Search NASA⌕ Search

SEARCH · Search NASA

Results for “HiL test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

A Plug-and-Play Design Suite of Converters for the Electric Grid

Power electronic (PE) systems are increasingly being integrated into the electric grid in a distributed fashion. As the number of installations increases, the challenge of integration of these systems into the grid is also growing. Advanced control features of these systems are often overlooked or neglected due to the complex nature and novelty of these systems. This is also complicated from the vendor point of view as different converter topology integration is usually composed of single system designs with tight coupling and configurations. The presented work discusses a novel architecture for the integration of PE systems with other sources and loads to create a coordinated controllable resource for the grid. The presented work also describes a system level controller to coordinate these systems. 1 Testing results on a hardware in the loop (HIL) platform are provided to show the validity of the proposed architecture and framework.

Starke, Michael↗

Bulb-style Kaplan Turbine - Run-of-the-river (ror) Hydro Governor And Turbine Model

This software package includes hydro governor and turbine models developed in Simulink (Mathworks Inc.) and RSCAD (RTDS Technologies) for low-head bulb-style Kaplan turbine hydropower plants. The model developed in Simulink has been designed and tuned to match the governor-turbine response for a real-world hydropower unit owned by Idaho Falls Power (IFP). The Simulink and RSCAD models enable real-time testing in a hardware-in-the-loop (HIL) implementation using OPAL-RT and RTDS digital real-time simulators, respectively. An automatic initialization for dynamic simulation has also been integrated to each model in both Simulink and RSCAD. The RSCAD initialization involves a novel python-based interfacing for automatic modification of the initial conditions in the model. The parameters of these models can be tuned to match other hydropower plants in this class.

Alam, SMShafiul↗

Real-Time Testbed for Studying Cyberattacks and Defense in DER-integrated Smart Inverter Systems

In this paper, we propose a Hardware-in-the-Loop (HIL) simulation testbed suitable for the implementation and testing of realistic cyberattacks on grid-tied smart inverter systems integrated with Distributed Energy Resources (DER) that use the Distributed Network Protocol-3 (DNP3) protocol for communications between grid components. Specifically, our testbed combines a Real-Time Digital Simulator (RTDS) NovaCor device, outfitted with GNETx2 network interface cards, a gridtied DER topology implemented via the RTDS software package RSCAD, and a custom virtual network that emulates a man in the middle attacker. The Man-in-the-Middle (MITM) attacker captures DNP3 traffic and falsifies telemetry data in DNP3 packets to trigger unwarranted commands from a DNP3 controller that exploit smart inverter grid support functions. We choose DNP3 and implement grid support functions according to the IEEE Std. 1547-2018 mandated for the interconnection and interoperability of DER power systems with associated power components. Furthermore, we develop a protocol payload agnostic attack detection framework that leverages the round-trip time (RTT) anomalies between DNP3 requests and responses and can detect the presence of attacks without having to analyze the payload’s contents, while balancing trade-offs between false alarm counts, missed detections, and time to detection. To facilitate further research, we publicly release benign and attack network traffic exchanged between various sensors, controllers, and actuators in our grid-tied inverter testbed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Azura Advanced Controls 1/15th Scale Wave Tank Testing

Experimental data from the wave tank test of the Advanced control systems developed by NWEI for the Azura. Summary data is included utilizing the WEC Lab Testing Content Model v2.1. All raw and processed experimental data files are also included. The test plan and test report are included, along with the test plan and the test report from prior, passively controlled tests of the same model for reference.

16 TIDAL AND WAVE POWER↗

Advanced Platform for Development and Evaluation of Grid Interconnection Systems Using Hardware-in-the-Loop: Part III – Grid Interconnection System Evaluator

This paper describes a Grid Interconnection System Evaluator (GISE) that leverages hardware-in-the-loop (HIL) simulation techniques to rapidly evaluate the grid interconnection standard conformance of an ICS according to the procedures in IEEE Std 1547.1. The architecture and test sequencing of this evaluation tool, along with a set of representative ICS test results from three different photovoltaic (PV) inverters, are presented. The GISE adds to the National Renewable Energy Laboratory's (NREL) evaluation platform that now allows for rapid development of ICS control algorithms using controller HIL (CHIL) techniques, the ability to test the dc input characteristics of PV-based ICSs through the use of a PV simulator capable of simulating real-world dynamics using power HIL (PHIL), and evaluation of ICS grid interconnection conformance.

14 SOLAR ENERGY↗

Advanced Platform for Development and Evaluation of Grid Interconnection Systems Using Hardware-in-the-Loop: Part III -- Grid Interconnection System Evaluator: Preprint

This paper, presented at the IEEE Green Technologies Conference 2013, describes a Grid Interconnection System Evaluator (GISE) that leverages hardware-in-the-loop (HIL) simulation techniques to rapidly evaluate the grid interconnection standard conformance of an ICS according to the procedures in IEEE Std 1547.1 (TM). The architecture and test sequencing of this evaluation tool, along with a set of representative ICS test results from three different photovoltaic (PV) inverters, are presented. The GISE adds to the National Renewable Energy Laboratory's (NREL) evaluation platform that now allows for rapid development of ICS control algorithms using controller HIL (CHIL) techniques, the ability to test the dc input characteristics of PV-based ICSs through the use of a PV simulator capable of simulating real-world dynamics using power HIL (PHIL), and evaluation of ICS grid interconnection conformance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Platform for Development and Evaluation of Grid Interconnection Systems Using Hardware-in-the-Loop (Poster)

This poster describes a Grid Interconnection System Evaluator (GISE) that leverages hardware-in-the-loop (HIL) simulation techniques to rapidly evaluate the grid interconnection standard conformance of an ICS according to the procedures in IEEE Std 1547.1TM. The architecture and test sequencing of this evaluation tool, along with a set of representative ICS test results from three different photovoltaic (PV) inverters, are presented. The GISE adds to the National Renewable Energy Laboratory's (NREL) evaluation platform that now allows for rapid development of ICS control algorithms using controller HIL (CHIL) techniques, the ability to test the dc input characteristics of PV-based ICSs through the use of a PV simulator capable of simulating real-world dynamics using power HIL (PHIL), and evaluation of ICS grid interconnection conformance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Control and Management of Multiple Converters in a Residential Smart Grid

Power electronic systems are becoming a staple building block for electric grid networks. However, these systems have been largely designed to grid integrate in ad hoc configurations with little or no coordination of control. This work proposes a central controller and power electronic system hardware and software design for a residential system (photovoltaic, energy storage and residential building). This system supports auto-integration, plug and play capabilities, and optimal energy management to meet different use cases. Modelling and multi-day testing of the system have been conducted in a controller hardware-in-the-loop (C-HIL) testbed. Multiple use cases and pricing options have been considered as part of the simulation and testing. Results are presented of these systems as a proof of principle.

Starke, Michael↗

Real-Time Testbed for Smart Grid Recloser Controller

The growing need for a low voltage recloser has become apparent due to the rise in requirements for a smart grid. This includes more detailed management of power flow forward (towards load) and backward (towards generation), source synchronization in real time, more indepth fault responses, and the use of green energy. The SEL-651R-2 relay is a device that can manage these needs, especially in fault response and synchronization, and is commonly used in systems called microgrids. Microgrids are distribution level systems that are able to operate separated from the main grid, are typically installed much closer to the load(s), and are fed by distributed energy resources (DERs), such as wind, solar or diesel generators. The SEL-651R-2 is normally used in the field with presets operative settings, but the Western Michigan University (WMU) Center for Interdisciplinary Research on Secure, Efficient and Sustainable Energy Technology (WMU InterEnergy Center) wished to test this device in its range of capabilities for microgrid application. A Hardware-In-the-Loop (HIL) testbed was implemented and used through the Real Time Digital Simulator (RTDS) using the RSCAD software to test the SEL-651R-2's use cases and functions. The testbed includes a microgrid with interconnection to a larger main grid, and the relay is meant to control the recloser at the point of common coupling (PCC) between the main grid and microgrid. The testbed shows how basic protections, reclosing, and synchronization checks function when handling faults that affect both the microgrid and the main grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Power-Hardware-in-the-Loop Evaluation of Inverter-Based Resources (IBRs)

Power-hardware-in-the-loop evaluation of IBRs has become more and more important as it provides reliable testing results to investigate the real responses of inverters with interconnected systems. A successful laboratory PHIL testing gives confidence of the hardware system to be deployed and de-risk technology integration prior to field deployment. So far, there are two important applications for PHIL evaluation: (1) test stability and functionality of large utility inverters into the system when it interconnects to the distribution systems/microgrids; and (2) test the collective grid service that inverters can provide to the grid. For the first application, the PHIL evaluation has high requirements for the stability and accuracy of the PHIL interface as the close-loop in digital real time simulator (DRTS) should replicate the actual current and voltage dynamics in the inverter. This is challenging because of the delays, sensing errors, nonlinearities of inverters, and hardware bandwidth limitations of the elements in the HIL loop. For the second application, multiple inverters will be tested resulting in multiple PCCs, which naturally causes competing dynamics and oscillations among hardware inverters if traditional PHIL interface is used. Therefore, new PHIL interface should be developed to compromise between stability and accuracy and represent the dispatched grid services for the hardware inverters. In this presentation, we will share our latest work in developing PHIL interface in these two applications to address the two key challenges.

DERMS↗

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy M. Mclaughlin↗

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy McLaughlin↗

Commercial PV Inverter IEEE 1547.1 Ride-Through Assessments Using an Automated PHIL Test Platform

As more countries seek solutions to their de-carbonization targets using renewable energy (RE) technologies, interconnection standards and national grid codes for distributed energy resources (DER) are being updated to support higher penetrations of RE and improve grid stability. Common grid-code revisions mandate DER devices, such as solar inverters and energy storage systems, ride-through (RT) voltage and frequency disturbances. This is necessary because as the percentage of generation from DER increases, there is a greater risk power system faults will cause many or all DER to trip, triggering a substantial load-generation imbalance and possible cascading blackout. This paper demonstrates for the first time a methodology to verify commercial DER devices are compliant to new voltage, frequency, and rate of change of frequency (ROCOF) RT requirements established in IEEE Std. 1547-2018. The methodology incorporates a software automation tool, called the SunSpec System Validation Platform (SVP), in combination with a hardware-in-the-loop (HIL) system to execute the IEEE Std. 1547.1-2020 RT test protocols. In this paper, the approach is validated with two commercial photovoltaic inverters, the test results are analyzed for compliance, and improvements to the test procedure are suggested.

14 SOLAR ENERGY↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Report

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of subcritical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

15 MW HArdware-in-the-loop Grid Simulation Project

The 15MW Hardware-in-the-loop (HIL) Grid Simulator project was to (1) design, (2) construct and (3) commission a state-of-the-art grid integration testing facility for testing of multi-megawatt devices through a ‘shared facility’ model open to all innovators to promote the rapid introduction of new technology in the energy market to lower the cost of energy delivered. The 15 MW HIL Grid Simulator project now serves as the cornerstone of the Duke Energy Electric Grid Research, Innovation and Development (eGRID) Center. This project leveraged the 24 kV utility interconnection and electrical infrastructure of the US DOE EERE funded WTDTF project at the Clemson University Restoration Institute in North Charleston, SC. Additionally, the project has spurred interest from other technology sectors, including large PV inverter and energy storage testing and several leading edge research proposals dealing with smart grid technologies, grid modernization and grid cyber security. The key components of the project are the power amplifier units capable of providing up to 20MW of defined power to the research grid. The project has also developed a one of a kind solution to performing fault ride-through testing by combining a reactive divider network and a large power converter into a hybrid method. This unique hybrid method of performing fault ride-through analysis will allow for the research team at the eGRID Center to investigate the complex differences between the alternative methods of performing fault ride-through evaluations and will ultimately further the science behind this testing. With the final goal of being able to perform HIL experiments and demonstration projects, the eGRID team undertook a significant challenge with respect to developing a control system that is capable of communicating with several different pieces of equipment with different communication protocols in real-time. The eGRID team developed a custom fiber optical network that is based upon FPGA hardware that allows for communication between the key real-time interfaces and reduces the latency between these interfaces to acceptable levels for HIL experiments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a DC Distribution Testbed for High-Power EV Charging

This paper explores the design and implementation of a power hardware-in-the-loop (P-HIL) setup for DC distribution infrastructure integrated with high-power charging (HPC) of electric vehicles (EVs), DC loads, and sources. The utilization of DC distribution holds significant potential for enhancing the operation of a HPC station architecture. However, there are challenges establishing a DC charging hub including interoperability, commoditization, distributed energy resource integration, stability, DC protection, and lack of common system level controllers. To address these challenges, a testing setup is required that accommodates commercial off-the-shelf (COTS) products to evaluate different use cases at rated power and voltage levels. The developed P-HIL setup features a dedicated DC charging hub, DC-coupled chargers, DC loads/sources, DC protection, and a communication architecture. The integrated P-HIL system provides a versatile testing environment to address technology and interoperability gaps and implements a smart energy management system (SEMS). This platform enables comprehensive and robust testing of COTS devices, charger prototypes, SEMS controllers and protection schemes, which together will accelerate transition to EVs at scale. The setup is tested for various use-cases at full-scale, integrating 950 V DC bus voltage, 660 kW grid-tied inverter, 150 kW COTS charger, and 100 kW energy storage system within an open-source SEMS platform.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Oak Ridge National Laboratory Pilot Demonstration of an Attestation and Anomaly Detection Framework using Distributed Ledger Technology for Power Grid Infrastructure

This report summarizes the design and pilot demonstration of a framework called Grid Guard that was created to provide increased data and device trustworthiness to electric grid devices by leveraging distributed ledger technology (DLT), specifically blockchain. Grid Guard contains a combination of core cryptographic methods such as the secure hash algorithm (SHA), and asymmetric cryptography, private permissioned blockchain, baselining configuration data, consensus algorithm (Raft) and the Hyperledger Fabric (HLF) framework. The system implements a low energy, fast, and robust enhancement to system trustworthiness within and across electric grid systems such as substations, control centers and metering infrastructures. Blockchain is a distributed database structured that provides a practically unalterable (immutable) timeline of stored transactions. By relying on hashing and the Raft consensus algorithm, if an entity tries to illegitimately alter a record at one instance of the database the other ledger nodes are not altered. They work to cross-reference each other and easily locate any incorrectly added data and remove it. The bulk raw data is stored in an off-chain storage (outside of the blockchain ledger) and a hash of this baseline data is stored in the Blockchain ledger via hashing windows of time-series and configuration data, after aggregation and filtering. The bulk off-chain data repository is then considered to be trust-anchored using the hashes stored in the blockchain. To secure the electric grid testbed devices and data, device configuration baselines were compared to those baselines that had been previously stored in the ledger. Statistical baselines for device configurations, network communication patterns, and high-speed sensor data are calculated and then stored off-chain and hashes stored in the ledger. Measurements such as three-phase voltage and current, frequency, breaker status, protection scheme settings, network configuration settings (and other device configuration artifacts) and network traffic features (packet interarrival times) are compared every minute or other selected time windows. During phase 1 of the Grid Guard DLT project different DLT technologies were studies, and an assessment was performed on DLT technology vulnerabilities, uses, and key characteristics. DLT consensus protocols were studies (e.g., RAFT, named after Reliable, Replicated, Redundant, And Fault-Tolerant). Also, cryptography, public, private and permissioned or permissionless systems were assessed. Grid Guard implements a permissioned private DLT. Consensus algorithm selection and choice of DLT implementation depended heavily on the use-case. For this use-case, parameters were selected to measure performance and existing tools for assessment. Benchmarking was performed theoretically and practically. During phase 2 hashed transactions/blocks were inserted into the ledger every second. During phase 2 of the Grid Guard DLT project, a prototype framework was developed and demonstrated for attestation of critical substation devices and data using precision timing systems that use PTP and IRIG-B protocols) on a testbed of operational devices that emulated a distribution substation, control center, and power metering infrastructure using real Operational Technology (OT). The testbed includes OT devices such as protective relays, human machine interfaces (HMI), and power meters. To determine when to collect and compare system and network baselines, an initial examination of an anomaly detection capability to identify malicious manipulation of data streams was conducted. The resulting anomaly detection was demonstrated in a set of experiments and leveraged to trigger device artifact attestation checks. Attestation checks occur against device configuration baselines when compared with the immutable blockchain-stored baselines, which provided a cryptographically supported means by which to store baselines. The electrical substation-grid testbed was created to test the Grid Guard framework. The testbed emulates the operations of a portion of a power grid and SCADA systems as closely as possible. The testbed integrates real protocols, mainly IEC 61850 standard protocols, such as the Sampled Value (SV) and the GOOSE protocols. The testbed also supports DNP3 and other layer 2 and layer 3 protocols such as Telnet, SSH, SFTP/FTP and other proprietary protocols needed to connect to industrial control system equipment. The testbed emulates real power conditions using the OpalRT hardware-in-the-loop (HIL) device which can create fault situations that cannot be easily tested on real systems. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that electrical utilities commonly use.

24 POWER TRANSMISSION AND DISTRIBUTION↗