Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fixture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Mode I fracture testing fixture

An apparatus and method for preparing Double Cantilever Beam (DCB) specimens are disclosed as an apparatus and method for conducting Mode I fracture resistance testing using the DCB specimens. In a first embodiment, a drill jig is used to locate the DCB specimen and guide a drilling process during creation of at least one through-hole in the DCB specimen. The drilling process may employ a traditional drill and drill bit, a laser drill, or a water jet. In another embodiment, a set of rotating pin blocks, each with a full-round or a half-round specimen pin at one end and a hanger full-round pin at the other end, engage the DCB specimen and facilitate the internal application of a fracturing load to the DCB specimen for the Mode I fracture resistance test. The present invention may significantly reduce the time and materials needed to prepare and test a DCB specimen.

Briggs, Timothy↗

Mode I fracture testing fixture

An apparatus and method for preparing Double Cantilever Beam (DCB) specimens are disclosed as an apparatus and method for conducting Mode I fracture resistance testing using the DCB specimens. In a first embodiment, a drill jig is used to locate the DCB specimen and guide a drilling process during creation of at least one through-hole in the DCB specimen. The drilling process may employ a traditional drill and drill bit, a laser drill, or a water jet. In another embodiment, a set of rotating pin blocks, each with a full-round or a half-round specimen pin at one end and a hanger full-round pin at the other end, engage the DCB specimen and facilitate the internal application of a fracturing load to the DCB specimen for the Mode I fracture resistance test. The present invention may significantly reduce the time and materials needed to prepare and test a DCB specimen.

Briggs, Timothy↗

Demonstration Assessment of Light Emitting Diode (LED) Residential Downlights and Undercabinet Lights in the Lane County Tour of Homes, Eugene, Oregon

In August 2008 the Pacific Northwest National Laboratory (PNNL) conducted a light emitting diode (LED) residential lighting demonstration project for the U.S. Department of Energy (DOE), Office of Building Technologies, as part of DOE’s Solid State Lighting (SSL) Technology Demonstration Gateway Program. Two lighting technologies, an LED replacement for downlight lamps (bulbs) and an LED undercabinet lighting fixture, were tested in the demonstration which was conducted in two homes built for the 2008 Tour of Homes in Eugene, Oregon. The homes were built by the Lane County Home Builders Association (HBA), and Future B Homes. The Energy Trust of Oregon (ETO) also participated in the demonstration project. The LED downlight product, the LR6, made by Cree LED Lighting Solutions acts as a screw-in replacement for incandescent and halogen bulbs in recessed can downlights. The second product tested is Phillips/Color Kinetics’ eW® Profile Powercore undercabinet fixture designed to mount under kitchen cabinets to illuminate the countertop and backsplash surfaces. Quantitative and qualitative measurements of light performance and electrical power usage were taken at each site before and after initially installed halogen and incandescent lamps were replaced with the LED products. Energy savings and simple paybacks were also calculated and builders who toured the homes were surveyed for their responses to the LED products. The LED downlight product drew 12 Watts of power, cutting energy use by 82% compared to the 65W incandescent lamp and by 84% compared to the 75W halogen lamp. The LED undercabinet fixture drew 10 watts, cutting energy use by 83% to 90% compared to the halogen product, which was tested at two power settings: a low power 60W setting and a high power 105W setting. The LED downlight consistently provided more light than the halogen and incandescent lamps in horizontal measurements at counter height and floor level. It also outperformed in vertical illuminance measurements taken on the walls, indicating better lateral dispersion of the light. The undercabinet fixture’s light output was midway between the low and high power halogen undercabinet fixture light outputs (35.8 foot candle versus 13.4 fc and 53.4 fc) but it produced a more uniform light (max/min ratio of 7.0 versus 10.8). The color correlated temperature (CCT, the blue or yellowness) of the LED light correlated well with the halogen and incandescent lights (2675 K vs 2700 K). The color rendering of the LED downlight also correlated well at 92 CRI compared to 100 CRI for the halogen and incandescent lamps. The LED undercabinet fixture had measures of 2880 K CCT and 71 CRI compared to the 2700 K and 100 CRI scores for the halogen undercabinet fixture. Builders who toured the homes were surveyed; they gave the LED downlight high marks for brightness, said the undercabinet improved shadows and glare and said both products improved overall visibility, home appearance, and home value. Paybacks on the LED downlight ranged from 7.6 years (assuming electricity cost of 11 c/kWh) to 13.5 years (at 5C/kWh). Paybacks on the LED undercabinet fixture in a new home ranged from 4.4 years (11c/kWh electricity) to 7.6 years (5c/kWh) based on product costs of $95 per LED downlight and $140 per LED undercabinet fixture at 3 hrs per day of usage for the downlight and 2 hrs per day for the undercabinet lighting.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Memorial Pools Energy Efficiency Retrofits

The National September 11 Memorial & Museum completed a retrofit of the submergible LED lighting fixtures in its North and South Memorial Pools, located at the World Trade Center site in New York City. The two one-acre pools are illuminated nightly by custom LED fixtures set into their base, and the original lights — in place since 2011 — had begun reaching the end of their useful life, leaving sections of the pools dim or dark. Rather than fully replacing the fixtures, the project team worked with the original manufacturer, Acuity Brands, to retrofit and reuse existing components across all eight pool walls (34 fixtures per wall), reducing cost and waste. Fixtures were shipped in custom crates to Minnesota for retrofitting, then reinstalled onsite by Memorial & Museum staff and contractor ABM. The team addressed two key technical challenges during the project: early leakage in retrofitted fixtures, resolved by introducing vacuum-sealing and nitrogen-fill testing before shipment; and chord damage during transit, resolved with custom-designed shipping crates. All eight pool walls were successfully retrofitted and reinstalled by August 27, 2025, ahead of the 25th anniversary of the September 11, 2001 attacks. Sitewide electrical consumption in September 2025 reflected an approximate 7% reduction, contributing to the institution's broader net-zero and LEED Gold sustainability goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Improve Replication of In-service Mechanical Environments

Structural dynamic testing is a common method for determining if the design of a component of a system will mechanically fail when deployed into its field environment. To satisfy the test's goal, the mechanical stresses must be replicated. Structural dynamic testing is commonly executed on a shaker table or a shock apparatus such as a drop table or a resonant plate. These apparatus impart a force or load on the component through a test fixture that connects the unit under test to the apparatus. Because the test fixture is directly connected to the unit under test, the fixture modifies the structural dynamics of the system, thus varying the locations and relative levels of stress on the unit under test. This may lead to a false positive or negative indication if the unit under test will fail in its field environment depending on the environment and the test fixture. This body of research utilizes topology optimization using the Plato software to design a test fixture that attaches to the unit under test that matches the dynamic impedance of the next level of assembly. The optimization's objective function is the difference between the field configuration and the laboratory configuration's frequency response functions. It was found that this objective function had many local minima and posed difficulties in converging to an acceptable solution. A case study is presented that uses this objective function and although the results are not perfect, they are quantifiably better than the current method of using a sufficiently stiff fixture.

42 ENGINEERING↗

Modular anti-rotation drilling systems and methods

A modular anti-rotation device for preventing rotation with respect to the central axis of a drilling tool in a borehole and for producing a notch in a borehole surface. The anti-rotation device includes an upper fixture portion and a lower fixture portion in axial alignment. The upper fixture portion and the lower fixture portion are connected by yoke assemblies. Each yoke assembly is connected to the fixture portion and fixture portion at one end, and forming an articulated joint of the upper yoke assembly and the lower yoke assembly at a distal end opposite the first end. A roller is connected at each joint, connecting the upper and lower yoke assemblies. The rollers engage vertically with a borehole surface, the rollers travelling axially, as a drill shaft penetrates into the borehole, the rollers simultaneously preventing radial movement of the anti-rotation device and prevent rotation with respect to the central axis of the borehole.

Su, Jiann-Cherng↗

Wynkoop Building Performance Measurement: Water

This report is a summary of the water analysis performance for the Denver, Colorado Wynkoop Building. The Wynkoop Building (Figure 1) was built in 2006 as the Environmental Protection Agency (EPA) Region 8 Headquarters intended to house over 900 occupants in the 301,292 gross square feet (248,849 rentable square feet). The building was built on a brownfield in the Lower Downtown Historic District as part of an urban redevelopment effort. The building was designed and constructed through a public-private partnership with the sustainable design elements developed jointly by General Services Administration (GSA) and EPA. That partnership is still active with all parties still engaged to optimize building operations and use the building as a Learning Laboratory. The building design achieved U.S. Green Building Council Leadership in Energy and Environmental Design for New Construction (LEED-NC) Gold Certification in 2008 (Figure 2) and a 2008 EPA Energy Star Rating of 96 with design highlights that include: (1) Water use was designed to use 40% less than a typical design baseline. The design included low flow fixtures, waterless urinals and dual flush toilets; (2) Native and adaptive vegetation were selected to minimize the need for irrigation water for landscaping; and (3) Energy use intensity was modeled at 66.1 kBtus/gross square foot, which is 39% better than ASHRAE 90.1 1999. The Wynkoop Building water use (10 gallons/square foot) was measured at lower than industry average (15 gallons/square foot) and GSA goals (13 gallons/square foot), however, it was higher than building management expected it would be. The type of occupants and number of occupants can have a significant impact on fixture water use. The occupancy per floor varied significantly over the study time period, which added uncertainty to the data analysis. Investigation of the fixture use on the 2nd, 5th, and 7th floors identified potential for water use reduction if the flush direction of the dual-flush toilet handles was reversed. The building management retrofitted the building's toilets with handles that operated on reduced flush when pushed down (0.8 gallons) and full flush when pulled up (1.1 gallons). The water pressure on the 5th floor (< 30 psi) is less than half the pressure on the 7th floor (>80 psi). The measured water savings post-retrofit was lower on the 5th floor than the 7th floor. The differences in water pressure may have had an impact on the quantity of water used per floor. The second floor water use was examined prior to and following the toilet fixture retrofit. This floor is where conference rooms for non-building occupants are available for use, thus occupancy is highly variable. The 3-day average volume per flush event was higher post-retrofit (0.79 gallons per event), in contrast to pre-retrofit (0.57 gallons per event). There were 40% more flush events post retrofit, which impacted the findings. Water use in the third floor fitness center was also measured for a limited number of days. Because of water line accessibility, only water use on the men's side of the fitness center was measured and from that the total fitness center water use was estimated. Using the limited data collected, the fitness center shower water use is approximately 2% of the whole building water use. Overall water use in the Wynkoop Building is below the industry baseline and GSA expectations. The dual flush fixture replacement appears to have resulted in additional water savings that are expected to show a savings in the total annual water use.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Balancing Impedance and Controllability in Response Reconstruction with $\mathrm{TS-IMMAT}$

In a prior work the authors proposed a variant on the Impedance Matched Multi-Axis Test (IMMAT) in which a fixture is defined, called the Transmission Simulator (TS), and the desired environment is matched at a set of sensors on the TS. If the motion of the TS is matched then the response of the rest of the component will also match, provided that the attached component has the same dynamics as it did when the environment was measured. Hence, one would like the TS to be flexible so that it reproduces the boundary conditions that the component of interest experiences during flight, but the more flexible the TS, the more shakers might be needed to control its response. This work presents a derivation that gives expressions for these two potential error sources in TS-IMMAT. Then, various case studies are presented, both on simulated and real hardware, to understand the importance of each error term in practical testing. The theory explains the phenomena that were observed when using measurements from a component that flew on a sounding rocket. The environmental response was measured and then various fixtures were attached, each comprising more of the next assembly, or the hardware to which the component was attached in flight. MIMO testing was repeated with each fixture and the results were compared to seek to understand the role of the impedance match in this type of testing. Here the results show that the number of modes that are active in the transmission simulator is also very important, and so the best solution balances these two considerations. An improved method of simulating the MIMO test is then proposed, so simulations can be used to predict what fixture, or transmission simulator, will give the best results in a TS-IMMAT test.

42 ENGINEERING↗

Additive Manufacturing of Tooling for Refrigeration Cabinet Foaming Processes

The primary objective of this project was to leverage the Big Area Additive Manufacturing (BAAM) process and materials into a long term, quick change tooling concept to drastically reduce product lead and development timelines and costs. Current refrigeration foam molds are complicated to manufacture involving casting several aluminum parts in an approximate shape, machining components of the molds and post fitting and shimming of the parts in an articulated fixture. The total process timeline can take over 6 months. The foaming process is slower than required for production, therefore multiple fixtures, 10 to 27, are required per refrigerator model. Molds are particular to a specific product configuration making mixed model assembly challenging for sequencing, mold changes or auto changeover features. The initial goal was to create a tool leveraging the ORNL materials and additive process to build a tool in 4 to 6 weeks or less. A secondary goal was to create common fixture cores and provide lightweight fixture sections that could be revised in a very short time to increase equipment flexibility reduce lead times, lower the barriers to first production trials, and reduce tooling costs.

3d Printing↗

Xcel Energy – LBNL ‘Beyond Widgets’ Project. Workstation Specific Lighting with Daylight Dimming Controls System Program Manual

This program manual was developed through a U.S. Department of Energy project to develop streamlined utility program approaches to the deployment of integrated systems in commercial offices. Integrated systems present deep opportunities for energy savings, however by nature these systems have additional levels of complexity and effort required for their design and energy savings assessment, which create barriers for utility incentive programs to develop streamlined cost effective incentive programs to capture these savings. This project worked with Xcel Energy in Colorado and Minnesota to select an integrated system and develop a streamlined approach to its deployment for small and large commercial offices. Xcel Energy worked with LBNL to select a workstation specific lighting system with daylight dimming controls, applied as a retrofit in commercial office spaces. Previous studies indicated a potential lighting annual energy savings of 28-63%, with an average of 47% for this system type, due to reduced fixture LPD and controls only, not including a full fixture replacement from a condition such as T8 to LED. Xcel also had a desire to incorporate this fixture replacement in their integrated system package, and as a result annual energy lighting savings are expected to be higher. FLEXLAB testing of the system for 500 lux minimum output conditions translated into a 94% annual energy savings for this system. Market analysis was developed for large and medium commercial office buildings in Xcel’s Minnesota and Colorado markets showing a potential for 48-295 and 120-672 GWh of energy savings potential for Colorado and Minnesota respectively. Total Resource Costs (TRC) vary by location and technology package used (enterprise versus non-enterprise lighting controls system), and vary from 0.29 to 1.27 and 0.06 and 0.44 for a Retrofit case, and 0.20 to 1.63 and 0.07 to 0.57 for a Replace on Burnout strategy for Colorado and Minnesota respectively. These results indicate good potential for demonstrating a strong technical and economic case for deployment of this system type in Xcel’s Colorado territory, while deployment in the Minnesota market may be advisable as well as part of a portfolio of programs, or as an effort to help shift the market into integrated systems deployment in general. It should be noted that the cost of avoided energy in both markets is significantly low ($0.07/kWh for Minnesota, $0.08/kWh for Colorado), and these TRC values would not be representative of deployment potential in other markets with higher utility rates. In addition, installation costs used for these systems may decrease with time, further enhancing their return on investment. Overall, workstation specific lighting systems with daylight dimming controls present a very strong potential for cost effective lighting energy savings, as demonstrated by the FLEXLAB test results and previous case studies. Further energy savings may be realized from the use of fixture-specific occupancy sensors as well, although this approach was not considered in this study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Polymer Aging/Characterization Core Capability Enhancement is Underway (Progress Summary)

Motivation: Accelerated aging of polymeric materials is needed to predict their long-term mechanical functionality. Two key metrics used to evaluate their performance are compression set and load retention. Currently, specimens are aged under compressive strain at four different temperatures (25, 40, 55, and 70°C) for 1-2 years, and compression set and load retention are measured at various timepoints. At each timepoint, specimens are measured at three different relaxation times (immediately, 1 hr, and 24 hrs) after removal from the aging fixtures. The measurements include both thickness measurement and load testing. Time-temperature superposition (TTS) is applied to the isothermal data to obtain long-term predictions. There is a desire to reduce both the length of the studies and the amount of effort required to perform the studies. Significance: Additional aging ovens will provide the opportunity to add a higher fifth temperature, which could reduce the length of accelerated aging studies, as well as provide a spare oven in case one fails. If determined to be feasible, instrumented aging fixtures could reduce the amount of effort required to perform the studies, potentially eliminating the need to remove the specimens from the fixtures. Progress: Two new aging ovens have been received. The controllers were verified to be operational. The nitrogen purge still needs to be verified. Instrumented aging fixtures potentially including gap adjustment (to set the aging strain and measure specimen thickness) and a load transducer are under consideration.

36 MATERIALS SCIENCE↗

Metrics for diagnosing negative mass and stiffness when uncoupling experimental and analytical substructures.

Recently, a new substructure coupling/uncoupling approach has been introduced, called Modal Constraints for Fixture and Subsystem (MCFS) [Allen, Mayes, & Bergman, Journal of Sound and Vibration, vol. 329, 2010]. This method reduces ill-conditioning by imposing constraints on substructure modal coordinates instead of the physical interface coordinates. The experimental substructure is tested in a free-free configuration, and the interface is exercised by attaching a flexible fixture. An analytical representation of the fixture is then used to subtract its effects in order to create an experimental model for the subcomponent of interest. However, it has been observed that indefinite mass and stiffness matrices can be obtained for the experimental substructure in some situations. This paper presents two simple metrics that can be used by the analyst to determine the cause of indefinite mass or stiffness matrices after substructure uncoupling. The metrics rank the experimental and fixture modes based upon their contribution to offending negative eigenvalues. Once the troublesome modes have been identified, they can be inspected and often reveal why the mass has become negative. Two examples are presented to demonstrate the metrics and to illustrate the physical phenomena that they reveal.

99 GENERAL AND MISCELLANEOUS↗

Fabrication of a Nb-Ti Superconducting Closed-Loop Coil for the Next-Generation 45 GHz ECR Ion Source MARS-D

Electron Cyclotron Resonance Ion Sources (ECRISs) that utilize Nb-Ti superconducting coils for 28 GHz frequencies have been operating effectively for over twenty years. However, transitioning to higher frequencies demands stronger magnetic fields, and the conventional racetrack-and-solenoid ECRIS structures have reached their maximum capability with Nb-Ti. To address this, a Mixed Axial and Radial field System Demonstrator (MARS-D) is being developed at Lawrence Berkeley National Laboratory (LBNL). This system features an innovative Closed-Loop Coil (CLC) design that optimizes the use of the conductor fields, enabling the application of Nb-Ti in the next-generation 45 GHz ECRISs. The fabrication of the hexagonal CLC is particularly challenging due to its complex winding path and shape, the stiffness of the Nb-Ti superconducting wire, and the small bending radius. Here, to address these challenges, a series of unique fixtures and tools, as well as a pre-over-bending method, were developed for winding the CLC. To validate the winding fixtures, tools, procedures, and materials used in the coil assembly, a 4-layer practice CLC was wound, epoxy-impregnated, and then cold-tested using liquid nitrogen. The full-size MARS-D CLC is in the process of winding. This paper presents the structure of the MARS-D CLC, the winding fixtures and tools, the winding procedures, the quality control, the impregnation, the test results, and the potential future improvements.

ECR ion sources↗

NTRCI Legacy Engine Research and Development Project Final Technical Report

The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engine's commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was designed, manufactured and demonstrated in the GEN2.5B prototype.

33 ADVANCED PROPULSION SYSTEMS↗

Silicon Carbide Temperature Monitor Processing Improvements. Status Report

Silicon carbide (SiC) temperature monitors are used as temperature sensors in Advanced Test Reactor (ATR) irradiations at the Idaho National Laboratory (INL). Although thermocouples are typically used to provide real-time temperature indication in instrumented lead tests, other indicators, such as melt wires, are also often included in such tests as an independent technique of detecting peak temperatures incurred during irradiation. In addition, less expensive static capsule tests, which have no leads attached for real-time data transmission, often rely on melt wires as a post-irradiation technique for peak temperature indication. Melt wires are limited in that they can only detect whether a single temperature is or is not exceeded. SiC monitors are advantageous because a single monitor can be used to detect for a range of temperatures that occurred during irradiation. As part of the process initiated to make SiC temperature monitors available at the ATR, post-irradiation evaluations of these monitors have been previously completed at the High Temperature Test Laboratory (HTTL). INL selected the resistance measurement approach for determining irradiation temperature from SiC temperature monitors because it is considered to be the most accurate measurement. The current process involves the repeated annealing of the SiC monitors at incrementally increasing temperature, with resistivity measurements made between annealing steps. The process is time consuming and requires the nearly constant attention of a trained staff member. In addition to the expensive and lengthy post analysis required, the current process adds many potential sources of error in the measurement, as the sensor must be repeatedly moved from furnace to test fixture. This time-consuming post irradiation analysis is a significant portion of the total cost of using these otherwise inexpensive sensors. An additional consideration of this research is that, if the SiC post processing can be automated, it could be performed in an MFC hot cell, further reducing the time and expense of lengthy decontaminations prior to processing. Sections of this report provide a general description of resistivity techniques currently used to infer peak irradiation temperature from silicon carbide temperature monitors along with some representative data, the proposed concepts to improve the process of analyzing irradiated SiC temperature monitors, the completed efforts to prove the proposed concepts, and future activities. The efforts detailed here succeeded in designing and developing a real-time automated SiC resistivity measurement system, and performed two initial test runs. Activities carried out include the assembly and integration of the system hardware; the design and development of a preliminary monitor fixture; the design of a technique to automate the data analysis and processing; the development of the communication, coordination, and user software; and the execution and troubleshooting of test run experiments using the box furnace. Although the automation system performed as required, the designed fixture did not succeed in establishing the needed electrical contacts with the SiC monitor.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗