Technology and Innovation Roadmap

This Technology and Innovation Roadmap (Roadmap) presents a comprehensive and integrated assessment of technology needs related to executing the River Protection Project (RPP) baseline, reducing risk, and providing opportunity for improvement in executing efficiencies, worker safety and environmental protection. As such, some of the proposed activities herein are pending final decision in the form of an upcoming Tri-party Holistic Agreement. Addressing the identified technology needs will contribute to achieving successful completion of the Hanford Site tank waste cleanup mission.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of Vadose Zone Flow and Transport Properties with Gravel Fraction Corrections for the Hanford Site Composite Analysis and Cumulative Impact Evaluation

This environmental calculation file (ECF) is a compilation of hydrologic and radiological/chemical properties to be used for the updated Hanford Site Composite Analysis (CA) and Cumulative Impact Evaluation (CIE) vadose zone (VZ) modeling. The CA will provide an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at the Hanford Site following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1 Chg 1, Radioactive Waste Management, related to managing low-level waste disposal facilities at the Hanford Site. The CIE evaluates the effects of cleanup decisions regarding groundwater quality in the Hanford Site Central Plateau (DOE/RL-2018-69, Cumulative Impact Evaluation Technical Approach Document). Due to the complexity and large number of waste sites in source operable units (OUs), the computational tools used for the CIE must be capable of representing a range of site conditions and source terms in the VZ while also efficiently computing the impact that cleanup decisions have on the underlying aquifer. Waste-site proximity between and within source OUs has resulted in contaminants commingling in the vadose and saturated zones in complex ways. Plume commingling requires cleanup decisions to be evaluated considering the surrounding waste sites and existing groundwater contamination, therefore demonstrating the need to evaluate cumulative impacts from the VZ to groundwater.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model Package Report: Central Plateau Vadose Zone Models

This model package report describes concisely the modeling objectives, conceptualization, implementation, uncertainty and sensitivity, configuration control, limitations, data needs, and recommendations for improvement of the Central Plateau Vadose Zone Models. This collection of models is developed to meet the vadose zone simulation needs of the Hanford Site Composite Analysis (CA), the Hanford Site Cumulative Impact Evaluation (CIE), and are expected to find other applications in Hanford Site remedial cleanup decision-making processes. This model package report describes and documents the development of the models themselves to fulfill technical approaches defined for the CA and the CIE. This report does not document any specific calculation using these models: instead, applications of individual vadose models to perform specific calculations will be documented in environmental calculation files, including inputs and results, as appropriate. Configuration management for the Central Plateau Vadose Zone Models is managed through assignment of unique sequential numerical version numbers and archival of the models in the Environmental Modeling Management Archive.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Functionalized Cellular Magmatics

We are pioneering the development of fundamental and applied research related to engineered cellular magmatics (ECM) technology. Over the course of our first year, we developed the methodology and measured the effects of various additives on ECM properties. We demonstrated the ability to control the phase and morphology of post-process secondary minerals on ECMs based on starting conditions and compositions. Both achievements are critical to advancing the use of ECMs for applications such as water filtration and runoff remediation. We established the ability to grow various microbiologic consortia on ECM surfaces as well as a process that allows industrial scaling of the technology for rapid field deployment in applications such as the cleanup of fossil fuel contamination. Furthermore, this biotechnology also has potential application in the nascent fields of biomining of precious metals and bioremediation of toxic heavy metals.

36 MATERIALS SCIENCE↗

Challenges and Practical Solutions for Conducting Structural MARSSIM Surveys in Elevated Radon Environments - 20413

The Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) [1] provides comprehensive guidance for the development and implementation of radiological surveys conducted to demonstrate compliance with a dose- or risk-based cleanup goal during final status survey. The MARSSIM methodology follows an integrated strategy combining direct measurements and sampling to assess uniform residual contamination, and scanning surveys to identify localized areas of elevated activity. Building surveys assessing residual surface contamination present unique challenges from reliance on field measurements that may be subject to less than ideal environmental conditions. Additionally, limited characterization and excessive conservatism incorporated into the conceptual site model may result in derived concentration guideline levels (DCGL) and, as a consequence of relatively inefficient field instrumentation, corresponding attributable count rates generally comparable to background. The presence of elevated ambient radon concentrations and associated progeny deposition both exacerbate these intrinsic survey challenges and introduce a series of technical, logistic, and administrative obstacles that can wreak havoc on the statistical legitimacy of each component of the MARSSIM process. Short-lived radon progeny including polonium-218, lead-214, bismuth-214, and polonium-214 produce excessive alpha and beta radiation that may decrease instrument sensitivity through an increase in background count rates, and, at worst, may result in incorrect survey unit failure through the simulation of residual surface activity. Aside from the obvious solution of exhaustive radon mitigation, the primary objectives are to distinguish between radon progeny deposition and actual surface activity, and collect sufficient defensible data. The following is a technical discussion of the consequences of performing building MARSSIM surveys in the presence of elevated ambient radon atmospheres, conceptual examples, and an overview of practical strategies to minimize the effects of radon interference while collecting sufficient defensible data to complete the survey. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Components Refurbishment and Chemical Analysis Facility, SWMU #041 - Per- and Polyfluoroalkyl Substances Site Assessment Report Kennedy Space Center, Florida

This PFAS Site Assessment (SA) Report presents the activities and results associated with PFAS investigations at the Components Refurbishment and Chemical Analysis (CRCA) facility located at Kennedy Space Center (KSC), Florida. In 2022, CRCA was identified as an Area of Potential Concern because the facility stores several potential PFAS-containing chemicals. A groundwater sample collected from an onsite monitoring well detected PFOA and PFOS at concentrations greater than State of Florida provisional Groundwater Cleanup Target Levels (pGCTLs). PFAS SA activities were conducted between March 2022 and February 2024. During this timeframe, a total of 16 direct-push technology (DPT) locations and 82 discrete samples were collected from these locations, along with 90 monitoring well samples. The analytical data screening process focused on State of Florida pGCTLs and United States Environmental Protection Agency (USEPA) Regional Screening Level (RSLs) from November 2023 to evaluate the data. Analytical results identified PFOS, PFOA, and PFBA at concentrations exceeding their respective RSLs at each depth interval (shallow, intermediate, and deep). PFOS and PFOA had the largest footprint of RSL exceedances in each depth interval, but pGCTL exceedances were only observed at limited locations in the shallow and intermediate intervals. PFBA had the highest detections of any PFAS compound, with concentrations exceeding 180,000 nanograms per liter (ng/L), which is 100-times the RSL of 1,800 ng/L in the shallow and intermediate intervals and 10-times the RSL in the deep interval. The maximum PFBA detection was 841,000 ng/L at shallow monitoring well, MW0006. The PFAS SA also included samples collected from the onsite hydraulic containment system (HCS) which was installed to control and treat the onsite chlorinated volatile organic compound (CVOC) plume. Influent and effluent aqueous samples were collected monthly from the system. PFAS concentrations were relatively the same for both influent and effluent samples, indicating that while the HCS has been effective for CVOC treatment, it does not provide any additional treatment for PFAS compounds. Since the HCS has achieved its objectives, the system was shut down in December 2024. PFAS data gaps still exist, to include surface water and soil, which were not sampled during this SA. Soil sampling near the Chemical Process Area is recommended. Surface water and soil sampling at select stormwater outfalls is also recommended. Additionally, further groundwater sampling is recommended (DPT and monitoring well) in all depth intervals to delineate the extent of PFAS impacts at CRCA.

K Alex Murphy↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing Effects of Climate Change on Legacy Waste at the Enewetak Atoll

The Republic of the Marshall Islands (RMI) is in the central Pacific Ocean ~4,500 km west of Hawaii. The Enewetak Atoll, located in the northwest part of the RMI, was the site for 43 nuclear weapon tests between 1948 and 1958. Fallout and deposition from the tests contaminated the island surfaces, lagoon waters and sediment, and nearby ocean waters at the atoll. In the 1970s, a cleanup effort collected radioactive waste and placed it in the Cactus Crater on Runit Island (also called the Runit Dome). In December 2021, Congress directed the U.S. Department of Energy to study the impacts of climate change on the Runit Dome nuclear waste disposal site. Pacific Northwest National Laboratory (PNNL) assembled a multidisciplinary team of climate scientists, ocean modelers, environmental scientists, and health physicists to assess the likely effects of remaining radionuclides at the Enewetak Atoll. PNNL’s approach focused on effects of tropical cyclones that were postulated to mobilize and transport contaminated lagoon sediments and result in human and biota exposure. PNNL’s study estimated (1) the radionuclide source term, (2) the effects of climate change on severe storms, (3) mobilization and transport of radionuclides, and (4) radiation dose to humans and biota. Radionuclides in the lagoon and/or ocean waters of the Enewetak Atoll were characterized by the U.S. Atomic Energy Commission (AEC) in 1972, Woods Hole Oceanographic Institution in 2015, and Lawrence Livermore National Laboratory in 2018. The RMI Nationwide Radiological Study was conducted in the early 1990s for radionuclides remaining in island soils. The 1972 AEC survey remains the most comprehensive source of radionuclide data on lagoon sediments. Climate change modeling at a regional scale in the central Pacific Ocean is limited. PNNL climate scientists simulated severe historical storms postulated to occur both in a recent climate (2015) and in the future (2090) using the Advanced Research Weather Research and Forecasting (WRF-ARW) model, employing a pseudo-global-warming technique. A postulated complete, future failure of the Runit Dome was also considered. PNNL developed a high-resolution regional ocean hydrodynamics model covering the entire RMI extended economic zone using the Finite Volume Coastal Ocean Model (FVCOM). The FVCOM model was run using global reanalysis data for current climate and WRF-ARW simulation for the future climate. PNNL also developed a radionuclide fate and transport model using the FVCOM Integrated Compartment Model (FVCOM-ICM) to simulate the current and future mobilization and transport of radionuclides sorbed to lagoon sediments and the exchange of radionuclides between the water and sediment. FVCOM-ICM-predicted radionuclide concentrations were then used to estimate radiation dose to humans and biota at all islands of the Enewetak Atoll. Under current climate conditions, annual radiation exposures for the southern islands including Enewetak (Fred) and Medren (Elmer) were below the current U.S. standards. Radiation doses were somewhat elevated starting at Runit Island northward and westward to Enjebi Island (Janet). The islands in the northwest quadrant, particularly Bokoluo (Alice) and Bokombako (Belle), remain relatively contaminated. The islands in the southwestern quadrant have low contamination. The highest contribution to radiation doses comes from consumption of locally grown foods. Two radionuclides, 90Sr and 137Cs, contributed the greatest fraction for most terrestrial foods. In current climate conditions, the storms temporarily increased radionuclide concentrations in the lagoon waters, increasing the radiation dose slightly. In future conditions, doses are expected to be smaller, primarily because of the radioactive decay of the shorter-lived radioisotopes of 90Sr and 137Cs. This could make all islands in the far northwest of the atoll – except Bokombako (Belle) and perhaps Bokoluo (Alice) – suitable for residency. For the f

Prasad, Rajiv↗

Data Summary Report for Soil and Slab Sampling at Former Building 175

Lawrence Livermore National Security (LLNS) and the U.S. Department of Energy (DOE) are in the process of returning the area where Building 175 existed to beneficial use for future site development. The completed assessment will help LLNS and DOE to outline project scope and costs associated with the removal, characterization, and disposal of materials generated when the concrete slab for the former building and any associated remaining subsurface structures are demolished. Slab removal under the Transition & Disposition process requires full screening for potential site contamination to determine appropriate future land use. Borehole locations and depths were designed to correctly assess DOE’s future liability for characterizing residual vadose zone contamination. If a residual source area is identified at depth, DOE will need to evaluate the additional cost of future subsurface cleanup (with limited access) due to planned development. This is necessary to leave the location in a “ready-to-build” status. As a result, Phase II sampling requirements may in some cases extend beyond the construction zone required for slab removal to ensure the necessary due diligence. To avoid the potential spread of contamination and/or the creation of an environmental release by impacting the integrity of known contamination areas (e.g., pit within room 102 and the east to west boundary seam), these locations were not sampled for this project. During demolition of the slab, these locations and their underlying soils should be further evaluated. The assessment was conducted in accord with the May 2022 Lawrence Livermore National Laboratory Former Building 175 Assessment Soil Sampling and Analysis Plan / Quality Assurance Plan. Thirty-six, direct-push borings were advanced, along with collecting concrete (where present) and soil samples for laboratory analyses. Thirty-two of the borings were advanced to a depth of 25 feet below ground (bgs), and four borings were advanced to a depth of 55 feet bgs. The concrete slab for former Building 175 ranged from approximately 8 inches to over two feet in thickness. Soils encountered during the investigation consisted primarily of clayey silt, with interbeds of sandy gravel and silty sand to the total depth explored of 55 feet bgs. Field photoionization detector readings – checking for volatile organic compound (VOC) vapors in soils, ranged from zero (0) to a peak of 33 parts per million at 25 feet bgs in boring PC-B175- 028. The cause for the peak reading is unknown, however, no visually discolored or odorous soils were encountered during the assessment and all VOC results were below Lawrence Livermore National Laboratory’s (LLNL’s) Soil Screening and Management Plan (SSMP) soil screening levels (SSL). Groundwater was not encountered during the assessment and is expected to occur at roughly 65 feet bgs in the project area. No metals were detected at concentrations of concern in the concrete core samples collected and analyzed. Low gross alpha and beta activity concentrations were detected in the concrete core samples collected and analyzed. The detected activity concentrations would appear to be from naturally occurring radioactive isotopes, i.e., potassium 40, present in the raw materials used to make concrete and not artificially added. Tritium was not detected above the testing laboratory's Method Detection Limit (MDL) in any of the concrete core samples collected and analyzed. The radioactive isotopes - actinium 228, bismuth 214, lead 212, lead 214, potassium 40, radium 226, radium 228, and thallium 208, were detected at low activity concentrations in the concrete core samples analyzed. Based on the detected activity concentrations, the isotopes would appear to be naturally occurring in the raw materials used to make concrete and not artificially added. Acetone – a common laboratory contaminant, was detected in nine of the soil samples collected and analyzed. Concentrations of two other volatile organic compounds (benzene and tetrachloroethene) were detected in five of the soil samples analyzed. All concentrations were below SSLs. Total petroleum hydrocarbons as diesel range organics were detected at 43.9 milligrams per kilogram (mg/kg) in the 20-foot bgs duplicate sample from boring PC-B175-007. Total petroleum hydrocarbons as motor oil were detected at 7.20 mg/kg in the 15-foot bgs routine sample from boring PC-B175-001, and at 20.7 mg/kg in the 20-foot bgs duplicate sample from boring PC-B175-007. The SSL for diesel-range TPHs is 260 mg/kg. LLNL does not have an SSL for motor oil range TPHs. No indications of a release, e.g., visibly stained, or odorous soil, were present at the boring locations. No samples collected contained polychlorinated biphenyls (PCBs) in concentrations above the laboratory reporting limit. Arsenic was detected above its SSL of 8.51 mg/kg in the 25-foot bgs routine sample collected from boring PC-B175-023. Nickel was detected above its SSL of 86.0 mg/kg in the 10-foot bgs routine sample from boing PC-B175-005, the 20-foot bgs routine sample from boring PC-B175-025, and the 25-foot bgs routine sample from boring PC-B175-034. The detected concentrations, however, were well below ten times (10x) their respective STLCs. Gross alpha and/or gross beta were detected above their respective SSL activity concentrations in three routine soil samples. Retesting (two per sample) of the samples showed that the initial reported activity concentrations were anomalous. Tritium was not detected in any of the routine or duplicate soil samples collected and analyzed during the investigation. The radioactive isotopes - actinium 228, bismuth 212 and 214, lead 212 and 214, potassium 40, radium 224, 226 and 228, thallium 208, thorium 234 and uranium, were detected at low activity concentrations in the soil samples analyzed for radioactive constituents. The detected isotopes and their associated activity concentrations are typical of those naturally occurring in the marine-type sedimentary deposits underlying the Livermore Valley. No radiological controls are necessary for the soil evaluated.

54 ENVIRONMENTAL SCIENCES↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bacteria Provide Cleanup of Oil Spills, Wastewater

Through Small Business Innovation Research (SBIR) contracts with Marshall Space Flight Center, Micro-Bac International Inc., of Round Rock, Texas, developed a phototrophic cell for water purification in space. Inside the cell: millions of photosynthetic bacteria. Micro-Bac proceeded to commercialize the bacterial formulation it developed for the SBIR project. The formulation is now used for the remediation of wastewater systems and waste from livestock farms and food manufacturers. Strains of the SBIR-derived bacteria also feature in microbial solutions that treat environmentally damaging oil spills, such as that resulting from the catastrophic 2010 Deepwater Horizon oil rig explosion in the Gulf of Mexico.

Source record↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Contaminant Transport Simulation with the P2R Model for the Composite Analysis Recharge Sensitivity Case

The Plateau-to-River (P2R) model is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by the Central Plateau Cleanup Company (CPCCo) at the Hanford Site in south-central Washington State. The overall objective of the saturated zone modeling effort is to provide a basis for making informed remedial action decisions based on descriptions of current and expected future contaminant concentrations in groundwater at decision points within and downgradient of the Central Plateau of the Hanford Site. Specifically, the purpose of this environmental calculation file (ECF) is to describe a recharge sensitivity case of the CA base case. The recharge sensitivity case implements a change in the activity contribution from the vadose zone in the A Trenches Area model (for tritium [H-3] and iodine-129 [I-129]), BC Cribs and Trenches model (for I-129 and technetium-99 [Tc-99]), or the Plutonium Uranium Extraction (PUREX) Area model (for H-3 and I-129). All other simulated inventories are identical to the CA base case. The simulation of fate and transport of contaminants reported in this case will support dose predictions as part of the updated Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Observations and analysis of oil spills using polarized imagery

On Saturday, July 28, 1990, a train of barges collided with the Greek tanker Shinoussa in Galveston Bay off Red Fish Island near Texas City, Texas. The first barge sank and the second began to leak while the third barge in the chain and the Shinoussa both escaped without damage. The NASA Flight Science Support Office sponsored a graduate student from SUNY - College of Environmental Science and Forestry and a student from Texas, to survey the damage. The purpose of these surveys was to correlate aircraft base data with orbital data obtained during the Space Shuttle Polarization Experiment and existing laboratory data to evaluate the potential for an application such as oil spill monitoring and mapping. NASA has no charter with the local response agencies to support oil spill monitoring and cleanup.

Israel, S. A.↗

High temperature environmental effects on metals

The gas turbine engine was used as an example to predict high temperature environmental attack on metals. Environmental attack in a gas turbine engine derives from high temperature, combustion products of the air and fuel burned, and impurities. Of all the modes of attack associated with impurity effects, hot corrosion was the most complicated mechanistically. Solutions to the hot corrosion problem were sought semi-empirically in: (1) improved alloys or ceramics; (2) protective surface coating; (3) use of additives to the engine environment; and (4) air/fuel cleanup to eliminate harmful impurities.

Grisaffe, S. J.↗

Flexible Gasification of Coal and Biomass to Generate Carbon Free Electric Power and Hydrogen

This paper describes the development of a coal and biomass-fed plant concept to co-produce electric power and hydrogen with net-negative CO2 emissions under the aegis of the 21st Century Power Plant initiative of the U.S. Department of Energy (DOE), whose goal is to advance innovative power plant concepts that are capable of flexible, net-zero carbon emission operations while producing cost-effective “blue” hydrogen to support economy-wide decarbonization goals. The proposed standalone plant will be in Nebraska, USA. The specified design feedstock is a hybrid blend of Powder River Basin (PRB) subbituminous coal from Wyoming and local Nebraska biomass (corn stover), 50 wt.% each (dry basis). Other potential feedstocks, including woody biomass (eastern red cedar) and waste plastic (auto shredder residue) were evaluated or reviewed as alternates. The proposed process block comprises a high-pressure, oxygen-blown fluidized bed gasifier (GTI Energy U-GAS® process) coupled with water gas shift, the Selexol process for acid gas (H2S and CO2) removal, and pressure-swing adsorption (PSA) to yield 8,500 kg/h of high-purity hydrogen. The off gas from the PSA unit is used in the power block (gas turbine combined cycle) to generate electric power to support the gasification process, hydrogen production, and 50 MWe net electric power to the grid. All major plant equipment including the gasifier, gas cleanup system, and power generation are commercially available and proven in other applications and considered at TRL 8-9. However, gasification of corn stover biomass is considered at TRL 6. Overall thermal efficiency of the plant is 50% (net HHV) with net atmospheric CO2 removal at a rate of 250-300,000 tpa. Design activities necessary to provide input to a FEED study (Phase II of the project), including the development of the Environmental Information Volume (EIV) for the host site, and an investment case, based on a pro-forma pre-FEED level cost estimate, have been completed and are described in detail in this paper.

Gülen, S. Can↗

Pilot-Scale Modular Research Facility for Acidic Water Pollution Cleanup and Domestic Production of Critical Minerals for National Security

A recent study by Penn State researchers revealed that Pennsylvania AMD streams originate from abandoned mines, with coal refuse piles of the lower Kittanning coal seam containing the most valuable heavy rare earth elements. Penn State has developed a three-stage process to recover these critical minerals, tested it for proof of concept, and secured a patent. Funded by the US DOE, a modular pilot-scale research and development unit has been designed and built to process 1,000 gallons per day of AMD from a site managed by the Pennsylvania Department of Environmental Protection (PA DEP). The system will selectively recover iron, aluminum, rare earth elements, and cobalt-nickel-manganese concentrates from AMD, followed by a proprietary downstream purification process. These operations aim to produce concentrates of critical minerals while treating acid mine drainage to meet environmental standards and evaluate different feedstocks. This presentation will describe the design, operation, and innovations of the proposed process and pilot facility, emphasizing its role in promoting sustainable recovery of critical minerals from legacy waste streams.