Search NASASearch

SEARCH · Search NASA

Results for “Crew Module”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Executive Summary of Propulsion on the Orion Abort Flight-Test Vehicles

The NASA Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This paper provides a brief overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. An overview of the propulsive systems originally planned for future flight-test vehicles is also provided, which also includes the cold gas Reaction Control System within the Crew Module, and the Peacekeeper first stage rocket motor encased within the Abort Test Booster aeroshell. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 and the other flight-test vehicles could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles.

Jones, Daniel S.

Executive Summary of Propulsion on the Orion Abort Flight-Test Vehicles

The National Aeronautics and Space Administration Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This report provides a brief overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. An overview of the propulsive systems originally planned for future flight-test vehicles is also provided, which also includes the cold gas Reaction Control System within the Crew Module, and the Peacekeeper first stage rocket motor encased within the Abort Test Booster aeroshell. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 and the other flight-test vehicles could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles

Jones, Daniel S.

Orion Launch Abort System Performance During Exploration Flight Test 1

The Orion Launch Abort System Office is taking part in flight testing to enable certification that the system is capable of delivering the astronauts aboard the Orion Crew Module to a safe environment during both nominal and abort conditions. Orion is a NASA program, Exploration Flight Test 1 is managed and led by the Orion prime contractor, Lockheed Martin, and launched on a United Launch Alliance Delta IV Heavy rocket. Although the Launch Abort System Office has tested the critical systems to the Launch Abort System jettison event on the ground, the launch environment cannot be replicated completely on Earth. During Exploration Flight Test 1, the Launch Abort System was to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. Exploration Flight Test 1 was successfully flown on December 5, 2014 from Cape Canaveral Air Force Station's Space Launch Complex 37. This was the first flight test of the Launch Abort System preforming Orion nominal flight mission critical objectives. The abort motor and attitude control motors were inert for Exploration Flight Test 1, since the mission did not require abort capabilities. Exploration Flight Test 1 provides critical data that enable engineering to improve Orion's design and reduce risk for the astronauts it will protect as NASA continues to move forward on its human journey to Mars. The Exploration Flight Test 1 separation event occurred at six minutes and twenty seconds after liftoff. The separation of the Launch Abort System jettison occurs once Orion is safely through the most dynamic portion of the launch. This paper will present a brief overview of the objectives of the Launch Abort System during a nominal Orion flight. Secondly, the paper will present the performance of the Launch Abort System at it fulfilled those objectives. The lessons learned from Exploration Flight Test 1 and the other Flight Test Vehicles will certainly contribute to the vehicle architecture of a human-rated space launch vehicle.

McCauley, Rachel

Project SPARC: Space-Based Aeroassisted Reusable Craft

Future United States' space facilities include a Space Station in low Earth orbit (LEO) and a Geosynchronous Operations Support Center, or GeoShack, in geosynchronous orbit (GEO). One possible mode of transfer between the two orbits is an aerobraking vehicle. When traveling from GEO to LEO, the Earth's atmosphere can be used to aerodynamically reduce the velocity of the vehicle, which reduces the amount of propulsive change in velocity required for the mission. An aerobrake is added to the vehicle for this purpose, but the additional mass increases propellant requirements. This increase must not exceed the amount of propellant saved during the aeropass. The design and development of an aerobraking vehicle that will transfer crew and cargo between the Space Station and GeoShack is examined. The vehicle is referred to as Project SPARC, a SPace-based Aeroassisted Reusable Craft. SPARC consists of a removable 45 ft diameter aerobrake, two modified Pratt and Whitney Advanced Expander Engines with a liquid oxygen/liquid hydrogen propellant, a removable crew module with a maximum capacity of five, and standard sized payload bays providing a maximum payload capacity of 28,000 lbm. The aerobrake, a rigid, ellipsoidally blunted elliptical cone, provides lift at zero angle-of-attack due to a 73 deg rake angle, and is covered with a flexible multi-layer thermal protection system. Maximum dry mass of the vehicle without payload is 20,535 lbm, and the maximum propellant requirement is 79,753 lbm at an oxidizer to fuel ratio of 6/1. Key advantages of SPARC include its capability to meet mission changes, and its removable aerobrake and crew module.

Source record

A Proposed Ascent Abort Flight Test for the Max Launch Abort System

The NASA Engineering and Safety Center initiated the Max Launch Abort System (MLAS) Project to investigate alternate crew escape system concepts that eliminate the conventional launch escape tower by integrating the escape system into an aerodynamic fairing that fully encapsulates the crew capsule and smoothly integrates with the launch vehicle. This paper proposes an ascent abort flight test for an all-propulsive towerless escape system concept that is actively controlled and sized to accommodate the Orion Crew Module. The goal of the flight test is to demonstrate a high dynamic pressure escape and to characterize jet interaction effects during operation of the attitude control thrusters at transonic and supersonic conditions. The flight-test vehicle is delivered to the required test conditions by a booster configuration selected to meet cost, manufacturability, and operability objectives. Data return is augmented through judicious design of the boost trajectory, which is optimized to obtain data at a range of relevant points, rather than just a single flight condition. Secondary flight objectives are included after the escape to obtain aerodynamic damping data for the crew module and to perform a high-altitude contingency deployment of the drogue parachutes. Both 3- and 6-degree-of-freedom trajectory simulation results are presented that establish concept feasibility, and a Monte Carlo uncertainty assessment is performed to provide confidence that test objectives can be met.

Tartabini, Paul V.

Handbook for Designing MMOD Protection

Spacecraft are subject to micro-meteoroid and orbital debris (MMOD) impact damage which have the potential to degrade performance, shorten the mission, or result in catastrophic loss of the vehicle. Specific MMOD protection requirements are established by NASA for each spacecraft early in the program/project life, to ensure the spacecraft meets desired safety and mission success goals. Both the design and operations influences spacecraft survivability in the MMOD environment, and NASA considers both in meeting MMOD protection requirements. The purpose of this handbook is to provide spacecraft designers and operations personnel with knowledge gained by NASA in implementing effective MMOD protection for the International Space Station, Space Shuttle, and various science spacecraft. It has been drawn from a number of previous publications [10-14], as well as new work. This handbook documents design and operational methods to reduce MMOD risk. In addition, this handbook describes tools and equations needed to design proper MMOD protection. It is a living report, in that it will be updated and re-released periodically in future with additional information. Providing effective and efficient MMOD protection is essential for ensuring safe and successful operations of spacecraft and satellites. A variety of shields protect crew modules, external pressurized vessels and critical equipment from MMOD on the International Space Station (ISS). Certain Space Shuttle Orbiter vehicle systems are hardened from MMOD impact, and operational rules are established to reduce the risk from MMOD (i.e., flight attitudes are selected and late inspection of sensitive thermal protection surfaces are conducted to reduce MMOD impacts). Science spacecraft include specific provisions to meet MMOD protection requirements in their design (for example, Stardust & GLAST). Commercial satellites such as Iridium and Bigelow Aerospace Genesis spacecraft incorporate MMOD protection. The development of low-weight, effective MMOD protection has enabled these spacecraft missions to be performed successfully. This handbook describes these shielding techniques. For future exploration activities to the Moon and Mars, implementing high-performance MMOD shielding will be necessary to meet protection requirements with minimum mass penalty. A current area of technology development in MMOD shielding is the incorporation of sensors to detect and locate MMOD impact damage. Depending on the type of sensor the signals from the sensor can be processed to infer the location of the impact and the extent of damage. The objective of the sensors is to locate critical damage that would endanger the spacecraft or crew immediately or during reentry (such as an air leak from crew module or critical damage to thermal protection system of reentry vehicles). The information from the sensors can then be used with repair kits, patch kits, hatch closure or other appropriate remedial techniques to reduce MMOD risk.

Arnold, Jim

An Agile-Like Approach to Hardware Development: The Ejectable Data Recorder (EDR) for Orion's Ascent Abort 2 (AA-2) Test Flight

On July 2, 2019, the Ascent Abort 2 (AA-2) Flight Test Vehicle was launched from Cape Canaveral, with the goal of demonstrating the performance of Orion’s Launch Abort System (LAS) and collecting data from hundreds of sensors throughout the vehicle. The data collected during this test flight is of paramount importance, as it will be used to certify the Orion vehicle for human spaceflight. Originally, the data was to be downlinked via a single string network of antennas on the LAS, with the associated risk of potential data dropouts, as well as loss of data once the LAS was jettisoned. Thus, additional antennas were added onto the crew module (CM) to support data downlink post-LAS jettison, a buffer rebroadcast capability was added to fill in any gaps in data downlink transmissions, and an ejectable data recorder (EDR) subsystem was added to the CM as a redundant measure to collect all the instrumentation data. The EDR subsystem was added to the project about one year after the project commenced, which significantly reduced the available development time when compared with the other subsystems of the AA-2 Test Flight. The project was further accelerated by six months, around the critical design review gate. Due to the schedule compression challenge and the fact that the EDR subsystem was a backup system and not flight critical, the EDR subsystem was further challenged to find a new and more efficient way to develop hardware. Thus, the EDR subsystem experimented with different management and systems engineering processes, team sizes, communication methods, and tools. Some examples are novel uses of SharePoint as a Data-centric Project Management & Systems Engineering environment, a continuous testing approach through the lifecycle, and a Skunkworks approach to managing the team. The EDR subsystem blended Commercial Off The Shelf (COTS) hardware with in-house developed hardware and software to create a novel data retrieval capability. The capability evolved rapidly through a hardware in the loop simulation environment that enabled incremental component updates for not only the EDR subsystem but across the entire Crew Module. This paper will present an overview of how the EDR subsystem was managed and compare it to an Agile approach to managing projects. The paper will further provide a recommended approach to future Agile-like hardware development that incorporates lessons learned from the EDR experience.

Agile

Design of a fast crew transfer vehicle to Mars

A final report is made on the trajectory and vehicle requirements for a fast crew transfer vehicle to Mars which will complete an Earth to Mars (and Mars to Earth) transfer in 150 days and will have a stay time at Mars of 40 days. This vehicle will maximize the crew's effectiveness on Mars by minimizing detrimental physiological effects such as bone demineralization and loss of muscle tone caused by long period exposure to zero gravity and radiation from cosmic rays and solar flares. The crew transfer vehicle discussed will complete the second half of a Split Mission to Mars. In the Split Mission, a slow, unmanned cargo vehicle, nicknamed the Barge, is sent to Mars ahead of the crew vehicle. Once the Barge is in orbit around Mars, the fast crew vehicle will be launched to rendezvous with the Barge in Mars orbit. The vehicle presented is designed to carry six astronauts for a mission duration of one year. The vehicle uses a chemical propulsion system and a nuclear power system. Four crew modules, similar to the proposed Space Station Common Modules, are used to house the crew and support equipment during the mission. The final design also includes a command module that is shielded to protect the crew during radiation events.

Source record

First lunar outpost

Design and research efforts at the University of Puerto Rico have focused on the evaluation and refinement of the Habitability Criteria for a prolonged human presence in space during the last four years. Living quarters for a Mars mission and a third generation lunar base concept were proposed. This academic year, 1991-92, work on further refinement of the habitability criteria and design of partial gravity furniture was carried on. During the first semester, design alternatives for furniture necessary in a habitat design optimized for lunar and Martian environments were developed. Designs are based on recent research data from lunar and Mars gravity simulations, and current NASA standards. Artifacts will be submitted to NASA architects to be tested in KC-135 flights. Test findings will be submitted for incorporation in future updates to NASA habitat design standards. Second semester work was aimed at integrating these findings into the First Lunar Outpost (FLO), a mission scenario currently being considered by NASA. The mission consists of a manned return to the moon by crews of four astronauts for periods of 45 days. The major hardware components of the mission are as follows: (1) a Crew Module for the delivery of the crew and their supplies, and (2) the Habitat Module, which will arrive on the Moon unmanned. Our design efforts concentrated on this Habitat Module and on application of habitability criteria. Different geometries for the pressure vessel and their impact on the interior architecture were studied. Upon the selection of a geometry, a more detailed analysis of the interior design was performed, taking into consideration the reduced gravity, and the protection against radiation, micrometeorites, and the extreme temperature variation. A proposal for a FLO was submitted by the students, consisting essentially of a 24-feet (7.3 m.) by 35-feet (10.67 m) high vertical cylinder with work areas, crew quarters, galley, wardroom, leisure facilities, health maintenance, waste management, EVA operations facilities, and safe havens.

Andino, Aureo F.

Framework for Analyzing the Complex Interactions Between Spacecraft Motion and Slosh Dynamics in Low-G Environments

The fuel-to-dry-mass ratio of spacecraft continues to grow as new human spaceflight missions target destinations from Earth. Large amounts of liquid propellant can lead to significant coupling between the rigid-body dynamics of the spacecraft and the motion of the fuel within its storage tank. The present work gives an overview of the dynamic features and a flowchart for a method of simulating the motion of a spacecraft with fuel slosh inside a cylindrical, domed tank in a low-g environment. The method involves modeling the liquid propellant as a particle that transfers momentum to the spacecraft through perfectly inelastic collisions with the tank wall. The foundation of the modeling methodology is the approach taken during the Apollo program used to predict the effect of fuel slosh on the complex motion exhibited by the Service Module following separation from the Crew Module. This paper discusses the motivation, methodology, and conclusions from the Apollo-era method, and subsequently builds upon it by incorporating corrections to the derivation of the dynamics and filling in the gaps due to unavailability of the detailed contractor report and simulation code. The results presented in this paper provide an example that demonstrates the effect that fuel slosh can have on the trajectory of a spacecraft in a low-g environment.

William J Elke III

Common manned module

An economic analysis examines a reusable single crew module to reduce the cost of Moon to stay exploration by 5 billion dollars. Topics covered in viewgraph format include the following: aerodynamics, weight, runway landing, technology support, and common module reentry requirements.

Andrews, Dana

Summary of Propulsion System Needs in Support of Project Constellation

In January 2004, the President of the United States established the Vision for Space Exploration (VSE) to return man to the moon and ultimately to extend manned space travel to Mars. This paper will summarize the manned space flight liquid propulsion system needs in support of Project Constellation over the next 10 years. It will include all engine needs to return man to the moon. An overview of engines currently under contract, those baselined but not yet under contract, and those engine needs that hav.e yet to be initiated. Project Constellation includes the components as shown Figure 1. Liquid propulsion systems supporting the manned portion of these elements include the following: the Crew Exploration Vehicle named Orion (crew module reaction control system (CMRCS), service module Orion Main Engine (OME), service module auxiliary RCS, and service module reaction control system (SMRCS)), the Crew Launch Vehicle named Ares 1 (J2X upper stage, first stage roll control system, second stage reaction control system, and the Ares I-X roll control system), the Heavy Lift Launch Vehicle named Ares V (RS68B first stage booster, J-2X upper stage, roll control systems, and the Earth Departure Stage (EDS) (powered by the same Ares V Upper Stage J-2X), and the Lunar Lander named Altair with both descent and ascent stages (lunar orbit insertion and descent main engine, ascent main engine, and attitude control systems for both stages). In addition, there may be additional engine needs for early demonstrators, but those will not be speculated on as part of this paper. Also, other portions of the VSE architecture, including the planned Orion abort demonstrations and the Lunar Precursor Robotic Program, are not addressed here as they either use solid motors or are focused on unmanned precursor missions.

Sumrall, Phil

Alternate transportation system

Three missions have been identified by NASA for a Space Shuttle-supplementing Alternate Transportation System (ATS) encompassing combinations of booster vehicles, crew modules, and service modules: (1) to achieve manned access to orbit for Space Station crew rotation every 90 days, (2) the lofting of a logistics module resupplying the Space Station every 180 days, and (3) the simultaneous launch of both crews and logistics to the Space Station. A reentry glider is considered, in conjunction with the Space Shuttle's unmanned cargo version and the Apollo manned capsule, as an important ATS element. The Titan IV/NUS is used as a booster.

Zertuche, Tony

Electrical Pressurization Concept for the Orion MPCV European Service Module Propulsion System

The paper presents the design of the pressurization system of the European Service Module (ESM) of the Orion Multi-Purpose Crew Vehicle (MPCV). Being part of the propulsion subsystem, an electrical pressurization concept is implemented to condition propellants according to the engine needs via a bang-bang regulation system. Separate pressurization for the oxidizer and the fuel tank permits mixture ratio adjustments and prevents vapor mixing of the two hypergolic propellants during nominal operation. In case of loss of pressurization capability of a single side, the system can be converted into a common pressurization system. The regulation concept is based on evaluation of a set of tank pressure sensors and according activation of regulation valves, based on a single-failure tolerant weighting of three pressure signals. While regulation is performed on ESM level, commanding of regulation parameters as well as failure detection, isolation and recovery is performed from within the Crew Module, developed by Lockheed Martin Space System Company. The overall design and development maturity presented is post Preliminary Design Review (PDR) and reflects the current status of the MPCV ESM pressurization system.

Helium

Constellation Training Facility Support

The National Aeronautics and Space Administration is developing the next set of vehicles that will take men back to the moon under the Constellation Program. The Constellation Training Facility (CxTF) is a project in development that will be used to train astronauts, instructors, and flight controllers on the operation of Constellation Program vehicles. It will also be used for procedure verification and validation of flight software and console tools. The CxTF will have simulations for the Crew Exploration Vehicle (CEV), Crew Module (CM), CEV Service Module (SM), Launch Abort System (LAS), Spacecraft Adapter (SA), Crew Launch Vehicle (CLV), Pressurized Cargo Variant CM, Pressurized Cargo Variant SM, Cargo Launch Vehicle, Earth Departure Stage (EDS), and the Lunar Surface Access Module (LSAM). The Facility will consist of part-task and full-task trainers, each with a specific set of mission training capabilities. Part task trainers will be used for focused training on a single vehicle system or set of related systems. Full task trainers will be used for training on complete vehicles and all of its subsystems. Support was provided in both software development and project planning areas of the CxTF project. Simulation software was developed for the hydraulic system of the Thrust Vector Control (TVC) of the ARES I launch vehicle. The TVC system is in charge of the actuation of the nozzle gimbals for navigation control of the upper stage of the ARES I rocket. Also, software was developed using C standards to send and receive data to and from hand controllers to be used in CxTF cockpit simulations. The hand controllers provided movement in all six rotational and translational axes. Under Project Planning & Control, support was provided to the development and maintenance of integrated schedules for both the Constellation Training Facility and Missions Operations Facilities Division. These schedules maintain communication between projects in different levels. The CxTF support provided is one that requires continuous maintenance since the project is still on initial development phases.

Flores, Jose M.