Systems and methods for controlling electrical grid resources

The present invention relates to PMU-based control systems for dampening inter-area oscillations in large-scale interconnected power systems or grids to protect against a catastrophic blackout. The control systems receive phasor measurements from two or more locations on an AC transmission line and generates a power control command to a power resource on the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnections Seam Study [Slides]

The Interconnections Seam Study analyzes the grid impacts of increased connections between the Eastern and Western Interconnections in North America.

17 WIND ENERGY↗

Advanced Transmission Technologies – GETs and HPCs Session 2: Advanced Power Flow Control and Transmission Topology Optimization

The INL TADA GETs Cohort Session 2, held on November 7, 2025, conducted in collaboration with ScottMadden, focused on two core Advanced Transmission Technologies (ATTs): Advanced Power Flow Control (APFC) and Transmission Topology Optimization (TTO). These technologies are pivotal in enhancing grid flexibility, reliability, and cybersecurity resilience. APFC, particularly through modular FACTS devices like Modular Static Synchronous Series Compensators (M-SSSCs), enables dynamic voltage injection to reroute power flows. The session highlighted the deployment benefits of APFC, such as rapid installation, minimal civil works, and re-deployability. Regulatory drivers like FERC Order 2023 mandate the inclusion of Grid-Enhancing Technologies (GETs) in interconnection studies. Case studies from Central Hudson, CAISO, and National Grid (UK) demonstrated APFC’s effectiveness in congestion relief and cost savings. The session also addressed cybersecurity concerns, including firmware vulnerabilities, SCADA integration risks, and supply chain dependencies. Participants engaged in interactive exercises to rank cybersecurity and supply chain risks, emphasizing the need for robust digital assurance strategies. TTO involves software-based reconfiguration of transmission networks to optimize power flow without new infrastructure. The session showcased its operational value, with examples from SPP, PJM, and MISO showing significant congestion cost reductions. Cybersecurity vulnerabilities were discussed, particularly in API security and software supply chains, referencing incidents like SolarWinds and attacks on Danish utilities. Digital assurance exercises explored worst-case scenarios, attack paths, and mitigation responsibilities between vendors and utilities. Reliability challenges such as algorithm stability, vendor dependency, and operator trust were also examined. Cross-cutting themes emphasized the importance of digital assurance tools, including Software Bills of Materials (SBOMs) and hardware-in-loop testing. Human performance, training, and operational confidence were identified as critical enablers of technology adoption. The session concluded with a preview of Session 3, which will focus on High Performance Conductors (HPCs) and risk-based cybersecurity tools. Session 2 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Harmonics and Stability Evaluation of Converter-Interfaced Combined Heat and Power Units

Grid integration of medium-sized combined heat and power (CHP) units is challenging due to strict grid codes and conventional generators lack of control flexibility to meet these grid codes. Adding a two-stage ac-dc-ac power electronics interface between the generator and the utility grid will accelerate the interconnection process of CHP units. For the dc-ac stage, a voltage source converter (VSC) has been widely used as a grid-tied inverter because of its fast control and low total harmonics distortion (THD). In this paper, several topologies of generator-side rectifiers for ac-dc power conversion are explored and analyzed. The harmonics impact of various rectifiers on the CHP generator are evaluated. The overall cost of the electrical system, when using various types of rectifiers, is assessed and the VSC back-to-back converter interface configuration is found to be optimal. The overall system stability is also examined using small-signal impedance analysis to assess potential instability issues at the system level.

CHP, Harmonics, Generator Rectifier Unit, DC Imped↗

How a Large-Scale Deployment of Grid-Forming Inverters May Impact Inter-Area Oscillation Modes: An Investigation in the US Western Interconnection

This report describes work performed to evaluate the impact of high grid-forming (GFM) inverter penetration on the inter-area oscillation mode characteristics of the Western Interconnection. Using simulations, this work analyzes how: a) replacing fossil-fuel-based synchronous generators by GFM inverters will impact properties of the North-South mode, and b) replacing the Colstrip power plant by grid-following (GFL) and GFM inverters will change the characteristics of the Montana mode. Results obtained indicate that high penetration of GFM inverters will significantly alter inter-area oscillation characteristics in interconnections. Low frequency oscillations in the 0.11 Hz range will be predominantly driven by remaining synchronous machines, and hence their relative distribution in the interconnection will impact mode characteristics and observability.

20 FOSSIL-FUELED POWER PLANTS↗

Security Enhancement of Network Constraint Grid-Edge Energy Management System

Network constrained grid edge energy management system (EMS) provides economic solution for active and reactive power dispatch of distributed energy resources (DERs) at the grid edge level. Grid edge EMS ensures secure interconnection of a circuit segment to the distribution system by maintaining grid code requirements (e.g. IEEE 1547–2018). Grid edge EMS is dependent on communication to receive load measurement, which brings a risk of unobservable false data injection attacks (FDIAs). To mitigate the risk, this paper proposes a framework to enhance resilient operation of grid edge EMS by detecting the unobservable FDIAs on loads and replacing them with forecasted values. In this work, a two-step detection algorithm is proposed. In first step, conventional residual based algorithm is deployed. Autoencoder (AE) based data driven mechanism is included in second step to detect the presence of unobservable FDIAs. After ensuring the presence of FDIA, its specific location is detected by checking the maximum residue values till the predefined threshold value is reached. Detected false data injected loads are then replaced with forecasted load values following long-short term memory (LSTM) based forecast to ensure resilient performance of grid edge EMS in the presence of attacks. This proposed security enhancement framework for grid edge EMS is evaluated in IEEE 13 bus system with three integrated DERs. Numerical simulation shows the validation of the proposed framework by reducing voltage violation in real operation of grid edge EMS.

cyber attack detection↗

Monthly hydropower generation data for Western Canada to support Western-US interconnect power system studies

Hydroelectric power generation in Western Canada significantly contributes to power grid operations of the North American Western Interconnection through substantial generation, some of which is exported to the United States (U.S.). However, the lack of publicly available hydropower generation datasets poses challenges for future market projections and resource adequacy evaluations. We present a simulation-based monthly power system model-ready hydropower generation dataset for 110 facilities in British Columbia and Alberta from 1981 to 2019. These monthly hydropower generation estimates are developed from integrated hydrologic model simulations of runoff and reservoir-operated streamflow, followed by scaling that considers diversion inflow constraints based on hydropower water license information. To address the lack of comparable hydropower generation records, we conduct step-by-step evaluations for simulated runoff, regulated streamflow, and hydropower generation using available observations or estimates. The presented hydropower dataset aims to enhance the representation of hydropower resources in Western Canada, supporting power grid system studies for the Western Interconnection of the U.S. and Canada.

13 HYDRO ENERGY↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

GMLC Survey of Distributed Energy Resource Interconnection and Interoperability Standards

This document reports on the Grid Modernization Laboratory Consortium effort to identify gaps in standards for the interconnection and interoperability of distributed energy resources (DERs). The project extended a 3-year period from 2017 to 2019. Under the work plan, the team identified standards and test procedures related to interconnection and interoperability, grouped under the broad headings of their primary applicable technology domain: automotive, responsive loads, photovoltaic inverters, inverter-based energy storage, machine-based DERs, and microgrids. The team then conducted a gap analysis by comparing the current standards to the expected future requirements needed for specific grid services. Overall, gaps could be any activity needed to harmonize requirements among standards development organizations, minimize conflicting requirements among technology domains, or streamline conformance test procedures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Small Hydropower Interconnections: Analysis of Interconnection Processes

Small hydropower projects have faced the challenge of navigating the process to interconnect their generation source to electricity distribution and transmission grids. Small hydropower developers have found interconnection procedures to be opaque and ultimately result in unexpected cost surprises and long timelines. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. After reviewing the status of small hydropower (“Small Hydropower Interconnections: Small Hydropower in the United States”) and the interconnection procedures across the United States (“Small Hydropower Interconnections: State Interconnection Processes”) in the first two white papers of this series, this paper uses recent data from small hydropower interconnection applications to benchmark the efficacy of the process. Using data from interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs), this paper provides context for the costs, timelines, and types of upgrades required for small hydropower projects. Interconnection applications and study reports for small hydropower projects were analyzed to collect key pieces of information about the interconnection process, timeline, costs, and type of upgrades required for interconnection. Information sourced from the reports was entered into an Interconnection Benchmarking database (IBdb), which may be found in Appendix A.1. Information from this database was used to evaluate the performance and challenges associated with interconnecting small hydropower projects. This white paper presents a description of the sources contained in the interconnection database (Section 2.0), an analysis of the interconnection timeline (Section 3.0), an evaluation the cost of interconnection upgrades (Section 4.0), and a description of the types of infrastructure upgrades (Section 5.0). The final paper in this series (“Small Hydropower Interconnections: Best Practices”) will use the analysis described here to outline best practices for interconnection processes that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Optimized allocation method of the VSC-MTDC system for frequency regulation reserves considering the cost

In recent years, the interconnection of asynchronous power grids through the VSC-MTDC system has been proposed and extensively studied in light of the potential benefits of economical bulk power exchanges and frequency regulation reserves sharing. This paper proposed an optimized allocation method for sharing frequency regulation reserves among the interconnected power systems and the corresponding frequency regulation control of the VSC-MTDC system under emergency frequency deviation events. Firstly, the frequency regulation reserve classification is proposed. In the classification, the available frequency response capacity reserves of each interconnection are divided into commercial reserves and regular reserves. While the commercial reserves are procured through long-term contracts, the regular reserves are purchased based on market prices of frequency regulation services. Secondly, based on the proposed frequency regulation reserve classification, a novel frequency regulation control is then introduced for the VSC-MTDC system. This control method could minimize the costs of the disturbed power grid for the needed frequency response supports from the other power grids. Simulation verifications are performed on a modified IEEE 39 bus system and a highly reduced power system model representing the North American grids. The simulation verification indicates that the developed frequency regulation control significantly reduced ancillary service costs of the disturbed power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cooperative Inverters to Overcome PLL Malfunctions

This paper presents a cooperative strategy between smart inverters to overcome instability and undesired trips of inverters caused by Phase-Locked Loop (PLL) malfunctions. For the grid-interactive inverter, PLL is typically required to measure the phase angle of the AC voltage at the Point of Common Coupling (PCC) of the inverter. Accurate phase-angle measurement is critical for grid-interactive inverters to stay synchronized with the power grid. If the inverters are interconnected through a communication link, they can support each other by sharing their grid information, such as phase-angles at their PCCs. The cooperative strategy utilizes the phase-angles and voltages at PCCs in a neighborhood to identify any possible PLL malfunctions or measurement inaccuracies and then enable the inverters to make corrective decisions. The efficacy of the cooperative strategy has been verified through simulation results in MATLAB/Simulink environment in this paper.

Sadeque, Fahmid↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling and Automation Framework for High IBR Integration in Large-Scale Power Systems

The increasing prevalence of power electronics- interfaced renewable generation sources is leading to a gradual replacement of traditional thermal generation-based synchronous machines. In this context, the modeling of a large-scale power grid that incorporates a significant number of inverter-based resources is crucial for understanding the dynamics and effects of these resources on the power system. This study investigates the positive sequence model of grid-following and grid-forming inverters. Additionally, this work explores the integration of distributed energy resources using population as an indicator of their relative geographic locations. To address challenge to integrate these inverter based resources into a realistic grid of the US Western interconnection, automation scripts are developed to streamline the process of replacing conventional generators with grid-following and grid-forming inverters, as well as allocating distributed energy resources. Different penetration levels of these inverters are considered, and their frequency regulation support following a disturbance is compared through dynamic simulations.

Lyu, Xue↗

Distribution Grid Impacts of Community Solar [Slides]

Community solar (CS) projects often face uncertain interconnection costs and fees associated with distribution grid infrastructure upgrades required to connect the project. These costs can determine the economic viability of a CS project, but they are difficult to assess. Cost uncertainty can discourage new projects and prevent communities from accessing the benefits of community solar projects. At the same time, CS deployment strategies hold potential to defer or avoid some distribution costs due to new loads. To mitigate CS interconnection costs, it is important to find least-cost combinations of distribution system infrastructure solutions (transformer upgrades, reconductoring, voltage regulators, storage), and to understand how location of CS projects within a feeder impact distribution grid upgrade costs. This study aims to quantify CS impacts on the distribution grid and provide policy and regulatory insights and CS deployment strategies to address them. It is the first analysis that has systematically studied the technical impacts of community solar projects on a wide range of distribution feeders using state-of-the-art optimization and power flow tools. The analysis employs Berkeley Lab’s novel Least-cost Optimal Distribution Grid Expansion (LODGE) model, a deterministic version of the REPAIR model, that optimally upgrades hundreds or even thousands of distribution circuits or feeders. This is the first application of the LODGE model. LODGE finds the least-cost portfolio of traditional distribution system upgrades to integrate CS in combination with alternative solutions, such as utility-owned storage and downsizing CS capacity. Working with a set of least-cost solutions per feeder allows us to benchmark, compare and find techno-economic trends in CS interconnection.

14 SOLAR ENERGY↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Communication-Constrained Robust Control and Learning of Grid-Connected

The electric grid of things (EGoT) promises great potential for innovative grid services by tapping into vast load flexibility. However, the unique characteristics of EGoT, being a part of the cyber-physical electric power system, present both opportunities and challenges, especially concerning supply-demand balancing, stability, and communication constraints. Traditionally, centralized control was employed to ensure balance and stability in power systems. However, with the massive influx of EGoT devices, new strategies are needed to efficiently coordinate and control these distributed devices for optimal grid operations. While some studies have explored efficiency and economic models, there remains a gap in ensuring reliability under everyday operations and resilience during extreme conditions. Addressing this gap, this project develops the technology for an Energy Service Interface (ESI) that includes novel pricing, control, learning, and distributed optimization algorithms, which will enable utilities to recruit EGoT assets for crucial grid services such as load flexibility, voltage regulation, and situation-awareness. The key novelty of the proposed technology is the careful distribution of learning and control functions across utility and EGoT asset owners such that provably efficient and resilient grid operations are attained while respecting communication and information-exchange constraints. Specifically, the project team develops machine-learning enhanced load modeling methods to allow EGoT asset owners to learn their load capability and flexibility, and develops pricing-based and decentralized learning-based control so that asset owners can coordinate to meet system-wide demand-supply balance and reliability goals. For extreme situations involving high-impact, low-probability catastrophic events (termed the “black-sky” events), the team also develops (1) a “Feeder-Operating Center-on-a-Laptop” (FOCAL) software that can assist utility personnel in leveraging EGoT assets to accelerate the service recovery of damaged feeders, and (2) distributed optimization algorithms that can coordinate the operation points of EGoT devices under severe communication constraints. The proposed technology has been extensively tested and evaluated through simulations and on a testbed. In summary, as we transition into a more interconnected and digital power grid era, our project’s findings and developments offer a pivotal step toward guaranteeing both efficiency and resilience in the face of both everyday operations and rare “black-sky” events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The value of long-duration energy storage under various grid conditions in a zero-emissions future

Long-duration energy storage (LDES) is a key resource in enabling zero-emissions electricity grids but its role within different types of grids is not well understood. Using the Switch capacity expansion model, we model a zero-emissions Western Interconnect with high geographical resolution to understand the value of LDES under 39 scenarios with different generation mixes, transmission expansion, storage costs, and storage mandates. We find that a) LDES is particularly valuable in majority wind-powered regions and regions with diminishing hydropower generation, b) seasonal operation of storage becomes cost-effective if storage capital costs fall below US$\$$5 kWh −1 , and c) mandating the installation of enough LDES to enable year-long storage cycles would reduce electricity prices during times of high demand by over 70%. Given the asset and resource diversity of the Western Interconnect, our results can provide grid planners in many regions with guidance on how LDES impacts and is impacted by energy storage mandates, investments in LDES research and development, and generation mix and transmission expansion decisions.

25 ENERGY STORAGE↗