Search NASA⌕ Search

SEARCH · Search NASA

Results for “Electric boilers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

KOH concentration effect on the cycle life of nickel-hydrogen cells. Part 4: Results of failure analyses

KOH concentration effects on cycle life of a Ni/H2 cell have been studied by carrying out a cycle life test of ten Ni/H2 boiler plate cells which contain electrolytes of various KOH concentrations. Failure analyses of these cells were carried out after completion of the life test which accumulated up to 40,000 cycles at an 80 percent depth of discharge over a period of 3.7 years. These failure analyses included studies on changes of electrical characteristics of test cells and component analyses after disassembly of the cell. The component analyses included visual inspections, dimensional changes, capacity measurements of nickel electrodes, scanning electron microscopy, BET surface area measurements, and chemical analyses. Results have indicated that failure mode and change in the nickel electrode varied as the concentration was varied, especially, when the concentration was changed from 31 percent or higher to 26 percent or lower.

Lim, H. S.↗

KOH concentration effect on the cycle life of nickel-hydrogen cells. IV - Results of failure analysis

Potassium hydroxide concentration effects on the cycle life of a Ni/H2 cell have been studied by carrying out a cycle life test on ten Ni/H2 boiler plate cells which contain electrolytes of various KOH concentrations. Failure analyses of these cells were carried out after completion of the life test, which accumulated up to 40,000 cycles at an 80-percent depth of discharge over a period of 3.7 years. These failure analyses included studies on changes of electrical characteristics of test cells, and component analyses after disassembly of the cell. The component analyses included visual inspections, dimensional changes, capacity measurements of nickel electrodes, scanning electron microscopy, surface area measurements, and chemical analyses. Results have indicated that failure mode and change in the nickel electrode varied as the concentration was varied, especially when the concentration was changed from 31 percent or higher to 26 percent or lower.

Lim, H. S.↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Conversion Alternatives Study (ECAS), Westinghouse phase 1. Volume 11: Advanced steam systems

A parametric analysis was made of three types of advanced steam power plants that use coal in order to have a comparison of the cost of electricity produced by them a wide range of primary performance variables. Increasing the temperature and pressure of the steam above current industry levels resulted in increased energy costs because the cost of capital increased more than the fuel cost decreased. While the three plant types produced comparable energy cost levels, the pressurized fluidized bed boiler plant produced the lowest energy cost by the small margin of 0.69 mills/MJ (2.5 mills/kWh). It is recommended that this plant be designed in greater detail to determine its cost and performance more accurately than was possible in a broad parametric study and to ascertain problem areas which will require development effort. Also considered are pollution control measures such as scrubbers and separates for particulate emissions from stack gases.

Wolfe, R. W.↗

AMTEC vapor-vapor series connected cells

An alkali metal thermoelectric converter (AMTEC) having a plurality of cells structurally connected in series to form a septum dividing a plenum into two chambers, and electrically connected in series, is provided with porous metal anodes and porous metal cathodes in the cells. The cells may be planar or annular, and in either case a metal alkali vapor at a high temperature is provided to the plenum through one chamber on one side of the wall and returned to a vapor boiler after condensation at a chamber on the other side of the wall in the plenum. If the cells are annular, a heating core may be placed along the axis of the stacked cells. This arrangement of series-connected cells allows efficient generation of power at high voltage and low current.

Underwood, Mark L.↗

Advanced Coating Compositions and Microstructures to Improve Uptime and Operational Flexibility in Cyclic, Low-Load Thermal Utility Plants

GE, the University of Tennessee, and Oak Ridge National Laboratory collaborated from 2020 to 2023 developing two key technologies for improving the viability of fuel switching and load following in thermal utility plants: a) cost-effective weld overlay compositions for boiler tubing b) cathodic arc coatings that deliver improvements in both erosion resistance and oxidation resistance in high temperature steam for HP turbine blades The team worked through a robust, logical project map to de-risk these two technologies and advance them from TRL 3 to TRL 6. For the cost-effective weld overlay, the team developed a ferritic filler material which was fabricated at a vendor for 18% the average market cost of Inconel 625 wire, had a corrosion rate 3x lower in conditions simulating a biomass-fired superheater and 10x lower in conditions simulating a coal-fired superheater, and was fabricated into prototype overlaid tubing that passed ASME requirements including transverse bending, dye penetrant inspection, and ASTM G-76 evaluation. For the cathodic arc coatings applied to steam turbine blades, the team developed a novel composition that was successfully transferred to a qualified vendor. The vendor was able to produce coated prototypes with 4x the as-deposited erosion resistance and 10.4x the post-steam-exposure erosion resistance of the TiN coating the vendor currently applies on GE steam turbine components, without significantly increasing process cost. These coated prototypes also passed a GE inspection and showed favorable performance in high temperature erosion, nanoindentation, sliding wear, scratch adhesion, and high cycle fatigue testing. If successfully deployed by GE, it is anticipated that the technologies will enable the following: • 25%-50% increase in time between outages for both boilers and HP turbines. • 50% decrease in cost for weld overlay on a per foot basis relative to todays NiCr alloys. • Adequate oxidation resistance and erosion for HP turbine inlet steam at >620°C and >220 bar. • No need for changes in component supply chain or any notable Capital Expenditures. 5 Decreasing component cost, increasing performance, and extending time between outages represent direct value propositions to GE and their customers. For the American consumer, these objectives translate into increased grid reliability (fewer unexpected outages), decreased Levelized Cost of Electricity, and improved environmental health (low-loading/load following to accelerate penetration of renewables). The results also have implications for wear resistant tooling, wire arc additive manufacturing, more durable components for syngas cleanup, and deployment of more efficient thermochemical pathways for carbon negative fuel production

09 BIOMASS FUELS↗

Modeling Needs to Support the Reconstruction Strategy of Ukraine

Ukraine has been facing difficult times. Russia started a full-scale invasion on February 24, 2022, and has caused huge human and infrastructure losses. As a result of the invasion, more than 8 million people left their homes. The Russian army has targeted Ukrainian energy sources, destroying or damaging over 50% of thermal power generation capacity (coal and gas), 30% of solar generation, and 90% of wind generation. The Russians are also threatening Ukrainian energy security, as they currently control the Zaporizhzhia nuclear power plant – Europe’s largest. In addition, Russia has destroyed 121,000 buildings, including 5,300 multistory buildings - more buildings than Ukraine built during the past five years. The occupiers destroyed or damaged 343 district heat boiler stations (destroyed 12 / damaged 331) and 8 CHPs (destroyed 4/ damaged 4). There is no doubt that Ukraine will be able to protect its sovereignty and restore its territorial integrity; however, this will be a long process. The Government of Ukraine needs to simultaneously focus on many issues, from waging war to the restoration of electricity, water, and heat supply in the territories close to the front line. In addition to these time-sensitive issues, the government also needs to plan a long term multi-sector strategy for the reconstruction of Ukraine’s economy. Ukraine initiated a broad-based political process for recovery at the International Ukraine Recovery Conference (URC 2022) in Lugano, Switzerland. Prior to URC 2022, Ukraine applied for EU membership on February 28 and was granted the status of candidate country by the European Council on June 23, 2022. More than 40 nations are fully committed to supporting Ukraine throughout its path from early to long-term recovery. In addition, these countries link a successful recovery to Ukraine’s European future (URC, 2022a). The reconstruction process will be long. The government also recognizes that it is not enough to build energy infrastructure back – it should be built back better. The government is committed to building a more sustainable and cleaner energy sector. Energy modeling can provide important insights into paths to decarbonize Ukraine’s economy while rebuilding it after the war. Pacific Northwest National Laboratory (PNNL) and the Institute for Economics and Forecasting of the National Academy of Sciences of Ukraine (IEF) work on modeling decarbonization scenarios in the energy sector of Ukraine. The teams focus on the heat sector, which includes district heat, autonomous and individual heating, and energy consumption by final energy consumption sectors, including buildings. Since the teams use world-class integrated assessment models, other sectors will be analyzed as well. The purpose of the document is to describe the needs of key Ukrainian ministries in modeling the reconstruction process. The scope of this document is limited to modeling energy consumption by the power and heat sectors, final energy consumption by buildings, and GHG emissions from these two sectors. The rest of this policy memo is organized as follows. After this introduction, Chapter 2 discusses key provisions of the reconstruction strategy with a focus on energy, buildings, heat supply, environment, and European integration aspirations. Section 3 provides an overview of recent developments and key decisions of the Government of Ukraine in the area of energy efficiency and decarbonization. Finally, Section 4 provides key suggestions on how PNNL and IEF can help the Government of Ukraine in developing strategic documents.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

IEA/SPS 500 kW distributed collector system

Engineering studies for an International Energy Agency project for the design and construction of a 500 kW solar thermal electric power generation system of the distributed collector system (DCS) type are reviewed. The DCS system design consists of a mixed field of parabolic trough type solar collectors which are used to heat a thermal heat transfer oil. Heated oil is delivered to a thermocline storage tank from which heat is extracted and delivered to a boiler by a second heat transfer loop using the same heat transfer oil. Steam is generated in the boiler, expanded through a steam turbine, and recirculated through a condenser system cooled by a wet cooling tower.

Neumann, T. W.↗

Assessment of disk MHD generators for a base load powerplant

Results from a study of the disk MHD generator are presented. Both open and closed cycle disk systems were investigated. Costing of the open cycle disk components (nozzle, channel, diffuser, radiant boiler, magnet and power management) was done. However, no detailed costing was done for the closed cycle systems. Preliminary plant design for the open cycle systems was also completed. Based on the system study results, an economic assessment of the open cycle systems is presented. Costs of the open cycle disk conponents are less than comparable linear generator components. Also, costs of electricity for the open cycle disk systems are competitive with comparable linear systems. Advantages of the disk design simplicity are considered. Improvements in the channel availability or a reduction in the channel lifetime requirement are possible as a result of the disk design.

Chubb, D. L.↗

Raising the Bar in High Performance Laboratory Design

Laboratory facilities are expensive to build and operate, they consume energy at high rates compared to other types of buildings, and modifications are frequently required to accommodate ever-changing research activities. PNNL sought ways to address these issues in the design and construction of a 14,700 sq. ft. new laboratory building. To improve adaptability to change a high roof structure was used that allows raising the ceiling when needed with minimal disruption to installed HVAC and electrical utilities. Also, HVAC equipment was located on a mezzanine above the central corridor rather than above ceilings. This eliminates the need for maintenance personnel to routinely access lab spaces, reducing disruption to research staff and improving maintenance access. To improve the reliability of operations while reducing energy consumption, heat pipe heat recovery with evaporative cooling, zoned heating/cooling coils, high-efficiency condensing boilers, district cooling, VAV fume hoods, DDC controls, energy use monitoring, and implementation of the US Department of Energy’s Guiding Principles for Federal Leadership in Sustainable Buildings were all used. The energy model developed during design projected energy use at 2,840 MBtu/yr, a 13.5% savings over ASHRAE Standard 90.1-2010. The first full year of operation resulted in actual energy use of 2,661 MBtu, a savings of 19% over Standard 90.1. As a result of the project design’s demonstrated success, these strategies will be incorporated into a significantly larger (125,000 sq ft), $65 million lab facility to be constructed on the PNNL campus in 2020.

Scott, Jeffery M.↗

Manufacturing and Hydro Testing of a 10 MWe sCO2 Axial Turbine

Abstract Supercritical CO2 (sCO2) power cycles designed for thermodynamic efficiencies above 50% push component designs into pressure and temperature combinations that approach the limits of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and ASME Piping Design Codes with Turbine inlet conditions near 250 bar and 715 °C. These design conditions which limit available materials to high nickel alloys are compounded by the high fluid densities of sCO2 at these conditions which result in very compact machinery at the 10 MWe class which are currently being developed for the DOE supercritical transformational electric power (STEP) program. Design of the STEP Turbine is complete with integrated lessons learned from a previous 1 MWth subscale demonstration of a high temperature 10 MWe Turbine designed under the DOE SunShot Program. Fabrication of the STEP Turbine is nearing completion with all housings and pressure containing components in hand. This paper provides a detailed look at design intentions and limitations for the pressurized sections of the main pressure casing and the fabrication of key turbine components. Additional discussion is provided regarding postfabrication inspection and acceptance of the casing for use after issues with casing welds were identified late in the fabrication process.

Engineering↗

Process Design and Techno-Economic Analysis of the Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Biomass

This work describes the process design and techno-economic analysis (TEA) of the modular SPOC power plant for biomass firing and coal-biomass co-firing. Two Rankine cycles were considered: a supercritical steam cycle (242 bar, 593°C, 593°C) with 550 MWe net output and a subcritical cycle (166 bar, 566°C, 566°C) with 200 MWe net output. For both cases, 95% carbon capture was modeled, and hybrid poplar biomass was chosen to generate carbon-negative power. In addition, the supercritical 500 MWe case included a 25% biomass co-firing (carbon neutral) case. For both cycles, a 100% Powder River Basin coal firing case was used for comparison purposes. In the SPOC process, oxygen is produced via a cryogenic air separation unit (ASU) and the heat generated from the compression of air is integrated into the steam cycle and utilized for boiler feed water pre-heating. Unique to the SPOC process, the boilers are pressurized and arranged in a series-parallel configuration, with minimized flue gas recirculation. The flue gas is cooled and scrubbed in the direct-contact cooler (DCC) column, and the moisture in the flue gas is condensed, leaving the bottom of the DCC at a sufficiently high temperature such that it can be used for boiler feed water pre-heating, improving plant thermal efficiency. Following drying and purification, CO2 in the flue gas is at the purity required for storage or utilization. The performance data were obtained from process modelling via Aspen Plus®. The stream data from Aspen Plus® were used as an input for the AACE Class 5 cost study. Ultimately, the capital costs, Levelized Cost of Electricity (LCOE), and cost of CO2 captured and avoided were obtained. The HHV efficiency of the carbon negative 550 MWe supercritical SPOC case (34.8%) was clearly above those reported by NETL for the BECCS baseline cases of supercritical pulverized coal with capture (B12B, 31.5%) and the 49% biomass co-firing case with capture (PA3, 29.2%). The HHV efficiency of the carbon-negative subcritical plant is also higher than the subcritical baseline PC plant with capture (case B11B.95) presented by NETL (32% vs 29.7%). The LCOE for the SPOC 100% biomass case was similar to the LCOE for the BECCS 49% biomass with carbon capture case ($147/MWh), and the SPOC carbon neutral case LCOE was lower ($110/MWh) than the cost for the NETL baseline SC coal firing case with 90% carbon capture ($114/MWh).

Magalhaes, Duarte↗

Co-design optimization of combined heat and power-based microgrids

With the emergent need for clean and reliable energy resources, hybrid energy systems, such as the microgrid, are widely adopted in the United States. A microgrid can consist of various distributed energy resources, for instance, combined heat and power (CHP) systems. Here, the CHP module is a distributed cogeneration technology that produces electricity and recaptures heat generated as a by-product. It is an energy-efficient technology converting heat that would otherwise be wasted to valuable thermal energy. For an optimal system configuration, this study develops a novel co-design optimization framework for CHP-based cogeneration microgrids. The framework provides the stakeholder with a method to optimize investments and attain resilient operations. The proposed co-design framework has a mixed integer programming (MIP) model that outputs decisions for both plant designs and operating controls. The microgrid considered in this study contains six components: the CHP, boiler, heat recovery unit, thermal storage system, power storage system, and photovoltaic plant. After solving the MIP model, the optimal design parameters of each component can be found to minimize the total installation cost of all components in the microgrid. Furthermore, the online costs from energy production, operation, maintenance, machine startup, and disruption-induced unsatisfied loads are minimized by solving the optimal control decisions for operations. Case studies based on designing a CHP-based microgrid with empirical data are conducted. Moreover, we consider both nominal and disruptive operational scenarios to validate the performance of the proposed co-design framework in terms of a cost-effective, resilient system.

42 ENGINEERING↗

Development of creep resistant ferritic-martensitic steels for operation at 650°C

Creep resistant ferritic-martensitic steels capable of operating at 650°C have long been under development for electricity generation. This presentation will showcase the design and development of alloys CPJ-7 and JMP with approximately 420,000 h of in-house creep testing, the equivalent of ~50 years of cumulative creep tests. Approximately fifty different alloy compositions were manufactured as part of an ICME approach. CPJ-7 present superior creep properties compared to COST alloys for steam turbine and P91/92 for boiler applications. The prolonged creep life was attributed to slowing down the destabilization of fine precipitates at 650°C. The JMP steels were designed with higher Co for solid solution strengthening and increased W for matrix strength and stability. The creep life compared to CPJ-7 increased between 118 and 150% at 650°C depending on the stress. On a Larson-Miller plot, the performance of the JMP steels surpasses that of MARBN steel. Composition-microstructure-properties relationships will be discussed.

Detrois, Martin↗

Front-End Engineering Design Study for Retrofit Post-Combustion Carbon Capture on a Natural Gas Combined Cycle Power Plant

The objective of the project is to conduct a Front-End Engineering Design (FEED) study to determine the technical and economic feasibility of installing a retrofit, post-combustion, carbon capture facility on a commercially operating, natural gas-fired, combined cycle (NGCC) power plant. The Electric Power Research Institute (EPRI), California Resources Corporation (CRC), and Fluor Corporation used Fluor's Econamine FG Plus SM (EFG+) conducted the FEED study for capturing CO 2 produced by CRC's 550 MWe Elk Hills Power Plant (EHPP), located in the Elk Hills Oil Field near Tupman, Kern County, California. The EHPP was commissioned in 2003 and is powered by two General Electric 7FA gas turbines, with two heat recovery steam generators (HRSGs) providing steam to a General Electric D11 steam turbine. The target capture amount is 4,000 tonnes CO 2 /day for use in either enhanced oil recovery or dedicated geological saline storage located on CRC property at or nearby EHPP. This CO 2 is captured from a combination of the CO 2 emitted from the flue gas from EHPP and the flue gas generated from a natural gas-fired auxiliary boiler that supplies steam to the EFG+ process.

03 NATURAL GAS↗

Technoeconomic Analysis of Kraft Pulp Mill Integration with an Advanced Nuclear Reactor

This study focuses on post-combustion capture and oxy-fuel combustion for the boilers at the mill, as well as steam integration with the nuclear power plant. The primary goal of the research outlined in this report is to design, analyze, and document the integration of industrial-scale HTGR with a reference Kraft Pulp Mill. The purpose is to deliver reliable, cost-effective, and sustainable clean energy alternatives while reducing CO2 emissions. Specifically, this study focuses on 6 different scenarios that include carbon capture equipment and some of them use nuclear power to meet the heat and electricity needs of the reference plant. Also, 2 of these scenarios are created while also producing clean hydrogen through integrated High-Temperature Steam Electrolysis (HTSE). This report offers a detailed techno-economic assessment of different scenarios for a Kraft Pulp Mill, including an analysis of tax credits (section 45V, 45Q, and 48E) provided by the Inflation Reduction Act (IRA) of 2022. The evaluation explores the potential economic benefits and challenges of incorporating different configurations, including nuclear energy, into Kraft Pulp Mill operations, with particular attention to energy efficiency, economic implications, and environmental impact. By assessing both the technical feasibility and economic viability, this analysis aims to identify existing gaps and propose solutions for the successful implementation of nuclear integration. The findings are intended to provide valuable insights for stakeholders considering the adoption of advanced nuclear reactors in the pulp and paper industries.

08 HYDROGEN↗

Final design of a free-piston hydraulic advanced Stirling conversion system

Under the US Department of Energy's (DOEs) Solar Thermal Technology Program, Sandia National Laboratories is evaluating heat engines for solar distributed receiver systems. The final design is described of an engineering prototype advanced Stirling conversion system (ASCS) with a free-piston hydraulic engine output capable of delivering about 25 kW of electric power to a utility grid. The free-piston Stirling engine has the potential for a highly reliable engine with long life because it has only a few moving parts, has noncontacting bearings, and can be hermetically sealed. The ASCS is designed to deliver maximum power per year over a range of solar input with a design life of 30 years (60,000 h). The system includes a liquid Nak pool boiler heat transport system and a free-piston Stirling engine with high-pressure hydraulic output, coupled with a bent axis variable displacement hydraulic motor and a rotary induction generator.

Wallace, D. A.↗

Advanced nuclear reactor integration opportunities for the pulp and paper industry in the U.S. context: Technical perspectives, gap analysis, and preliminary technoeconomic assessment

Pulp and paper (P&P) manufacturing requires a large amount of low-pressure (LP) steam to digest, wash wood fibers and dry pulp into paper. Most of the LP steam is extracted from backpressure turbines that produce power from high-pressure (HP) steam. This HP steam is generated from burning wood waste material; bark is burned in hog boilers, and lignin is boiled in a black liquor recovery boiler. In a typical integrated P&P mill, 50–100% of the steam is produced from these sources, while additional steam is produced in natural gas (NG), fuel oil, or coal boilers. The other energy-intensive process in the plant is the chemical-recovery section (e.g., lime kiln), which requires high-temperature processing from NG combustion to retrieve and recirculate spent chemicals. This paper assesses the energy and heat demand and material balances of a typical generic kraft pulp mill, along with the nuclear heat, steam, and power integration opportunities to replace conventional combustion systems. The paper also addresses steam and electricity generation through a comprehensive technical and engineering gap analysis of five different nuclear-integration opportunities and their process economics, thus enabling the lignin and bark to be further processed into biobased chemicals or fuels, as well as the potential to reduce overall emissions from kraft pulping. Preliminary findings have shown that the P&P industry could achieve technological benefits by integrating their current manufacturing process with small modular nuclear reactors (SMNRs) on a national level. This research aims to set the path forward for a cleaner and more resilient P&P industry.

Advanced nuclear reactor↗