Search NASA⌕ Search

SEARCH · Search NASA

Results for “Hardware Demonstration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

SEXTANT - Station Explorer for X-ray Timing and Navigation Technology

The Station Explorer for X-ray Timing and Navigation Technology (SEXTANT) is a technology demonstration enhancement to the Neutron-star Interior Composition Explorer (NICER) mission, which is scheduled to launch in late 2016 and will be hosted as an externally attached payload on the International Space Station (ISS) via the ExPRESS Logistics Carrier (ELC). During NICER's 18-month baseline science mission to understand ultra-dense matter though observations of neutron stars in the soft X-ray band, SEXTANT will, for the first-time, demonstrate real-time, on-board X-ray pulsar navigation, which is a significant milestone in the quest to establish a GPS-like navigation capability that will be available throughout our Solar System and beyond. Along with NICER, SEXTANT has proceeded through Phase B, Mission Definition, and received numerous refinements in concept of operation, algorithms, flight software, ground system, and ground test capability. NICER/SEXTANT's Phase B work culminated in NASA's confirmation of NICER to Phase C, Design and Development, in March 2014. Recently, NICER/SEXTANT successfully passed its Critical Design Review and SEXTANT received continuation approval in September 2014. In this paper, we describe the X-ray pulsar navigation concept and provide a brief history of previous work, and then summarize the SEXTANT technology demonstration objective, hardware and software components, and development to date.

X-rays↗

Advanced Mirror Technology Development (AMTD) Project: 3.0 Year Status

Advanced Mirror Technology Development (AMTD) is a funded NASA Strategic Astrophysics Technology project. Begun in 2011, we are in Phase 2 of a multi-year effort. Our objective is to mature towards TRL6 critical technologies needed to produce 4-m or larger flight-qualified UVOIR mirrors by 2018 so that a viable astronomy mission can be considered by the 2020 Decadal Review. The developed technology must enable missions capable of both general astrophysics and ultra-high contrast observations of exoplanets. Just as JWST's architecture was driven by launch vehicle, a future UVOIR mission's architecture (monolithic, segmented or interferometric) will depend on capacities of future launch vehicles (and budget). Since we cannot predict the future, we must prepare for all potential futures. Therefore, we are pursuing multiple technology paths. AMTD uses a science-driven systems engineering approach. We mature technologies required to enable the highest priority science AND result in a high-performance low-cost low-risk system. One of our key accomplishments is that we have derived engineering specifications for advanced normal-incidence monolithic and segmented mirror systems needed to enable both general astrophysics and ultra-high contrast observations of exoplanets missions as a function of potential launch vehicle and its inherent mass and volume constraints. Another key accomplishment is that we have matured our technology by building and testing hardware. To demonstrate stacked core technology, we built a 400 mm thick mirror. Currently, to demonstrate lateral scalability, we are manufacturing a 1.5 meter mirror. To assist in architecture trade studies, the Engineering team develops Structural, Thermal and Optical Performance (STOP) models of candidate mirror assembly systems including substrates, structures, and mechanisms. These models are validated by test of full- and subscale components in relevant thermo-vacuum environments. Specific analyses include: maximum mirror substrate size, first fundamental mode frequency (i.e., stiffness) and mass required to fabricate without quilting, survive launch, and achieve stable pointing and maximum thermal time constant.

Stahl, H. Philip↗

Advanced Wavefront Sensing and Control Testbed (AWCT)

The Advanced Wavefront Sensing and Control Testbed (AWCT) is built as a versatile facility for developing and demonstrating, in hardware, the future technologies of wave front sensing and control algorithms for active optical systems. The testbed includes a source projector for a broadband point-source and a suite of extended scene targets, a dispersed fringe sensor, a Shack-Hartmann camera, and an imaging camera capable of phase retrieval wavefront sensing. The testbed also provides two easily accessible conjugated pupil planes which can accommodate the active optical devices such as fast steering mirror, deformable mirror, and segmented mirrors. In this paper, we describe the testbed optical design, testbed configurations and capabilities, as well as the initial results from the testbed hardware integrations and tests.

active optics↗

Accommodating Thickness in Origami-Based Deployable Arrays

The purpose of this work is to create deployment systems with a large ratio of stowed-to-deployed diameter. Deployment from a compact form to a final flat state can be achieved through origami-inspired folding of panels. There are many models capable of this motion when folded in a material with negligible thickness; however, when the application requires the folding of thick, rigid panels, attention must be paid to the effect of material thickness not only on the final folded state, but also during the folding motion (i.e., the panels must not be required to flex to attain the final folded form). The objective is to develop new methods for deployment from a compact folded form to a large circular array (or other final form). This paper describes a mathematical model for modifying the pattern to accommodate material thickness in the context of the design, modeling, and testing of a deployable system inspired by an origami six-sided flasher model. The model is demonstrated in hardware as a 1/20th scale prototype of a deployable solar array for space applications. The resulting prototype has a ratio of stowed-to-deployed diameter of 9.2 (or 1.25 m deployed outer diameter to 0.136 m stowed outer diameter).

flasher↗

Quantum Computing to Accelerate High Fidelity Computational Materials Modeling

In this CIF we worked to develop quantum algorithms for material science simulations based on new ideas recently proposed on plane wave basis sets. Many body simulations are not generally performed in plane wave basis sets on classical hardware, but with newly proposed quantum algorithms, it is possible this will be a highly efficient basis set to run quantum simulations on quantum hardware. Using state of the art classical simulations we ran small test simulations to estimate the resources that will be needed to run such plane wave algorithms on quantum hardware. We demonstrate our approach for a series of atoms and molecular systems.

Norman Tubman↗

Vibration isolation technology development to demonstration

The main thrust of these studies has resulted in an active inertial feedforward/feedback isolation system. This prototype magnetic suspension system has been demonstrated in a laboratory setting in six degrees-of-freedom and has been preliminarily characterized in its isolation performance with favorable results. This isolation system consists of a closed loop digital control system referencing a platform around six relative and six inertial sensors. These sensors control the isolated mass through nine attractive electromagnetic actuators with a system capability of +/- three-tenths of an inch travel in three dimensions. The development of a prototype system from design to fabrication leads directly into the demonstration phase of the project which will attempt a low gravity environmental demonstration of engineering hardware for the isolation of a scientific payload. The demonstration phase of the project will use an aircraft low gravity maneuver to establish a research testbed for the study of isolation hardware and control strategies in an off-loaded environment. In developing this demonstration capability the Lewis Learjet aircraft has been characterized through its parabolic flight maneuvers and a trunnioned experimental volume has been designed for the test of both active and passive isolation packages. This vibration isolation testbed is operational and has two data acquisition systems available for both autonomous and interactive operation, with a combined input capability of 32 channels.

Grodsinsky, Carlos↗

Active damping application to the shuttle RMS

Control Structure Interaction (CSI) is a relatively new technology developed over the last 10 to 15 years for application to large flexible space vehicles. The central issue is recognition that high performance control systems necessary for good spacecraft performance may adversely interact with the dynamics of the spacecraft structures, a problem increasingly aggravated by the large size and reduced stiffness of modern spacecraft structural designs. The CSI analysis and design methods were developed to avoid interactions while maintaining spacecraft performance without exceeding structural capabilities, but they remain largely unvalidated by hardware experiments or demonstrations, particularly in-space flight demonstrations. One recent proposal for a low cost flight validation of CSI technology is to demonstrate active damping augmentation of the Space Shuttle Remote Manipulator System (RMS). An analytical effort to define the potential for such an active damping augmentation demonstration to improve the structural dynamic response of the RMS following payload maneuvers is described. It is hoped that this study will lead to an actual inflight CSI test with the RMS using existing shuttle hardware to the maximum extent possible. By using the existing hardware, the flight demonstration results may eventually be of direct benefit to actual Space Shuttle RMS operations, especially during the construction of the Space Station Freedom.

Gilbert, Michael G.↗

The Mission Operations Directorate's International Space Station Alpha Hardware Familiarization Role

The National Aeronautics and Space Administration's Mission Operation Directorate's (MOD) On-Orbit Maintenance Operations Mission Controllers are participating in space station hardware tests and demonstrations in multiple neutral buoyancy facilities. This is part of the controllers' hardware familiarization world in preparation to support the astronauts in the operation and maintenance of the hardware. This paper describes the larger context of Mission Controller hardware familiarization with specifics of participation in the Boeing neutral buoyancy tests. Also covered is what participation has occurred in the past and future plans.

Zingrebe, Kenneth W., II↗

Hardware Photos: Image Showing JWST Engineering Demonstration Mirror, Mounted Ready for Machining at AXYS and Image Showing HIP Can Containing Light Mirrors 1 and 2 Ready for Mirror Fabrication

The images in this viewgraph presentation have the following captions: 1) EDU mirror after being sawed in half; 2) EDU Delivered to Axsys; 3) Be EDU Blank Received and Machining Started; 4) Loaded HIP can for flight PM segments 1 and 2; 5) Flight Blanks 1 and 2 Loaded into HIP Can at Brush-Wellman; 6) EDU in Machining at Axsys.

OKeefe, Sean↗

Demonstration Advanced Avionics System (DAAS) functional description

A comprehensive set of general aviation avionics were defined for integration into an advanced hardware mechanization for demonstration in a Cessna 402B aircraft. Block diagrams are shown and system and computer architecture as well as significant hardware elements are described. The multifunction integrated data control center and electronic horizontal situation indicator are discussed. The functions that the DAAS will perform are examined. This function definition is the basis for the DAAS hardware and software design.

Source record↗

NASA Exploration Hardware Status and Crew Feedback from Artemis-2 Demonstration

The Universal Waste Management System (UWMS), ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continues to be made with each on-orbit operation and will ultimately culminate with nominal US crew use of the hardware on ISS. During 2023, the Artemis-2 Demonstration was started, and this paper discusses issues encountered, on-orbit troubleshooting, subsequent ground failure investigation and proposed repairs as well as near-term plans to resume the Artemis-2 demo. Also discussed is an update to the commercial-off-the-shelf (COTS) Conductivity Monitor which is planned to be flown for the resumption of the demo along with additional UWMS hardware and Toilet Integration Hardware (TIH). An updated design of the commode seat and fecal bag for Artemis-2 UWMS will be demonstrated on ISS and a summary of the hardware is included in the paper. Use of the hardware during the first days of the aborted demonstration by crewmembers and feedback received is summarized as well as hardware updates resulting from that feedback. The paper will also provide an overview of the demo results to date that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗

Pan and Tilt Platform for a Thermal Vacuum Video Camera

The purpose of the Space Simulation Test Engineering (SSTE) Section at NASA Goddard Space Flight Center is "to provide full service test support, engineering expertise, and state-of-the-art facilities to perform simulated space and thermal cycle testing of Earth orbit and deep space flight hardware"(ref. 1). During the Integration & Testing phase of space flight projects, flight hardware must successfully demonstrate its functionality under conditions similar to the actual environment experienced in space. When testing hardware with mechanical components, such as antenna extensions, door openings, or solar panel deployments, visual observation would allow test personnel to verify mechanical operations in real-time. A video camera can supply data that the usual sensors inside a TV chamber cannot provide. Since mechanical functional testing could affect multiple regions of a test item, a camera with a fixed position may not be able to monitor and record the performance of different components of a mechanism, especially for large test items. By mounting the camera to a Pan and Tilt Platform, the camera can cover a larger area and its field-of-view (FOV) will increase significantly. This paper details the design process for the Pan and Tilt Platform.

Lui, Yan↗

Telerobotic manipulator developments for ground-based space research

New opportunities for the application of telerobotic systems to enhance human intelligence and dexterity in the hazardous environment of space are presented by the National Aeronautics and Space Administration (NASA) Space Station Program. Because of the need for significant increases in extravehicular activity and the potential increase in hazards associated with space programs, emphasis is being heightened on telerobotic systems research and development. The Automation Technology Branch at NASA Langley Research Center currently is sponsoring the Laboratory Telerobotic Manipulator (LTM) program at Oak Ridge National Laboratory to develop and demonstrate ground-based telerobotic manipulator system hardware for research and demonstrations aimed at future NASA applications. The LTM incorporates traction drives, modularity, redundant kinematics, and state-of-the-art hierarchical control techniques to form a basis for merging the diverse technological domains of robust, high-dexterity teleoperations and autonomous robotic operation into common hardware to further NASA's research.

Herndon, J. N.↗

The laboratory telerobotic manipulator program

New opportunities for the application of telerobotic systems to enhance human intelligence and dexterity in the hazardous environment of space are presented by the NASA Space Station Program. Because of the need for significant increases in extravehicular activity and the potential increase in hazards associated with space programs, emphasis is being heightened on telerobotic systems research and development. The Laboratory Telerobotic Manipulator (LTM) program is performed to develop and demonstrate ground-based telerobotic manipulator system hardware for research and demonstrations aimed at future NASA applications. The LTM incorporates traction drives, modularity, redundant kinematics, and state-of-the-art hierarchical control techniques to form a basis for merging the diverse technological domains of robust, high-dexterity teleoperations and autonomous robotic operation into common hardware to further NASA's research.

Herndon, J. N.↗

Towards Autonomous Inspection of Space Systems Using Mobile Robotic Sensor Platforms

The space transportation systems required to support NASA's Exploration Initiative will demand a high degree of reliability to ensure mission success. This reliability can be realized through autonomous fault/damage detection and repair capabilities. It is crucial that such capabilities are incorporated into these systems since it will be impractical to rely upon Extra-Vehicular Activity (EVA), visual inspection or tele-operation due to the costly, labor-intensive and time-consuming nature of these methods. One approach to achieving this capability is through the use of an autonomous inspection system comprised of miniature mobile sensor platforms that will cooperatively perform high confidence inspection of space vehicles and habitats. This paper will discuss the efforts to develop a small scale demonstration test-bed to investigate the feasibility of using autonomous mobile sensor platforms to perform inspection operations. Progress will be discussed in technology areas including: the hardware implementation and demonstration of robotic sensor platforms, the implementation of a hardware test-bed facility, and the investigation of collaborative control algorithms.

Wong, Edmond↗

Automated longwall guidance and control vertical control subsystem, volume 1

A design, fabrication, and implementation of a horizon control of a longwall shearer was performed. This equipment was tested and demonstrated aboveground. This hardware was also installed on a longwall face. The feasibility of providing horizon control for a shearer was demonstrated aboveground. The feasibility of retrofitting the necessary sensors in a survivable manner was demonstrated underground. Subsequent field tests of a specific component, the natural background sensor, at a western location demonstrated the particular usefulness of this device on a wider application basis.

Griffiths, W. R.↗

Surgical Instrument Restraint in Weightlessness

Performing a surgical procedure during spaceflight will become more likely with longer duration missions in the near future. Minimal surgical capability has been present on previous missions as the definitive medical care time was short and the likelihood of surgical events too low to justify surgical hardware availability. Early demonstrations of surgical procedures in the weightlessness of parabolic flight indicated the need for careful logistical planning and restraint of surgical hardware. The consideration of human ergonomics also has more impact in weightlessness than in the conventionall-g environment. Three methods of surgical instrument restraint - a Minor Surgical Kit (MSK), a Surgical Restraint Scrub Suit (SRSS), and a Surgical Tray (ST) were evaluated in parabolic flight surgical procedures. The Minor Surgical Kit was easily stored, easily deployed, and demonstrated the best ability to facilitate a surgical procedure in weightlessness. Important factors in this surgical restraint system include excellent organization of supplies, ability to maintain sterility, accessibility while providing secure restraint, ability to dispose of sharp items and biological trash, and ergonomical efficiency.

Campbell, Mark R.↗

Neural Networks Based Approach to Enhance Space Hardware Reliability

This paper demonstrates the use of Neural Networks as a device modeling tool to increase the reliability analysis accuracy of circuits targeted for space applications. The paper tackles a number of case studies of relevance to the design of Flight hardware. The results show that the proposed technique generates more accurate models than the ones regularly used to model circuits.

Neural Networks↗