Building 704 Construction Fabric Fence Photos for Dust Control Permit Application.
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The primary objective of the monitoring effort is to support the DOE Environmental Management Nevada Program (EM NV) in the safe remediation of the environmental legacy of nuclear device development and testing by determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites, and to provide information for designing long-term monitoring of the sites. The monitoring program in 2018 included five stations. Station 400, located within TTR Area 3 and near the ROC, monitors conditions near the local workforce center. Stations 401 and 403 are located on the northern and southeastern perimeter fence lines, respectively, of the Clean Slate III site. Stations 404 and 405 are along the northern and eastern boundary fence, respectively, at Clean Slate II. The stations are generally downwind of the contaminated areas during either northwesterly or southerly winds, which are the predominant wind directions. The stations—which are similar in design to the Community Environmental Monitoring Program (CEMP) stations operating at locations surrounding the Nevada National Security Site and TTR—include meteorological instruments and continuous-flow, low-volume air samplers. Three pressurized ionization chambers for measuring gamma energy are in use at Stations 400, 401, and 403. Saltation sensors and saltation traps are deployed at the stations adjacent to the Clean Slate sites. Detailed meteorological data are recorded on data loggers, with periodic uploads via a satellite system to the Western Regional Climate Center (WRCC) at Desert Research Institute (DRI), to monitor instrument and site conditions. Air filter samples are collected every two weeks and the deposits in the saltation traps are collected when a sufficient sample mass for analysis has accumulated (generally a six- to eight-month interval). Monitoring at TTR in calendar year (CY) 2018 provided surveillance of both ambient conditions, and ground disturbance associated with remediation activities at Clean Slate II and III. The first half of CY2018 data from Stations 404 and 405 at Clean Slate II were collected during remediation activities at that site, and data collected during the final third of the year at Stations 401 and 403 at Clean Slate III coincided with remediation work at the site. Ambient conditions prevailed at Station 400 throughout the year. Dust transport by suspension and saltation is strongly dependent on wind speed. Concentrations of PM 10 (particulate matter of aerodynamic diameter ≤10 micrometers [μm], a size fraction of small particles that are suspended in the air and can be easily inhaled) remain low until winds exceed approximately 32 kilometers per hour (km/hr) (20 miles per hour [mph]). Saltation particle counts also increase above the same general threshold wind speed. Wind speeds in excess of 32 km/hr (20 mph) occur less than three percent of the time at the sites. Ground disturbing remediation activities were carried out at Clean Slate II from October 31, 2017, until July 26, 2018. Station 404 is located closest to the remediation area and is downwind of the area when winds are from the south. By late November, analysis of dust from the air sampler at Station 404 registered increases in plutonium-239+240 ( 239+240 Pu) concentrations. Peak plutonium concentrations, accompanied by elevated gross alpha concentrations and the detection of americium-241 ( 241 Am) by gamma spectroscopy, occurred between March and May 2018. During spring and early summer of 2018, elevated radionuclide concentrations were also measured in dust collected from the air sampler at Station 405, which is more than twice the distance from the remediation activity as Station 404. A minor but sustained increase in gross alpha concentration of suspended dust collected at Stations 400, 401, and 403 was also observed starting in May 2018 and continuing into August. Stations 401 and 403 are approximately 4.8 to 6.4 km (three to four miles) from Clean Slate II and Station 400 is approximately 13 km (eight miles) from that site. The radionuclide content of material that saltated into the passive Big Spring Number Eight (BSNE) traps during the Clean Slate II remediation period increased in both the traps facing toward and away from the fenced contamination area at Station 404, with the largest increases in concentration (almost five times the previous 239+240 Pu concentration) observed in the traps facing the fenced area. The radionuclide concentration in material in the trap facing away from the fence more than doubled from that measured in 2017. A similar increase was observed for the saltation trap facing away from the fenced area at Station 405, although no increase was observed for material captured in the trap facing the fenced area. Particles ranging in size from 50 to 500 µm generally move by saltation processes and are not expected to significantly contribute to dose for someone breathing in the standard respiratory zone for adult humans (1.5 to 1.7 m [4.9 to 5.6 ft] above ground level) because they are too large to be entrained in the air as suspended dust. Remediation activities at Clean Slate III began on September 5, 2018, and continued until a brief hiatus started on December 20, 2018. Although Station 401 is much closer to the remediation area than Station 403, the first increase in gross alpha and 239+240 Pu concentrations was noted in dust from filters collected at Station 403 in early November 2018. The highest radionuclide concentrations of 2018 at the Clean Slate III stations were recorded in air samples taken from Stations 401 and 403 in late December 2018 and these concentrations were comparable between the two station locations. Gamma rate data measured by the PICs was slightly higher than the annual average at Stations 401 and 403 after remediation activities began, but no single measurement was outside of the range observed in 2018 prior to remediation activities. No increase in radionuclide concentration was observed for the Clean Slate III remediation time period on air filters collected from the other stations. Radiological monitoring at Station 400—which is located at the ROC, and therefore the closest regularly staffed work location to the Clean Slate sites—recorded a higher mean gross alpha activity from dust collected on air sampler filters than in previous years. The individual biweekly air filters yielded measurements of gross alpha that were at or below the mean plus one standard deviation measured in CY2017, except for the period from April 25, 2018, through September 12, 2018. Nonetheless, gamma spectroscopy of all air filters from Station 400 identified only naturally occurring radionuclides, with no detection of americium-241 ( 241 Am) (which is used as an indicator of plutonium-241[ 241 Pu]). Alpha spectroscopy of selected air filters collected at Station 400 did not detect plutonium-238 ( 238 Pu) or 239+240 Pu above the analytical detection limit. Gross beta and gamma exposure rate data were comparable to data from regional CEMP stations. No saltation traps are deployed at Station 400. Considering the ambient monitoring periods during CY2018, the monitoring stations adjacent to the Clean Slate sites recorded above-background 238 Pu and 239+240 Pu concentrations (SNL, 1998; Turner et al., 2003) in samples collected by passive saltation traps and on selected air filters. These observations were consistent with previous years and indicated that radionuclide movement occurred under ambient conditions by processes of both saltation and suspension. The presence of radionuclides in all saltation traps, both upwind and downwind of the fenced contamination areas, was consistent with previous radiological survey results (EG&G, 1979) that show lower concentration radiologically contaminated material dispersed outside the fenced area. Although 239+240 Pu concentrations in the air filter samples were sometimes orders of magnitude higher than background, the concentrations were below risk-based action levels defined for an industrial area worker scenario (U.S. DOE, 2014). The interception of airborne dust with above-background radionuclide concentrations demonstrates that dispersal processes are continuing. Strong winds are the driver for both suspension and saltation of dust and soil. The recorded wind speed and PM10 during remediation activities at Clean Slate II and III identified discrete wind events lasting approximately five to eight hours each, which accounted for the greatest PM 10 concentrations at the monitoring stations. These events captured the effect of winds from the northwest and from the south. The observed differences in dust loading and radionuclide concentrations for the monitoring stations when they were either upwind or downwind of the contamination area identify the remediation area as a source of plutonium contaminated dust. The increase in concentration of radionuclides in airborne dust during the remediation activities, compared with measurements under previous ambient conditions (mean 239+240 Pu concentrations during remediation activities are approximately nine to 40 times higher compared to pre-remediation concentrations, depending on monitoring station), highlights the impact of land disturbance on wind-borne contaminant transport from the Clean Slate test areas. The meteorological and particulate matter monitoring indicated that conditions for wind-borne contaminant movement exist at the Clean Slate sites, and that transport of radionuclide-contaminated soil by both suspension and saltation occurred under ambient conditions and accelerated when the sites were disturbed. The 239+240 Pu alpha spectroscopy results indicated that airborne concentrations during remediation activities ranged from 2 × 10-16 to 380 × 10-16 µCi/ml. These results can be compared to the derived air concentration limit for 239 Pu of 6 × 10-11 µCi/ml for occupational workers contained in Code of Federal Regulations 10 CFR 835, Occupational Radiation Protection. Even though the air sampling results document an increase in concentration during remediation activities, the observed concentrations are less than 0.06 percent of the occupational limit. The Corrective Action Unit (CAU) closure strategy uses a risk-based approach, whereby acceptable contaminant concentrations are determined as a function of anticipated human exposure.
Purpose: To present and validate a set of quality control tests for trajectory treatment delivery using synchronized dynamic couch (translation and rotation), MLC and collimator motion. Methods: The quality control tests are based on the Picket fence test, which consist of 5 narrow band 2mm width spaced at 2.5cm intervals, and adds progressively synchronized dynamic motions. The tests were exposed on GafChromic EBT3 films. The first test is a regular (no motion and MLC static while beam is on) Picket Fence test used as baseline. The second test includes simultaneous collimator and couch rotation, each stripe corresponding to a different rotation speed. Errors in these tests were introduced (0.5 degree and 1 degree error in rotation synchronization) to assess the error sensitivity of this test. The second test is similar to the regular Picket Fence but now including dynamic MLC motion and couch translation (including acceleration during delivery) while the beam is on. Finally in the third test, which is a combination of the first and second test, the Picket Fence pattern is delivered using synchronized collimator and couch rotation and synchronized dynamic MLC and couch translation including acceleration. Films were analyzed with FilmQA Pro. Results: The distance between the peaks in the dose profile where measured (18.5cm away from the isocentre in the inplane direction where non synchronized rotation would have the largest effect) and compared to the regular Picket Fence tests. For well synchronized motions distances between peaks where between 24.9–25.4 mm identical to the regular Picket Fence test. This range increased to 24.4–26.4mm and 23.4–26.4mm for 0.5 degree and 1 degree error respectively. The amplitude also decreased up to 15% when errors are introduced. Conclusion: We demonstrated that the Roucoulette tests can be used as a quality control tests for trajectory treatment delivery using synchronized dynamic motion.
A three dimensional linear plug nozzle of area ratio 12.79 was designed by Astrium. The nozzle was tested within the German National Technology Program LION in a cold air wind tunnel by TU Dresden. The experimental hardware and test conditions are described. Experimental data was obtained for the nozzle without plug side wall fences and then with plug side wall fences. Experimental data for two nozzle pressure ratios (NPR), 116 and 45, are presented for the without fence and with fence configurations. Schlieren images of both NPR were recorded. Axial profiles of plug wall static pressures were measured at several spanwise locations and on the plug base. Detailed computational fluid dynamics (CFD) analysis was performed for these nozzle configurations by NASA MSFC. The CFD exhibits good agreement with the experimental data. A detailed comparison of the CFD results and the experimental plug wall pressure data is given for four test conditions; at both NPRs, without and with plug side wall fences. Numerical schlieren images are compared to experimental schlieren images. Nozzle thrust efficiencies are calculated from the CFD results. The CFD results are used to illustrate the plug nozzle fluid dynamics for all four test conditions. The effect of the plug side wall fences at both NPRs is emphasized.
Iron-nitrogen-carbon (FeNC) catalysts are considered among the most promising alternative to Pt catalysts in acidic oxygen reduction reaction (ORR), yet the geometric and electronic structures of the true active site under reaction conditions have not been clearly elucidated. Herein, we synthesized a representative FeNC catalyst by pyrolyzing Fe 3+ absorbed on ZIF-8-derived N-doped carbon at a mild temperature under the H 2 /Ar atmosphere, where a formation mechanism of FeN 4 sites through a Zn-mediated Fe nanoparticle atomization process was proposed. The resulting FeNC-750 catalyst shows high acidic ORR activity with a half-wave potential of 0.838 V and a peak power density of 1 W cm -2 in proton-exchange membrane fuel cell (PEMFC). By using operando 57 Fe Mössbauer spectroscopy on FeNC-750, it was revealed that the pyrrolic N-coordinated high-spin Fe 2+ N 4 sites, which are in situ generated from high-spin Fe 3+ N 4 during ORR, are identified as catalytic active states. Density functional theory calculations further verified that, compared to the pyridinic N-coordinated low-spin Fe 2+ N 4 , the pyrrolic N-coordinated high-spin Fe 2+ exhibits optimized adsorption energy for reaction intermediates, thereby lowering the energy barrier of the rate-determining step (RDS) and facilitating OH* desorption. In conclusion, this work provides both experimental and theoretical evidence of the true active site in the FeNC during acidic ORR, offering significant insights for the rational design of high-performance materials for acidic fuel cells.
Purpose: The “InCise™ multileaf-collimator (MLC)” is the first commercial MLC to be mounted on a robotic SRS/SBRT platform (CyberKnife). The authors assessed characteristics and performance of this novel device in a preclinical five months test period. Methods: Commissioning beam data were acquired with unshielded diodes. EBT3 radiochromic films were employed for measurement of transmission, leaf/bank position accuracy (garden fence) before and after exercising the MLC, for end-to-end testing and further characterization of the beam. The robot workspace with MLC was assessed analytically by transformation to an Euler geometry (“plane,” “gantry,” and “collimator” angles) and by measuring pointing accuracy at each node. Stability over time was evaluated in picket fence and adapted Winston–Lutz tests (AQA). Results: Beam penumbrae (80%–20%, with 100% = 2 × dose at inflection point for field sizes ≥ 50 × 50 mm{sup 2}) were 2.2–3.7 mm for square fields in reference condition (source-axis-distance 800 mm, depth 15 mm) and depended on field size and off-axis position. Transmission and leakage did not exceed 0.5%. Accessible clinical workspace with MLC covered non-coplanar gantry angles of [−113°; +112°] and collimator angles of [−100°; +107°], with an average robot pointing accuracy of 0.12 ± 0.09 mm. For vertical beams, garden fence tests exhibited an average leaf positioning error of ≤0.2 mm, which increased by 0.25 and 0.30 mm (banks X1 and X2) with leaves traveling parallel to gravity. After execution of a leaf motion stress routine, garden fence tests showed slightly increased jaggedness and allowed to identify one malfunctioning leaf motor. Total system accuracy with MLC was 0.38 ± 0.05 mm in nine end-to-end tests. Picket fence and AQA tests displayed stable results over the test period. Conclusions: The InCise™ MLC for CyberKnife showed high accuracy and adequate characteristics for SRS/SBRT applications. MLC performance after exercise demands specific quality assurance measures.
In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The primary objective of the monitoring effort is to support the DOE Environmental Management Nevada Program (EM NV) in the safe cleanup of the environmental legacy of nuclear device development and testing by determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites. The monitoring program underwent a significant change during 2017 with the decommissioning of one monitoring station and the establishment of three new stations. Station 400, located within TTR Area 3 and near the ROC, monitors conditions near the local workforce center and was in operation the full calendar year. Stations 401 and 403 are located on the northwest and southeast perimeter fence lines, respectively, of the Clean Slate III site. Station 401 operated throughout 2017, whereas Station 403 began operation at the end of April 2017. Stations 404 and 405 are along the northern and eastern boundary fence, respectively, at Clean Slate II and both began data collection at the end of April 2017. Also at the end of April, the Clean Slate I monitoring site, Station 402, was decommissioned. The stations are located to be generally downwind of the contaminated areas during either north-northwesterly or south-southeasterly winds, which are the predominant wind directions. The stations—which are similar in design to the Community Environmental Monitoring Program (CEMP) stations operating at locations surrounding the Nevada National Security Site and TTR—include meteorological instruments and continuous-flow, low-volume air samplers. Three pressurized ionization chambers for measuring gamma energy are in use at Stations 400, 401, and 403 (formerly at 402). Saltation sensors and saltation traps are deployed at the stations adjacent to the Clean Slate sites. Detailed meteorological data are recorded on data loggers, with periodic uploads via a satellite system to the Western Regional Climate Center (WRCC) at Desert Research Institute (DRI), to monitor instrument and site conditions. Air filter samples are collected every two weeks and the deposits in the saltation traps are collected when a sufficient sample mass for analysis has accumulated (generally a six- to eight-month interval). Dust transport by suspension and saltation is strongly dependent on wind speed. Concentrations of PM10 (particulate matter of aerodynamic diameter ≤10 micrometers [μm], a size fraction of small particles that are suspended in the air and can be easily inhaled) remain low until winds exceed approximately 32 km/hr (20 mph). Saltation particle counts also increase above the same general threshold wind speed. Wind speeds in excess of 32 km/hr (20 mph) occur less than three percent of the time. High winds are associated with two predominant directions: north-northwest and south. In 2017, the very highest winds were from the north, but all winds above 40 km/hr (25 mph) were approximately evenly split between south and northwest directions. The low-volume air samplers collect total suspended dust, and saltating particles are captured by the passive saltation traps, both for radiological analysis. Radionuclide monitoring at the ROC in TTR Area 3 (Station 400) found natural background levels of gross alpha and gross beta radiation. Similar background levels were found on filter samples analyzed using gamma and alpha spectroscopy. The gamma exposure rate data from pressurized ionization chambers (PIC) are comparable to those from the regional CEMP stations. Plutonium concentrations above background values were measured during 2017 from soil samples collected in passive saltation traps and on select air filters from the monitoring stations adjacent to the Clean Slate sites. The background for soils in the region is assumed to be 0.014 pCi/g plutonium-239+240 ( 239+240 Pu) as measured by Turner et al. (2003), whereas the background concentration of suspended 239+240Pu is assumed to be 9.5 x 10 -19 μCi/ml, which was determined by continuous air monitoring at the TTR airport in 1996 and 1997 (SNL, 1998). Background concentrations are exceeded by one to four orders of magnitude by the majority of samples from Clean Slate I, II, and III. The gross alpha and gross beta measurements of the air filters are also generally higher than those measured at the regional CEMP stations, although the gamma exposure rates determined by the PICs located at Clean Slate I and III are similar to CEMP measurements. The highest radionuclide concentrations of suspended dust are associated with individual filter samples from Clean Slate II Station 404 and Clean Slate III Station 401. Both of the stations are downwind of their respective sites during southerly winds, but they are also geographically closer to the highly contaminated detonation areas than the other monitoring stations. Considering all the analyzed samples, the 239+240Pu concentrations are generally higher for the Clean Slate II samples compared with those from Clean Slate III. The highest gross alpha and gross beta results are also observed for the Clean Slate II stations. The highest radionuclide concentrations are measured on the smaller (≤63 μm) saltation-sized particles and particulate matter collected downwind of each site. Nonetheless, traps oriented to collect dust moving toward the contamination areas also had plutonium concentrations significantly above background values, which is consistent with observations of low-level contamination dispersed beyond the fenced area. All the observed 239+240 Pu concentrations are below the risk-based action level (25 millirem per year, equivalent to a 239+240 Pu concentration of 4,120 pCi/g for an industrial worker scenario; U.S. DOE, 2014). The meteorological and particulate matter monitoring indicate that conditions for wind-borne contaminant movement exist at the Clean Slate sites, and that transport of radionuclide-contaminated soil by both suspension and saltation is occurring. The Corrective Action Unit (CAU) closure strategy uses a risk-based approach, whereby acceptable contaminant concentrations are determined as a function of anticipated human exposure. This strategy is consistent with the fence lines at the Clean Slate sites encircling areas of higher concentration and the observed presence of lower concentrations of contamination outside the fences.
During the late 1950s, the Atomic Energy Commission (AEC) (now the U.S. Department of Energy [DOE]) conducted a series of safety experiments to determine if a nuclear device subjected to a large conventional explosives detonation would result in a nuclear yield. The AEC obtained temporary use of a large portion of western Emigrant Valley from the U.S. Department of Defense (DOD) for one of these experiments: Project 57. Following the Project 57 safety experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DOD. Emigrant Valley is part of the Nevada Test and Training Range (NTTR). For safety and security reasons, access to the NTTR is controlled using both physical (i.e., fences) and administrative (e.g., signs and postings) controls. Therefore, the public cannot access the Project 57 site and there are no known human receptors that routinely access the site. Project 57 was detonated on April 24, 1957, in Emigrant Valley approximately 13 mi (21 km) northeast of the north end of Yucca Flat. This test was undertaken to develop: (1) a means of estimating immediate distribution and long-term redistribution of plutonium dispersed during a nonnuclear detonation; (2) biomedical evaluation techniques for use in likely plutonium-laden environments; (3) methods of decontaminating ground areas, pavements, and building materials; and (4) alpha survey instruments and field monitoring procedures to promptly estimate contaminant deposition. Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the ground surface. Various radiological surveys have been performed in the area since Project 57 was conducted. The AEC delineated the area containing radioactive material based on radioactivity surveys performed shortly after the test was conducted. A designated Contamination Area (CA), marked by a fence, was established later. The distribution of americium-241 (Am-241) in the area was determined again in a 1997 flyover, which showed Am-241 ranging from as much as 70,000 counts per second (cps) at ground zero to background (<70 cps). This survey also documented Am-241 radioactivity on the ground surface beyond the east side CA fence at levels of up to 150 cps. In 2007, the DOE expanded the CA by posting “Contamination Area” signs 200 ft to 400 ft (60 m to 120 m) beyond the original fence, which formed a new CA boundary.
An investigation into aerodynamic problems associated with large building rooftop STOLports was performed. Initially, a qualitative flow visualization study indicated two essential problems: (1) the establishment of smooth, steady, attached flow over the rooftop, and (2) the generation of acceptable crosswind profile once (1) has been achieved. This study indicated that (1) could be achieved by attaching circular-arc rounded edge extensions to the upper edges of the building and that crosswind profiles could be modified by the addition of porous vertical fences to the lateral edges of the rooftop. Important fence parameters associated with crosswind alteration were found to be solidity, fence element number and spacing. Large scale building induced velocity fluctuations were discovered for most configurations tested and a possible explanation for their occurrence was postulated. Finally, a simple equation relating fence solidity to the resulting velocity profile was developed and tested for non-uniform single element fences with 30 percent maximum solidity.
While improved activity was recently reported for bimetallic iron-metal-nitrogen-carbon (FeMNC) catalysts for the oxygen reduction reaction (ORR) in acid medium, the nature of active sites and interactions between the two metals are poorly understood. Here, FeSnNC and FeCoNC catalysts were structurally and catalytically compared to their parent FeNC and SnNC catalysts. While CO cryo-chemisorption revealed a twice lower site density of M-N x sites for FeSnNC and FeCoNC relative to FeNC and SnNC, the mass activity of both bimetallic catalysts is 50–100% higher than that of FeNC due to a larger turnover frequency in the bimetallic catalysts. Electron microscopy and X-ray absorption spectroscopy identified the coexistence of Fe-N x and Sn-N x or Co-N x sites, while no evidence was found for binuclear Fe-M-N x sites. 57 Fe Mössbauer spectroscopy revealed that the bimetallic catalysts feature a higher D 1 /D 2 ratio of the spectral signatures assigned to two distinct Fe-N x sites, relative to the FeNC parent catalyst. Furthermore, the addition of the secondary metal favored the formation of D 1 sites, associated with the higher turnover frequency.
Purpose: This work reports the results of the physics evaluation of a newly released InCise™2 Multileaf Collimator (MLC) installed in our institution. Methods: Beam property data was measured with unshielded diode and EBT2 films. The measurements included MLC leaf transmission, beam profiles, output factors and tissue-phantom ratios. MLC performance was evaluated for one month after commissioning. Weekly Garden Fence tests were performed for leaf / bank positioning in standard (A/P) and clinically relevant non-standard positions, before and after MLC driving exercises of 10+ minutes. Daily Picket Fence test and AQA test, End-to-End tests and dosimetric quality assurance were performed to evaluate the overall system performance. Results: All measurements including beam energy, flatness and symmetry, were within manufacture specifications. Leaf transmission was 0.4% <0.5% specification. The values of output factors ranged from 0.825 (7.6 mm × 7.5 mm) to 1.026 (115.0 mm × 100.1 mm). Average beam penumbra at 10 cm depth ranged from 2.7mm/2.7mm(7.6 mm × 7.5 mm) to 6.0 mm/6.2mm(84.6 mm × 84.7 mm). Slight penumbra difference (<10% from average penumbra for fields >20 mm) was observed in the direction perpendicular to leaf motion due to the tilting of the leaf housing. Mean leaf position offsets was −0.08±0.07mm and −0.13 ± 0.08 for X1 and X2 leaf banks in 13 Garden Fence tests. No significant difference on average leaf positioning offsets was observed between different leaf orientations and before/after MLC driving exercises. Six End-to-End tests showed 0.43±0.23mm overall targeting accuracy. Picket-Fence and AQA showed stable performance of MLC during the test period. Dosimetric point dose measurements for test cases agreed with calculation within 3%. All film measurements on relative dose had Gamma (2%, 2mm) passing rate of >95%. Conclusion: The Incise™2 MLC for CyberKnife M6™ was proven to be accurate and reliable, and it is currently in clinical use. Stanford was one of the physics evaluation sites for the newly released InCise 2 MLC for Accuray Inc.
The L-Bar, New Mexico, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title II Disposal Site was inspected on August 18, 2015. The tailings impoundment was in excellent condition. Erosion and vegetation measurements to monitor the condition of the impoundment cover indicated that no erosion is occurring, and perennial vegetation foliar cover at the measurement plots increased substantially compared to previous years due to above-average precipitation for the year. A short segment of the perimeter fence near the site entrance was realigned in spring 2015 because a gully was undermining the fence corner. Loose fence strands at another location were repaired during the inspection, and a section of fence needs to be realigned to avoid areas affected by deep gullies and sediment deposition. Inspectors identified no other maintenance needs or cause for a follow-up inspection. Groundwater monitoring is required every 3 years. The next monitoring event will be in 2016.
A line spread device capable of yielding direct measure of a laser beam's line spread function (LSF) was developed and employed in propagation tests conducted in a wind tunnel to examine optimal acoustical suppression techniques for laser cavities exposed to simulated aircraft aerodynamic environments. Measurements were made on various aerodynamic fences and cavity air injection techniques that effect the LSF of a propagating laser. Using the quiescent tunnel as a control, the relative effect of each technique on laser beam quality was determined. The optical instrument employed enabled the comparison of relative beam intensity for each fence or mass injection. It was found that fence height had little effect on beam quality but fence porosity had a marked effect, i.e., 58% porosity alleviated cavity resonance and degraded the beam the least. Mass injection had little effect on the beam LSF. The use of a direct LSF measuring device proved to be a viable means of determining aerodynamic seeing qualities of flow fields.
Tail buffet studies were conducted on a full-scale, production, F/A-18 fighter aircraft in the 80- by 120-Foot Wind Tunnel of the National Full-Scale Aerodynamic Complex at NASA Ames Research Center at Moffett Field, California. Tail buffet data were acquired over an angle-of-attack range of +20 deg to +40 deg, a side-slip range of -16 deg to + 16 deg, and at wind speeds up to 100 knots. The maximum speed corresponds to a Reynolds number of l2.3 x l0(exp 6) based on mean aerodynamic chord and a Mach number of 0. 15. The port, vertical tail fin was instrumented with ninety-six surface-pressure transducers, arranged in six by eight arrays, on each side of the fin. ne aircraft was also equipped with a removable Leading-Edge Extension (LEX) fence whose purpose is to reduce tail-buffet loads. Current analysis methods for the unsteady aerodynamic pressures and loads are described. Only results for the zero side-slip condition are to be presented, both with and without the LEX fence. Results of the time-averaged, power-spectral analysis are presented for the tail fin bending moments which are derived from the integrated pressure field. Local wave velocities on the tail surfaces are calculated from pressure correlations. It was found that the LEX fence significantly reduces the magnitude of the root-mean-square pressures and bending moments. Scaling and repeatability issues are addressed by comparing the present full scale results for pressures at the 60%-span and 45%-chord location with previous full-scale F/A-18 tail-buffet test in the 80- by 120- Foot Wind Tunnel, and with several small-scale tests. The comparisons show that the tail buffet frequency scales very well with tail chord and free-stream velocity, and that there is good agreement with the previous full-scale test. Root-mean-square pressures and power spectra do not scale as well as the frequency results. Addition of a LEX fence caused tail-buffet loads to be reduced at all model scales.
Tail buffet studies were conducted on a full-scale, production F/A-18 fighter aircraft in the 80 by 120 ft Wind Tunnel at NASA Ames Research Center. The F/A-18 was tested over an angle-of-attack range of 18-50 deg, and at wind speeds of up to 168 ft/s, corresponding to a Reynolds number of 12.3x10(exp 6) based on mean aerodynamic chord and a Mach number of 0.15. The port, vertical tail fin was instrumented and the aircraft was equipped with a removable leading-edge extension (LEX) fence. Time-averaged, power-spectral analysis results are presented for the tail fin bending moment derived from the integrated pressure field, for the zero side-slip condition, both with and without the LEX fence. The LEX fence significantly reduces the magnitude of the rms pressures and bending moments. Scaling issues are addressed by comparing full-scale results for pressures at the 60%-span and 45%-chord location with small-scale, F/A-18 tail-buffet data. The comparison shows that the tail buffet frequency scales very well with length and velocity. Root-mean-square pressures and power spectra do not scale as well. The LEX fence is shown to reduce tail buffet loads at all model scales.