Phase-Retrieval Uncertainty Estimation and Algorithm Comparison for the JWST-ISIM Test Campaign

Phase retrieval, the process of determining the exitpupil wavefront of an optical instrument from image-plane intensity measurements, is the baseline methodology for characterizing the wavefront for the suite of science instruments (SIs) in the Integrated Science Instrument Module (ISIM) for the James Webb Space Telescope (JWST). JWST is a large, infrared space telescope with a 6.5-meter diameter primary mirror. JWST is currently NASA's flagship mission and will be the premier space observatory of the next decade. ISIM contains four optical benches with nine unique instruments, including redundancies. ISIM was characterized at the Goddard Space Flight Center (GSFC) in Greenbelt, MD in a series of cryogenic vacuum tests using a telescope simulator. During these tests, phase-retrieval algorithms were used to characterize the instruments. The objective of this paper is to describe the Monte-Carlo simulations that were used to establish uncertainties (i.e., error bars) for the wavefronts of the various instruments in ISIM. Multiple retrieval algorithms were used in the analysis of ISIM phase-retrieval focus-sweep data, including an iterativetransform algorithm and a nonlinear optimization algorithm. These algorithms emphasize the recovery of numerous optical parameters, including low-order wavefront composition described by Zernike polynomial terms and high-order wavefront described by a point-by-point map, location of instrument best focus, focal ratio, exit-pupil amplitude, the morphology of any extended object, and optical jitter. The secondary objective of this paper is to report on the relative accuracies of these algorithms for the ISIM instrument tests, and a comparison of their computational complexity and their performance on central and graphical processing unit clusters. From a phase-retrieval perspective, the ISIM test campaign includes a variety of source illumination bandwidths, various image-plane sampling criteria above and below the Nyquist- Shannon critical sampling value, various extended object sizes, and several other impactful effects.

Design Analysis↗

Alignment Test Results of the JWST Pathfinder Telescope Mirrors in the Cryogenic Environment

After integration of the Optical Telescope Element (OTE) to the Integrated Science Instrument Module (ISIM) to become the OTIS, the James Webb Space Telescope OTIS is tested at NASAs Johnson Space Center (JSC) in the cryogenic vacuum Chamber A for alignment and optical performance. The alignment of the mirrors comprises a sequence of steps as follows: The mirrors are coarsely aligned using photogrammetry cameras with reflective targets attached to the sides of the mirrors. Then a multi-wavelength interferometer is aligned to the 18-segment primary mirror using cameras at the center of curvature to align reflected light from the segments and using fiducials at the edge of the primary mirror. Once the interferometer is aligned, the 18 primary mirror segments are then adjusted to optimize wavefront error of the aggregate mirror. This process phases the piston and tilt positions of all the mirror segments. An optical fiber placed at the Cassegrain focus of the telescope then emits light towards the secondary mirror to create a collimated beam emitting from the primary mirror. Portions of the collimated beam are retro-reflected from flat mirrors at the top of the chamber to pass through the telescope to the SI detector. The image on the detector is used for fine alignment of the secondary mirror and a check of the primary mirror alignment using many of the same analysis techniques used in the on-orbit alignment. The entire process was practiced and evaluated in 2015 at cryogenic temperature with the Pathfinder telescope.

Interferometer↗

Status of the JWST Science Instrument Payload

The James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM) system consists of five sensors (4 science): Mid-Infrared Instrument (MIRI), Near Infrared Imager and Slitless Spectrograph (NIRISS), Fine Guidance Sensor (FGS), Near InfraRed Camera (NIRCam), Near InfraRed Spectrograph (NIRSpec); and nine instrument support systems: Optical metering structure system, Electrical Harness System; Harness Radiator System, ISIM Electronics Compartment, ISIM Remote Services Unit, Cryogenic Thermal Control System, Command and Data Handling System, Flight Software System, Operations Scripts System.

JWST Payload↗

Cryogenic Testing of the Thermal Vacuum Chamber and Ground Support Equipment for the James Webb Space Telescope in Chamber A at Johnson Space Center

The James Webb Space Telescope (JWST) is the largest cryogenic instrument telescope to be developed for space flight. The telescope will be passively cooled to 50 K and the instrument package will be at 40 K with the mid-infrared instrument at 6 K. The final cryogenic test of the Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) as an assembly (OTE + ISIM OTIS) will be performed in the largest 15 K chamber in the world, Chamber A at Johnson Space Center. The planned duration of this test will be 100 days in the middle of 2017. Needless to say, this ultimate test of OTIS, the cryogenic portion of JWST will be crucial in verifying the end-to-end performance of JWST. A repeat of this test would not only be expensive, but would delay the launch schedule (currently October 2018). Therefore a series of checkouts and verifications of the chamber and ground support equipment were planned and carried out between 2012 and 2016. This paper will provide a top-level summary of those tests, trades in coming up with the test plan, as well as some details of individual issues that were encountered and resolved in the course of testing.

thermal vacuum chamber↗

The James Webb Space Telescope: Contamination Control and Materials

The James Webb Space Telescope (JWST), expected to launch in 2018 or early 2019, will be the premier observatory for astronomers worldwide. It is optimized for infrared wavelengths and observation from up to 1 million miles from Earth. JWST includes an Integrated Science Instrument Module (ISIM) containing the four main instruments used to observe deep space: Near-Infrared Camera (NIRCam), Near-Infrared Spectrograph (NIRSpec), Mid-Infrared Instrument (MIRI), and Fine Guidance Sensor/Near InfraRed Imager and Slitless Spectrograph (FGS/NIRISS). JWST is extremely sensitive to contamination directly resulting in degradation in performance of the telescope. Contamination control has been an essential focus of this mission since the beginning of this observatory. A particular challenge has been contamination challenges in vacuum chamber operations.

James Webb Space Telescop↗

Power Distribution for Cryogenic Instruments at 6-40K The James Webb Space Telescope Case

The Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope (JWST) operates its instruments passively cooled at around 40 Kelvin (K), with a warm Instrument Electronic Compartment (IEC) at 300K attached to it. From the warm electronics all secondary signal and power harnesses have to bridge this 300-40K temperature difference and minimize the power dissipation and parasitic heat leak into the cold region. After an introduction of the ISIM with its instruments, the IEC with the electronics, and the harness architecture with a special radiator, this paper elaborates on the cryogenic wire selection and tests performed to establish current de-rating rules for different wire types. Finally failure modes are analyzed for critical instrument interfaces that could inject excessive currents and heat into the harness and cold side, and several solutions for the removal of such failures are presented.

Rumler, Peter↗

Alignment Test Results of the JWST Pathfinder Telescope Mirrors in the Cryogenic Environment

After integration of the Optical Telescope Element (OTE) to the Integrated Science Instrument Module (ISIM) to become the OTIS, the James Webb Space Telescope OTIS is tested at NASAs Johnson Space Center (JSC) in the cryogenic vacuum Chamber A for alignment and optical performance. The alignment of the mirrors comprises a sequence of steps as follows: The mirrors are coarsely aligned using photogrammetry cameras with reflective targets attached to the sides of the mirrors. Then a multi-wavelength interferometer is aligned to the 18-segment primary mirror using cameras at the center of curvature to align reflected light from the segments and using fiducials at the edge of the primary mirror. Once the interferometer is aligned, the 18 primary mirror segments are then adjusted to optimize wavefront error of the aggregate mirror. This process phases the piston and tilt positions of all the mirror segments. An optical fiber placed at the Cassegrain focus of the telescope then emits light towards the secondary mirror to create a collimated beam emitting from the primary mirror. Portions of the collimated beam are retro-reflected from flat mirrors at the top of the chamber to pass through the telescope to the SI detector. The image on the detector is used for fine alignment of the secondary mirror and a check of the primary mirror alignment using many of the same analysis techniques used in the on-orbit alignment. The entire process was practiced and evaluated in 2015 at cryogenic temperature with the Pathfinder telescope.

OTIS↗

Thermal Control of Boundaries for JWST Infrared Tests in Cryogenic Vacuum Configuration

In 2017, the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) of the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification under cryogenic vacuum conditions in Chamber A at the Johnson Space Center (JSC). Testing the infrared Science Instruments and OTIS optics below 50 degrees Kelvin required an environment architecture that comprehensively controlled the temperature and energy path of every seam and penetration in the over 1100 m2 of Chamber A helium shroud surfaces as well as the Ground Support Equipment (GSE) inside it. This paper outlines the design and implementation of thermal closeouts, thermal anchoring systems for electrical cables, and thermal control systems around room-temperature optical metrology equipment inside the helium shroud. It also details lessons learned from the repeated implementation and testing of these environmental control systems throughout the JWST Pathfinder test campaign.

Huguet, Jesse A.↗

Thermal Control of Boundaries for JWST Infrared Tests in Cryogenic Vacuum Configuration

In 2017, the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) of the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification under cryogenic vacuum conditions in Chamber A at the Johnson Space Center (JSC). Testing the infrared Science Instruments and OTIS optics below 50 K required an environment architecture that comprehensively controlled the temperature and energy path of every seam and penetration in the over 1100 sq m of Chamber A helium shroud surfaces as well as the Ground Support Equipment (GSE) inside it. This paper outlines the design and implementation of thermal closeouts, thermal anchoring systems for electrical cables, and thermal control systems around room-temperature optical metrology equipment inside the helium shroud. It also details lessons learned from the repeated implementation and testing of these environmental control systems throughout the JWST Pathfinder test campaign.

Huguet, Jesse A.↗

Thermal Management of JWST Cryo-Vacuum Test Support Equipment

In 2017, the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification of the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) under cryogenic vacuum conditions in Chamber A at the Johnson Space Center. The ground support and test equipment developed and tested over the previous decade to facilitate this test event were crucial elements of its success. Ground systems required for this test fall into several groups, including thermal simulators, mechanical support hardware, telemetry systems, and metrology systems. This paper will provide a summary of these systems, their development challenges, key features, and highlight thermal performance in the cryovac test.

Havey, Keith A., Jr.↗

Initial Jitter Analysis of Lynx, a Proposed Future Large Astrophysics Facility

Lynx is an X-Ray telescope large-mission concept for consideration in NASA's 2020 Astrophysics Decadal Survey. A conceptual structural design is evolving that leverages the success and lessons learned from Chandra and that takes into account unique needs of Lynx. Space optics systems require extreme stability. Any motion in-service (thermal effects, structural dynamics, etc.) impacts performance. An initial analysis was performed to predict the first-cut dynamic responses, jitter, at two selected points on the Lynx observatory. One point is on the Lynx X-ray Mirror Assembly (LMA) and the other, on the focal plane Integrated Science Instrument Module (ISIM). Relative motion between these two points was predicted along with vibration spectra. This information will be used in upcoming analyses of the LMA and the ISIM.

Knight, J. Brent↗

Troubleshooting Challenges on the James Webb Space Telescope (JWST)

This presentation provides a summary of troubleshooting efforts on the power interface of the James Webb Space Telescope (JWST) during cryovac testing at Johnson Space Center (JSC). [Of special interest: OTIS (OTE (Optical Telescope Element) and ISIM (Integrated Science Instrument Module))].

Electromagnetics↗

Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test

In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.

Optics↗

Precious Cargo: Transporting Contamination-Sensitive Instruments & Optics

The James Webb Space Telescope (JWST) is a multi-national program with instruments and hardware supplied by companies all over the world and numerous states in the United States. In order to transport larger assemblies, like the Optical Telescope Element / Integrated Science Instrument Module (OTIS), and ultimately JWST, the Space Telescope Transporter for Air, Road and Sea (STTARS) was designed and constructed. STTARS is a massive mobile cleanroom (longer than 2 semi-trailers) that provides an ISO class 7 payload environment while being transported by road, airborne and marine vehicles. Temperature, humidity, and particle counts are controlled and continuously tracked, with fallout and NVR witness samples placed in strategic locations for confirmation. Instruments or sensitive hardware were purged continuously during transport. STTARS has 5 main components: the upper tent frame, lower tent frame, pallet, strong back and lid. After transporting OTIS to Northrup Grumman (NG), STTARS was modified to increase its height to house the JWST Observatory on its voyage to French Guiana. This new configuration was designated Observatory STTARS (OSTTARS). OSTTARS was too tall to travel by C5 aircraft, so the trip to the launch site was made by ship. Through JWST’s land, air, and sea transports, STTARS and OSTTARS kept JWST hardware exceptionally clean and safe.

James Webb Space Telescope↗

Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test

In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.

James Webb Space Telescope↗

Precious Cargo: Transporting contamination-sensitive instruments & optics

The James Webb Space Telescope (JWST) is a multi-national program with instruments and hardware supplied by companies all over the world and numerous states in the United States. In order to transport larger assemblies, like the Optical Telescope Element / Integrated Science Instrument Module (OTIS), and ultimately JWST, the Space Telescope Transporter for Air, Road and Sea (STTARS) was designed and constructed. STTARS is a massive mobile cleanroom (longer than 2 semi-trailers) that provides an ISO class 7 payload environment while being transported by road, airborne and marine vehicles. Temperature, humidity, and particle counts are controlled and continuously tracked, with fallout and NVR witness samples placed in strategic locations for confirmation. Instruments or sensitive hardware were purged continuously during transport. STTARS has 5 main components: the upper tent frame, lower tent frame, pallet, strong back and lid. After transporting OTIS to Northrup Grumman (NG), STTARS was modified to increase its height to house the JWST Observatory on its voyage to French Guiana. This new configuration was designated Observatory STTARS (OSTTARS). OSTTARS was too tall to travel by C5 aircraft, so the trip to the launch site was made by ship. Through JWST’s land, air, and sea transports, STTARS and OSTTARS kept JWST hardware exceptionally clean and safe.

James Webb Space Telescope↗

The Design, Verification and Performance of the James Webb Space Telescope

The James Webb Space Telescope (JWST) is NASA’s flagship mission successor to the highly successful Hubble Space Telescope. It is an infrared observatory featuring a cryogenic 6.6 m aperture, deployable Optical Telescope Element (OTE) with a payload of four science instruments (SIs) assembled into an Integrated Science Instrument Module (ISIM) that provide imagery and spectroscopy in the near-infrared band between 0.6 and 5 μm and in the mid-infrared band between 5 and 28.1 μm. JWST was successfully launched on 2021 December 25 aboard an Ariane 5 launch vehicle. All 50 major deployments were successfully completed on 2022 January 8. The observatory performed all midcourse correction maneuvers and achieved its operational mission orbit around the Sun–Earth second Lagrange point (L2). All commissioning and calibration activities have been completed, and JWST has begun its science mission. This paper will provide a description of the driving requirements and their technical challenges, the engineering processes involved in the design formulation, the resulting observatory design, the verification programs that proved it to be flightworthy, and the measured on-orbit performance of the observatory. Since companion papers will describe the details of the OTE and SIs, this paper will concentrate on describing the key features of the observatory architecture that accommodates these elements, particularly those features and capabilities associated with accommodating the radiometric and image-quality performance.

Galaxy evolution↗

Thermal Vacuum Chamber Repressurization with Instrument Purging

At the end of James Webb Space Telescope (JWST) OTIS (Optical Telescope Element-OTE-Integrated Science Instrument Module-ISIM) cryogenic vacuum testing in NASA Johnson Space Centers (JSCs) thermal vacuum (TV) Chamber A, contamination control (CC) engineers are mooting the idea that chamber particulate material stirred up by the repressurization process may be kept from falling into the ISIM interior to some degree by activating instrument purge flows over some initial period before opening the chamber valves. This memo describes development of a series of models designed to describe this process. These are strung together in tandem to estimate overpressure evolution from which net outflow velocity behavior may be obtained. Creeping flow assumptions are then used to determine the maximum particle size that may be kept suspended above the ISIM aperture, keeping smaller particles from settling within the instrument module.

Venting↗