Search NASA⌕ Search

SEARCH · Search NASA

Results for “Florida”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Satellite-Derived Estimates of Suspended CaCO3 Mud Con-Centrations from the West Florida Shelf Induced by Hurricane Ian

In the days following the passage of Hurricane Ian over the West Florida Shelf, a large plume of calcium carbonate (CaCO3) mud slurry was observed extending from west of the Dry Tortugas and curving to the east into the Straits of Florida. This discreet target offered a unique opportunity to quantify the suspended mass of CaCO3 in the slurry. Estimating the concentration of sediment in a plume of suspended CaCO3 by satellite sensor observations has been stymied up to now owing to a lack of in situ suspended sediment measurements during storm events, as “sea truth” data for such events is difficult to acquire. However, the Particulate Inorganic Carbon (PIC) standard product provided by the NASA Ocean Biology Distributed Active Archive Center (OBDAAC) is based on Moderate Resolution Imaging Spectroradiometer (MODIS) observations of a plume of coccolith chalk released from a ship in the “Chalk-Ex” experiment. Due to the similarities (particle size, mineralogy, and reflectance properties) of the suspended chalk features and the Ian-induced slurry, we utilized this data product to make initial estimates of the concentration of suspended sediment in the plume.

remote sensing↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

General Services Administration Reclamation Yard Solid Waste Management Unit 010: 2022 Groundwater Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the groundwater monitoring activities that occurred in September and October 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consist of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume were tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. Groundwater monitoring for VOCs in the Chlorinated VOC Plume area was discontinued following the December 2021 annual monitoring event. Annual groundwater monitoring for underground injection control (UIC) parameters continues for both the PCB/VOA Plume and the Chlorinated VOC Plume areas. The activities presented in this report include one field event: September and October 2022, which includes sitewide semi-annual water level measurements of 55 monitoring wells, redevelopment of all monitoring wells listed in the sampling plan, and groundwater sampling of 28 monitoring wells. The sampling and analysis demonstrated that the PCB/VOA plume is not expanding and is significantly reduced compared to before a 2018 source removal interim measure. Recommendations are made for the 2023 groundwater monitoring program.

groundwater↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

Paint and Oil Locker SWMU 067 Southern Treatment Area Air Sparge System Year 2 Performance Monitoring and Paint and Oil Locker Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Kennedy Space Center, Florida

This Year 2 Air Sparge (AS) System Performance Monitoring (PM) Report for Paint and Oil Locker (POL) Solid Waste Management Unit (SWMU) 067 Southern Treatment Area and Long- Term Monitoring (LTM) Report for POL Northern Area (SWMU 067) and Supply Warehouse #3 (SW3) SWMU 088 documents ongoing remedial efforts at the POL and SW3 sites at Kennedy Space Center (KSC), Florida. The overall goal for these sites is to reduce concentrations of groundwater contaminants of concern (COCs), specifically trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE) and vinyl chloride (VC), to below the State of Florida Groundwater Cleanup Target Levels (GCTLs). Remediation and reporting of POL and SW3 have been streamlined over the years due to the proximity of the two sites. The scope for these sites currently includes two main components: (1) LTM at SW3 and the POL Northern Area, where an AS system began operation in May 2009 (with expansion in December 2012) and June 2013, respectively, and subsequently turned off for both sites in March 2018 (NASA, 2019a); and (2) Active AS operations and PM in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The timeframe for activities covered under this report is from September 2022 to July 2023. Based on Year 2 system operation and PM results, the AS system at POL operated as designed and successfully met the performance objective of reducing VOCs to concentrations that support transition of the site from active remediation to long-term monitoring. The results from the samples collected from performance monitoring wells within the AS system ROI showed a significant decrease in COC concentrations since the baseline sampling event conducted in April 2020. Based on the Year 2 OM&M and monitoring results obtained from the POL Southern Treatment Area, the IM objective to reduce concentrations to below the LTM transition target concentrations for TCE, cDCE, tDCE, and VC has been achieved. LTM sampling events at SW3 were conducted in October 2022 and July 2023. LTM sampling was conducted at the POL Northern Area in October 2022, December 2022, March 2023, and July 2023. Analytical results from October 2022 and July 2023 generally indicate that concentrations of COCs have been stable or decreasing compared to the previous year. TCE remains greater than the NADC in one monitoring well (POL-MW0034S) and greater than the GCTL in one monitoring well (POL-MW0009S). Concentrations of cDCE were greater than the GCTL in one monitoring well (POL-MW0026S), and tDCE was non-detect or less than the GCTL in all monitoring wells sampled. VC was greater than the GCTL in four monitoring wells (MW0024, MW0025, MW0027, and MW0028) at SW3 and one monitoring well (MW0026S) at the POL Northern Area.

remediation↗

Comparison of Daily, Monthly (Lunar), Yearly, Decadal, Quarter-Century, Half-Century, and Centurial Shoreline Change Rates at the Kennedy Space Center, Cape Canaveral, Florida, USA

The Kennedy Space Center (KSC) is North America’s premier spaceport and provides crucial access to space for both government and private entities. The National Aeronautics and Space Administration (NASA) facilities are clustered along a 12 km active shoreline at Cape Canaveral, Florida, USA, with the entire NASA and US Space Force station (SF) shoreline stretching over 32 km (Figure 1). Several Launch Complexes (LC’s) including the modern heavy lift facilities are only a few tens of meters from the active shoreline and are imminently threatened by continued sea level rise and ongoing coastal erosion. The space center was built on the northern part of Cape Canaveral. Images collected in 1943 show that Apollo Heavy Lift Launch Complexes were built in swales on ground that was at or below sea level with Launch Complex 39B constructed on a paleo inlet (Figures 2 and 3). Today the Heavy Lift Launch Complexes are ~220 meters from the shoreline with the area between the complexes retreating at the highest rates along the cape (Figure 4). To better understand the intersection of environmental concerns, limited budgets for shoreline protection, and sheltering critical infrastructure; NASA, The University of Florida, United States Geological Survey (USGS), National Park Service (NPS) and contractors have and continue to conduct numerous studies to characterize and understand the shoreline evolution and rates of change at KSC. This project aims to better understand and visualize the temporal and spatial variability of change along the NASA shoreline beyond a simple point to point solution.

Richard MacKenzie III↗

Per- and Polyfluoroalkyl Substances Confirmatory Sampling Report, South Repeater Building (SWMU 121), Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Confirmatory Sampling (CS) Report was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document CS activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121, formerly known as the Area 3 Repeater Building (A3RB). A Phase I SWMU Assessment and Confirmatory Sampling Report (NASA 2019) and a Phase II and III SWMU Assessment and Confirmatory Sampling Report (NASA 2022b) were previously submitted detailing Center-Wide assessment activities performed at the John F. Kennedy Space Center (KSC) in Florida that identified 33 locations of concern and 19 areas of potential concern at KSC associated with the storage, use, or release of materials containing PFAS. A review of the analytical results from investigation derived waste samples collected in 2020 from the South Repeater Building area indicated concentrations of perfluorooctanesulfonic acid (PFOS) were above Florida Department of Environmental Protection (FDEP) provisional Groundwater Cleanup Target Levels of 70 nanograms per liter (ng/L) at a concentration of 1,750 ng/L. Following this review, the KSC Fire Chief was contacted; the Chief recalled fighting a brush fire in 1998 in the area, during which an unknown volume of aqueous film-forming foam was used to extinguish the fire. The Phase II and Phase III SWMU Assessment Report recommended this area proceed to CS. Historical results in this area are provided in Appendix A . PFAS CS activities were contracted at the South Repeater Building. Initial CS activities were conducted in accordance with the PFAS Assessment and Mitigation Work Plan (AECOM 2022), which was submitted to the NASA Remediation Project Management team and accepted by the team on November 1 and 8, 2021. The objectives of the PFAS CS were to: - - Confirm and begin to assess the extent of PFAS affected media in the South Repeater Building area. - - Identify locations for groundwater, soil, surface water, and soil core sampling. - - Qualitatively characterize the migration potential of released PFAS to environmental media (soil, groundwater, and surface water). The following activities were completed to meet the PFAS CS objectives: - - Installation of monitoring wells via direct push technology (DPT) and rotosonic techniques - - Groundwater, soil, and surface water sampling - - Collection of soil cores to evaluate site lithology - - Development of initial PFAS plume characterization

PFAS↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Launch Complex 39A, SWMU 008 2023 Long-Term Monitoring Report Kennedy Space Center, Florida

The 2023 Long-Term Monitoring (LTM) Report (LTMR) presents the annual and semi-annual groundwater monitoring results for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, at Kennedy Space Center (KSC), Florida. The reporting period covered under this LTMR is from January to December 2023, and represents the first year of site-wide monitoring following Air Sparge (AS) system shutdown at the end of 2022. AS system operation at LC39A began operation in 2015. The AS system consisted of a total of 173 AS wells ranging in depth from 11 to 37 feet below land surface. The overall remedial objective for the AS Interim Measure was to actively decrease concentrations of COCs to less than their respective Florida Department of Environmental Protection Natural Attenuation Default Concentrations, so that LC39A can transition into an LTM program. This objective was achieved in 2022, with 2023 marking Year 1 of the LTM program to monitor the residual groundwater plume. VOC results indicate that COC concentrations have continued to decrease or stabilize, with no rebound observed since AS system shutdown. Vinyl chloride was the only COC detected above its GCTL, with the highest concentration detected at 8.0 μg/L. PFAS results detected 15 different PFAS compounds (out of 32 analyzed) between the six monitoring wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). PFOS was detected in one of the six samples above the FDEP Provisional GCTL at a concentration of 200 ng/L. PFOA was not detected above the FDEP Provisional GCTL in any of the six samples. PFOS and PFOA also currently have United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 ng/L. PFOS was detected in all six samples above the USEPA MCL. PFOA was detected in three of the six samples above the USEPA MCL. Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the six wells. Additional PFAS sampling will occur as part of a PFAS Site Assessment to be conducted in the future. Based on Year 1 LC39A LTM results, recommendations for 2024 are to continue with the second year of LTM in 2024 with the same monitoring well network as Year 1 (18 wells). The three wells that were on a semi-annual schedule will transition to an annual schedule to align with the remaining wells. The next annual event is scheduled for May 2024. The three wells that were found to be inadvertently destroyed will be properly abandoned and a replacement well in the vicinity of former monitoring well 21ST-MW0030I will be installed. This new well will be added to the LTM sampling plan upon installation.

Deborah M. Wilson↗

Interim Groundwater Monitoring Report, Revision 0, Fluid Servicing Road Area, Solid Waste Management Unit (SWMU)s 037 and 102, Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings from the IGWM events, completed between December 2022 and June 2023, at the Fluid Servicing Road Area (FSRA), Kennedy Space Center (KSC), Florida. KSC is located on the northern portion of Merritt Island, between the Indian and Banana Rivers in Brevard County, Florida. The IGWM program is implemented at sites where active remediation is not occurring. The IGWM events at the Propellants Support Building Area (PSBA; Solid Waste Management Unit [SWMU] 102) included the collection of eight groundwater monitoring well samples and 107 direct-push technology (DPT) samples. The DPT samples were collected for the Five-Year supplemental plume monitoring event. Additionally, 27 wells were sampled as part of the December 2022 IGWM event at the Former Drum Storage Area (FDSA), SWMU 037. This IGWM Report was prepared by HydroGeoLogic, Inc. (HGL) for the National Aeronautics and Space Administration (NASA) under Task Order 4 of Indefinite Delivery Indefinite Quantity Contract 80KSC019D0012/80KSC019F0090.

FDSA↗

Hypergol Maintenance Facility North, SWMU 090, Year 3 Air Sparge System Performance Monitoring Report, Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents Year 3 Air Sparge (AS) System operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from September 2022 to August 2023. The HMFN AS IM was implemented in 2019-2020 to treat a chlorinated solvent groundwater plume that resulted from historical operations supporting the National Aeronautics and Space Administration (NASA) Space Program. The system includes 213 AS wells, with screen depths ranging from 25 feet to 45 feet below land surface (bls) and treats approximately 1.62 acres of contaminated groundwater. The objective of the AS IM is to actively reduce groundwater concentrations exceeding Florida Department of Environmental Protection Natural Attenuation Default Concentrations (NADCs) (identified as the High Concentration Plume [HCP]) to levels that facilitate transition into a Long-Term Monitoring program. The AS IM targets all of the HCP, except for a source zone area within the HCP where trichloroethene (TCE) concentrations exceed 11,000 micrograms per liter (μg/L) at depths greater than 45 feet bls. This is because site lithology was found to not be conducive to the AS treatment technology at these deeper depths. NASA will re-visit plans for potentially utilizing another remedial technology for residual deeper contamination following completion of the AS IM. OM&M activities and results from Year 3 indicate that the AS system at HMFN is operating as designed and is meeting performance criteria. Groundwater performance monitoring results indicate that following the third year of AS system operation, TCE concentrations in wells across all treated depth intervals have been reduced by an average of more than 99 percent. Overall, the areal extent of the plume showed a reduction following Year 3 of AS operations; however, continued operation of the AS system is required to meet the IM objective.

VOCs↗

Formational History and Geomorphic Preservation of Sea Level Highstands Over the Last 150 ky Near Cape Canaveral, Florida, USA

Cape Canaveral, Florida, is perhaps one of the most important stretches of coastline in the United States of America (USA) due to its critical strategic role in the pursuit of space exploration and as the locus of advanced technological innovation. Due to its geographical setting, the entirety of Cape Canaveral, including its infrastructure, facilities, and important natural habitats (e.g., wetlands, estuaries and dunes) is vulnerable to coastal hazards such as continued sea level rise, storm surges, erosion and flooding. As such, accurate sea level characterization and coastal resiliency predictions are essential to promoting long-term coastal planning and sustainability in the area. This study aims to better understand the temporal and spatial evolution of this area with the purpose of more accurately documenting historical sea level fluctuations and calibrating more localized projections at this site. The Cape Canaveral coastline is situated on a passive margin mostly affected by oceanic (sea level change and wave impact) and atmospheric (aeolian) alteration. This sector is part of the east Florida coast microtidal (1.2 m) setting and low wave energy (1.2-1.6 m and 6.1-8.2 sec for average significant waves) regime and is defined by a well delineated set of beach ridge or cape systems. While the name “Cape Canaveral” is often used as a generic term to describe the geographic area, it is actually an amalgamation or complex of multiple preserved capes. The preserved Cape Canaveral beach ridge plain has largely documented the paleo-sea level highstand history over the last 150 ky. High-resolution mapping of these beach ridges is completed using GPS, LiDAR, aerial, as well as satellite imagery. In order to reconstruct the formational history of the Cape Kennedy Complex and the preserved record of sea level highstands, these detailed geomorphological observations are integrated with OSL and C14 dating techniques. The chronological framework delineated by the OSL dates coupled with detailed geomorphological mapping allows for the creation of high-resolution calibrated site-specific sea level curves that reflect the local environmental and geological conditions. This refinement has the potential to improve the understanding of past sea level variability which is crucial for predicting future trends and assessing the impacts on coastal regions such as Cape Canaveral.

geomorphology↗

Strengthening Resilience: Florida Resident Voices on Resource Needs During Power Outages

Extreme weather events related to climate change, and an aging electricity infrastructure are disrupting reliable electricity services to a greater degree. Further, previous research has found that more socially vulnerable populations are more likely to live in areas with a higher probability of power outages. Here, this study examines the issues that people face during power outages and the resources that help individuals maintain resilience during power outages caused by extreme weather events in socially vulnerable communities. Using qualitative data from focus groups with 56 individuals in Central and North Florida, the research highlights lived experiences during outages and difficulties using and accessing resources during these conditions. Based on a qualitative review of the focus group discussions, this paper explores the solutions and support systems residents believe would improve their ability to cope. The findings offer insights to guide policy and strategic planning, with the goal of strengthening personal preparedness and response by focusing on the resources people consider most helpful for enduring frequent and severe outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

Florida Regional DAC Hub

This project supported the U.S. Department of Energy's (DOE) mission to reduce the environmental and climate impacts of fossil fuels and industrial processes, contributing to the goal of achieving net-zero emissions across the U.S. economy. The primary objective is to conduct a feasibility study for a Regional Direct Air Capture (DAC) Hub in Bay County, Florida. This hub takes advantage of the region’s deep, permeable saline aquifers (Tuscaloosa Group, 1,500–2,150 meters deep), which have been the focus of numerous geological storage studies.

42 ENGINEERING↗

Responses of Florida Scrub Vegetation to Water Additions from a Groundwater Treatment Project and to Hurricane Disturbance

Florida scrub is a fire-maintained shrub vegetation of well-drained, sandy soils; dominant species include several species of Quercus and Serenoa repens. In a remediation project, treated groundwater was distributed through an exfiltration gallery into intact scrub. We established eight permanent line-intercept transects (15 m length) in the site in April 2002, four close to the exfiltration gallery and four more distant from it. We sampled vegetation, < 0.5 m and ≥ 0.5 m, along each transect and measured vegetation height at four points (0, 5, 10, 15 m) annually through 2019. The initial phase of the project operated from October 2002 to early March 2004 (494 days) and distributed 1.74 x 10^8 L of water. The final phase of the project occurred from March 2005 through August 2008 (1251 days) and distributed 1.90 x 10^8 L of water. Pumping raised the water table near the exfiltration gallery. Vegetation height did not differ between the near and far transects initially. Vegetation height increased in the near transects by 2004 with the greatest percent change in 2003 and 2004 as did total cover ≥ 0.5 m. Total cover < 0.5 m and bare ground were similar initially in the near and far transects and declined in the near transects by 2004. Scrub species, particularly the dominant scrub oaks, increased height and cover in response to water additions with no loss of dominant scrub species and no establishment of mesophytes. Hurricane Frances (September 2004) reduced cover ≥ 0.5 m the following year. Hurricane Matthew (October 2016) and Hurricane Irma (September 2017) caused greater damage including breaking limbs as reflected in reduced height and total cover ≥ 0.5 m probably because the older, taller scrub was more vulnerable to wind damage.

Florida scrub↗

Population Viability Analysis (PVA) as a Platform for Predicting Outcomes of Management Options for the Florida Scrub-Jay in Brevard County

The Florida scrub-jay (FSJ) is a species in decline because of extinction debt caused by habitat fragmentation and degradation. Understanding and managing the species and its habitats is challenging due to the complex interactions among the social system, a dynamic mosaic of scrub habitat, and active management. To provide insights into the possible fates of the FSJ populations of mainland, cape, and island sections of Brevard County, we modeled the population dynamics using the Vortex population viability analysis (PVA) software. Vortex is an individual-based simulation that allowed us to include such factors as demographic rates dependent on habitat state, impact of helpers on breeding success, and helper to breeder transition probabilities responding to availability of nearby vacant optimal habitat and vacancies due to the death of breeders. Detailed modeling of the FSJ was possible only because a lot of data about the species and its habitats have been gathered over decades of intensive research. We followed a phased approach to constructing population models that incorporated the best available science and data to address a variety of conservation actions. The first phase focused on constructing a model that incorporates sociobiology and source-sink habitat dynamics. This model allowed us to address some of the most important questions about population size and habitat quality. Once the model framework was in place, we considered the real landscapes and actual local populations, rather than just generic representations of typical FSJ dynamics. After examining the viability of the metapopulations under current conditions, we explored the likely consequences of various management actions that might slow or reverse population declines.

Population Viability Analysis↗

Effects of Repeated Fire on Florida Oak-Saw Palmetto Scrub

Background: The dominant species of Florida oak-saw palmetto scrub sprout after burning from belowground rhizomes or fire-resistant aboveground buds with rapid reestablishment of cover. Responses to single fires are well documented; however, responses to repeated fires may differ. Fire return intervals, differences among sites, and species may influence responses. We used transect data from four sites on Kennedy Space Center/Merritt Island National Wildlife Refuge to test whether growth differed through repeated fires. Two sites burned five times in 36 years, one site burned five times in 25 years, and one burned four times in 18 years. We used linear mixed models that account for repeated measures to determine if the number of fires affected height, total cover ≥ 0.5 m and < 0.5 m, bare ground, and cover of the dominant oak (Quercus) ≥ 0.5 m and of saw palmetto (Serenoa repens) ≥ 0.5 m. We compared community composition through repeated fires using nonmetric multidimensional scaling ordination. Results: Height, total cover ≥ 0.5 m, and cover of the dominant oak ≥ 0.5 m and of saw palmetto ≥ 0.5 m increased with time since burn; total cover < 0.5 m and bare ground decreased. A quadratic term in the growth model was significant except for total cover < 0.5 m. There were site differences for all variables except bare ground. The number of fires decreased height, total cover ≥ 0.5 m, and cover of the dominant oak ≥ 0.5 and increased total cover < 0.5 m and bare ground but had no effect on cover of Serenoa repens ≥ 0.5 m. Community changes after repeated fires were similar in nonmetric multidimensional ordinations with time since burn correlated to the first or second axis. Conclusions: Scrub recovered from repeated fires at a range of intervals and seasons, but short return intervals reduced growth with responses differing among species.

Florida↗