Search NASA⌕ Search

SEARCH · Search NASA

Results for “EPICS Control System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

119 records · Page 7

Controls Status for Fermilab’s PIP-II Project

Testing of Cryomodule first articles at PIP-II's on-site Cryomodule Test Facility (CMTF), where EPICS based controls are already being used, has been invaluable to the project. In addition to validating hardware and controls components, it has provided opportunities to build buy-in and illicit meaningful feedback early-on. A device naming convention has also been significantly refined with an internal working group and the PIP-II integration team. Compressed air and Process Control Water (PCW) systems have been installed, and operations has been engaged in Phoebus display development in preparation for a transition to operations for these systems by 2026. Cryoplant hardware has been put in place, and collaboration between controls and PIP-IIs cryo group for IOC and display development is well underway for commissioning of cryoplant systems to begin early 2026. The project has also received beneficial occupancy of the High-Bay Building in October 2025, keeping us on schedule for Warm Front End commissioning to begin in 2027.

Crisp, Dan [Fermilab]↗

Commissioning the JLab LERF Cryomodule Test Facility

The JLab Low Energy Recirculating Facility, LERF, has been modified to support concurrent testing of two LCLS-II cryomodules. The cryomodules are installed in a similar fashion as they would be in the L1 section of the LCLS-II linac, including the floor slope and using all of the LCLS-II hardware and controls for cryomodule cryogenics, vacuum, and RF (SSA and LLRF). From the start, it was intended to use LCLS-II electronics and EPICS software controls for cryomodule testing. In affect the LERF test facility becomes the first opportunity to commission and operate the LCLS-II LINAC hardware and software controls. Support for specific cryomodule high level test applications like Q0 and HOMs measurements, are being developed from the basic cryomodule control suite. To support the testing, 2 K He is supplied from the CEBAF south linac cryogenic system, where care must be taken when using the LERF test facility to not upset the CEBAF cryogenics plant. This paper discusses the commissioning of the hardware and software development for testing the first two LCLS-II cryomodules.

Hovater, C.↗

RFSoC based digital low level RF control firmware and software suite (mimo_llrf) v1.0

It features a framework of a firmware and software architecture in support of building a digital low-level RF control system for accelerators, where precised digital RF generation and measurement are needed across many RF channels. It primarily supports the Xilinx RFSoC chips (xczu48dr, xczu47dr, xczu29dr) and their evaluation boards (zcu208, zcu216), for a highly integrated solution enabling the need for synchronous low-level RF systems, including: multi-tile synchronization, external reference for sampling clocks, deterministic delay, aligned NCO phase for digital mixers, and built-in EPICS IOC.

Du, Qiang [Lawrence Berkeley National Laboratory (↗

areaDetector/ADTimePix3

ADTimePix3 is an open‑source EPICS areaDetector driver for TimePix3 pixel detectors from Advanced Scientific Instruments (ASI). It provides a complete control and data‑acquisition interface between EPICS and the Serval server, supporting both real detectors (single‑chip and 2×2 quad configurations) and the TimePix3 emulator. The driver configures measurements via an HTTP/JSON REST API and acquires data through high‑rate TCP streams for raw events, images, and histograms. It offers real‑time preview and accumulated images, Time‑of‑Flight histogram processing, pixel masking (including Binary Pixel Configuration files and hot‑pixel tools), extensive health and status monitoring, and integration with standard areaDetector plugins for file saving and downstream analysis. ADTimePix3 is designed for Linux 64‑bit systems (tested on Ubuntu and RHEL) and is distributed under an MIT license with additional institutional disclaimers, enabling reuse and extension in photon science beamlines and other TimePix3‑based experimental facilities.

Gofron, Kaz↗

Beamline Insertions Manager at Jefferson Lab

The beam viewer system at Jefferson Lab provides operators and beam physicists with qualitative and quantitative information on the transverse electron beam properties. There are over 140 beam viewers installed on the 12 GeV CEBAF accelerator. This paper describes an upgrade consisting of replacing the EPICS-based system tasked with managing all viewers with a mixed system utilizing EPICS and high-level software. Most devices, particularly the beam viewers, cannot be safely inserted into the beam line during high-current beam operations. Software is partly responsible for protecting the machine from untimely insertions. The multiplicity of beam-blocking and beam-vulnerable devices motivates us to try a data-driven approach. The beamline insertions application components are centrally managed and configured through an object-oriented software framework created for this purpose. A rules-based engine tracks the configuration and status of every device, along with the beam status of the machine segment containing the device. The application uses this information to decide on which device actions are allowed at any given time.

43 PARTICLE ACCELERATORS↗

Applying Service-Oriented Architecture to Archiving Data in Control and Monitoring Systems

Current trends in the architecture of software systems focus our attention on building systems using a set of loosely coupled components, each providing a specific functionality known as service. It is not much different in control and monitoring systems, where a functionally distinct sub-system can be identified and independently designed, implemented, deployed and maintained. One functionality that renders itself perfectly to becoming a service is archiving the history of the system state. The design of such a service and our experience of using it are the topic of this article. The service is built with responsibility segregation in mind, therefore, it provides for reducing data processing on the data viewer side and separation of data access and modification operations. The service architecture and the details concerning its data store design are discussed. An implementation of a service client capable of archiving EPICS process variables (PV) and LabVIEW shared variables is presented. Data access tools, including a browser-based data viewer and a mobile viewer, are also presented.

Nogiec, J. M.↗

WE-AB-207B-09: Margin Reduction for Planning Target Volume (PTV) in Patients with Localized Prostate Cancer: Impact On Delivered Dose and Quality of Life

Purpose: To estimate the delivered (cumulative) dose to targets and organs at risk for localized prostate cancer patients treated with reduced PTV margins and to evaluate preliminary patient reported quality-of-life (QOL). Methods: Under an IRB-approved protocol, 20 prostate cancer patients (including 11 control patients) were treated with reduced planning margins (5 mm uniform with 4 mm at prostate/rectum interface). Control patients had standard margin (10/6 mm)-based treatments. A parameter-optimized Elastix algorithm along with energy-mass mapping was used to deform and resample dose of the day onto the planning CT for each fraction to estimate the delivered dose over all fractions. QOL data were collected via Expanded Prostate cancer Index Composite (EPIC-26) questionnaires at time points pre-treatment, post-treatment, and at 2, 6, 12, 18 month follow-ups. Standardized QOL scores [range: 0–100] were determined and baseline-corrected by subtracting pre-treatment QOL data. Mean QOL differences between the margin reduced group and control group (QOLmr-QOLcontrol) were calculated for first 18 months. Results: The difference between the cumulative mean dose (Dmean) and the planned mean dose (±SD) for PTV, prostate, bladder, and rectum were −2.2±1.0, 0.3±0.5, −0.7±2.6, and −2.1±1.3 Gy respectively for the margin-reduced group, and −0.8±2.0, 0.9±1.4, - 0.7±3.1 and −1.0±2.4 Gy for the control group. Difference between the two groups was statistically insignificant (p=0.1). Standardized and baseline corrected QOLmr-QOLcontrol for EPIC domains categorized as “Urinary Incontinence”, “Urinary Irritative/Obstructive”, “Bowel”, “Sexual”, and “Hormonal” were 0.6, 12.1, 9.1, 13.3, and −0.9 for the 18 months following radiation therapy (higher values better). Delivered dose to rectum showed a weak correlation to “Bowel” domain (Pearson’s coefficient −0.24, p<0.001), while bladder dose did not correlate to Urinary Incontinence/Irritative/Obstructive QOL domains. Conclusion: The margin-reduced group exhibited clinically meaningful improvement of QOL without compromising the PTV dose. A larger number of patients and greater follow-up is needed to draw unequivocal conclusions. This work was supported in part by a research grant from Varian Medical Systems, Palo Alto, CA.

60 APPLIED LIFE SCIENCES↗

Intelligent Optimization of the Digital Low Level RF Control System for LANSCE LINAC

The LINAC at the Los Alamos Neutron Science Center (LANSCE) accelerates protons from 750 keV to its final energy at 800 MeV via 48 radio frequency (RF) modules. However, the startup and recovery process of the low-level RF (LLRF) systems, the primary controls for the RF modules, cost significant time for the beam operation, while the process itself is highly prone to human errors. With the new conversion from the analog LLRF (aLLRF) to digital LLRF (dLLRF) system under the recent LANSCE Modernization Project, new approaches with the new dLLRF capabilities can be achieved to address this issue. We propose to develop an intelligent optimization scheme that can significantly lower the downtime caused by the LLRF systems. This directly address the MFR problem statement that asks for “innovative engineering improvements to ancillary systems such as RF and pulsed power that improve reliability, maintainability, and/or performance.”

43 PARTICLE ACCELERATORS↗

NEW EPICS/RTEMS IOC BASED ON ALTERA SOC AT JEFFERSON LAB

A new EPICS/RTEMS IOC based on the Altera System-on-Chip (SoC) FPGA is being designed at Jefferson Lab. The Altera SoC FPGA integrates a dual ARM Cortex-A9 Hard Processor System (HPS) consisting of processor, peripherals and memory interfaces tied seamlessly with the FPGA fabric using a high-bandwidth interconnect backbone. The embedded Altera SoC IOC has features of remote network boot via U-Boot from SD card or QSPI Flash, 1Gig Ethernet, 1GB DDR3 SDRAM on HPS, UART serial ports, and ISA bus interface. RTEMS for the ARM processor BSP were built with CEXP shell, which will dynamically load the EPICS applications at runtime. U-Boot is the primary bootloader to remotely load the kernel image into local memory from a DHCP/TFTP server over Ethernet, and automatically run RTEMS and EPICS. The first design of the SoC IOC will be compatible with Jefferson Lab’s current PC104 IOCs, which have been running in CEBAF 10 years. The next design would be mounting in a chassis and connected to a daughter card via standard HSMC connectors. This standard SoC IOC will become the next generation of low-level IOC for the accelerator controls at Jefferson Lab.

Yan, Jianxun↗

Intelligent Experiments Through Real-time AI: Fast Data Processing and Autonomous Detector Control for sPHENIX and Future EIC Detectors (Final Report)

The overall vision of this project was to integrate real-time artificial intelligence (AI) directly into the data acquisition and detector-control systems of nuclear physics experiments, including both fast online event selection and an autonomous detector-control feedback loop. The work carried out under the award focused on the fast online event-selection half of that vision: the efficient recording of low-momentum heavy-flavor (HF) hadron decays in proton-proton collisions at the sPHENIX experiment at the Relativistic Heavy Ion Collider (RHIC)—an observable that requires fast tracking and topological trigger selection not previously demonstrated at RHIC, and that is essential for QCD studies at future facilities such as the Electron-Ion Collider (EIC). The autonomous detector-control (GPU-based feedback) component named in the project title remained a design concept and was not implemented under this award. The Massachusetts Institute of Technology (MIT) group led the offline simulation and data processing needed to train the machine-learning (ML) models, the translation of trained models to Field-Programmable Gate Array (FPGA) firmware using the hls4ml framework, and the physics validation of heavy-flavor reconstruction. Over the award period, the team developed and hardware-tested the principal components of an AI-based heavy-flavor trigger on simulated and recorded sPHENIX tracker data: a software Bipartite Graph Attention Network (BiGAT) trigger model reaching > 95% signal efficiency at 99% background rejection; an FPGA-native hit clusterizer matching the offline clustering; smaller networks synthesized to FPGA within the required sub-10 µs latency; and an assembled decoder–clusterizer–inference firmware chain exercised on the FELIX readout board. A complete, fully integrated hardware demonstrator was not finished within the award period. This report documents the project goals, the MIT group’s contributions, the technical accomplishments, and the outlook toward applications at the future EIC ePIC detector.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗