Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

The National Transmission Planning Study: Chapter 2: Long-Term U.S. Transmission Planning Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 3: Transmission Portfolios and Operations for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 5: Stress Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 6: Conclusions

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 4: AC Power Flow Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Planning and Operations in Electricity Markets Under System Tansformation: Key Findings

This report summarizes a set of key findings that have been developed through a set of interconnected research activities performed by five institutions between January 2020 and December 2023. The project team, comprising Argonne National Laboratory, the National Renewable Energy Laboratory, Lawrence Berkeley National Laboratory, the Electric Power Research Institute, and Johns Hopkins University, collective engaged with the North American Independent System Operators and Regional Transmission Operators (ISO/RTOs) to identify the key challenges they are facing and opportunities for the project team to provide technical assistance in several prioritized challenge areas.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Resource and Infrastructure Assessment for the Town of Wendell

This report is a solar resource and infrastructure assessment for the town of Wendell, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Wendell. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Wendell are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. It appears that National Grid is planning an upgrade to the Wendell Depot substation, which might then allow in-process projects are to proceed, and potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Multi-State Transportation Electrification Impact Study: Preparing the Grid for Light-, Medium-, and Heavy-Duty Electric Vehicles

Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Scalable Transmission Expansion Under Uncertainty Using Three-Stage Stochastic Optimization

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and uncertain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty.

multi-stage stochastic optimization↗

Scalable Energy System Expansion Under Uncertainty Using Multi-Stage Stochastic Optimization

The intermittent nature of renewable energy sources poses challenges for electrical grids. This is due to the variable and uncertain nature of the power output from these resources. These features of renewable generation are more relevant to energy system planning as grids reach higher penetration levels of renewable energy. We present approaches for energy system planning based on scalable computational approaches which enable explicit consideration of operational uncertainties in the planning process. Using multi-stage stochastic programming and the progressive hedging algorithm, we compute energy system expansion decisions on modified versions of the RTS-GMLC test system.

electrical↗

Scalable Stochastic Transmission Expansion: A Use Case for ExaSGD

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and un- certain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty. This is an example of a possible use of the ExaSGD security constrained AC optimal power flow solver.

Exascale Computing Project↗

Transportation Electrification Impact Study (TEIS)

Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Representative Period Selection for Robust Capacity Expansion Planning in Low-carbon Grids

With the increasing urgency to decarbonize power systems, while mitigating extreme events, capacity expansion models can play a vital role in reliably planning the expansion of power systems and facilitating the integration of renewable energy sources. Optimizing capacity expansion generally involves selecting surrogate representative days from forecasts of load and the generation profiles of variable renewable energy resources. To properly select those representative days, we propose a novel input-based approach in combination with the k-means clustering algorithm that utilize three unique operational inputs: load shedding, renewable curtailment, and transmission congestion. The proposed method allows for more robust and cost-effective capacity planning. The method is validated using a capacity expansion model and a production cost model based on California Independent System Operator (CAISO)'s decarbonization goals, and results in reduced costs and drastically lower load shedding.

Anderson, Osten P.↗

Alternative Ratemaking in the US: A Prerequisite for Grid Modernization or an Unwarranted Shift of Risk to Customers?

With increasing frequency, investor-owned electric utilities are requesting preferred cost recovery for "grid modernization" in multiple forms, from multi-year rate plans to riders. Utilities' claims that massive grid investment is necessary, and that exceptional investment requires exceptional cost recovery, are typically accepted by policymakers with little challenge. It is difficult for policymakers to resist the siren call of grid modernization's perceived outcomes, from improved reliability and resilience to reduced risks to safety and new customer technology adoption (electric vehicles, distributed energy resources, and more). This paper provides a contrarian viewpoint that is virtually absent as policymakers consider alternative ratemaking practices. It introduces the possibility that excess grid investment in the name of modernization is not only possible, and economically harmful, but has already occurred, encouraged by alternative ratemaking. It provides examples of common grid modernization expenditures the authors have identified as cost-ineffective in the course of their work. It also describes traditional grid planning practices with proven ability to address changing requirements over time, calling into question the need for exceptional grid modernization investment plans. Most important, the paper explains the moral hazard inherent in alternative ratemaking, and the fundamental shift in ratemaking risks and responsibilities from utilities to customers that results. The perspectives this paper presents are critical for policymakers to understand before adopting, extending, or expanding alternative ratemaking practices in their respective jurisdictions.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Scalable Energy System Expansion Under Uncertainty Using Multi-Stage Stochastic Optimization

The intermittent nature of power from renewable energy sources poses new challenges for electrical grids. This is due to the variable and uncertain nature of the power output from these resources. These features of renewable generation are becoming more relevant to energy system planning as grids reach higher penetration levels of renewable energy. In this presentation we present approaches for energy system planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using multi-stage stochastic programming and the progressive hedging algorithm, we compute energy system expansion decisions on modified versions of the RTS-GMLC test system augmented with large amounts of renewable generation.

MATHEMATICS AND COMPUTING↗