Search NASA⌕ Search

SEARCH · Search NASA

Results for “Libration Point Orbit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

James Webb Space Telescope Orbit Determination Analysis

The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-Earth/Moon L2 libration point, 1.5 million km away from Earth. This paper describes the results of an orbit determination (OD) analysis of the JWST mission emphasizing the challenges specific to this mission in various mission phases. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate OD solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cm/sec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.

Libration Point Orbit↗

Orbits of the Tethys Lagrangian bodies

Preliminary libration parameters are derived for the objects found in 1980 at the triangular libration points of Tethys. The parameters are obtained from an orbit analysis of ground-based and Voyager I data obtained in 1980 for the separation from Saturn along the ring major axis, the projected separations from the Tethys L4 and L5 points and the separations from Tethys in orbital longitude. The best fitting libration parameters indicate a small (approximately 2 deg) libration amplitude for the L4 body. Data for the object at the L5 point may be fit either by orbits with libration amplitudes greater than 50 deg, or with small libration amplitudes, which are in agreement with recent Voyager II observations.

Reitsema, H. J.↗

Mission Architecture Comparison for Human Lunar Exploration

The Vision for Space Exploration outlines a bold new national space exploration policy that holds as one of its primary objectives the extension of human presence outward into the Solar System, starting with a return to the Moon in preparation for the future exploration of Mars and beyond. The National Aeronautics and Space Administration is currently engaged in several preliminary analysis efforts in order to develop the requirements necessary for implementing this objective in a manner that is both sustainable and affordable. Such analyses investigate various operational concepts, or mission architectures , by which humans can best travel to the lunar surface, live and work there for increasing lengths of time, and then return to Earth. This paper reports on a trade study conducted in support of NASA s Exploration Systems Mission Directorate investigating the relative merits of three alternative lunar mission architecture strategies. The three architectures use for reference a lunar exploration campaign consisting of multiple 90-day expeditions to the Moon s polar regions, a strategy which was selected for its high perceived scientific and operational value. The first architecture discussed incorporates the lunar orbit rendezvous approach employed by the Apollo lunar exploration program. This concept has been adapted from Apollo to meet the particular demands of a long-stay polar exploration campaign while assuring the safe return of crew to Earth. Lunar orbit rendezvous is also used as the baseline against which the other alternate concepts are measured. The first such alternative, libration point rendezvous, utilizes the unique characteristics of the cislunar libration point instead of a low altitude lunar parking orbit as a rendezvous and staging node. Finally, a mission strategy which does not incorporate rendezvous after the crew ascends from the Moon is also studied. In this mission strategy, the crew returns directly to Earth from the lunar surface, and is thus referred to as direct return. Figures of merit in the areas of safety and mission success, mission effectiveness, extensibility, and affordability are used to evaluate and compare the lunar orbit rendezvous, libration point rendezvous, and direct return architectures, and this paper summarizes the results of those assessments.

Geffre, Jim↗

Trajectory Design Strategies for the NGST L2 Libration Point Mission

The Origins' Next Generation Space Telescope (NGST) trajectory design is addressed in light of improved methods for attaining constrained orbit parameters and their control at the exterior collinear libration point, L2. The use of a dynamical systems approach, state-space equations for initial libration orbit control, and optimization to achieve constrained orbit parameters are emphasized. The NGST trajectory design encompasses a direct transfer and orbit maintenance under a constant acceleration. A dynamical systems approach can be used to provide a biased orbit and stationkeeping maintenance method that incorporates the constraint of a single axis correction scheme.

Folta, David↗

Sun-earth libration point trajectories that avoid the solar exclusion zone

Three-dimensional orbits in the restricted three-body problem have been the subject of a number of recent studies. One type of three-dimensional, quasi-periodic orbit that emanates from the general vicinity of the collinear libration points is known as a 'Lissajous' trajectory. Future mission plans include trajectories near the interior libration point. (L1) in the sun-earth system and may consider Lissajous orbits as part of the trajectory design. Such orbits may be constrained, however, to remain beyond the region of the solar disk as viewed from earth. This effort involves the numerical determination of Lissajous trajectories of arbitrary, but predetermined, length that never violate such a constraint as a result of maneuvers directed, in general, perpendicular to the ecliptic plane.

Howell, K. C.↗

Early Mission Maneuver Operations for the Deep Space Climate Observatory Sun-Earth L1 Libration Point Mission

The Deep Space Climate Observatory mission launched on February 11, 2015, and inserted onto a transfer trajectory toward a Lissajous orbit around the Sun-Earth L1 libration point. This paper presents an overview of the baseline transfer orbit and early mission maneuver operations leading up to the start of nominal science orbit operations. In particular, the analysis and performance of the spacecraft insertion, mid-course correction maneuvers, and the deep-space Lissajous orbit insertion maneuvers are discussed, com-paring the baseline orbit with actual mission results and highlighting mission and operations constraints..

OPERATIONS↗

Preliminary Analysis of Ground-Based Orbit Determination Accuracy for the Wide Field Infrared Survey Telescope (WFIRST)

The Wide Field Infrared Survey Telescope is a 2.4-meter telescope planned for launch to the Sun-Earth L2 point in 2026. This paper details a preliminary study of the achievable accuracy for WFIRST from ground-based orbit determination routines. The analysis here is divided into two segments. First, a linear covariance analysis of early mission and routine operations provides an estimate of the tracking schedule required to meet mission requirements. Second, a simulated operations'' scenario gives insight into the expected behavior of a daily Extended Kalman Filter orbit estimate over the first mission year given a variety of potential momentum unloading schemes.

Libration Point↗

Libration point staging options for SEI lunar missions - Station keeping implications

Libration point staging is one alternative to lunar orbit rendezvous which is being examined for the Space Exploration Initiative lunar missions. The libration point staging strategy being considered would eliminate the lunar mid-latitude accessibility constraint for long duration missions. Staging options for such a strategy are discussed with particular emphasis on the impact of the libration points' stability. The equations of motion for a satellite at the libration points are numerically integrated to investigate the stability and to determine the station-keeping requirements. These requirements are presented, and overall requirements for libration point staging briefly summarized. The results indicate that the slight eccentricity of the Moon's orbit would result in excessive station-keeping requirements for long duration missions.

Haynes, Davy A.↗

Substorm warnings - An ISEE-3 real time data system

The use of solar wind measurements made by ISEE-3 in its halo orbit around the L1 libration point to predict the onsets of magnetospheric substorms and geomagnetic storms is discussed. Consideration is given to the limitations on the predictive ability of the satellite measurements set by the bulk solar wind velocity, the elliptical orbit of the satellite and the correlation lengths of the magnetic field and the solar wind plasma. The ISEE-3 real-time data system is presented, with attention given to the ground receiving stations, the NASCOM communications system, the Multisatellite Operations Control Center and Information Processing Division at the Goddard Space Flight Center, the link between Goddard and the NOAA Space Environmental Services Center, and the NOAA Space Environment Laboratory data acquisition and display data system, which includes displays allowing storm forecasts. It is noted that the entire system should be operational by March, 1980.

Tsurutani, B.↗

Mission design for a halo orbiter of the earth

The International Sun-Earth Explorer (ISEE) scientific satellite to be stationed in 1978 in the vicinity of the sun-earth interior libration point to continuously monitor the space between the sun and the earth, including the distant geomagnetic tail is described. Orbit selection considerations for the ISEE-C are discussed along with stationkeeping requirements and fuel-optimal trajectories. Due to the alignment of the interior libration point with the sun as viewed from the earth, it will be necessary to place the satellite into a 'halo orbit' around the libration point, in order to eliminate solar interference with down-link telemetry. Parametric data for transfer trajectories between an earth parking orbit (altitude about 185 km) and a libration-point orbit are presented. It is shown that the insertion magnitude required for placing a satellite into an acceptable halo orbit is rather modest.

Farquhar, R. W.↗

An Anomalous Force on the Map Spacecraft

The Microwave Anisotropy Probe (MAP) orbits the second Earth-Sun libration point (L2)-about 1.5 million kilometers outside Earth's orbit-mapping cosmic microwave background radiation. To achieve orbit near L2 on a small fuel budget, the MAP spacecraft needed to swing past the Moon for a gravity assist. Timing the lunar swing-by required MAP to travel in three high-eccentricity phasing loops with critical maneuvers at a minimum of two, but nominally all three, of the perigee passes. On the approach to the first perigee maneuver, MAP telemetry showed a considerable change in system angular momentum that threatened to cause on-board Failure Detection and Correction (FDC) to abort the critical maneuver. Fortunately, the system momentum did not reach the FDC limit; however, the MAP team did develop a contingency strategy should a stronger anomaly occur before or during subsequent perigee maneuvers, Simultaneously, members of the MAP team developed and tested various hypotheses for the cause of the anomalous force. The final hypothesis was that water was outgassing from the thermal blanketing and freezing to the cold side of the solar shield. As radiation from Earth warmed the cold side of the spacecraft, the uneven sublimation of frozen water created a torque on the spacecraft.

Starin, Scott R.↗

Preliminary Analysis of Ground-based Orbit Determination Accuracy for the Wide Field Infrared Survey Telescope (WFIRST)

The Wide Field Infrared Survey Telescope is a 2.4-meter telescope planned for launch to the Sun-Earth L2 point in 2026. This paper details a preliminary study of the achievable accuracy for WFIRST from ground-based orbit determination routines. The analysis here is divided into two segments. First, a linear covariance analysis of early mission and routine operations provides an estimate of the tracking schedule required to meet mission requirements. Second, a simulated operations scenario gives insight into the expected behavior of a daily Extended Kalman Filter orbit estimate over the first mission year given a variety of potential momentum unloading schemes.

Estimation↗

End of Life Disposal for Three Libration Point Missions through Manipulation of the Jacobi Constant and Zero Velocity Curves

Flight Dynamics Facility (FDF) located at NASA Goddard Space Flight Center (GSFC) provides the flight dynamics expertise for three Sun-Earth Moon L1 missions. Advanced Composition Explorer (ACE) launched August 1997 Solar and Heliospheric Observatory (SOHO) launched December 1995 Global Geospace Science WIND satellite launched November 1994 entered Lagrange point orbit in 2004.

Ace↗

L1 libration point manned space habitat

Second generation stations or Manned Space Habitats (MSHs) are discussed for an Earth-Moon libration point and in lunar orbit. The conceptual design of such a station is outlined. Systems and subsystems described reflect anticipation of moderate technology growth. The evolution of the L1 environments is discussed, several selected subsystems are outlined, and how the L1 MSH will complete some of its activities is described.

Luttges, Marvin↗

Libration Point Navigation Concepts Supporting the Vision for Space Exploration

This work examines the autonomous navigation accuracy achievable for a lunar exploration trajectory from a translunar libration point lunar navigation relay satellite, augmented by signals from the Global Positioning System (GPS). We also provide a brief analysis comparing the libration point relay to lunar orbit relay architectures, and discuss some issues of GPS usage for cis-lunar trajectories.

Carpenter, J. Russell↗

Finding Acceptable James Webb Space Telescope Mission Orbits From a Fixed Ariane Flight Profile

The James Webb Space Telescope (JWST) will be launched into orbit about the Sun/Earth L2 libration point. Trajectory design was recently completed which included expected separation states from the Ariane launch vehicle, constraints such as eclipses, maximum orbit size, maximum Sun-Vehicle-Earth/Moon angles, and launch opportunities. The results of this trajectory design give a set of possible trajectories for JWST with bounded stray light zones and provide a complete launch window. This data is also used to design the initial trajectory correction maneuver such that a maneuver towards the Sun is not required.

Beckman, Mark↗

Abort Options for Human Missions to Earth-Moon Halo Orbits

Abort trajectories are optimized for human halo orbit missions about the translunar libration point (L2), with an emphasis on the use of free return trajectories. Optimal transfers from outbound free returns to L2 halo orbits are numerically optimized in the four-body ephemeris model. Circumlunar free returns are used for direct transfers, and cislunar free returns are used in combination with lunar gravity assists to reduce propulsive requirements. Trends in orbit insertion cost and flight time are documented across the southern L2 halo family as a function of halo orbit position and free return flight time. It is determined that the maximum amplitude southern halo incurs the lowest orbit insertion cost for direct transfers but the maximum cost for lunar gravity assist transfers. The minimum amplitude halo is the most expensive destination for direct transfers but the least expensive for lunar gravity assist transfers. The on-orbit abort costs for three halos are computed as a function of abort time and return time. Finally, an architecture analysis is performed to determine launch and on-orbit vehicle requirements for halo orbit missions.

Jesick, Mark C.↗