Search NASA⌕ Search

SEARCH · Search NASA

Results for “Control Centers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Understanding Cognitive and Collaborative Work: Observations in an Electric Transmission Operations Control Center

This paper describes research that is part of an ongoing project to design tools to assist in the integration of renewable energy into the electric grid. These tools will support control room dispatchers in real-time system operations of the electric power transmission system which serves much of the Western United States. Field observations comprise the first phase of this research in which 15 operators have been observed over various shifts and times of day for approximately 90 hours. Findings describing some of the cognitive and environmental challenges of managing the dynamically changing electric grid are presented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Contemplating the plasmalemmal control center model

An abundant epidermal mechanosensory calcium-selective ion channel appears able not only to detect mechanical stimuli such as those that initiate gravitropism but also to detect thermal, electrical, and various chemical stimuli. Because it responds to multimodal input with a second messenger output, this channel system seems likely to be an integrator that can engage in feedbacks with many other systems of the cell--and feedback is the hallmark of regulation. In general, the mechanical tension required for channel activation is likely transmitted from the relatively rigid cell wall to the plasma membrane system via linkage or adhesion sites that display antigenicities recognized by antibodies to animal beta-1 integrin, vitronectin, and fibronectin and which have mechanical connections to the cytoskeleton. Thus, functionally, leverage exerted against any given adhesion site will tend to control channels within a surrounding domain. Reactions initiated by passage of calcium ions through the channels could presumably be more effectively regulated if channels within the domains were somewhat clustered and if appropriate receptors, kinases, porters, pumps, and some key cytoskeletal anchoring sites were in turn clustered about them. Accumulating evidence suggests not only that activity of clusters of channels may contribute to control of cytoskeletal architecture and of regulatory protein function within their domain, but also that both a variety of regulatory proteins and components of the cortical cytoskeleton may contribute to control of channel activity. The emerging capabilities of electronic optical microscopy are well suited for resolving the spatial distributions of many of these cytoskeletal and regulatory molecules in living cells, and for following some of their behaviors as channels are stimulated to open and cytosolic calcium builds in their vicinity. Such microscopy, coupled with biochemical and physiological probing, should help to establish the nature of the feedback loops putatively controlled by the linkage sites and their channel domains.

Review↗

Development and Preliminary Results of CTAS on Airline Operational Control Center Operations

Continued growth and expansion of air traffic and increased air carrier economic pressures have mandated greater flexibility and collaboration in air traffic management. The ability of airspace users to select their own routes, so called "free-flight", and to more actively manage their fleet operations for maximum economic advantage are receiving great attention. A first step toward greater airspace user and service provider collaboration is information sharing. In this work, arrival scheduling and airspace management data generated by the NASA/FAA Center/TRACON Automation System (CTAS) and used by the FAA service provider is shared with an airline with extensive operations within the CTAS operational domain. The design and development of a specialized airline CTAS "repeater" system is described, as well as some preliminary results of the impact and benefits of this information on the air carrier's operations. FAA controller per aircraft scheduling information, such as that provided by CTAS, has never before been shared in real-time with an airline. Expected airline benefits include improved fleet planning and arrival gate management, more informed "hold-go" decisions, and avoidance of costly aircraft diversions to alternate airports when faced with uncertain airborne arrival delays.

Zelenka, Richard↗

Development and Preliminary Results of CTAS on Airline Operational Control Center Operations

Continued growth and expansion of air traffic and increased air carrier economic pressures have mandated greater flexibility and collaboration in air traffic management. The ability of airspace users to select their own routes, so called "free-flight", and to more actively manage their fleet operations for maximum economic advantage are receiving great attention. A first step toward greater airspace user and service provider collaboration is information sharing. In this work, arrival scheduling and airspace management data generated by the NASA/FAA Center/TRACON Automation System (CTAS) and used by the FAA service provider is shared with an airline with extensive operations within the CTAS operational domain. The design and development of a specialized airline CTAS "repeater" system is described, as well as some preliminary results of the impact and benefits of this information on the air carrier's operations. FAA controller per aircraft scheduling information, such as that provided by CTAS, has never before been shared in real-time with an airline. Expected airline benefits include improved fleet planning and arrival gate management, more informed "hold-go decisions, and avoidance of costly aircraft diversions to alternate airports when faced with uncertain airborne arrival delays.

Zelenka, Richard↗

Adaptation of Control Center Software to Commerical Real-Time Display Applications

NASA-Marshall Space Flight Center (MSFC) is currently developing an enhanced Huntsville Operation Support Center (HOSC) system designed to support multiple spacecraft missions. The Enhanced HOSC is based upon a distributed computing architecture using graphic workstation hardware and industry standard software including POSIX, X Windows, Motif, TCP/IP, and ANSI C. Southwest Research Institute (SwRI) is currently developing a prototype of the Display Services application for this system. Display Services provides the capability to generate and operate real-time data-driven graphic displays. This prototype is a highly functional application designed to allow system end users to easily generate complex data-driven displays. The prototype is easy to use, flexible, highly functional, and portable. Although this prototype is being developed for NASA-MSFC, the general-purpose real-time display capability can be reused in similar mission and process control environments. This includes any environment depending heavily upon real-time data acquisition and display. Reuse of the prototype will be a straight-forward transition because the prototype is portable, is designed to add new display types easily, has a user interface which is separated from the application code, and is very independent of the specifics of NASA-MSFC's system. Reuse of this prototype in other environments is a excellent alternative to creation of a new custom application, or for environments with a large number of users, to purchasing a COTS package.

Collier, Mark D.↗

Cryoplasty Versus Conventional Balloon Angioplasty of the Femoropopliteal Artery in Diabetic Patients: Long-Term Results from a Prospective Randomized Single-Center Controlled Trial

The purpose of this study was to investigate the immediate and long-term results of cryoplasty versus conventional balloon angioplasty in the femoropopliteal artery of diabetic patients. Fifty diabetic patients (41 men, mean age 68 years) were randomized to cryoplasty (group CRYO; 24 patients with 31 lesions) or conventional balloon angioplasty (group COBA; 26 patients with 34 lesions) of the femoropopliteal artery. Technical success was defined as <30% residual stenosis without any adjunctive stenting. Primary end points included technical success, primary patency, binary in-lesion restenosis (>50%), and freedom from target lesion recanalization. Cox proportional hazards regression analysis was performed to adjust for confounding factors of heterogeneity. In total, 61.3% (19 of 31) in group CRYO and 52.9% (18 of 34) in group COBA were de novo lesions. More than 70% of the lesions were Transatlantic Inter-Society Consensus (TASC) B and C in both groups, and 41.4% of the patients in group CRYO and 38.7% in group COBA suffered from critical limb ischemia. Immediate technical success rate was 58.0% in group CRYO versus 64.0% in group COBA (p = 0.29). According to 3-year Kaplan-Meier estimates, there were no significant differences with regard to patient survival (86.8% in group CRYO vs. 87.0% in group COBA, p = 0.54) and limb salvage (95.8 vs. 92.1% in groups CRYO and COBA, respectively, p = 0.60). There was a nonsignificant trend of increased binary restenosis in group CRYO (hazard ratio [HR] 1.3; 95% CI 0.6-2.6, p = 0.45). Primary patency was significantly lower in group CRYO compared with group COBA (HR 2.2; 95% CI 1.1-4.3, p = 0.02). Significantly more repeat intervention events because of recurrent symptoms were required in group CRYO (HR 2.5; 95% CI 1.2-5.3, p = 0.01). Cryoplasty was associated with lower primary patency and more clinically driven repeat procedures after long-term follow-up compared with conventional balloon angioplasty.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-F-T-269: Preliminary Experience of Kuwait Cancer Control Center (KCCC) On IMRT Treatment Planning and Pre-Treatment Verification

Purpose: The complexity of IMRT delivery requires pre-treatment quality assurance and plan verification. KCCC has implemented IMRT clinically in few sites and will extend to all sites. Recently, our Varian linear accelerator and Eclipse planning system were upgraded from Millennium 80 to 120 Multileaf Collimator (MLC) and from v8.6 to 11.0 respectively. Our preliminary experience on the pre-treatment quality assurance verification is discussed. Methods: Eight Breast, Three Prostate and One Hypopharynx cancer patients were planned with step and shoot IMRT. All breast cases were planned before the upgrade with 60% cases treated. The ICRU 83 recommendations were followed for the dose prescription and constraints to OAR for all cases. Point dose measurement was done with CIRS cylindrical phantom and PTW 0.125 cc ionization chamber. Measured dose was compared with calculated dose at the point of measurement. Map CHECK diode array phantom was used for the plan verification. Planned and measured doses were compared by applying gamma index of 3% (dose difference) / 3 mm DTA (average distance to agreement). For all cases, a plan is considered to be successful if more than 95% of the tested diodes pass the gamma test. A prostate case was chosen to compare the plan verification before and after the upgrade. Results: Point dose measurement results were in agreement with the calculated doses. The maximum deviation observed was 2.3%. The passing rate of average gamma index was measured higher than 97% for the plan verification of all cases. Similar result was observed for plan verification of the chosen prostate case before and after the upgrade. Conclusion: Our preliminary experience from the obtained results validates the accuracy of our QA process and provides confidence to extend IMRT to all sites in Kuwait.

43 PARTICLE ACCELERATORS↗

Earth Resources Technology Satellite Operations Control Center (OCC). ERTS-B flight activation plan

Included in this plan are general objectives through Day 7, operational guidelines and restraints. Following the activation of all subsystems (through Day 3), special series of payload operations were performed to obtain data samples for the different combinations of exposure/gain settings. This took place from Day 4 through Day 7. The Orbit Adjust was employed to perform vernier corrections after the orbit had been defined. The orbit data was collected through Day 3, with the corrections being made from Day 4 through Day 7. ERTS command auxiliary memory (ECAM) was turned on in Day 3 and the memory dumped to a narrow band tape recorder. A verification of memory was done in the off line mode. ECAM was not used in a payload support mode until Day 7.

Source record↗

LANDSAT D operations control center study

Various aspects of the planned LANDSAT D system are discussed. LANDSAT D incorporates the Thematic Mapper (TM) as a sensor, it utilizes the Multi-mission Modular Spacecraft (MMS), it makes use of the Tracking and Data Relay Satellite System (TDRSS) and it employs a more advanced ground system. Each of these represent significant improvements in the state-of-the-art.

Alexander, L.↗