Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAUNCH SITE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Winds aloft statistical analysis in support of day of launch Shuttle systems evaluation

In connection with the development of the Meteorological Interactive Data Display System (MIDDS) for utilization by the Launch Systems Evaluation Advisory Team (LSEAT), requirements have been established to expand the pre-launch analysis of winds aloft for the Space Shuttle. Statistical analyses developed for the system include: comparison of pre-launch wind component profiles to wind component extremes at each altitude calculated from launch site historical data; conditional probability ellipses for wind vectors at a future time given the wind vector at an initial time; comparison of observed extreme wind shear and associated wind speed with launch site historical data utilizing the bivariate extreme value (Gumbel) distribution; estimation of extremes of wind speed or wind shear at a future time given the extremes of either variable at an initial time, utilizing the conditional extreme value distribution; power spectrum analysis for tracking wind perturbation energy in sequential pre-launch Jimsphere wind profiles.

Adelfang, S. I.↗

CODA: Coordinated Observations of Dynamics in Aurora

The grant funds were provided to carry out chemical tracer wind and turbulence measurements in the mesosphere and lower thermosphere as part of the Coordinated Observations of Dynamics in Aurora (CODA) experiment for which Dr. Andy Christensen of the Aerospace Corp. was the Principal Investigator. Clemson University was a co-investigator institution on the project and was tasked with designing, building, and testing a total of four chemical tracer release payloads which were used to release trimethyl aluminum (TMA) to measure the winds and turbulent diffusion. All four payloads were flown from the rocket range at Poker Flat, Alaska, in support of instrumented payloads flown from the same location. The CODA experiment was designed to investigate the changes in the chemical composition in the lower thermosphere during an auroral substorm event. In particular, the objective was to determine the relative importance of two competing mechanisms. The first mechanism is associated with the advection of air from the polar cap into the auroral oval. A flow in that direction is typical in the postmidnight sector of the oval. As the air moves from the region of negligible forcing in the polar cap to the region of strong forcing and heating in the oval, changes in the composition are expected to occur. Alternatively, enhanced local mixing will also cause such changes. Since the auroral forcing accelerates the neutral winds in the lower E region, but not at lower altitudes, the forcing results in large shears that can be large enough to be unstable in the Richardson number sense. The unstable shears are expected to generate turbulence and therefore enhanced mixing. Such mixing will also create composition changes similar to what is observed. In the CODA experiment an instrumented payload designed and built by the Aerospace Corporation was used to measure the composition and plasma parameters needed to define the auroral forcing. In addition, three chemical tracer payloads were to be flown along three trajectories widely separated in azimuth to map out the winds and wind gradients. The measurements would thus provide information about the local composition changes above the launch site as well as detailed information about the advection and location of stable or unstable shears both locally and over a broader area in the vicinity of the launch site.

Larsen, M. F.↗

Ascent abort capability for the HL-20

The HL-20 has been designed with the capability for rescue of the crew during all phases of powered ascent from on the launch pad until orbital injection. A launch-escape system, consisting of solid rocket motors located on the adapter between the HL-20 and the launch vehicle, provides the thrust that propels the HL-20 to a safe distance from a malfunctioning launch vehicle. After these launch-escape motors have burned out, the adapter is jettisoned and the HL-20 executes one of four abort modes. In three abort modes - return-to-launch-site, transatlantic-abort-landing, and abort-to-orbit - not only is the crew rescued, but the HL-20 is recovered intact. In the ocean-landing-by-parachute abort mode, which occurs in between the return-to-launch-site and the transatlantic-abort-landing modes, the crew is rescued, but the HL-20 would likely sustain damage from the ocean landing. This paper describes the launch-escape system and the four abort modes for an ascent on a Titan III launch vehicle.

Naftel, J. C.↗

Simulation of Wind Profile Perturbations for Launch Vehicle Design

Ideally, a statistically representative sample of measured high-resolution wind profiles with wavelengths as small as tens of meters is required in design studies to establish aerodynamic load indicator dispersions and vehicle control system capability. At most potential launch sites, high- resolution wind profiles may not exist. Representative samples of Rawinsonde wind profiles to altitudes of 30 km are more likely to be available from the extensive network of measurement sites established for routine sampling in support of weather observing and forecasting activity. Such a sample, large enough to be statistically representative of relatively large wavelength perturbations, would be inadequate for launch vehicle design assessments because the Rawinsonde system accurately measures wind perturbations with wavelengths no smaller than 2000 m (1000 m altitude increment). The Kennedy Space Center (KSC) Jimsphere wind profiles (150/month and seasonal 2 and 3.5-hr pairs) are the only adequate samples of high resolution profiles approx. 150 to 300 m effective resolution, but over-sampled at 25 m intervals) that have been used extensively for launch vehicle design assessments. Therefore, a simulation process has been developed for enhancement of measured low-resolution Rawinsonde profiles that would be applicable in preliminary launch vehicle design studies at launch sites other than KSC.

Adelfang, S. I.↗

NASA Space Launch System Prepares for Key Hotfire Test Before Vehicle Integration

NASA this year is working toward the final major integrated hardware and avionics test for its Space Launch System (SLS), the agency’s new super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars and beyond. As the backbone of the Artemis human lunar exploration program, Artemis I SLS operations will then shift to the launch site and integration for the inaugural mission. For this final major test of the first vehicle NASA has built exclusively for deep space exploration since the Saturn V, a NASA/Boeing/Aerojet Rocketdyne team will conduct the final core stage “green run” test at NASA's Stennis Space Center with a dramatic firing of all four core stage engines. This test will validate the operation of the stage structures, main propulsion system, engines, avionics, and software. Following data review, stage inspection, and refurbishment, the stage will be barged to NASA’s Kennedy Space Center to continue integration of the Artemis I launch vehicle. Already underway is assembly of the mission’s five-segment solid rocket boosters. The mission’s upper stage and spacecraft adapters also are staged at the launch site ready for integration. Even as the Artemis I SLS proceeds toward launch later this year, the Artemis II and Artemis III vehicles are coming together, with core stages, engines, boosters, upper stage, and payload accommodations in various stages of manufacturing and/or processing. Planning is also underway for additional core stages and a new, more powerful upper stage that will increase lunar payload mass. SLS is the anchor transportation leg of a plan for sustained human exploration of the Moon, including the first human landing later in the decade. This paper will discuss SLS progress to date and expected 2021 milestones.

Bruce R. Askins↗

Intercenter Problem Reporting and Corrective Action System (PRACAS)

The Kennedy Space Center is transforming the PRACA bath automatic data processing (ADP) system of today into a fully integrated data base with on-line update and retrieval capabilities. The present manual system of reporting (Datafax, mail, and telephone) to the off-site design and engineering organizations is to be replaced by direct access to the most current information as it accrues at KSC or VAFB. Two major goals of the Intercenter PRACA are to provide a single data depository for both launch sites and to fully integrate the problem data with engineering data as well as other relevant information. The resulting ADP system can provide a closed loop system for problem reporting, corrective action and recurrence control that should serve the engineering community as well as reliability and quality assurance at the launch sites, KSC and VAFB, and at the design centers, JSC and MSFC.

Brock, G. H.↗

Terrestrial Applications of Zero Boil-Off Cryogen Storage

Storing cryogenic propellants with zero boil off (ZBO) using a combination of active (cryocoolers) and passive technologies has recently received a great deal of attention for applications such as future long-term space missions. This paper will examine a variety of potential near-term terrestrial applications for ZBO and, where appropriate, provide a rough order of magnitude cost benefit of implementing ZBO technology. NASA's Space Shuttle power system uses supercritical propellant tanks, which are filled several days before launch. If the launch does not occur within 48-96 hours, the tanks must be drained and refilled, further delaying the launch. By implementing ZBO, boil off could be eliminated and pad hold time extended. At the launch site, vented liquid hydrogen (LH2) storage dewars lose 1200-1600 gal/day through boiloff. Implementing ZBO would eliminate this, saving $300,000-$400,000 per year. Similarly, overland trucking of LH2 from the supplier to the launch site via roadable dewars results in a cryogen loss of ten percent per tanker (1500 gal/tanker). Providing a cryocooler on board the rig would prevent this loss. Previous work investigating variable density insulation found that a 50% reduction in evaporation from a 6000 gallon dewar would save $5000 per year. For a 20 year dewar lifetime, the payback period would be less than two years. Similar benefits could be realized at other storage facilities across the nation. Within the superconductivity community, there is skepticism about using coolers, based upon reliability concerns. By providing a cooler on the dewar, lifetime could be extended while retaining fail-safe capability. If the cooler failed, it would merely lower the storage life of the dewar.

Salerno, L. J.↗

Dark Forward Electrical Test Techniques Developed for Large-Area Photovoltaic Arrays

Spacecraft photovoltaic arrays (PVA's) must be carefully handled during ground integration processing and transportation to the launch site. Care is exercised to avoid damage that could degrade on-orbit electrical performance. Because of this damage risk, however, PVA's are typically deployed and illuminated with a light source so performance characteristics can be measured prior to launch. For large-area arrays, such as the Mir Cooperative Solar Array (2.7- by 18-m) and the International Space Station PVA blankets (4.6- by 31.7-m), this integrity check becomes resource intensive. Large test support structures are needed to offload the array during deployment in 1g, and large-aperture illumination equipment is required to uniformly illuminate array panels. Significant program time, funds, and manpower must be allocated for this kind of test program. Alternatively, launch site electrical performance tests can be bypassed with an attendant increase in risk.

Kerslake, Thomas W.↗

Five-Segment Booster (FSB) Abort to Orbit (ATO) Studies

The Five Segment Booster (FSB) concept has been evolving for a number of years as a means to enhance the overall safety and reliability of the Space Shuttle system by minimizing the need to fly the more challenging Return to Launch Site (RTLS) and Transoceanic Abort Landing (TAL) abort profiles. The initial evaluation of the FSB concept was conducted in 1996 to determine the feasibility of the FSB in achieving transatlantic abort leading TAL from the pad, thus eliminating the return to launch site (RTLS) abort mode. The initial study was conducted by ATK Thiokol and did show the potential for the FSB to eliminate the RTLS abort mode. Later Rockwell (now Boeing) conducted a similar study utilizing FSB performance characteristics and verified that the FSB could indeed achieve TAL from the pad, thereby eliminating the necessity for the RTLS abort. The purpose of this paper is to discuss the details of the enhancements achieved through the internally funded study conducted by Boeing and ATK Thiokol. To better understand the enhancements that were addressed as part of this follow-on study, some background on what was achieved in the Phase A study is appropriate.

Tobias, Mark↗

Large Payload Ground Transportation and Test Considerations

During test and verification planning for the Altair lunar lander project, a National Aeronautics and Space Administration (NASA) study team identified several ground transportation and test issues related to the large payload diameter. Although the entire Constellation Program-including Altair-has since been canceled, issues identified by the Altair project serve as important lessons learned for payloads greater than 7 m diameter being considered for NASA's new Space Launch System (SLS). A transportation feasibility study found that Altair's 8.97 m diameter Descent Module would not fit inside available aircraft. Although the Ascent Module cabin was only 2.35 m diameter, the long reaction control system booms extended nearly to the Descent Module diameter, making it equally unsuitable for air transportation without removing the booms and invalidating assembly workmanship screens or acceptance testing that had already been performed. Ground transportation of very large payloads over extended distances is not generally permitted by most states, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA's Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure-roads, bridges, airframes, and buildings-necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications.

Rucker, Michelle A.↗

Large Payload Transportation and Test Considerations

Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure - roads, bridges, airframes, and buildings - necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider how large spacecraft are designed, and where they are manufactured, tested, or launched, could result in unforeseen cost to modify/develop infrastructure, or incur additional risk due to increased handling or elimination of key verifications. During test and verification planning for the Altair project, a number of transportation and test issues related to the large payload diameter were identified. Although the entire Constellation Program - including Altair - was canceled in the 2011 NASA budget, issues identified by the Altair project serve as important lessons learned for future payloads that may be developed to support national "heavy lift" strategies. A feasibility study performed by the Constellation Ground Operations (CxGO) project found that neither the Altair Ascent nor Descent Stage would fit inside available transportation aircraft. Ground transportation of a payload this large over extended distances is generally not permitted by most states, so overland transportation alone would not have been an option. Limited ground transportation to the nearest waterway may be permitted, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing (which includes hypergolic fuels, pyrotechnic devices, and high pressure gasses).

Rucker, Michelle A.↗

EASE/ACCESS ground processing at Kennedy Space Center

The Kennedy Space Center (KSC) Payload Management and Operations Directorate is responsible for the processing of Space Shuttle payloads. The KSC responsibilities begin prior to hardware arrival at the launch site and extend until the experiments are returned to the investigators after the flight. The KSC involvement with the integration and checkout of payloads begins with participation in experiment, Mission Peculiar Equipment (MPE), and integrated payload design reviews. This involvement also includes participation in assembly and testing of flight hardware at the appropriate design center, university, or private corporation. Once the hardware arrives at the launch site, KSC personnel install the experiments and MPE onto a carrier in the Operations and Checkout (O & C) building. Following integration, the payload is functionally tested and then installed into the orbiter. After the mission, the payload is removed from the orbiter, deintegrated in the O & C building, and the experiments are turned over to the mission manager. One of the many payloads process at KSC consisted of two space construction experiments: the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). The details of EASE/ACCESS integration, testing, and deintegration are addressed and how this mission can serve as a guide for future space construction payloads is discussed.

Moates, Deborah J.↗

Strategies for Validation Testing of Ground Systems

In order to accomplish the full Vision for Space Exploration announced by former President George W. Bush in 2004, NASA will have to develop a new space transportation system and supporting infrastructure. The main portion of this supporting infrastructure will reside at the Kennedy Space Center (KSC) in Florida and will either be newly developed or a modification of existing vehicle processing and launch facilities, including Ground Support Equipment (GSE). This type of large-scale launch site development is unprecedented since the time of the Apollo Program. In order to accomplish this successfully within the limited budget and schedule constraints a combination of traditional and innovative strategies for Verification and Validation (V&V) have been developed. The core of these strategies consists of a building-block approach to V&V, starting with component V&V and ending with a comprehensive end-to-end validation test of the complete launch site, called a Ground Element Integration Test (GEIT). This paper will outline these strategies and provide the high level planning for meeting the challenges of implementing V&V on a large-scale development program. KEY WORDS: Systems, Elements, Subsystem, Integration Test, Ground Systems, Ground Support Equipment, Component, End Item, Test and Verification Requirements (TVR), Verification Requirements (VR)

Annis, Tammy↗

Aerodynamic separation and glideback of a Mach 3 staged booster

A study has been conducted of the staging maneuver for a two-stage, vertical-takeoff, launch vehicle and the subsequent glideback of the booster to a launch site runway. The booster and orbiter are both winged, fully reusable, and have liquid rocket main propulsion. for the staging maneuver, which nominally occurs at Mach 3, a flight control system and separation technique were devised which produced successful separations over a wide range of staging angles of attack. A guidance algorithm was developed for the unpowered glide-back of the booster from the completion of the staging maneuver to touchdown on a runway in the vicinity of the launch site. Using this guidance technique, the booster successfully touched down on the runway while being subjected to a wide range of seasonal and perturbed atmospheric conditions with and without wids as well as errors in staging state conditions and errors in predicted aerodynamics.

Naftel, J. C.↗

Analysis of the staging maneuver and booster glideback guidance for a two-stage, winged, fully reusable launch vehicle

One of the promising launch concepts that could replace the current space shuttle launch system is a two-stage, winged, vertical-takeoff, fully reusable launch vehicle. During the boost phase of ascent, the booster provides propellant for the orbiter engines through a cross-feed system. When the vehicle reaches a Mach number of 3, the booster propellants are depleted and the booster is staged and glides unpowered to a horizontal landing at a launch site runway. Two major design issues for this class of vehicle are the staging maneuver and the booster glideback. For the staging maneuver analysis, a technique was developed that provides for a successful separation of the booster from the orbiter over a wide range of staging angles of attack. A longitudinal flight control system was developed for control of the booster during the staging maneuver. For the booster glide back analysis, a guidance algorithm was developed that successfully guides the booster from the completion of the staging maneuver to a launch site runway while encountering many off-nominal atmospheric, aerodynamic, and staging conditions.

Naftel, J. Christopher↗

Future space transportation system architecture avionics requirements

NASA began a multi-center study in January 1993 to examine options for providing the most cost effective space transportation system in the future. The key advanced avionics requirements for these vehicle concepts are envisioned to provide significantly improved operational efficiency and effectiveness. It is very desirable to have adaptive guidance, navigation, and control approaches that will allow launch and return in almost any weather condition. The vehicles must be able to accommodate atmospheric density variations and winds without software changes. The flight operations must become much more autonomous in all flight regimes like an aircraft, and preflight checkout should make use of the onboard systems. When the vehicle returns to the launch site, subsystem health must be known and maintenance tasks scheduled accordingly. Ground testing of most subsystems must be eliminated. Also, the health monitoring system must be designed to enhance the ability to abort the mission significantly and save the crew and the vehicle. The displays and controls must be much less complex than current systems and must significantly reduce pilot work load. It is important to have low power, light weight displays and controls. Rendezvous and docking and all flight phases must have autopilot capability to reduce pilot work load for routine operations and in abort situations. The vehicles must have the demonstrated ability to return to the launch site. Abort from all mission phases can put additional demands on the communications system.

Stone, Howard↗

Spacelab Level 4 Programmatic Implementation Assessment Study. Volume 4: Executive summary

The study objectives of the Spacelab level 4 analysis were defined, along with the most significant results. The approach used in the synthesis and selection of alternate level 4 integration is described; the options included distributed site, lead center, and launch site. Principal characteristics, as well as the functional flow diagrams for each option, are presented and explained.

Source record↗

Monitoring biological impacts of space shuttle launches from Vandenberg Air Force Base: Establishment of baseline conditions

Space shuttle launches produce environmental impacts resulting from the formation of an exhaust cloud containing hydrogen chloride aerosols and aluminum oxide particulates. Studies have shown that most impacts occur near-field (within 1.5 km) of the launch site while deposition from launches occurs far-field (as distant as 22 km). In order to establish baseline conditions of vegetation and soils in the areas likely to be impacted by shuttle launches from Vandenberg Air Force Base (VAFB), vegetation and soils in the vicinity of Space Launch Complex-6 (SLC-6) were sampled and a vegetation map prepared. The areas likely to be impacted by launches were determined considering the structure of the launch complex, the prevailing winds, the terrain, and predictions of the Rocket Exhaust Effluent Diffusion Model (REEDM). Fifty vegetation transects were established and sampled in March 1986 and resampled in September 1986. A vegetation map was prepared for six Master Planning maps surrounding SLC-6 using LANDSAT Thematic Mapper imagery as well as color and color infrared aerial photography. Soil samples were collected form the 0 to 7.5 cm layer at all transects in the wet season and at a subsample of the transects in the dry season and analyzed for pH, organic matter, conductivity, cation exchange capacity, exchangeable Ca, Mg, Na, K, and Al, available NH3-N, PO4-P, Cu, Fe, Mn, Zn, and TKN.

Schmaizer, Paul A.↗