Search NASA⌕ Search

SEARCH · Search NASA

Results for “LONG RANGE PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Automating Mid- and Long-Range Scheduling for the NASA Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system was designed and deployed as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users of the DSN. These users represent not only NASA's deep space missions, but also international partners and ground-based science and calibration users. The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. This paper describes some key aspects of the S(sup 3) system and on the challenges of modeling complex scheduling requirements and the ongoing extension of S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

Deep Space Network↗

Automating Mid- and Long-Range Scheduling for NASA's Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system is architected as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users who utilize the DSN (representing 37 projects including international partners and ground-based science and calibration users). The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. S(sup 3) has been used for negotiating schedules since April 2011, including the baseline schedules for three launching missions in late 2011. S(sup 3) supports a distributed scheduling model, in which changes can potentially be made by multiple users based on multiple schedule "workspaces" or versions of the schedule. This has led to several challenges in the design of the scheduling database, and of a change proposal workflow that allows users to concur with or to reject proposed schedule changes, and then counter-propose with alternative or additional suggested changes. This paper describes some key aspects of the S(sup 3) system and lessons learned from its operational deployment to date, focusing on the challenges of multi-user collaborative scheduling in a practical and mission-critical setting. We will also describe the ongoing project to extend S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

scheduling↗

NASA Space Rocket Logistics Challenges

The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discreet programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as commonality especially problematic. Additionally, a very low manifest rate of one flight every four years makes logistics comparatively expensive. That, along with the SLS architecture being developed using a block upgrade evolutionary approach, exacerbates long-range planning for supportability considerations. These common and unique logistics challenges must be clearly identified and tackled to allow SLS to have a successful program. This paper will address the common and unique challenges facing the SLS programs, along with the analysis and decisions the NASA Logistics engineers are making to mitigate the threats posed by each.

Neeley, James R.↗

Handling Late Changes to Titan Science

The Cassini mission has been in orbit for eight years, returning a wealth of scientific data from Titan and the Saturnian system. The mission, a cooperative undertaking between NASA, ESA and ASI, is currently in its second extension of the prime mission. The Cassini Solstice Mission (CSM) extends the mission's lifetime until Saturn's northern summer solstice in 2017. The Titan Orbital Science Team (TOST) has the task of integrating the science observations for all 56 targeted Titan flybys in the CSM. In order to balance Titan science across the entire set of flybys during the CSM, to optimize and influence the Titan flyby altitudes, and to decrease the future workload, TOST went through a "jumpstart" process before the start of the CSM. The "jumpstart" produced Master Timelines for each flyby, identifying prime science observations and allocating control of the spacecraft attitude to specific instrument teams. Three years after completing this long-range plan, TOST now faces a new challenge: incorporating changes into the Titan Science Plan without undoing the balance achieved during the jumpstart.

Pitesky, Jo Eliza↗

International Earth Science Constellation (ESC) Introduction

This is the Welcome and Introduction presentation for the International Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) meeting held in Albuquerque NM from September 27-29. It contains an org chart, charter, history, significant topics to be discussed, AquaAura 2017 inclination adjust maneuver calendar, a-train long range plans, upcoming events, and action items.

ECS↗

Temperature Constraints on the Storage and Curation of Volatile-Rich Samples from the Lunar Poles

Final Document is attached. Introduction: NASA's Lunar Exploration Campaign includes Lunar sample return efforts beginning in the mid-2020's and human landed missions in the late 2020's-early 2030's. Volatile-rich samples from the Lunar poles will be high-priority targets due to their resource potential for human explorers and high science value. In order to precisely characterize the nature of these polar volatile materials upon return to Earth, they will need to be transported and curated under conditions that minimize their chemical and physical alteration. NASA Policy Directive (NPD) 7100.10F mandates the preservation of existing extraterrestrial samples with minimal alteration, extensive and quantitative documentation of alteration that is provided to investigators, and "the development of long-range plans" for samples yet to be acquired. This abstract summarizes new efforts by the Astromaterials Acquisition and Curation Office at JSC to assess the optimal

Mitchell, J. L.↗

Twin Telescope Tests: Assessing Station Oriented Systematic Errors

Each of NASA’s three Deep Space Network sites has multiple large antennas capable of acquiring VLBI data. The long range plan is to have four 34-meter beam waveguide antennas at each site. At present Goldstone has three, Canberra has three, and Madrid has two with two more under construction. These antennas offer the opportunity to do connected element interferometry (CEI) over the few hundred meter baselines within each complex. Given that all antennas within a site are of nominally the same structural design, are run off the same clock, observe through almost the same atmosphere, and are subject to almost the same geophysics, doing CEI experiments is an excellent way to probe the limits of VLBI accuracy and expose station-specific systematic errors. This paper will report the results of just such tests which achieved about 0.2 mm baseline precision per pass. Some stations exhibit more than 1 mm systematics. Based on this data we will discuss the implications for whether the IAG’s goal of 1 mm station stability in VLBI geodesy is possible for large antennas.

Jacobs, Christopher↗

An Initial Study of Using the 34-m Antenna for Lunar Missions Support

As a part of the long-range planning of future Mars and lunar missions, a rudimentary study has been made of a 34-m antenna system with differentially pointed multiple beams. The performance loss mechanisms of the differentially pointed multiple-beam systems were identified and quantified. The goal is to determine the feasibility of using the 34-m antenna to support widely separated elements associated with lunar missions.

lunar↗

Autonomous Navigation by a Mobile Robot

ROAMAN is a computer program for autonomous navigation of a mobile robot on a long (as much as hundreds of meters) traversal of terrain. Developed for use aboard a robotic vehicle (rover) exploring the surface of a remote planet, ROAMAN could also be adapted to similar use on terrestrial mobile robots. ROAMAN implements a combination of algorithms for (1) long-range path planning based on images acquired by mast-mounted, wide-baseline stereoscopic cameras, and (2) local path planning based on images acquired by body-mounted, narrow-baseline stereoscopic cameras. The long-range path-planning algorithm autonomously generates a series of waypoints that are passed to the local path-planning algorithm, which plans obstacle-avoiding legs between the waypoints. Both the long- and short-range algorithms use an occupancy-grid representation in computations to detect obstacles and plan paths. Maps that are maintained by the long- and short-range portions of the software are not shared because substantial localization errors can accumulate during any long traverse. ROAMAN is not guaranteed to generate an optimal shortest path, but does maintain the safety of the rover.

Huntsberger, Terrance↗

Unprecedented Drought Challenges for Texas Water Resources in a Changing Climate: What Do Researchers and Stakeholders Need to Know?

Long‐range water planning is complicated by factors that are rapidly changing in the 21st century, including climate, population, and water use. Here, we analyze climate factors and drought projections for Texas as an example of a diverse society straddling an aridity gradient to examine how the projections can best serve water stakeholder needs. We find that climate models are robust in projecting drying of summer‐season soil moisture and decreasing reservoir supplies for both the eastern and western portions of Texas during the 21st century. Further, projections indicate drier conditions during the latter half of the 21st century than even the most arid centuries of the last 1,000 years that included megadroughts. To illustrate how accounting for drought non‐stationarity may increase water resiliency, we consider generalized case studies involving four key stakeholder groups: agricultural producers, large surface water suppliers, small groundwater management districts, and regional water planning districts. We also examine an example of customized climate information being used as input to long‐range water planning. We find that while stakeholders value the quantitative capability of climate model outputs, more specific climate‐related information better supports resilience planning across multiple stakeholder groups. New suites of tools could provide necessary capacity for both short and long‐term, stakeholder‐specific adaptive planning.

drought↗

JPL Resource Allocation Planning Scheduling Office (RAPSO) long range forecasting

The paper introduces the concept of the long range forecasting function, which is then used to identify periods of peak oversubscription of resources years before they actually happen, so that proper corrective actions (construction of additional antennas, reduction in support committment to the impacted projects) can be implemented.

RAPSO long range forecasting↗

James Webb Space Telescope Navigation Optimization Challenges

The James Webb Space Telescope (JWST) is a NASA flagship mission launched on December 25, 2021. The early orbit phase was highlighted by three midcourse correction burns that were performed to maneuver the vehicle into a libration orbit at the second Sun-Earth-Moon (SEM) libration point (L2). During the coast to L2, the vehicle’s primary observatory and sunshield were deployed. Once the tennis-court-sized sunshield was unfurled and tensioned into place, the large area exposed to solar radiation pressure (SRP) dictated that the SRP force model would need to account for the vehicle’s geometry, reflective properties, and orientation relative to the Sun. Following the insertion of JWST into its L2 libration orbit on January 24, 2022, the commissioning phase for the vehicle’s observatory commenced along with the first cycle of routine station-keeping maneuvers. The NASA Goddard Space Flight Center’s Flight Dynamics Facility (FDF) provides navigation services for the JWST mission. The FDF serves as the prime or backup navigation operations center for more than 30 active missions spanning a wide array of flight regimes performing orbit determination, maneuver planning, trajectory optimization, and tracking data evaluation. Definitive orbit determination for JWST is performed by the FDF using an Extended Kalman Filter (EKF) to estimate the vehicle’s trajectory and reflective properties using Deep Space Network (DSN) TRK-2-34 tracking data and spacecraft attitude telemetry. For the purposes of orbit prediction and station-keeping maneuver targeting, the sensitivity of the SRP force to the vehicle’s orientation requires that predictive attitude information must be incorporated to generate accurate orbit predictions and maneuver plans. Predictive attitude plans are provided to the FDF by the JWST Spacecraft Operations Center (SOC). Short-term (28 day) orbit predictions are propagated using a Short Range Attitude Plan (SRAP) to model the vehicle’s future attitude states for up to a week. SRAP attitude data is highly reliable, as it reflects finalized planned attitude states that the vehicle will be commanded to attain during the ensuing week. A Long Range Attitude Plan (LRAP) can be implemented to model predicted attitude states beyond one week, but these predictions are tentative and subject to revision due to changes in science operations plans. Instead, a conservative approach of applying a Sun-Pointing Neutral (SPN) attitude configuration is utilized for long-term (2 year) orbit predictions where reliable planned attitude data is not available. SPN attitude mode aligns the net SRP force along the JWST-to-Sun vector where it becomes independent of the vehicle’s angle of rotation about this vector, defined as the Sun yaw. Given the dynamic instability of the libration orbit, station-keeping thrust must be applied in either the sunward or anti-sunward direction to balance the resulting orbit. The attitude constraints of the vehicle also impose limits on the available pointing directions for station-keeping thrusters. The thrusters cannot be aligned with the optimal pointing direction for sunward maneuvers, rendering sunward maneuvers to be significantly less fuel efficient than anti-sunward maneuvers. Consequently, station-keeping maneuvers must be targeted to balance the orbit while ensuring that the next maneuver will also be performed in the anti-sunward direction to optimize propellant usage. When targeting a station-keeping maneuver, the attitude and SRP modeling configuration which is applied to the predicted post-maneuver trajectory will dictate the direction of the subsequent station-keeping maneuver, assuming nominal propulsion system performance. If the predicted post-maneuver attitude states result in an SRP model which under-predicts the cumulative SRP impact on the post-maneuver orbit, a targeted anti-sunward maneuver will be larger than necessary and the next maneuver will need to be executed sunward in order to compensate. In contrast, an anti-sunward maneuver which is targeted using an SRP model which over-predicts the cumulative SRP impact will achieve station-keeping while ensuring that the next maneuver will likewise be performed anti-sunward. For this reason, station-keeping maneuvers are targeted while applying the SPN attitude mode, as this mode entails the largest possible SRP area cross-section and therefore a larger modeled cumulative SRP impact. This paper documents the NASA Goddard Space Flight Center’s FDF support for JWST on-orbit operations and the analysis projects undertaken utilizing the experiences and data accumulated throughout the first full year of routine science operations. The results of these analysis efforts have been used to implement improvements to orbit prediction accuracy and maneuver efficiency which have the potential to prolong the lifespan of JWST to continue to conduct ground-breaking infrared astronomy for decades to come.

Flight Dynamics↗

The software analysis project for the Office of Human Resources

There were two major sections of the project for the Office of Human Resources (OHR). The first section was to conduct a planning study to analyze software use with the goal of recommending software purchases and determining whether the need exists for a file server. The second section was analysis and distribution planning for retirement planning computer program entitled VISION provided by NASA Headquarters. The software planning study was developed to help OHR analyze the current administrative desktop computing environment and make decisions regarding software acquisition and implementation. There were three major areas addressed by the study: current environment new software requirements, and strategies regarding the implementation of a server in the Office. To gather data on current environment, employees were surveyed and an inventory of computers were produced. The surveys were compiled and analyzed by the ASEE fellow with interpretation help by OHR staff. New software requirements represented a compilation and analysis of the surveyed requests of OHR personnel. Finally, the information on the use of a server represents research done by the ASEE fellow and analysis of survey data to determine software requirements for a server. This included selection of a methodology to estimate the number of copies of each software program required given current use and estimated growth. The report presents the results of the computing survey, a description of the current computing environment, recommenations for changes in the computing environment, current software needs, management advantages of using a server, and management considerations in the implementation of a server. In addition, detailed specifications were presented for the hardware and software recommendations to offer a complete picture to OHR management. The retirement planning computer program available to NASA employees will aid in long-range retirement planning. The intended audience is the NASA civil service employee with several years until retirement. The employee enters current salary and savings information as well as goals concerning salary at retirement, assumptions on inflation, and the return on investments. The program produces a picture of the employee's retirement income from all sources based on the assumptions entered. A session showing features of the program was conducted for key personnel at the Center. After analysis, it was decided to offer the program through the Learning Center starting in August 1994.

Tureman, Robert L., Jr.↗

V/STOL propulsion control analysis: Phase 2, task 5-9

Typical V/STOL propulsion control requirements were derived for transition between vertical and horizontal flight using the General Electric RALS (Remote Augmented Lift System) concept. Steady-state operating requirements were defined for a typical Vertical-to-Horizontal transition and for a typical Horizontal-to-Vertical transition. Control mode requirements were established and multi-variable regulators developed for individual operating conditions. Proportional/Integral gain schedules were developed and were incorporated into a transition controller with capabilities for mode switching and manipulated variable reassignment. A non-linear component-level transient model of the engine was developed and utilized to provide a preliminary check-out of the controller logic. An inlet and nozzle effects model was developed for subsequent incorporation into the engine model and an aircraft model was developed for preliminary flight transition simulations. A condition monitoring development plan was developed and preliminary design requirements established. The Phase 1 long-range technology plan was refined and restructured toward the development of a real-time high fidelity transient model of a supersonic V/STOL propulsion system and controller for use in a piloted simulation program at NASA-Ames.

Source record↗

NASA deep space network operations planning and preparation

The responsibilities and structural organization of the Operations Planning Group of NASA Deep Space Network (DSN) Operations are outlined. The Operations Planning group establishes an early interface with a user's planning organization to educate the user on DSN capabilities and limitations for deep space tracking support. A team of one or two individuals works through all phases of the spacecraft launch and also provides planning and preparation for specific events such as planetary encounters. Coordinating interface is also provided for nonflight projects such as radio astronomy and VLBI experiments. The group is divided into a Long Range Support Planning element and a Near Term Operations Coordination element.

Jensen, W. N.↗

Projected NASA power requirements for space science and exploration missions

NASA's Office of Space Science and Applications has recently completed its long-range strategic plan which describes a number of exciting space science missions into the early 21st century. In parallel, NASA's new Office of Exploration has begun defining in more detail the architectures of the Space Exploration Initiative (SEI) for returning to the Moon and going to Mars. Both the space science missions and the SEI missions are dependent upon power sources and energy storage with strong requirements for reliability, long life, ease of assembly, autonomy, and light weight. This paper reviews the currently planned space science and SEI missions and focuses upon the power requirements with a view toward guiding technology developers and power designers.

Gary L Bennett↗

AXAF: Current Developments and Future Plans for the Scientific Data Analysis

AXAF, the Advanced X-ray Astrophysics Facility, is one of NASA's great observatories scheduled for launch in January of 1999 by a Space Shuttle. This facility will be available to scientists in the United States and to the international astronomical community over an anticipated mission lifetime of at least 5 years. The objective of AXAF is to make astrophysical observations in the 0.09 to 10.0 keV energy range with two imaging detectors, and two sets of transmission gratings giving high spatial (0.5 arcsec) and spectral (E/(Delta)E=100-2000) resolution. The AXAF Science Center (ASC) in Cambridge, MA, USA is responsible for obtaining and reviewing observation proposals submitted by users, providing long range science planning and performing all science data calibration, data analysis, science instrument trend analysis, and science data archiving. The ASC will distribute science data products to the users. We will review here the current developments and future plans for the AXAF scientific data analysis system, its infrastructure and new key features, including the global modelling and fitting environment, integrated data analysis GUIs and new analysis tools.

Fruscione, Antonella↗

Advanced development of Pb-salt semiconductor lasers for the 8.0 to 15.0 micrometer spectral region

The technology was studied for producing Pb-salt diode lasers for the 8-51 micron spectral region suitable for use as local oscillators in a passive Laser Heterodyne Spectrometer (LHS). Consideration was given to long range NASA plans for the utilization of the passive LHS in a space shuttle environment. The general approach was to further develop the method of compositional interdiffusion (CID) recently reported, and used successfully at shorter wavelength. This technology was shown to provide an effective and reproducible method of producing a single-heterostructure (SH) diode of either the heterojunction or single-sided configuration. Performance specifications were exceeded in several devices, with single-ended CW power outputs as high as 0.88 milliwatts in a mode being achieved. The majority of the CID lasers fabricated had CW operating temperatures of over 60K; 30% of them operated CW above the boiling temperature of liquid nitrogen. CW operation above liquid nitrogen temperature was possible for wavelengths as long as 10.3 microns. Operation at 77K is significant with respect to space shuttle operations since its allows considerable simplification of cooling method.

Linden, K. J.↗