Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

DASAO: software tool for the management of safeguards, waste and decommissioning

Decommissioning of nuclear facilities is a complex process involving operations such as detailed surveys, decontamination and dismantling of equipment's, demolition of buildings and management of resulting waste and nuclear materials if any. This process takes place in a well-developed legal framework and is controlled and followed-up by stakeholders like the Safety Authority, the Radwaste management Agency and the Safeguards Organism. In the framework of its nuclear waste and decommissioning program and more specifically the decommissioning of the BR3 reactor, SCK-CEN has developed different software tools to secure the waste and material traceability, to support the sound management of the decommissioning project and to facilitate the control and the follow-up by the stakeholders. In the case of Belgium, it concerns the Federal Agency for Nuclear Control, the National Agency for radioactive waste management and fissile material and EURATOM and IAEA. In 2005, Belgonucleaire decided to shutdown her Dessel MOX fuel fabrication plant and the production stopped in 2006. According to the final decommissioning plan ('PDF') approved by NIRAS, the decommissioning works should start in 2008 at the earliest. In 2006, the management of Belgonucleaire identified the need for an integrated database and decided to entrust SCK-CEN with its development, because SCK-CEN relies on previous experience in comparable applications namely already approved by authorities such as NIRAS, FANC and EURATOM. The main objectives of this integrated software tool are: - simplified and updated safeguards; - waste and material traceability; - computerized documentation; - support to project management; - periodic and final reporting to waste and safety authorities. The software called DASAO (Database for Safeguards, Waste and Decommissioning) was successfully commissioned in 2008 and extensively used from 2009 to the satisfaction of Belgonucleaire and the stakeholders. SCK-CEN is now implementing a simplified release of the software for the management of the decommissioning of the Thetis reactor. Its decommissioning will start in March 2013 and will be completed by the end of 2014. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Consideration on Decommissioning Facilitation of Nuclear Power Plants In Korea

As the number of decommissioning NPPs worldwide increases, the necessity of decommissioning feasibility design at the initial design/construction stage of NPP is emphasized. Also as demand for NPP decommissioning increase, the generation of large amount of radioactive waste and environment contamination are expected. Based on the decommissioning experiences of nuclear facilities, it is recognized that the specific design and operational procedure are essentially required to minimize the radioactive waste generation and radiation exposure during decommissioning. Recently the legal framework of decommissioning in Korea was enhanced through the revision of Nuclear Safety Act (NSA) and its subordinate status in 2015. On the other hand, the Korean first NPP, Kori unit 1, will be scheduled permanently shut-down in mid-2017. The Korean regulatory body have experience for decommissioning of small-sized nuclear facilities like research reactors and nuclear fuel cycle facility. However we have no experience on decommissioning of NPP in Korea. Therefore the comprehensive and systematic technical standards and guidelines on safety review and inspection should be required for the Korean first case on decommissioning of NPP. According to the revised NSA, NPP operators in Korea should submit the decommissioning plan (DP) for the permanent shut-down NPP as well as the existing operating NPPs. The operator shall prepare and submit the design features and measures for decommissioning facilitation as one of DP items and regulatory body shall review the feasibility of decommissioning. Therefore the safety review guideline for those decommissioning facilitation should be required. In this paper, we studied the overseas safety requirements, design features and operational procedures for decommissioning facilitation. Through the overseas survey results, the regulatory position and major management plan were proposed for development of detailed implementation guideline on decommissioning facilitation of NPPs in Korea.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Main results of the french R and D on minor actinides partitioning, a significant improvement towards nuclear waste reduction - 15618

In the framework of the successive 1991 and 2006 Waste Management Act, French government supported a very significant R and D program on partitioning and transmutation of minor actinides (MA). This program aims to study potential solutions for still minimizing the quantity and the hazardousness of final waste, by MA recycling. Indeed, MA recycling can reduce the heat load and the half-life of most of the waste to be buried to a couple of hundred years, overcoming the concerns of the public related to the long-life of the waste. Within this framework, this paper aims to present the most recent progress obtained in CEA on the development of innovative actinide partitioning hydrometallurgical processes in support of their recycling, either in an homogeneous mode (MA are recycled at low concentration in all the standard reactor fuel) or in an heterogeneous mode (MA are recycled at higher concentration in specific targets, at the periphery of the reactor core). Recovery performances obtained on recent tests in high active conditions of the so-called GANEX and DIAMEX-SANEX process will be presented and discussed in light of the potential P and T scenarios. Finally, recent developments regarding the recycling of the sole Am will be presented as well as the results obtained on highly active solutions for this so-called EXAM process. This set of results gives to the French government a portfolio of potential recycling processes which could be separately and progressively implemented if decided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering management challenges of the CIGeO Project - 15576

After being involved for years in the conceptual studies on the French Deep Geological Repository's (DGR) design for ANDRA, INGeROP (www.ingerop.com) is carrying out since 2012 the global project management and the technical integration of the preliminary, basic and detailed design of the Cigeo project, within the framework of GAIYA consortium. The article presents some particular organizational aspects that turned out to be more challenging than foreseen in the course of our activities. Starting from the presentation of real examples, some lessons learned are derived as well as practices of interest in solving analogue issues in similar projects, with focus on their application to the engineering phase of geological repositories in different countries. Finally, the paper concludes with some avenues for reflection on the 'reversibility' - including 'retrievability' - requirement asked for by the French public and government and its consequences on the engineering choices, on the expected lifetime of components and structures and on the (increased) complexity of CIGeO systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Stewardship Challenges at the Piqua, Ohio, Decommissioned Reactor Site - 19578

This paper describes the site history following the decommissioning of the Piqua, Ohio, Nuclear Power Facility to include key features of the 1968 contract and 1969 lease agreement with the City of Piqua still in effect today. Long-term stewardship challenges facing the US Department of Energy Office of Legacy Management (LM) and the path to find long-term solutions that are in the best interest of all parties are described. Lastly, the applications of lessons learned to other LM legacy sites are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing Decommissioning Cost Estimating Relationships and the Decommissioning Estimate Analysis Library Estimating System - 20423

DOE-EM's Consolidated Business Center (EM-CBC) Office of Cost Estimating has developed a system of Decommissioning Cost Estimating Relationships (CERs) and Models to improve the reliability and efficiency of its estimates. The development builds on the multi-year process of collecting and organizing historical cost data from DOEEMs decommissioning projects and estimate model development to support project and program-level decommissioning estimates. The latest work has extended these models down to project scope element and component building area levels, allowing the actual costs of work for these estimate components to be assembled into estimates that reflect specific projects. The CERs have been incorporated into two estimator-friendly products - as cost libraries in the MII estimating program and as an MS Excel-based model, and are available for DOE federal staff use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of System Integration Analysis Activities for Integrated Waste Management

Spent nuclear fuel (SNF) generated by the current fleet of commercial nuclear reactors is being stored at the reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The US Department of Energy Office of Nuclear Energy (DOE-NE) is developing an Integrated Waste Management Program (IWMP) comprising a suite of options and supporting analyses to enable future informed choices. The IWMP is organized into the following five major areas: 1) Consent-Based Siting, 2) IWM Facilities and Equipment Concepts and Development, 3) Transportation Capability Analysis and Support, 4) Information Technology Solutions and Support, and 5) System Integration Analysis and Support. This paper discusses the activities ongoing in the IWMP System Integration Analysis and Support area. Two main areas of research in system integration are data and tools development, as well as system analysis assessments. One of the tools being developed in the system integration area is the Used Nuclear Fuel-Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS) tool. It is being developed as a foundational resource for DOE-NE to manage SNF data, along with several compatible analysis tools for time-dependent characterization of SNF and related systems. UNF-ST&DARDS has the unparalleled ability to track SNF through the entire back end of the fuel cycle—from the time the fuel is discharged from a reactor through its disposal in a geological repository. UNF ST&DARDS interfaces with the SCALE code system for nuclear analysis and COBRA-SFS for thermal analysis. Another main tool being developed is the Next Generation System Analysis Model (NGSAM). NGSAM is an agent-based simulation software tool expressly designed to be capable of modeling the waste management system. NGSAM has been developed to enable informed decision-making by providing the capability of analyzing various potential system options for the management of SNF and HLW. Using NGSAM, system architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analysis assessments may investigate the implications of various strategies such as different acceptance rates, acceptance queues, facility capacities and options, standardized canisters, and different assumed system operation start dates. Recently, some system analysis effort has begun to look at how the waste management system might operate for advanced reactor fuel cycles.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned From Decommissioning B411 Decontamination Centre at Whiteshell Laboratories - 18211

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on the largest organically cooled, heavy water moderated nuclear reactor in the world, the WR-1. It is now operated by Canadian Nuclear Laboratories (CNL) and is the first major decommissioning project of a nuclear research establishment in Canada. One of the major projects to support the closure of Whiteshell Laboratories (WL) is the decommissioning and demolition of the Building 411 (B411) Decontamination Centre, which provided a decontamination service for maintaining research and development of experimental rigs, equipment and tools in a safe usable state. It also provided a laundry service for radioactively contaminated clothing. The team successfully self-performed their first demolition of a nuclear facility, but not without challenges. The baseline decommissioning strategy assumed most of the facility would meet unconditional clearance levels; however when characterization revealed the extent of contamination exceeded initial assumptions projected from process knowledge, in conjunction with resource challenges and a waste disposal pathway not firmly established, active remediation of the facility was undertaken. With an unknown waste acceptance criteria for the future waste disposal facility, sludge that had accumulated in a tank used to collect xylene and organic coolant from contaminated tools and equipment and the selection of appropriate waste packages for waste storage, transportation and disposal forced the project team to adjust their demolition timeline. This, coupled with developing an open air demolition plan and managing an uncertain end state criteria, were just some of the major tasks the team successfully navigated. The impact on both schedule and cost performance caused by the change in strategy, and the lessons learned experienced by the WL Decommissioning Project Team that are being applied as the Whiteshell Laboratories Closure Project (WLCP) moves forward with the next major decommissioning challenge, are highlighted in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Year Work Plan to De-Inventory TRU Waste Stored at LANL - 12121

The Los Alamos National Laboratory (LANL) continues to accelerate disposition of transuranic (TRU) waste stored at its Technical Area 54 (TA-54) Area G waste management facility. The current focus is on complete removal of all non-cemented above-grade Legacy and newly-generated TRU waste that was in storage on October 1, 2011, by no later than June 30, 2014. This inventory of above-grade TRU is defined as 3,706 m{sup 3} of material. Legacy TRU waste containers were placed into storage up to 40 years ago, and most of the older containers must be remediated to address compliance issues before the waste can be characterized, certified as meeting the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), and shipped for disposition. More than half of the remaining TRU waste volume stored above grade is contained within oversize boxes that contain waste items that must be repackaged or size reduced. Facilities and major types of equipment needed to remediate and characterize the TRU waste inventory are largely in place, but two additional oversize box processing lines are being implemented in 2012. Multiple work shifts are planned for most remediation lines in 2013. An integrated risk-based project management schedule for all disposition activities has been developed that is based on a 'Solution Package' approach. Inventories of containers that have issues in common were compiled into about 15 waste categories and about 70 'Solution Packages' that identify all of the activities needed to disposition the inventory of TRU waste in storage. Scheduled activities include all precursor activities to begin remediation, remediation processing, characterization and certification to the WIPP WAC, and shipping of containers to WIPP. Processing of the 3,706 m{sup 3} is projected to result in about 4,500 55-gallon (208 L) drums and 1,000 standard waste boxes that will be shipped to WIPP. About 385 shipments from LANL to WIPP are projected before June 30, 2014, to ship these containers, at a rate of 5 to 6 shipments a week. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DISTINCTIVE University Consortium: AGR, Magnox and Exotic Spent Fuels - 18345

The Engineering and Physical Sciences Research Council (EPSRC) sponsored consortium Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories (DISTINCTIVE) is contributing to the development of skilled cross-disciplinary scientists and engineers with the knowledge and experience required to develop engineering solutions tailored for application within radiologically contaminated sites. Of the four themes addressed by the DISTINCTIVE consortium, the AGR (Advanced Gas-Cooled Reactor), Magnox and Exotic Spent Fuels theme considers the UK's diverse spent nuclear fuel inventory and the preferred options for disposal; this includes the retrieval of fuel from current storage facilities and the repackaging options available. Specifically, the research is concerned with AGR, Magnox and so-called 'Exotic' spent fuels; the goal being to increase knowledge and mechanistic understanding of the processes affecting long-term management and mitigation of any potential risks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On SCALE Validation for PBR Analysis

Studies were performed to assess the capabilities of the SCALE code system to provide accurate cross sections for analyses of pebble bed reactor configurations. The analyzed configurations are representative of fuel in the HTR-10 reactor in the first critical core and at full power operation conditions. Relevant parameters-multiplication constant, spectral indices, few-group cross sections-are calculated with SCALE for the considered configurations. The results are compared to results obtained with corresponding consistent MCNP models. The code-to-code comparison shows good agreement at both room and operating temperatures, indicating a good performance of SCALE for analysis of doubly heterogeneous fuel configurations. The development of advanced methods and computational tools for the analysis of pebble bed reactor (PBR) configurations has been a research area of renewed interest for the international community during recent decades. The PBR, which is a High Temperature Gas Cooled Reactor (HTGR) system, represents one of the potential candidates for future deployment throughout the world of reactor systems that would meet the increased requirements of efficiency, safety, and proliferation resistance and would support other applications such as hydrogen production or nuclear waste recycling. In the U.S, the pebble bed design is one of the two designs under consideration by the Next Generation Nuclear Plant (NGNP) Program.

08 HYDROGEN↗

Development of an Alternative Approach to Demonstrating Environmental Performance in the UK - 19354

European basic safety standards require that exposure of humans to the potentially harmful effects of ionising radiation are optimised so that they are as low as reasonably achievable, taking account of economic and societal factors. In the United Kingdom the responsibility for ensuring that exposures to humans are optimised is split between two regulatory functions. The Office of Nuclear Regulation regulates exposures to workers in all scenarios and to members of the public in the event of an accident. Environmental regulators in each of the four nations comprising the United Kingdom regulate exposures to members of the public from normal operations. Since the early 1990's, all permissions granted to nuclear sites in the UK for the discharge/disposal of radioactive waste to the environment have contained conditions requiring holders to demonstrate that they minimise the generation of radioactive waste, apply appropriate abatement and discharge/dispose of it in a way that minimises impacts on members of the public and the environment. For many years, the industry standard for providing this demonstration, which was heavily influenced by regulatory expectations and feedback, was to undertake one or a series of multi-attribute decision assessments (MADA). Wood's team of environmental specialists has been involved in undertaking such MADA studies for many years. Since the mid-2000's, our team has become increasingly aware of some of the limitations of undertaking MADA to demonstrate environmental performance for large scale new nuclear build projects and, in particular, the next generation of new nuclear power stations that are being planned and implemented in the UK. We have collaborated with the vendors of reactor technologies, the prospective/owner operators of new nuclear power stations and the developers of new facilities on existing sites to develop an alternative approach to demonstrating environmental performance. Our alternative approach comprises three main pillars which are summarised as: - Evolution - benefit from progressive improvements, operational experience and recent permitting activities. Our alternative approach uses the claim, argument, evidence approach which is commonly used for nuclear safety cases and which allows us to 'tell the story' of how environmental performance has been achieved. We have successfully deployed this approach for all new nuclear power stations proposed in the UK. - Integration - ensure that optimisation is integrated into the project programme and forms part of the 'big picture'. Our alternative approach allows environmental performance to be managed better throughout the life cycle of the project and ensures that our outputs are 'living' documents and do not 'sit on the shelf'. We have successfully demonstrated how this can be applied during rationalisation of major schemes and significant design changes on nuclear new build projects. - Opportunity - identify the best time to deliver elements of the programme. Our alternative approach aims to minimise the overall time, trouble and costs associated with demonstrating environmental performance by ensuring that decisions are made at the time when they offer greatest benefit and by minimising unnecessary rework. Our advice has helped to reduce the project costs and minimise delays associated with regulatory queries and interventions. This paper describes the journey that we have taken with our clients in developing our alternative approach to demonstrating environmental performance. We explain the UK regulatory context and explore the need for change. We present a number of case studies related to new nuclear power stations and other new facilities on existing nuclear sites that demonstrate the successful application of our alternative approach. We provide examples of how we have successfully implemented the outputs of our alternative approach into project and corporate management arrangements. Finally, we examine feedback from clients, regulators and other interested parties to propose future refinements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Routing Options for Transporting Commercial Spent Nuclear Fuel in the Continental United States - 17504

The U.S. Department of Energy (DOE) has a goal to develop solutions for the long-term, sustainable management of the nation's spent nuclear fuel and high-level radioactive waste. The DOE is planning for an integrated waste management system to transport, store, and dispose of spent nuclear fuel and high-level radioactive waste from commercial electricity generation, as well national defense activities. The DOE Office of Nuclear Energy (DOE-NE), Office of Spent Fuel and Waste Disposition's (SFWD) Integrated Waste Management (IWM) program is applying integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. Integrated waste management system architecture analyses are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all aspects of the back-end of the nuclear fuel cycle (transportation, storage, and disposal). One aspect of a potential future nuclear waste management system is transportation of spent nuclear fuel from the fleet of commercial nuclear reactors to destinations where waste management facilities, such as an interim storage facility, would be located. Example rail transportation routes from commercial nuclear reactor sites to various locations in the continental U.S. - chosen as hypothetical locations for future waste management system facilities - were evaluated in 2014 using DOE's GIS-based Stakeholder Tool for Assessing Radioactive Transportation (START). The objective of that evaluation was to identify and parameterize generic transportation routes for use in integrated waste management system analyses, the associated uncertainty in these selections, and the uncertainty associated with different transportation route selection criteria. The analysis presented herein considers rail transportation routes from commercial nuclear reactor sites to hypothetical destinations within the continental U.S. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

10 CFR 851, Worker Safety & Health Program↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NNSA-IAEC Science Area V Environmental ISR: Waste Management and Subsurface Science (Final Report FY18-FY20)

In August 2017, the U.S. National Nuclear Security Administration (NNSA) and the Israel Atomic Energy Commission (IAEC) launched a joint waste management program to evaluate the feasibility of siting a radioactive waste repository at intermediate depths in Israel. The bilateral collaboration involves three National Laboratories (LLNL, LANL, and Sandia), and the Nuclear Research Center, Negev, Geological Survey of Israel, and Ben Gurion University in Israel. This research is designed to assist with the evaluation of locations for an intermediate nuclear waste repository in Israel. This final report is a high-level summary of the results from the past three years by the team that worked on the WM-2: Radionuclide colloid-facilitated transport in fractured carbonate rock project for Science Area V, Environmental ISR: Subsurface Science and Waste Management. We have completed all of our tasks and met all of our milestones. MW-2 had three integrated tasks. Task 1 was laboratory experiments investigating colloid transport of radionuclides in natural fractured carbonate rocks from the Avdat formation, Israel. Task 2 was field experiments injecting radionuclide analogues pre-sorbed to clay colloids into fractured carbonate rock, and task 3 was numerical modeling of laboratory and field experimental results to assess the importance of colloids in the migration of relevant radionuclides. This task was incorporated into tasks 1 and 2. A 4 th task was initiated in FY20, to investigate the role of organics in facilitating radionuclide transport under the same conditions explored in task 1 due to the high organic content of the rocks being investigated for the immediate borehole locations. Preliminary results will be summarized here and the work will continue in FY21-23. The overall objective of this research is to evaluate the role of colloids (naturally occurring < 1 micron particles) in facilitating the transport of long-lived radionuclides from a nuclear waste repository situated in fractured carbonate rocks. Currently little data exists on radionuclide transport in carbonate rocks, but this is the main rock type available for siting a repository in Israel. Laboratory experiments were carried out in both Israel and the U.S., field experiments have taken place in Israel, and reactive transport modeling involved LLNL, LANL and Israel partner institutions. LLNL hosted a graduate student, Emily Tran, from Ben Gurion University in FY18 and FY19 and much of the work presented here was part of her PhD research.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Nevada Test Site Radioactive and Mixed Waste Disposal Operations

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office Environmental Management Program is responsible for carrying out the disposal of on-site and off-site generated low-level radioactive waste (LLW) and low-level radioactive mixed waste (MW) at the Nevada Test Site (NTS). Core elements of this mission are ensuring safe and cost-effective disposal while protecting workers, the public, and the environment. This paper focuses on the impacts of new policies, processes, and opportunities at the NTS related to LLW and MW. Covered topics include: the first year of direct funding for NTS waste disposal operations; zero tolerance policy for non-compliant packages; the suspension of mixed waste disposal; waste acceptance changes; DOE Consolidated Audit Program (DOECAP) auditing; the 92-Acre Area closure plan; new eligibility requirements for generators; and operational successes with unusual waste streams.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗