Search NASA⌕ Search

SEARCH · Search NASA

Results for “EUROPEAN SPACE PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Draft Tier 2 Environmental Impact Statement for International Space Station

The Draft Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA's participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop a human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.

Source record↗

Spacelab Accomplishments Forum 4

The Spacelab Module, exposed platforms, and supporting instrumentation were designed and developed by the European Space Agency to house advanced experiments inside the Space Shuttle cargo bay. The Spacelab program has hosted a cross-disciplinary research agenda over a 17-year flight history. Several variations of Spacelab were used to host payloads for almost every space research discipline that NASA pursues-life sciences, microgravity research, space sciences, and earth observation studies. After seventeen years of flight, Spacelab modules, pallets, or variations thereof flew on the Shuttle 36 times for a total of 375 flight days.

Emond, J.↗

Low cost test bed tool development for validation of mission control events

The Cassini Program is one of the last large interplanetary spacecraft missions. It is a joint effort between the European Space Agency, the Italian Space Agency and NASA.The U.S. portion of the mission is managed for NASA by the Jet Propulsion Laboratory (JPL). The primary mission is to survey the complex Saturnian system and release the ESA-Huygens probe at Titan. The success of the Cassini Mission has been largely due its many simulation test beds and its rigorous test program.

Cassini ITL test tools↗

Space Station Freedom crew training

The nature of the Space Station Freedom Program presents an array of new and enhanced challenges which need to be addressed en route to developing an effective and affordable infrastructure for crew training. Such an infrastructure is essential for the safety and success of the program. The three major challenges that affect crew training are the long lifetime of the program (thirty years), the interdependence of successive increments, and the participation of the three International Partners (Canada, European Space Agency, and Japan) and a myriad of experimenters. This paper addresses these major challenges as they drive the development of a crew training capability and the actual conduct of crew training.

Bobko, Karol J.↗

Space Station Freedom crew training

The nature of the Space Station Freedom Program presents an array of new and enhanced challenges which need to be addressed en route to developing an effective and affordable infrastructure for crew training. Such an infrastructure is essential for the safety and success of the program. The three major challenges that affect crew training are the long lifetime of the program (thirty years), the interdependence of successive increments, and the participation of the three International Partners (Canada, European Space Agency, and Japan) and a myriad of experimenters. This paper addresses these major challenges as they drive the development of a crew training capability and the actual conduct of crew training.

Space Flight/education/organization & administrati↗

Quo Vadis Payload Safety?

As we complete the preparations for the fourth Hubble Space Telescope (HST) servicing mission, we note an anniversary approaching: it was 30 years ago in July that the first HST payload safety review panel meeting was held. This, in turn, was just over a year after the very first payload safety review, a Phase 0 review for the Tracking and Data Relay Satellite and its Inertial Upper Stage, held in June of 1977. In adapting a process that had been used in the review and certification of earlier Skylab payloads, National Aeronautics and Space Administration (NASA) engineers sought to preserve the lessons learned in the development of technical payload safety requirements, while creating a new process that would serve the very different needs of the new space shuttle program. Their success in this undertaking is substantiated by the fact that this process and these requirements have proven to be remarkably robust, flexible, and adaptable. Furthermore, the payload safety process has, to date, served us well in the critical mission of safeguarding our astronauts, cosmonauts, and spaceflight participants. Both the technical requirements and their interpretation, as well as the associated process requirements have grown, evolved, been streamlined, and have been adapted to fit multiple programs, including the International Space Station (ISS) program, the Shuttle/Mir program, and most recently the United States Constellation program. From its earliest days, it was anticipated that the payload safety process would be international in scope, and so it has been. European Space Agency (ESA), Japan Aerospace Exploration Agency (JAXA), German Space Agency (DLR), Canadian Space Agency (CSA), Russian Space Agency (RSA), and many additional countries have flown payloads on both the space shuttle and on the ISS. Our close cooperation and long-term working relationships have culminated in the franchising of the payload safety review process itself to our partners in ESA, which in turn will serve as a roadmap for extending the franchise to other Partners.

Fodroci, Michael P.↗

Development Testing of the Gateway Integrated Bipropellant Refueling Subsystem

The Lunar Gateway is a deep space orbiting outpost being developed by the National Aeronautics and Space Administration (NASA) in partnership with the European Space Agency (ESA) and other domestic and international partners. Because Gateway is a vital component of NASA’s Artemis program supporting long-term human exploration of the moon, it is designed for on-orbit refueling to allow for a longer life performance. The reaction control system (RCS) bipropellant refueling system onboard the station will have the capability to transfer propellants, monomethyl hydrazine (MMH) and mixed oxides of nitrogen-3 (MON-3), under controlled conditions and will span across three modules: the European System Providing Refueling Infrastructure and Telecommunication Refueling Module (ESPRIT-RM or ERM), the Habitation and Logistics Outpost (HALO), and the Propulsion and Power Element (PPE). These propellant transfers are complex operations with known hazards, and one of the risk areas is exceeding the flight system’s maximum design pressure (MDP) in priming and refueling pause/stop operations. In priming, liquid propellant is transferred from a pressurized source tank to evacuated transfer lines, which could result in excessive transient surge pressures and potentially damage hardware. In refueling pause/stop operations, fast-acting isolation valves (IV) are closed, which could lead to damaging water hammer. To mitigate these risks and develop the system, a collaborative NASA/ESA/Thales Alenia Space – United Kingdom (TAS-UK) test program was completed at TAS-UK on a simplified refueling breadboard representing ERM, HALO, and PPE bipropellant transfer systems. The objectives of the integrated breadboard testing were to (1) gather performance data to characterize and demonstrate critical refueling operations, (2) help inform flight designs, and (3) to validate numerical models that can be extended to predicting flight system performance. Integrated breadboard test data has shown the architected system performance is closing initial design assumptions. Further testing with propellant on a higher fidelity fluid simulator and analysis are planned.

Adela D Han↗

Development Testing of the Gateway Integrated Bipropellant Refueling Subsystem

The Lunar Gateway is a deep space orbiting outpost being developed by the National Aeronautics and Space Administration (NASA) in partnership with the European Space Agency (ESA) and other domestic and international partners. Because Gateway is a vital component of NASA’s Artemis program supporting long-term human exploration of the moon, it is designed for on-orbit refueling to allow for a longer life performance. The reaction control system (RCS) bipropellant refueling system onboard the station will have the capability to transfer propellants, monomethyl hydrazine (MMH) and mixed oxides of nitrogen-3 (MON-3), under controlled conditions and will span across three modules: the European System Providing Refueling Infrastructure and Telecommunication Refueling Module (ESPRIT-RM or ERM), the Habitation and Logistics Outpost (HALO), and the Propulsion and Power Element (PPE). These propellant transfers are complex operations with known hazards, and one of the risk areas is exceeding the flight system’s maximum design pressure (MDP) in priming and refueling pause/stop operations. In priming, liquid propellant is transferred from a pressurized source tank to evacuated transfer lines, which could result in excessive transient surge pressures and potentially damage hardware. In refueling pause/stop operations, fast-acting isolation valves (IV) are closed, which could lead to damaging water hammer. To mitigate these risks and develop the system, a collaborative NASA/ESA/Thales Alenia Space – United Kingdom (TAS-UK) test program was completed at TAS-UK on a simplified refueling breadboard representing ERM, HALO, and PPE bipropellant transfer systems. The objectives of the integrated breadboard testing were to (1) gather performance data to characterize and demonstrate critical refueling operations, (2) help inform flight designs, and (3) to validate numerical models that can be extended to predicting flight system performance. Integrated breadboard test data has shown the architected system performance is closing initial design assumptions. Further testing with propellant on a higher fidelity fluid simulator and analysis are planned.

Adela D Han↗

Battery development and testing at ESA

The principal activities of the Energy Storage Section of the Space Research and Technology Center (ESTEC) of the European Space Agency are presented. Nickel-hydrogen and fuel cell systems development are reported. The European Space Battery Test Center (ESBTC) facilities are briefly described along with the current test programs and results obtained.

Verniolle, Jean↗

Proceedings of the Seventh International Space University Alumni Conference

The Seventh Alumni Conference of the International Space University, coordinated by the ISU U.S. Alumni Organization (IUSAO), was held at Cleveland State University in Cleveland, Ohio on Friday, July 24, 1998. These proceedings are a record of the presentations. The following topics are included: Remote sensing education in developing countries; Integrated global observing strategy; NASA's current earth science program; Europe's lunar initiative; Lunarsat: Searching for the South Polar cold traps; Asteroid hazards; ESA exobiological activities; Space testbed for photovoltaics; Teledesic Space infrastructure; Space instrument's concurrent design; NASA advanced fuel program; Mission preparation and training for the European Robotic Arm (ERA); and Global access to remote sensing systems.

Bailey, Sheila↗

Alterations of Cellular Immune Reactions in Crew Members Overwintering in the Antarctic Research Station Concordia

Background: Concordia Station is located inside Antarctica about 1000km from the coast at an altitude of 3200m (Dome C). Hence, individuals living in this harsh environment are exposed to two major conditions: 1.) hypobaric hypoxia and 2.) confinement and extreme isolation. Both hypoxia and confinement can affect human immunity and health, and are likely to be present during exploration class space missions. This study focused on immune alterations measured by a new global immunity test assay, similar to the phased out delayed type hypersensitivity (DTH) skin test. Methods: After informed written consent 14 healthy male subjects were included to the CHOICE-study (Consequences-of-longterm-Confinement-and-Hypobaric-HypOxia-on-Immunity-in-the Antarctic-Concordia-Environment). Data collection occurred during two winter-over periods lasting each one year. During the first campaign 6 healthy male were enrolled followed by a second campaign with 8 healthy males. Blood was drawn monthly and incubated for 48h with various bacterial, viral and fungal antigens followed by an analysis of plasma cytokine levels (TNF-alpha, IL2, IFN-gamma, IL10). As a control, blood was incubated without stimulation ("resting condition"). Goals: The scope of this study was to assess the consequences of hypoxia and confinement on cellular immunity as assessed by a new in vitro DTH-like test. Results: Initial results indicate that under resting conditions the in vitro DTH-like test showed low cytokine levels which remained almost unchanged during the entire observation period. However, cytokine responses to viral, bacterial and fungal antigens were remarkably reduced at the first month after arrival at Concordia when compared to levels measured in Europe prior to departure for Antarctica. With incrementing months of confinement this depressed DTH-like response tended to reverse, and in fact to show an "overshooting" immune reaction after stimulation. Conclusion: The reduced in vitro DTH-like test response in the early phase of Antarctic wintering over con rms distinct immune suppressive effects seen after (sub-)acute hypobaric hypoxia. The reversal and overshooting reaction of cellular immune responses upon stimulation, but not the resting state, indicate either a) priming of immune answers and/or b) an uncoupled or disregulated control of cellular immune answers by auto-, para- and endocrine pathways. Further analyses and correlations are warranted. Acknowledgement: Supported by the European Space Agency (ESA), the French (IPEV) and Italian (PNRA) polar institutes, the German National Space Program (DLR, 50WB0719/WB0919), by BELSPO/PROEDEX/ESA (C90-380/-391), NASA and by the Concordia crews who have participated with great enthusiasm.

Crucian, Brian↗

The Second European Service Module (ESM-2) Evolutions, Production and Challenges

This paper presents an overview of the Second European Service Module (ESM-2), the second in a series of European Service Modules produced as part of the Barter agreement between NASA and ESA for the Orion Program. The European Industrial consortium is led by the ESA prime contractor Airbus Defence and Space in Bremen. ESA and Airbus signed the ESM-2 contract on 16 February 2017, for this key element of the Orion Exploration Mission 2 (EM-2). EM-2 is the first crewed mission for Orion and will take astronauts farther into the solar system than humanity has ever travelled. EM-2 will also be a historic mission for Europe, as the ESM-2 will be the first European spacecraft to be part of a human transportation system carrying humans beyond low Earth orbit. ESM-2 is mainly a recurring production following ESM-1. Nevertheless, there are a number of important changes being implemented, for example, to incorporate upgrades to further enhance safety and reliability. The challenging delivery schedule for ESM-2 has driven the need to commence manufacturing prior to completion of the qualification on ESM-1. In addition, some requirement deviations and non-compliances approved for ESM-1 have resulted in modifications for ESM-2. In order to manage the competing constraints effectively, the ESM-2 Team has put in place a number of novel approaches to manage schedule, risk, and technical changes. Airbus has set up multi-functional teams according to an approach known as "Major Spacecraft Deliveries" consisting of quality assurance, engineering and procurement. The risk of starting manufacturing prior to qualification is managed through a special risk share agreement. This agreement necessitates rigorous risk reviews across the board for all manufacturing, assembly, integration and test milestones. The ESM-2 changes are managed by Configuration Management, but Airbus has also introduced the Technical Baseline Matrix to provide a transparent top-level overview of the changes from ESM-1 to ESM-2. The tool provides the basis for ESM-2 design and development needs, decisions, as well as the input for the Orion EM-2 Critical Design Review (CDR). The main technical evolutions, status of the production and the novel management approaches for ESM-2 are presented and discussed in the paper.

Orion European Service Module Programme↗

Columbus Programme (current status)

A description is presented for the Columbus Program. The Columbus program comprises a space segment, a ground segment, and operations preparation program, and a utilization preparation program. The space segment consist of three elements: an Attached Pressurized Module (APM); a Man Tended Free Flyer (MTFF); and a Polar platform (PPF). The ground segment is a program shared with other European programs such as Hermes, for communications, services, training and tracking facilities. The Operations preparation program focuses on preparing the ground segment for readiness for the launch of the space segment elements. And the Utilization preparation program includes definition of candidate payload facilities, initial payload selection and precursor flights (Eureca, Spacelab).

Source record↗

The Space Station Freedom - International cooperation and innovation in space safety

The Space Station Freedom (SSF) being developed by the United States, European Space Agency (ESA), Japan, and Canada poses novel safety challenges in design, operations, logistics, and program management. A brief overview discloses many features that make SSF a radical departure from earlier low earth orbit (LEO) space stations relative to safety management: size and power levels; multiphase manned assembly; 30-year planned lifetime, with embedded 'hooks and scars' forevolution; crew size and skill-mix variability; sustained logistical dependence; use of man, robotics and telepresence for on-orbit maintenance of station and free-flyer systems; closed-environment recycling; use of automation and expert systems; long-term operation of collocated life-sciences and materials-science experiments, requiring control and segregation of hazardous and chemically incompatible materials; and materials aging in space.

Rodney, George A.↗

Autonomy for SOHO Ground Operations

The SOLAR and HELIOSPHERIC OBSERVATORY (SOHO) project [SOHO Web Page] is being carried out by the European Space Agency (ESA) and the US National Aeronautics and Space Administration (NASA) as a cooperative effort between the two agencies in the framework of the Solar Terrestrial Science Program (STSP) comprising SOHO and other missions. SOHO was launched on December 2, 1995. The SOHO spacecraft was built in Europe by an industry team led by Matra, and instruments were provided by European and American scientists. There are nine European Principal Investigators (PI's) and three American ones. Large engineering teams and more than 200 co-investigators from many institutions support the PI's in the development of the instruments and in the preparation of their operations and data analysis. NASA is responsible for the launch and mission operations. Large radio dishes around the world, which form NASA's Deep Space Network (DSN), are used to track the spacecraft beyond the Earths orbit. Mission control is based at Goddard Space Flight Center in Maryland. The agent group at the NASA Goddard Space Flight Center, in collaboration with JPL, is currently involved with the design and development of an agent-based system to provide intelligent interactions with the control center personnel for SOHO. The basic approach that is being taken is to develop a sub-community of agents for each major subsystem of SOHO and to integrate these sub-communities into an overall SOHO community. Agents in all sub-communities will be capable of advanced understanding (deep reasoning) of the associated spacecraft subsystem.

Truszkowski, Walt↗

Ground based simulation of life sciences Spacelab experiments

The third in a series of Spacelab Mission Development tests was a joint effort of the Ames Research and Johnson Space Centers to evaluate planned operational concepts of the Space Shuttle life sciences program. A three-man crew conducted 26 experiments and 12 operational tests, utilizing both human and animal subjects. The crew lived aboard an Orbiter/Spacelab mockup for the seven-day simulation. The Spacelab was identical in geometry to the European Space Agency design, complete with removable rack sections and stowage provisions. Communications were controlled as currently planned for operational Shuttle flights. A Science Operations Remote Center at the Ames Research Center was managed by simulated Mission Control and Payload Operation Control Centers at the Johnson Space Center. This paper presents the test objectives, describes the facilities and test program, and outlines the results of this test.

Rummel, J. A.↗

Cassini Program Update

The Cassini Project is NASA's next mission the outer planets. Managed at the Jet Propulsion Laboratory and with the joint participation of the European Space Agency (ESA) and Agenzia Spatiale Italiana (ASI), Cassini will accomplish a comprehensive survey of the planet Saturn, Titan and the icy satellites of the Saturnian system, the rings, and the Saturnian magnetosphere. Early in 1992, the Project experienced significant change as the realities of the national economy and budget pressures forced a NASA-wide review of its programs. The Comet Rendezvous/Asteroid Flyby (CRAF) mission was deleted from the CRAF/Cassini Project and the remaining Cassini project was further rescoped to reduce cost. Many of the cost-savings measures involved reducing the capabilities of the spacecraft system. This paper examines the features of the redesigned spacecraft at the time of the rescope in Spring 1992 and compares it to today's design 18 months later.

C.P. Jones↗

International Solar Terrestrial Physics (ISTP) program

The International Solar Terrestrial Physics (ISTP) Program is a large, multi-national program involving three space agencies and up to eight spacecraft. NASA, together with the Institute of Space and Astronomical Science (ISAS) and the European Space Agency (ESA), has agreed in principle to coordinate their efforts in investigating the Sun and the Earth. Each agency is planning to construct and operate different spacecraft as part of this cooperative venture: Geotail provided by ISAS, the Solar Heliospheric Observatory (SOHO) and Cluster (four spacecraft) contributed by ESA, and Wind and Polar by NASA. A general description of the program is presented.

Sanford, R.↗