Search NASA⌕ Search

SEARCH · Search NASA

Results for “GROUND TEST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Active suspension design for a Large Space Structure ground test facility

The expected future high performance requirements for Large Space Structures (LSS) enforce technology innovations such as active vibration damping techniques e.g., by means of structure sensors and actuators. The implementation of new technologies like that requires an interactive and integrated structural and control design with an increased effort in hardware validation by ground testing. During the technology development phase generic system tests will be most important covering verification and validation aspects up to the preparation and definition of relevant space experiments. For many applications using advanced designs it is deemed necessary to improve existing testing technology by further reducing disturbances and gravity coupling effects while maintaining high performance reliability. A key issue in this context is the improvement of suspension techniques. The ideal ground test facility satisfying these requirements completely will never be found. The highest degree of reliability will always be obtained by passive suspension methods taking into account severe performance limitations such as non-zero rigid body modes, restriction of degrees of freedom of motion and frequency response limitations. Passive compensation mechanisms, e.g., zero-spring-rate mechanisms, either require large moving masses or they are limited with respect to low-frequency performance by friction, stiction or other non-linear effects. With active suspensions these limitations can be removed to a large extent thereby increasing the range of applications. Despite an additional complexity which is associated with a potential risk in reliability their development is considered promising due to the amazing improvement of real-time control technology which is still continuing.

Lange, Thomas J. H.↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

Status of the Correlation Process of the V-HAB Simulation with Ground Tests and ISS Telemetry Data

The Virtual Habitat (V-HAB) is a dynamic Life Support System (LSS) simulation, created to investigate future human spaceflight missions. V-HAB provides the capability to optimize LSS during early design phases. Furthermore, it allows simulation of worst case scenarios which cannot be tested in reality. In a nutshell, the tool allows the testing of LSS robustness by means of computer simulations. V-HAB is a modular simulation consisting of a: 1. Closed Environment Module 2. Crew Module 3. Biological Module 4. Physio-Chemical Module The focus of the paper will be the correlation and validation of V-HAB against ground test and flight data. The ECLSS technologies (CDRA, CCAA, OGA, etc.) are correlated one by one against available ground test data, which is briefly described in this paper. The technology models in V-HAB are merged to simulate the ISS ECLSS. This simulation is correlated against telemetry data from the ISS, including the water recovery system and the air revitalization system. Finally, an analysis of the results is included in this paper.

Ploetner, Peter↗

Survey of wing and flap lower-surface temperatures and pressures during full-scale ground tests of an externally blown flap system

Full-scale ground tests of an externally blown flap system were made using the wing of an F-111B airplane and a CF700 engine. Pressure and temperature distributions were determined on the undersurface of the wing, vane, and flap for two engine exhaust nozzles (conical and daisy) at several engine power and engine/wing positions. The tests were made with no airflow over the wing. The leading-edge wing sweep angle was fixed at 26 deg, the angle of incidence between the engine and the wing was fixed at 3 deg, and the tests were conducted with the flap retracted, extended and deflected 35 deg, and extended and deflected 60 deg. The integrated local pressures on the undersurface of the flap produced loads approximately three times as great at the 60 deg flap position as at the 35 deg flap position. With both nozzle configurations, more than 90 percent of the integrated pressure loads were contained within plus or minus 20 percent of the flap span centered around the engine exhaust centerline. The maximum temperature recorded on the flaps was 218 C (424 F) for the conical nozzle and 180 C (356 F) for the daisy nozzle.

Hughes, D. L.↗

NASA/MSFC Large Space Structures Ground Test Facility

This paper describes the NASA/MSFC Large Space Structures Ground Test Facility (LSS GTF) which has been developed for the purpose of implementing, testing, and evaluating LSS control and system identification techniques on representative large space structures. The facility presently consists of two laboratories: the Single Structure Control (SSC) Laboratory, which has been operational since 1984, and the Controls and Structures Experiment in Space (CASES) GTF which is presently under development. Test results from several experiments in the SSC laboratory are presented. The results of component testing and boom modal tests are presented for the CASES facility.

Jones, Victoria L.↗

2 kWe Solar Dynamic Ground Test Demonstration Project: Executive Summary - Volume 1

The Solar Dynamic Ground Test Demonstration (SDGTD) successfully demonstrated a solar-powered closed Brayton cycle system in a relevant space thermal environment. In addition to meeting technical requirements the project was completed 4 months ahead of schedule and under budget. The following conclusions can be supported: 1. The component technology for solar dynamic closed Brayton cycle technology has clearly been demonstrated. 2. The thermal, optical, control, and electrical integration aspects of systems integration have also been successfully demonstrated. Physical integration aspects were not attempted as these tend to be driven primarily by mission-specific requirements. 3. System efficiency of greater than 15 percent (all losses fully accounted for) was demonstrated using equipment and designs which were not optimized. Some preexisting hardware was used to minimize cost and schedule. 4. Power generation of 2 kWe. 5. A NASA/industry team was developed that successfully worked together to accomplish project goals. The material presented in this report will show that the technology necessary to design and fabricate solar dynamic electrical power systems for space has been successfully developed and demonstrated. The data will further show that achieved results compare well with pretest predictions. The next step in the development of solar dynamic space power will be a flight test.

Alexander, Dennis↗

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Mary-Elizabeth Davis↗

Affordable Development and Optimization of CERMET Fuels for NTP Ground Testing

CERMET fuel materials for Nuclear Thermal Propulsion (NTP) are currently being developed at NASA's Marshall Space Flight Center. The work is part of NASA's Advanced Space Exploration Systems Nuclear Cryogenic Propulsion Stage (NCPS) Project. The goal of the FY12-14 project is to address critical NTP technology challenges and programmatic issues to establish confidence in the affordability and viability of an NTP system. A key enabling technology for an NCPS system is the fabrication of a stable high temperature nuclear fuel form. Although much of the technology was demonstrated during previous programs, there are currently no qualified fuel materials or processes. The work at MSFC is focused on developing critical materials and process technologies for manufacturing robust, full-scale CERMET fuels. Prototypical samples are being fabricated and tested in flowing hot hydrogen to understand processing and performance relationships. As part of this initial demonstration task, a final full scale element test will be performed to validate robust designs. The next phase of the project will focus on continued development and optimization of the fuel materials to enable future ground testing. The purpose of this paper is to provide a detailed overview of the CERMET fuel materials development plan. The overall CERMET fuel development path is shown in Figure 2. The activities begin prior to ATP for a ground reactor or engine system test and include materials and process optimization, hot hydrogen screening, material property testing, and irradiation testing. The goal of the development is to increase the maturity of the fuel form and reduce risk. One of the main accomplishmens of the current AES FY12-14 project was to develop dedicated laboratories at MSFC for the fabrication and testing of full length fuel elements. This capability will enable affordable, near term development and optimization of the CERMET fuels for future ground testing. Figure 2 provides a timeline of the development and optimization tasks for the AES FY15-17 follow on program.

Hickman, Robert R.↗

Ground test experience with large composite structures for commercial transports

The initial ground test of each component resulted in structural failure at less than ultimate design loads. While such failures represent major program delays, the investigation and analysis of each failure revealed significant lessons for effective utilization of composites in primary structure. Foremost among these are secondary loads that produce through-the-thickness forces which may lead to serious weaknesses in an otherwise sound structural design. The sources, magnitude, and effects of secondary loads need to be thoroughly understood and accounted for by the designers of composite primary aircraft structures.

Bohon, H. L.↗

A ground test measurement system for the shuttle entry air data system

The Ground Test Measurement System (GTMS) for determining vacuum decay leak rate within the orifice tubing assembly of SEADS is described. The system can also monitor the absolute pressure in the tubing assembly under certain conditions. The GTMS determines leak rate by measuring vacuum-pressure decay which can be converted into leakage flow rate. Results of performance testing and operation of the GTMS are given.

Schutte, P. C.↗

Ground test experience with large composite structures for commercial transports

The initial ground test of each component resulted in structural failure at less than ultimate design loads. While such failures represent major program delays, the investigation and analysis of each failure revealed significant lessons for effective utilization of composites in primary structure. Foremost among these are secondary loads that produce through-the-thickness forces which may lead to serious weaknesses in an otherwise sound structural design. The sources, magnitude, and effects of secondary loads need to be thoroughly understood and accounted for by the designers of composite primary aircraft structures.

Bohon, H. L.↗

Peregrine Hybrid Rocket Ground Test Video

The attached edited and compressed video shows the final ground test of the Peregrine hybrid rocketflight-weight motor that took place at NASA Ames on March 15, 2017.

Zilliac, Gregory↗

Development of Biocompatibility Procedures for Assessment of Plant Growth in Ground Test Hardware for the EMCS

The European Modular Cultivation System (EMCS) is an European Space Agency-developed facility designed to support plant research in microgravity on the IS NASA is responsible for providing US specific hardware to use within the EMCS. In preparation for flight, research will be developed and tested at Ames Research Center in the EMCS ground test hardware, the Experiment Reference Module (ERM) In order to determine the acceptability of the ERM for such purposes, biocompatibility tests will be performed to determine that the hardware functions as intended and successfully supports the' growth of plants. In this report, we describe the development of procedures and the collection of baseline data against which to compare ERM function, e.g. biocompatibility testing. A simple and robust system was developed to grow whole Arabidopsis thaliana plants within the confined volumes characteristic of spaceflight hardware. Our system for growing plants eliminated the necessity of a water/nutrient delivery system and allowed for quantifiable assessment of individual plants, as well as entire population dynamics. To insure uniform germination, seeds were started in small straw segments and transplanted into modified scintillation vials. Seedlings were selected prior to transplantation to decrease genetic variability. Plants were grown for a total of 24 days in standard laboratory plant growth chambers under controlled conditions. Sequential digital still images were taken on a daily basis. Analysis of these images allowed for the quantification of even minute environmental effect, on growth dynamics whole plants. The data collected provide reliable growth curves against which to compare plants grown in the ERM.

Bowman, R. N.↗

Cabin noise control ground tests for UHB aircraft

Measurement and analysis procedures for cabin noise control ground tests conducted on a DC-9 aircraft test section are presented along with a summary of test results. These tests were designed to analyze the effectiveness of selected noise control treatments in reducing passenger cabin noise on aircraft with aft-mounted, advanced turboprop engines. The performance of various structural and cabin sidewall treatments is assessed, based on measurements of the resulting interior noise levels and fuselage acceleration levels under simulated advanced turboprop excitation.

Simpson, Myles A.↗