy-combustion systems and components at a scale commensurate with the maturity of the technology. A scale of 10 MWth, which includes steam-side integration and two stages would yield essential information with respect to heat transfer characteristics both in the radiative and convective sections of the pressure vessels, and the ability to operate the fuel staging process. In addition, while modeling results indicate that combustion and flame characteristics improve with scale, direct studies of the combustor at this scale will ensure that the models can be relied upon for scale up to commercial scale. Furthermore, a detailed analysis must be performed to understand the scaling aspects of key components and systems.

20 FOSSIL-FUELED POWER PLANTS↗

Integrated, Kerberized Login on MacOS X

Context for this information. MacOS X login process and available hooks. Authorization Services configuration. Authorization Services plug-in s. Kerberos plug-in s. Other bugs and recommendations. Authorization Services Called by loginwindow, screen saver and fast user switching. It calls Directory Services, Login Hook, and Login Items (System Preferences).

MacOSX↗

Integrated Radio and Optical Communications (iROC) Primary, Secondary, and Tertiary Optics Alignment Procedure

This Technical Memorandum (TM) describes a procedure and associated equipment for performing an initial, relative alignment of a multiple-element optical system. The specific system of interest motivating this procedure arises from the Integrated Radio and Optical Communications (iROC) project, but is applicable to the more general configuration of a two-element folded, reflective telescope. Each step of the procedure includes a description of the particular degree of freedom (DOF) being addressed, and the associated equipment required, including both commercially available items and those fabricated specifically for this purpose.

Paul S Greenberg↗

Propellant Delivery via VDC Driven Pump

The SMART (Scalable Mobile Autonomous Rocket engine Test) testbed system initiative at SSC was conceived to attempt to address many of the principal cost drivers in developing and maintaining a rocket engine test facility. The system (optimized to test engines and components generating up to 10K lbf nominal thrust) is serving as a testbed for innovative technologies and processes to provide lower cost test services with a rapid test cadence and expedient turnaround times. The system can also potentially be used as a testbed to test other related technologies relevant to surface situations (e.g., moon, Mars associated with crogenic fluid management, engine/component testing, autonomous operations, etc.). This FY20 CIF project, being conducted as part of the SMART testbed system, is developing and testing a propellant delivery system via electrically driven centrifugal pumps (obviating dependence upon Multi-Layer Pressure Vessels) with configuration and operation by a minimal number of personnel. During FY20 the team identified the requirements and worked with P3 and Masten Space Systems to develop the long lead (9 months after receipt of order) items, the 400 VDC pumps, for delivery in mid FY21. Since control of the 400 VDC pump motor is not well developed the team has established heuristics to control flows in LN2 at off nominal shaft speeds to allow deep throttling of the pump in flow test scenarios. Various test scenarios including nominal i.e. high flow high pressure, high flow low pressure, low flow high pressure, low flow low pressure, minimum throttle step change, and low inlet pressure cavitation testing were developed ahead of the anticipated hardware delivery and test. FY20 COVID Stage 3 conditions restricted access to the center and hindered lab work, so efforts focused on the system design and testing plans along with the project procurement paperwork for the hardware... now with its anticipated delivery in spring FY21. Some limited access to the center is expected by spring/summer FY21 for the continuing second year (FY21) CIF project effort meant to be focused upon system integration and initial testing.

Aaron Head↗

ASF3

This reporting period marked a change in the funding configuration from a combination of a grant and a contract from two different National Aeronautics and Space Administration (NASA) sections to one single contract. One year of this reporting was under the grant/kontract configuration with the changeover occurring on 1 April 2003. Much of the work duties remained the same with some exception, notably the removal of the RADARSAT Geophysical Processor System and the removal of the commercialization line item from the contract. We chose this reporting period as a transition from the previous reporting period of 1 April to 31 March, to the current reporting period of 18 November to 17 November. The Alaska Synthetic Aperture Facility s (ASF) mission has been updated to carry us forward into the future congruent with our changed relationship with NASA. ASF will continue to evolve, and NASA will remain our primary customer. To compliment our new mission, we have a new name, the Alaska Satellite Facility (ASF), deeply rooted in the University environment and focused on satellite data products, services, and science support. We have the opportunity to reshape and rebuild ASF; we will continue to honor our heritage and Serve the science community. Our long-term goals include the commitment to continued first-rate service to our user community. This report contains input from ASF as a whole on the three major components of the NASA Contract, namely tasks devoted to the Distributed Active Archive Center (DAAC), the Receiving Ground Station (RGS), and the National Oceanics and Atmospherics Administration (NOAA).

LaBelle-Hamer, Nettie↗

Design, Construction, and Commissioning of the RH LLW Disposal Facility at INL - 19445

The newly-commissioned Remote-Handled Low-Level Waste (RH LLW) Disposal Facility at Idaho National Laboratory (INL) provides permanent disposal capability critical for continuing INL nuclear research and Naval Reactors missions at the Idaho site. The facility mission need [critical decision (CD)- 0] was approved in 2009. Alternative selection (CD-1) was finalized in 2011. The project performance baseline (CD-2/3) was approved and design was initiated in 2014 and construction began in 2015. Construction was completed and transitioned to Materials and Fuels Complex (MFC) Operations in 2017. The facility successfully achieved readiness with authorization to begin operations (CD-4) in 2018. The $77 M line-item capital-acquisition project was completed six months ahead of the congressional commitment date and significantly under budget. This paper presents highlights of the RH LLW Disposal Facility project delivery and a summary of facility features and critical characteristics. Highlights include: - As a hazard category II nuclear facility, the project complied with United States Department of Energy (DOE) requirements for incorporation of nuclear safety into facility design and construction as identified in DOE-STD-1189 as well as 10 CFR 835 Subpart K requirements for incorporation of ALARA principles in facility design. - From an environmental compliance perspective, the facility was subject to National Environmental Policy Act requirements resulting in a Finding of No Significant Impact as determined by an Environmental Assessment. An operating disposal authorization statement from the Low-Level Waste Disposal Facility Federal Review Group (LFRG) authorizing waste disposal operations in accordance with DOE Order 435.1 was obtained. - The project was delivered using a design-build delivery method with a firm-fixed price with incentive fee contracting mechanism. The project was executed as a line-item capital-acquisition project, in full compliance with DOE Order 413.3B under INL's certified Earned Value Management System (EVMS) program. - The facility supports twenty years of waste disposal operations with five disposal vault configurations in four vault arrays supporting six different cask/canister system configurations. Three of the six cask/canister systems currently exist and three will be developed to support future operations. There are a total of 446 waste disposal vaults that will accommodate disposal of a total of 939 stainless steel radioactive waste canisters. The facility is designed to accommodate canisters with contact radiation dose rates as high as 600 Sievert/hour (60,000 Rem/hour). - The facility underwent a rigorous readiness review process in accordance with DOE Order 425.1D. Readiness activities included rigorous facility testing and shakedown activities, a management-self assessment, a contractor operational readiness review, and a DOE operational readiness review. Readiness was demonstrated for an existing cask/canister system (the MFC HFEF-5 cask). Separate readiness activities will be conducted for each cask/canister system as they are brought online for facility operations. INL's successful delivery of the project has provided waste disposal capability to ensure long-term viability of planned and current facilities and missions associated with both INL and the Naval Reactors Facility. Successful execution of the project has proven to be strategically important to future capital investments in capabilities necessary to advance INL's mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Confirming the absence of nuclear warheads via passive gamma-ray measurements

Arms-control agreements between the United States and Russia negotiated after the end of the Cold War have imposed limits on the number of deployed strategic nuclear weapons. Verification of these agreements has relied on onsite inspections, sometimes supported by radiation detection techniques to confirm the absence of a nuclear warhead when ambiguities arise. So far, these measurements have sought to detect neutron emissions associated with the presence of plutonium, but they would be inadequate for uranium devices. In an effort to offer instruments that could be used to confirm the absence of both plutonium and uranium weapons, here we propose an inspection system that uses only passive gamma radiation detection techniques. Such a system would be particularly valuable for next-generation arms-control agreements that limit total numbers of weapons and would involve containerized items in storage. We conducted extensive Monte Carlo simulations to support the development of a verification protocol and detection algorithm. Here, we demonstrate the viability of the technique using standard laboratory check sources and MCNP simulations for simplified configurations of special nuclear material.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

SALSA - A Synthesis Array for Lunar Submillimeter Astronomy

A conceptual design is described for a lunar submillimeter wavelength interferometer called SALSA, a Synthesis Array for Lunar Submillimeter Astronomy. Its design is greatly simplified over conventional submillimeter wavelength arrays because it takes advantage of a beam waveguide to relay signals to a centrally-located receiver system. The array is optimized to synthesize images at wavelengths between 60 and 300 microns, and it has an angular resolution of 10 milliarcsecs at 60 microns. Observations in this region provide unique insights into fundamental issues in astrophysics such as star formation, but are impossible from the earth's surface because of atmospheric absorption. The baseline design for SALSA consists of twelve, 3.5-meter diameter antennas arranged in a Y-shaped configuration consisting of three 0.5-km long arms, each with four antennas distributed according to a power-law function of distance. Such a beam-waveguide approach has significant advantages, since all the high-power-consumption items (active cryogenics, correlator) are at a central location and could share a single power source. In addition, the antennas can be quite simple and maintenance is greatly reduced. The primary technology challenges for developing such an array are the coherent detectors (mixers and local oscillator sources), and ensuring the dimensional stability of the optical elements under the extreme lunar thermal environment (85-385 K).

Mahoney, M. J.↗

Frequency modulation system test procedure shuttle task 501 approach and landing test configuration

Shuttle Task 501 is an in-line task to test the performance and compatibility of radiofrequency links between the SSO and ground, and relay via a satellite. Under Shuttle Task 501 approach and landing test (ALT) phase only a limited portion of the communication and tracking (C&T) equipment is to be tested. The principal item to be tested is a frequency modulated (FM) data link. To test this RF link, an ALT FM System was designed, constructed, and the console wiring verified. A step-by-step procedure to be used to perform the ALT FM system is presented. The ALT FM system test is to be performed prior to delivery of the equipment to the Electronic Systems Test Laboratory (ESTL).

Doland, G. D.↗

Techno-Economic Optimization of Advanced Energy Plants with Integrated Thermal, Mechanical, and Electro-Chemical Storage (Final Report)

The increasing use of renewable energy sources is leading to increased cycling of fossil-fueled power plants (FFPP) that are designed to operate at base-loaded conditions. Integrating energy storage facilities with the FFPPs can be helpful in reducing load-following operation of FFPPs. Decentralized deployment of energy storage facilities at the FFPP level has considerable advantages due to possibilities of smaller storage capacities, immediate benefits realized by the host power plant due to the increase in the efficiency, cleaner emission and higher plant life to name a few. Most importantly, deployment at the FFPP level can exploit the existing equipment items and facilities at the host power plant, thus reducing the CAPEX and reducing the storage capacity. However, realization of these benefits will critically depend on novel configuration/integration strategies with the least impact on the power plant operation and its configuration. Furthermore, dynamics of the entire integrated system including both the FFPP and the storage technologies must be taken into account to obtain the cost-optimal solution. With these motivations, the objective of this project was to complete a focused evaluation of decentralized deployments of energy storage facilities at the FFPP level. Promising thermal, chemical, mechanical, and electro-chemical storage technologies were evaluated with due consideration of their transient response to obtain various optimal system concepts that can minimize the levelized cost of storage. For thermal storage, cryogenic energy storage along with high temperature heat storage in molten salt as well as phase change material were evaluated. For mechanical storage, cryogenic air storage and pumped hydro storages were evaluated. For chemical storage, hydrogen storage was evaluated. For electrochemical storage, the team evaluated sodium sulfur, vanadium redox flow battery as well as Li-ion batteries. Integration of these storage technologies with the natural gas combined cycle (NGCC) and supercritical pulverized coal (SCPC) plants was considered. Six technologies, namely molten salt, cryogenics, compressed air, pumped hydro, H2 storage and Li-ion battery storage, were downselected based on their levelized cost of storage. It was observed that the ranking of the optimal storage technology can differ based on the host power plant technology even when same demand/supply/price profile for electricity are considered. It was also observed that as the variability in power demand varies, the ranking of the optimal storage technologies vary. However, for the same demand and LMP profile, top six optimal storage technologies for NGCC vs SCPC plants did not differ much even though LCOS for the same technology and optimal size of a given storage technology did differ. Detailed techno-economic assessment of these six technologies was undertaken.

01 COAL, LIGNITE, AND PEAT↗

TDRSS system configuration study for space shuttle program

This study was set up to assure that operation of the shuttle orbiter communications systems met the program requirements when subjected to electrical conditions similar to those which will be encountered during the operational mission. The test program intended to implement an integrated test bed, consisting of applicable orbiter, EVA, payload simulator, STDN, and AF/SCF, as well as the TDRSS equipment. The stated intention of Task 501 Program was to configure the test bed with prototype hardware for a system development test and production hardware for a system verification test. In case of TDRSS when the hardware was not available, simulators whose functional performance was certified to meet appropriate end item specification were used.

Source record↗

Operational Philosophy Concerning Manned Spacecraft Cabin Leaks

The last thirty years have seen the Space Shuttle as the prime United States spacecraft for manned spaceflight missions. Many lessons have been learned about spacecraft design and operation throughout these years. Over the next few decades, a large increase of manned spaceflight in the commercial sector is expected. This will result in the exposure of commercial crews and passengers to many of the same risks crews of the Space Shuttle have encountered. One of the more dire situations that can be encountered is the loss of pressure in the habitable volume of the spacecraft during on orbit operations. This is referred to as a cabin leak. This paper seeks to establish a general cabin leak response philosophy with the intent of educating future spacecraft designers and operators. After establishing a relative definition for a cabin leak, the paper covers general descriptions of detection equipment, detection methods, and general operational methods for management of a cabin leak. Subsequently, all these items are addressed from the perspective of the Space Shuttle Program, as this will be of the most value to future spacecraft due to similar operating profiles. Emphasis here is placed upon why and how these methods and philosophies have evolved to meet the Space Shuttle s needs. This includes the core ideas of: considerations of maintaining higher cabin pressures vs. lower cabin pressures, the pros and cons of a system designed to feed the leak with gas from pressurized tanks vs. using pressure suits to protect against lower cabin pressures, timeline and consumables constraints, re-entry considerations with leaks of unknown origin, and the impact the International Space Station (ISS) has had to the standard Space Shuttle cabin leak response philosophy. This last item in itself includes: procedural management differences, hardware considerations, additional capabilities due to the presence of the ISS and its resource, and ISS docking/undocking considerations with a cabin leak occurring. The paper also offers a look at how different equipment configurations on future spacecraft impact the previously defined cabin leak operational philosophy and includes additional operational methods and considerations that result due to various configurations. The intent is to showcase these various considerations and highlight the variability they allow. The paper concludes with a selection of the author s personal observations from a spacecraft operator's point of view and recommendations with the goal of improving the design and operations of future spacecraft.

DeSimpelaere, Edward↗