The Mission Accessibility of Near-Earth Asteroids

The population of near-Earth asteroids (NEAs) that may be accessible for human space flight missions is defined by the Near-Earth Object Human Space Flight Accessible Targets Study (NHATS). The NHATS is an automated system designed to monitor the accessibility of, and particular mission opportunities offered by, the NEA population. This is analogous to systems that automatically monitor the impact risk posed to Earth by the NEA population. The NHATS system identifies NEAs that are potentially accessible for future round-trip human space flight missions and provides rapid notification to asteroid observers so that crucial follow-up observations can be obtained following discovery of accessible NEAs. The NHATS was developed in 2010 and was automated by early 2012. NHATS data are provided via an interactive web-site, and daily NHATS notification emails are transmitted to a mailing list; both resources are available to the public.

Mission Design↗

A Planetary Protection Strategy for the Mars Aerial Regional-Scale Environmental Survey (ARES) Mission Concept

The Aerial Regional-scale Environmental Survey (ARES) is a Mars exploration mission concept designed to send an airplane to fly through the lower atmosphere of Mars, with the goal of taking scientific measurements of the atmosphere, surface, and subsurface phenomenon. ARES was first proposed to the Mars Scout program in December 2002 for a 2007 launch opportunity and was selected to proceed with a Phase A study, step-2 proposal which was submitted in May 2003. ARES was not selected for the Scout mission, but efforts continued on risk reduction of the atmospheric flight system in preparation for the next Mars Scout opportunity in 2006. The ARES concept was again proposed in July 2006 to the Mars Scout program but was not selected to proceed into Phase A. This document describes the Planetary Protection strategy that was developed in ARES Pre Phase-A activities to help identify, early in the design process, certain hardware, assemblies, and/or subsystems that will require unique design considerations based on constraints imposed by Planetary Protection requirements. Had ARES been selected as an exploration project, information in this document would make up the ARES Project Planetary Protection Plan.

Kuhl, Christopher A.↗

Recurring Causes of Human Spaceflight Mishaps during Flight Tests and Early Operations

n analysis of recurring causes underlying human spaceflight mishaps that occurred during flight tests and early operations was performed. Eight mishaps from the Apollo, Soyuz, Skylab, Space Shuttle, and Constellation Programs (i.e., the Ares-1X test flight) and commercial suborbital systems were included in the study. Detailed event analyses were performed for the historical mishaps and aggregate data analyses conducted to identify recurring issues. The nine most frequent issues were inadequate technical controls or risk management practices, incomplete procedures, system design and development issues, inadequate inspection or secondary verification requirements, failures of organizations to learn from previous incidents, inadequate schedule controls, inadequate task analyses or design processes, flaws in the design of organizations, and issues with organizational safety cultures.

Timothy S Barth↗

Testing, Requirements, and Metrics

The criticality of correct, complete, testable requirements is a fundamental tenet of software engineering. Also critical is complete requirements based testing of the final product. Modern tools for managing requirements allow new metrics to be used in support of both of these critical processes. Using these tools, potential problems with the quality of the requirements and the test plan can be identified early in the life cycle. Some of these quality factors include: ambiguous or incomplete requirements, poorly designed requirements databases, excessive or insufficient test cases, and incomplete linkage of tests to requirements. This paper discusses how metrics can be used to evaluate the quality of the requirements and test to avoid problems later. Requirements management and requirements based testing have always been critical in the implementation of high quality software systems. Recently, automated tools have become available to support requirements management. At NASA's Goddard Space Flight Center (GSFC), automated requirements management tools are being used on several large projects. The use of these tools opens the door to innovative uses of metrics in characterizing test plan quality and assessing overall testing risks. In support of these projects, the Software Assurance Technology Center (SATC) is working to develop and apply a metrics program that utilizes the information now available through the application of requirements management tools. Metrics based on this information provides real-time insight into the testing of requirements and these metrics assist the Project Quality Office in its testing oversight role. This paper discusses three facets of the SATC's efforts to evaluate the quality of the requirements and test plan early in the life cycle, thus preventing costly errors and time delays later.

Rosenberg, Linda↗

Test Results for an Off-the-Shelf GPS/INS During Approach and Landing Testing of the X-40A

The X-37 is an unpiloted, reusable space vehicle that will be launched into space, orbit the Earth, reenter the atmosphere, and land autonomously. At the heart of the Guidance, Navigation and Control (GN&C) will be the Space Integrated GPS/INS (SIGI) system, an off the shelf navigation grade GPS/INS that has been enhanced for space and reentry environments. SIGI will provide both navigation and flight control data to the X-37's GN&C. The X-40A is an unpiloted experimental vehicle whose shape and performance are similar to the X-37's and was flown earlier this year to develop and test the approach and landing phase of X-37. On board the X-40A is the X-37's SIGI, which is riding along as an experiment. The X-40A SIGI experiment provided early characterization of SIGI operation and performance with differential GPS (Global Positioning System) during real world approach and landing. Characterization testing was geared toward assessment of reliability and performance of the system. The objectives were to demonstrate performance levels sufficient to meet the X-37 requirements for automatic, autonomous approach and landing, demonstrate reliability over repeated ground and flight tests, and reduce risk for integration of SIGI into the vehicle and support environment. This paper presents a summary of this testing and the results to date.

Childers, Dave↗

Analyses and Methods of Solid Rocket Motor Material Irradiation at Marshall Space Flight Center

The search for life on other worlds is among humanity’s greatest endeavors. Europa represents the most probable location to discover extraterrestrial life in our solar system, owing to its surface composition of ice covering a liquid water ocean, warmed by the tidal forces of its orbit around Jupiter. Unfortunately, the Jovian system hosts the most intense planetary radiation environment in the solar system due to the charged particles, namely electrons and protons, trapped by Jupiter’s immense magnetic field. Any mission that attempts to approach or land on Europa must survive this radiation environment [Hand et al, 2017]. Radiation effects were identified as a priority risk to the successful development of a de-orbit stage and solid rocket motor (SRM) early in the Europa Lander De-orbit Stage project concept. The effects of primary concern tend to occur very near the outer surface of the SRM. The charged particles deposit their energy quickly and are mostly stopped in the outer metallic case, but a significant portion of radiation penetrates through the bondline and outer propellant regions. High doses of ionizing radiation are known to cause significant changes to mechanical properties of many materials, especially polymers. For polymers such as the rubber-like materials (elastomers) in a solid rocket motor, the primary damage mechanism is known as cross-linking, in which ionization causes the restructuring of the matrix of long polymer chains. Ionization energy breaks the long polymer chains and allows formation of new cross-linked bonding sites. This hardens and often strengthens the polymer, but at the cost of decreased flexibility (or modulus). Propellant, insulation, liner, and pyrotechnic materials were identified as higher risk items, and so were irradiated at Marshall Space Flight Center (MSFC) for investigation of changes in mechanical and ballistic properties. This process required significant levels of analysis to evaluate how the radiation environment evolves within the spacecraft during the mission, and also to evaluate how dose is delivered into test articles within the irradiating facilities.

Caffrey, Jarvis↗

Analyses and Methods of Solid Rocket Motor Material Irradiation at Marshall Space Flight Center

The search for life on other worlds is among humanity’s greatest endeavors. Europa represents the most probable location to discover extraterrestrial life in our solar system, owing to its surface composition of ice covering a liquid water ocean, warmed by the tidal forces of its orbit around Jupiter. Unfortunately, the Jovian system hosts the most intense planetary radiation environment in the solar system due to the charged particles, namely electrons and protons, trapped by Jupiter’s immense magnetic field. Any mission that attempts to approach or land on Europa must survive this radiation environment [Hand et al, 2017]. Radiation effects were identified as a priority risk to the successful development of a de-orbit stage and solid rocket motor (SRM) early in the Europa Lander De-orbit Stage project concept. The effects of primary concern tend to occur very near the outer surface of the SRM. The charged particles deposit their energy quickly and are mostly stopped in the outer metallic case, but a significant portion of radiation penetrates through the bondline and outer propellant regions. High doses of ionizing radiation are known to cause significant changes to mechanical properties of many materials, especially polymers. For polymers such as the rubber-like materials (elastomers) in a solid rocket motor, the primary damage mechanism is known as cross-linking, in which ionization causes the restructuring of the matrix of long polymer chains. Ionization energy breaks the long polymer chains and allows formation of new cross-linked bonding sites. This hardens and often strengthens the polymer, but at the cost of decreased flexibility (or modulus). Propellant, insulation, liner, and pyrotechnic materials were identified as higher risk items, and so were irradiated at Marshall Space Flight Center (MSFC) for investigation of changes in mechanical and ballistic properties. This process required significant levels of analysis to evaluate how the radiation environment evolves within the spacecraft during the mission, and also to evaluate how dose is delivered into test articles within the irradiating facilities.

Caffrey, Jarvis↗

Stochastic decision analysis

Small space flight project design at NASA Langley Research Center goes through a multi-phase process from preliminary analysis to flight operations. The process insures that each system achieves its technical objectives with demonstrated quality and within planned budgets and schedules. A key technical component of early phases is decision analysis, which is a structure procedure for determining the best of a number of feasible concepts based upon project objectives. Feasible system concepts are generated by the designers and analyzed for schedule, cost, risk, and technical measures. Each performance measure value is normalized between the best and worst values and a weighted average score of all measures is calculated for each concept. The concept(s) with the highest scores are retained, while others are eliminated from further analysis. This project automated and enhanced the decision analysis process. Automation of the decision analysis process was done by creating a user-friendly, menu-driven, spreadsheet macro based decision analysis software program. The program contains data entry dialog boxes, automated data and output report generation, and automated output chart generation. The enhancements to the decision analysis process permit stochastic data entry and analysis. Rather than enter single measure values, the designers enter the range and most likely value for each measure and concept. The data can be entered at the system or subsystem level. System level data can be calculated as either sum, maximum, or product functions of the subsystem data. For each concept, the probability distributions are approximated for each measure and the total score for each concept as either constant, triangular, normal, or log-normal distributions. Based on these distributions, formulas are derived for the probability that the concept meets any given constraint, the probability that the concept meets all constraints, and the probability that the concept is within a given amount of the best score. Formulas are also derived for the probability that one concept's total score is within a given amount of a second concept's total score. These probabilistic calculations provide more realistic data entry and output information for designers, enabling designers to better determine which concepts to eliminate and which concepts to retain at the decision points of each design phase.

Lacksonen, Thomas A.↗

(abstract) Mission Operations and Control Assurance: Flight Operations Quality Improvements

Mission Operations and Command Assurance (MO&CA), a recent addition to flight operations teams at JPL. provides a system level function to instill quality in mission operations. MO&CA's primary goal at JPL is to help improve the operational reliability for projects during flight. MO&CA tasks include early detection and correction of process design and procedural deficiencies within projects. Early detection and correction are essential during development of operational procedures and training of operational teams. MO&CA's effort focuses directly on reducing the probability of radiating incorrect commands to a spacecraft. Over the last seven years at JPL, MO&CA has become a valuable asset to JPL flight projects. JPL flight projects have benefited significantly from MO&CA's efforts to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit directly from previous and ongoing experience. Since MO&CA, like Total Quality Management (TQM), focuses on continuous improvement of processes and elimination of rework, we recommend that this effort be continued on NASA flight projects.

mission operation flight operations error detectio↗

Fission Surface Power Technology Development Testing at NASA's Early Flight Fission Test Facility

Fission surface power (FSP) systems could be used to provide power anytime, anywhere on the surface of the Moon or Mars. FSP systems could be used at polar locations, at locations away from the poles, or in permanently shaded regions, with excellent performance at all sites. A potential reference 40 kWe option has been devised that is cost-competitive with alternatives while providing more power for less mass anywhere on the lunar surface. The reference FSP system (FSPS) is also readily extensible for use on Mars. At Mars the system would be capable of operating through global dust storms and providing year-round power at any Martian latitude. Under the NASA Exploration Technology Development Program (ETDP), NASA and the Department of Energy (DOE) have begun technology development on Fission Surface Power (FSP). The primary customer for this technology is the NASA Constellation Program which is responsible for the development of surface systems to support human exploration on the moon and Mars. The objectives of the FSP technology project are: 1) Develop FSP concepts that meet expected surface power requirements at reasonable cost with added benefits over other options. 2) Establish a hardware-based technical foundation for FSP design concepts and reduce overall development risk. 3) Reduce the cost uncertainties for FSP and establish greater credibility for flight system cost estimates. 4) Generate the key products to allow Agency decision-makers to consider FSP as a viable option for flight development. To be mass efficient, FSP systems must operate at higher coolant temperatures and use different types of power conversion than typical terrestrial systems. The primary reason is the difficulty in rejecting excess heat to space. Although many options exist, NASA s current reference FSP system uses a fast spectrum, pumped-NaK cooled reactor coupled to a Stirling power conversion subsystem. The reference system uses technology with significant terrestrial heritage while still providing excellent performance on the surface of the moon or Mars. Recent testing at NASA s Early Flight Fission Test Facility (EFF-TF) has helped assess the viability of the reference FSP system, and has helped evaluate methods for system integration. In June, 2009, a representative pumped NaK loop (provided by Marshall Space Flight Center) was coupled to a Stirling power converter (provided by Glenn Research Center) and tested at various conditions representative of those that would be seen during actual FSP system operation. In all areas, performance of the integrated system exceeded project goals. High-temperature NaK pump testing has also been performed at the EFF-TF, as has testing of methods for providing long-duration NaK purity.

Houts. Michael G.↗

Lessons Learned for Planning and Estimating Operations Support Requirements

Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

Newhouse, Marilyn↗

Odyssey Mars Orbiter - Thirteen Years of On-Orbit Navigation

The Odyssey spacecraft has been in Mars orbit since October 24, 2001 and has nearly completed 61,490 orbits. Navigation operational objectives include the following: Control the local mean solar time for science observations; for most of the mission, this varied from 3:45 pm to 5:20 pm. Currently, an orbit trim maneuver planned for November 10, 2015 will place Odyssey at 6:45 pm/6:45 am at equator crossings in order to observe early morning ground frost, fog and clouds. Initially, Odyssey was late by 42 minutes for an over-flight of the critical seven minutes of Phoenix's entry, descent and landing (EDL). Odyssey was successfully positioned for this over-flight using the Delta V from angular momentum desaturations (AMD). Similar results for the Mars Science Laboratory's EDL and Comet Siding Spring's minimum risk location will be presented. Odyssey has and continues to relay significant quantities of rover data. Navigation successfully models frequent AMD Delta Vs in order to generate accurate sixty-day trajectory predictions; a typical timing error is 25 seconds after 60 days. However, unexpected events, such as safe-mode entries with their larger and more frequent thrusting, severely impact that trajectory accuracy. Impacted trajectories can have timing errors ranging from a few minutes to ten-to-fifteen minutes after sixty-days. Other analyses (briefly stated) include: a) the offset of the orbital ground track pattern after an initial cycle of 30 days or 362 orbits and b) an operations environment of continuous thrusting if/when one of the three remaining reaction wheels fails.

trajectory accuracy↗

Risk of Oxidative Damage to Bone from Increased Iron Stores During Space Flight

Iron stores are increased secondary to neocytolysis of red blood cells and a high dietary intake of iron during space flight. This raises concerns about the risk of excess iron causing oxidative damage in many tissues, including bone. Biomarkers of iron status, oxidative damage, and bone resorption during space flight were analyzed for 23 (16 M/7 F) International Space Station crewmembers as part of the Nutrition SMO project. Up to 5 in-flight blood samples and 24-h urine pools were collected over the course of the 4-6 month missions. Serum iron increased slightly during space flight and was decreased at landing (P < 0.0004). An increase in serum ferritin early in flight (217% in women and 68% in men, P < 0.0004), returning to preflight concentrations at landing, and a decrease in transferrin and transferrin receptors during flight indicated that a transient increase in iron stores occurred. No inflammatory response was observed during flight. The oxidative damage markers 8-hydroxy-2'-deoxyguanosine and prostaglandin F(sub 2(alpha)) were positively correlated (both P < 0.001) with serum ferritin. A greater area under the curve for ferritin during flight was correlated with greater changes in bone mineral density of several bone regions after flight (1). In a separate study (2), a ground-based investigation was conducted that examined the combined effects of radiation exposure and iron overload on sensitivity to radiation injury in several physiological systems in 12-wk male Sprague-Dawley rats. The rats were acclimated to an adequate iron diet (45 mg iron (ferric citrate)/kg diet) for 3 wk and then assigned to one of four groups: adequate iron (Fe) diet/no radiation, adequate Fe diet/ radiation, moderately high Fe diet (650 mg Fe (ferric citrate)/kg diet)/no radiation, and moderately high Fe diet/radiation. Animals remained on the assigned diet for 4 wk. Starting on day 14 of experimental diet treatment, animals were exposed to a fractionated dose (0.375 Gy) of Cs-137 every other day (3 Gy total dose). On day 29 (24 h after last radiation exposure), animals were euthanized. Oxidative stress markers in the liver, bone, eyes, and serum were assessed. There was evidence that the iron diet contributed to DNA damage as well as radiation exposure in the liver, eyes, and bone. Together, the results suggest that increased iron stores do constitute a risk factor for oxidative damage and bone resorption, during space flight and on Earth. Funded by the Human Health and Countermeasures Element of the NASA Human Research Program.

Zwart, S. R.↗

Pre-Launch Algorithms and Risk Reduction in Support of the Geostationary Lightning Mapper for GOES-R and Beyond

The Geostationary Lightning Mapper (GLM) is a single channel, near-IR optical transient event detector, used to detect, locate and measure total lightning activity over the full-disk as part of a 3-axis stabilized, geostationary weather satellite system. The next generation NOAA Geostationary Operational Environmental Satellite (GOES-R) series with a planned launch in 2014 will carry a GLM that will provide continuous day and night observations of lightning from the west coast of Africa (GOES-E) to New Zealand (GOES-W) when the constellation is fully operational.The mission objectives for the GLM are to 1) provide continuous,full-disk lightning measurements for storm warning and Nowcasting, 2) provide early warning of tornadic activity, and 3) accumulate a long-term database to track decadal changes of lightning. The GLM owes its heritage to the NASA Lightning Imaging Sensor (1997-Present) and the Optical Transient Detector (1995-2000), which were developed for the Earth Observing System and have produced a combined 13 year data record of global lightning activity. Instrument formulation studies were completed in March 2007 and the implementation phase to develop a prototype model and up to four flight units is expected to begin in latter part of the year. In parallel with the instrument development, a GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2B algorithms and applications. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) sate]lite and regional test beds (e.g., Lightning Mapping Arrays in North Alabama and the Washington DC Metropolitan area) are being used to develop the pre-launch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution. Real time lightning mapping data provided to selected National Weather Service forecast offices in Southern and Eastern Region are also improving our understanding of the application of these data in the severe storm warning process and help to accelerate the development of the pre-launch algorithms and Nowcasting applications. Abstract for the 3 rd Conference on Meteorological

Goodman, Steven↗

Pre-Launch Algorithms and Risk Reduction in Support of the Geostationary Lightning Mapper for GOES-R and Beyond

The Geostationary Lightning Mapper (GLM) is a single channel, near-IR optical transient event detector, used to detect, locate and measure total lightning activity over the full-disk as part of a 3-axis stabilized, geostationary weather satellite system. The next generation NOAA Geostationary Operational Environmental Satellite (GOES-R) series with a planned launch in 2014 will carry a GLM that will provide continuous day and night observations of lightning from the west coast of Africa (GOES-E) to New Zealand (GOES-W) when the constellation is fully operational. The mission objectives for the GLM are to 1) provide continuous,full-disk lightning measurements for storm warning and Nowcasting, 2) provide early warning of tornado activity, and 3) accumulate a long-term database to track decadal changes of lightning. The GLM owes its heritage to the NASA Lightning Imaging Sensor (1997-Present) and the Optical Transient Detector (1995-2000), which were developed for the Earth Observing System and have produced a combined 13 year data record of global lightning activity. Instrument formulation studies were completed in March 2007 and the implementation phase to develop a prototype model and up to four flight units is expected to begin in latter part of the year. In parallel with the instrument development, a GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2B algorithms and applications. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite and regional test beds (e.g., Lightning Mapping Arrays in North Alabama and the Washington DC Metropolitan area) are being used to develop the pre-launch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution. Real time lightning mapping data provided to selected National Weather Service forecast offices in Southern and Eastern Region are also improving our understanding of the application of these data in the severe storm warning process and help to accelerate the development of the pre-launch algorithms and Nowcasting applications.

Goodman, Steven↗

Making tomorrow's mistakes today: Evolutionary prototyping for risk reduction and shorter development time

In the early days of JPL's solar system exploration, each spacecraft mission required its own dedicated data system with all software applications written in the mainframe's native assembly language. Although these early telemetry processing systems were a triumph of engineering in their day, since that time the computer industry has advanced to the point where it is now advantageous to replace these systems with more modern technology. The Space Flight Operations Center (SFOC) Prototype group was established in 1985 as a workstation and software laboratory. The charter of the lab was to determine if it was possible to construct a multimission telemetry processing system using commercial, off-the-shelf computers that communicated via networks. The staff of the lab mirrored that of a typical skunk works operation -- a small, multi-disciplinary team with a great deal of autonomy that could get complex tasks done quickly. In an effort to determine which approaches would be useful, the prototype group experimented with all types of operating systems, inter-process communication mechanisms, network protocols, packet size parameters. Out of that pioneering work came the confidence that a multi-mission telemetry processing system could be built using high-level languages running in a heterogeneous, networked workstation environment. Experience revealed that the operating systems on all nodes should be similar (i.e., all VMS or all PC-DOS or all UNIX), and that a unique Data Transport Subsystem tool needed to be built to address the incompatibilities of network standards, byte ordering, and socket buffering. The advantages of building a telemetry processing system based on emerging industry standards were numerous: by employing these standards, we would no longer be locked into a single vendor. When new technology came to market which offered ten times the performance at one eighth the cost, it would be possible to attach the new machine to the network, re-compile the application code, and run. In addition, we would no longer be plagued with lack of manufacturer support when we encountered obscure bugs. And maybe, hopefully, the eternal elusive goal of software portability across different vendors' platforms would finally be available. Some highlights of our prototyping efforts are described.

Friedman, Gary↗

Status Report on Aeroelasticity in the Vehicle Development for X-57 Maxwell

Risk reduction is the objective of the X-57 Maxwell aeroelasticity team. The X-57, NASA’s experimental electric propulsion aircraft, has a long thin wing with primary propulsion systems located at the wing tips and high lift motors distributed along the span. Many of the classical aeroelastic concerns associated with such a configuration were addressed through early design decisions. The as-designed intermediate flight vehicle configurations show flutter mechanisms associated with flexible models of control surface systems –the stabilator, flaps and ailerons. Improvements to the analytical models, based on ground test data and project decisions about flight operations, show improved prospects of the vehicle being aeroelastically stable throughout the flight envelope. On-going ground testing and further analyses will lend credibility to the flutter predictions and vehicle safety.

Heeg, Jennifer↗

Pre-Launch Algorithms and Risk Reduction in Support of the Geostationary Lightning Mapper for GOES-R and Beyond

The Geostationary Lightning Mapper (GLM) is a single channel, near-IR imager/optical transient event detector, used to detect, locate and measure total lightning activity over the full-disk as part of a 3-axis stabilized, geostationary weather satellite system. The next generation NOAA Geostationary Operational Environmental Satellite (GOES-R) series with a planned launch in 2014 will carry a GLM that will provide continuous day and night observations of lightning from the west coast of Africa (GOES-E) to New Zealand (GOES-W) when the constellation is fUlly operational. The mission objectives for the GLM are to 1) provide continuous, full-disk lightning measurements for storm warning and nowcasting, 2) provide early warning of tornadic activity, and 3) accumulate a long-term database to track decadal changes of lightning. The GLM owes its heritage to the NASA Lightning Imaging Sensor (1997-Present) and the Optical Transient Detector (1995-2000), which were developed for the Earth Observing System and have produced a combined 13 year data record of global lightning activity. Instrument formulation studies were completed in March 2007 and the implementation phase to develop a prototype model and up to four flight models is expected to be underway in the latter part of 2007. In parallel with the instrument development, a GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2 ground processing algorithms and applications. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite and regional test beds (e.g., Lightning Mapping Arrays in North Alabama and the Washington DC Metropolitan area)

Goodman, Steven J.↗