Search NASA⌕ Search

SEARCH · Search NASA

Results for “ORBITAL ASSEMBLY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Modal identification experiment

The Modal Identification Experiment (MIE) is a proposed on-orbit experiment being developed by NASA's Office of Aeronautics and Space Technology wherein a series of vibration measurements would be made on various configurations of Space Station Freedom (SSF) during its on-orbit assembly phase. The experiment is to be conducted in conjunction with station reboost operations and consists of measuring the dynamic responses of the spacecraft produced by station-based attitude control system and reboost thrusters, recording and transmitting the data, and processing the data on the ground to identify the natural frequencies, damping factors, and shapes of significant vibratory modes. The experiment would likely be a part of the Space Station on-orbit verification. Basic research objectives of MIE are to evaluate and improve methods for analytically modeling large space structures, to develop techniques for performing in-space modal testing, and to validate candidate techniques for in-space modal identification. From an engineering point of view, MIE will provide the first opportunity to obtain vibration data for the fully-assembled structure because SSF is too large and too flexible to be tested as a single unit on the ground. Such full-system data is essential for validating the analytical model of SSF which would be used in any engineering efforts associated with structural or control system changes that might be made to the station as missions evolve over time. Extensive analytical simulations of on-orbit tests, as well exploratory laboratory simulations using small-scale models, have been conducted in-house and under contract to develop a measurement plan and evaluate its potential performance. In particular, performance trade and parametric studies conducted as part of these simulations were used to resolve issues related to the number and location of the measurements, the type of excitation, data acquisition and data processing, effects of noise and nonlinearities, selection of target vibration modes, and the appropriate type of data analysis scheme. The purpose of this talk is to provide an executive-summary-type overview of the modal identification experiment which has emerged from the conceptual design studies conducted to-date. Emphasis throughout is on those aspects of the experiment which should be of interest to those attending the subject utilization conference. The presentation begins with some preparatory remarks to provide background and motivation for the experiment, describe the experiment in general terms, and cite the specific technical objectives. This is followed by a summary of the major results of the conceptual design studies conducted to define the baseline experiment. The baseline experiment which has resulted from the studies is then described.

Kvaternik, Raymond G.↗

On-orbit parametric identification methodology

On-orbit system identification (ID) of large space systems is essential for various reasons. For example, the complex composite structure of such systems cannot be ground-tested; their structural dynamic characteristics must be known accurately in order to accomplish active control. Furthermore, such capability can be used to characterize/identify various disturbances. The identification process is consisted of four principal elements: (1) modeling, (2) the estimation algorithm, (3) input system, and (4) measurement system. These elements are highly correlated and all togerher determine the success of the identification problem. Accurate modeling of large space systems is the most important element of the identification process. Large flexible structures are non-linear and infinite dimensional systems with highly coupled parameters and low frequency packed modes. In addition, these systems are subject to stochastic and time-varying disturbances, they have structural parameters which can vary due to on-orbit assembly deployment, and operations. These systems are generally; however, represented by constant coefficient, finite order differential equations. The non-linearities, coupling and noise effects are also often neglected. Moreover, identification experiment designs which lead to highly complex optimization problems usually require the simultaneous choice of ID algorithm, sensor, and actuator type and placement. On-orbit bandwidth and power restrictions on excitation, limited data window, and restrictions on sensor/actuator type, placement and number, has led to practical questions of implementations.

Hadaegh, Fred Y.↗

Skylab Operations Handbook: Orbital Workshop (OWS), Airlock Module (AM), Multiple Docking Adapter (MDA): Systems Descriptions - Volume 1

The Skylab Program consists of three low-earth-orbit missions of the Orbital Assembly (OA) (figure 1.0-1), extending over.an a-month period. The OA consists of the CSM docked to the Saturn Workshop.(SWS). This handbook describes the systems for three of the four major components of the SWS (OWS, AM, and MDA), and also discusses significant interfaces with the Instrument Unit (IU), ATM, and CSM. The other major component of the SWS, the ATM, is treated separately in its own handbook. The OWS, AM, MDA, ATM Deployment Assembly (ATM-DA), Fixed Airlock Shroud (FAS), Payload Shroud (PS), and IU are addressed throughout this document as individual modules from a structural standpoint only. Although normally considered a part of the launch vehicle, the IU is treated in this document as part of the SWS because of its function in preparing the SWS for orbital operation. Section 1.0 describes vehicle and mission configurations of the Skylab program and provides general descriptions of the various systems. Section 2.0 provides detailed systems data covering system interfaces, functional description, subsystems and major components description, component operation, failure modes, performance and design data, operational limitations and restrictions, and instrumentation, and briefly outlines the experiments. Section 3.0 contains illustrations of all panels and identifies the controls and displays, panels, reference designators, nomenclature, functions, circuit breakers, and power sources. The Table of Contents lists in order of appearance all sections, subsections, major paragraphs, illustrations, and tables and provides their respective page locations. Appendix A defines the abbreviations and acronyms employed throughout this handbook, and Appendix B explains the symbols used. Appendix C is a locator index that references component controls contained in Section 3.0. Appendix D is an alphabetical index of paragraph headings, illustrations, and tables, according to the key word, with applicable page numbers. Additional items of significance to the user have been included in the index. The technical level to which this document is written assumes the reader to have general knowledge of engineering terms and principles.

West, W. D.↗

An Efficient and Versatile Means for Assembling and Manufacturing Systems in Space

Within NASA Space Science, Exploration and the Office of Chief Technologist, there are Grand Challenges and advanced future exploration, science and commercial mission applications that could benefit significantly from large-span and large-area structural systems. Of particular and persistent interest to the Space Science community is the desire for large (in the 10- 50 meter range for main aperture diameter) space telescopes that would revolutionize space astronomy. Achieving these systems will likely require on-orbit assembly, but previous approaches for assembling large-scale telescope truss structures and systems in space have been perceived as very costly because they require high precision and custom components. These components rely on a large number of mechanical connections and supporting infrastructure that are unique to each application. In this paper, a new assembly paradigm that mitigates these concerns is proposed and described. A new assembly approach, developed to implement the paradigm, is developed incorporating: Intelligent Precision Jigging Robots, Electron-Beam welding, robotic handling/manipulation, operations assembly sequence and path planning, and low precision weldable structural elements. Key advantages of the new assembly paradigm, as well as concept descriptions and ongoing research and technology development efforts for each of the major elements are summarized.

Dorsey, John T.↗

Establishing In-Space Assembly Technical Collaboration Environments Through Functional Capability Analyses

NASA OCT strategically collaborates with other government space agencies to find enterprise synergistic technology solutions to benefit the Nation through leadership of the interagency Science and Technology Partnership Forum. Successful collaborations depend on integrating knowledge across the intersection of industry, academe, and government within pioneering technical areas such as in-space assembly. High-quality data products that are timely, accurate, and trusted are used to communicate with internal and external stakeholders to influence portfolios by focusing investments to maximize impact on NASA missions and the U.S. economy. These data products succinctly describe and convey the breadth and dependencies of multiple capabilities, while incorporating diverse technical perspectives, to articulate and inform interagency collaborative developments of autonomous on-orbit assembly technologies.

Rodgers, Erica↗

Pre-Launch Risk Reduction Activities Conducted at KSC for the International Space Station

In the development of any large scale space-based multi-piece assembly effort, planning must include provisions for testing and verification; not only of the individual pieces but also of the pieces together. Without such testing on the ground, the risk to cost, schedule and technical performance increases substantially. This paper will review the efforts undertaken by the International Space Station (ISS), including the International Partners, during the pre-launch phase, primarily at KSC, to reduce the risks associated with the on-orbit assembly and operation of the ISS.

Kirkpatrick, Paul↗

Unpressurized Logistics Carriers for the International Space Station: Lessons Learned

The International Space Station has been in development since 1984, and has recently begun on orbit assembly. Most of the hardware for the Space Station has been manufactured and the rest is well along in design. The major sets of hardware that are still to be developed for Space Station are the pallets and interfacing hardware for resupply of unpressurized spares and scientific payloads. Over the last ten years, there have been numerous starts, stops, difficulties and challenges encountered in this effort. The Space Station program is now entering the beginning of orbital operations. The Program is only now addressing plans to design and build the carriers that will be needed to carry the unpressurized cargo for the Space Station lifetime. Unpressurized carrier development has been stalled due to a broad range of problems that occurred over the years. These problems were not in any single area, but encompassed budgetary, programmatic, and technical difficulties. Some lessons of hindsight can be applied to developing carriers for the Space Station. Space Station teams are now attempting to incorporate the knowledge gained into the current development efforts for external carriers. In some cases, the impacts of these lessons are unrecoverable for Space Station, but can and should be applied to future programs. This paper examines the progress and problems to date with unpressurized carrier development identifies the lessons to be learned, and charts the course for finally accomplishing the delivery of these critical hardware sets.

Robbins, William W., Jr.↗

Nuclear Thermal Propulsion (NTP): A Proven, Growth Technology for Fast Transit Human Missions to Mars

The "fast conjunction" long surface stay mission option was selected for NASA's recent Mars Design Reference Architecture (DRA) 5.0 study because it provided adequate time at Mars (approx. 540 days) for the crew to explore the planet's geological diversity while also reducing the "1-way" transit times to and from Mars to approx. 6 months. Short transit times are desirable in order to reduce the debilitating physiological effects on the human body that can result from prolonged exposure to the zero-gravity (0-gE) and radiation environments of space. Recent measurements from the RAD detector attached to the Curiosity rover indicate that astronauts would receive a radiation dose of approx. 0.66 Sv (approx. 66 rem)-the limiting value established by NASA-during their 1-year journey in deep space. Proven nuclear thermal rocket (NTR) technology, with its high thrust and high specific impulse (Isp approx. 900 s), can cut 1-way transit times by as much as 50 percent by increasing the propellant capacity of the Mars transfer vehicle (MTV). No large technology scale-ups in engine size are required for these short transit missions either since the smallest engine tested during the Rover program-the 25 klbf "Pewee" engine is sufficient when used in a clustered arrangement of three to four engines. The "Copernicus" crewed MTV developed for DRA 5.0 is a 0-gE design consisting of three basic components: (1) the NTP stage (NTPS); (2) the crewed payload element; and (3) an integrated "saddle truss" and LH2 propellant drop tank assembly that connects the two elements. With a propellant capacity of approx. 190 t, Copernicus can support 1-way transit times ranging from approx. 150 to 220 days over the 15-year synodic cycle. The paper examines the impact on vehicle design of decreasing transit times for the 2033 mission opportunity. With a fourth "upgraded" SLS/HLV launch, an "in-line" LH2 tank element can be added to Copernicus allowing 1-way transit times of 130 days. To achieve 100 to 120 day transit times, Copernicus' saddle truss/drop tank assembly is replaced by a "star truss" assembly with paired modular drop tanks to further increase the vehicle's propellant capacity. The HLV launch count increases (from approx. 5 to 7) and a fourth engine is needed to reduce total mission burn time and gravity losses. Using a "split mission" approach, the NTPS, in-line tank and the saddle truss/LH2 drop tank elements can be configured as a pre-deployed Earth Return Vehicle/propellant tanker supporting 90-day crewed mission transits. The split mission approach also eliminates the need for on-orbit assembly. Mission scenario descriptions, key features and operational characteristics for five different vehicle configurations are presented.

Borowski, Stanley K.↗

Space station architectural issues - The view from science

The evolution from current missions in space from Shuttle-directed to space station-directed is projected, with consideration given to space station missions that will affect the station architecture. The Shuttle science mission is basically to support astronomy and astrophysics work into the 1990s, particularly in launching and refurbishing satellites such as the SMM, the Space Telescope, and the Gamma Ray Observatory. Various new observational facilities are being planned and may be carried by the Shuttle for assembly in orbit. The assembly crews could live on a space station if sufficient capabilities and size were built into the station. The construction of large instruments in orbit, instruments that cannot be launched by any current booster, could permit enough data to be gathered to successfully characterize the evolution of the Universe.

Mcdonald, F. B.↗

Near-Earth Phase Risk Comparison of Human Mars Campaign Architectures

A risk analysis of the launch, orbital assembly, and Earth-departure phases of human Mars exploration campaign architectures was completed as an extension of a probabilistic risk assessment (PRA) originally carried out under the NASA Constellation Program Ares V Project. The objective of the updated analysis was to study the sensitivity of loss-of-campaign risk to such architectural factors as composition of the propellant delivery portion of the launch vehicle fleet (Ares V heavy-lift launch vehicle vs. smaller/cheaper commercial launchers) and the degree of launcher or Mars-bound spacecraft element sparing. Both a static PRA analysis and a dynamic, event-based Monte Carlo simulation were developed and used to evaluate the probability of loss of campaign under different sparing options. Results showed that with no sparing, loss-of-campaign risk is strongly driven by launcher count and on-orbit loiter duration, favoring an all-Ares V launch approach. Further, the reliability of the all-Ares V architecture showed significant improvement with the addition of a single spare launcher/payload. Among architectures utilizing a mix of Ares V and commercial launchers, those that minimized the on-orbit loiter duration of Mars-bound elements were found to exceed the reliability of no spare all-Ares V campaign if unlimited commercial vehicle sparing was assumed

Manning, Ted A.↗

Skylab RTCC mass properties system requirements

The computation equations and flow charts are presented for the Real Time Computer Complex mass properties system for computing and maintaining weight and centers of gravity for the CSM and orbital assembly, and SPS engine trim angles.

Hischke, E. R.↗

Orbital operations study. Volume 2: Interfacing activities analysis. Part 2: Structural and mechanical group

The activities of the structural and mechanical activity group of the orbital operations study project are discussed. Element interfaces, alternate approaches, design concepts, operational procedures, functional requirements, design influences, and approach selection are presented. The following areas are considered: (1) mating, (2) orbital assembly, (3) separation, EOS payload deployment, and EOS payload retraction.

Mattson, H. L.↗

Control system optimization studies. Volume 1: Payload deployment study

An analysis of the critical parameters involved in designing systems for spacecraft maneuvers involved in stationkeeping, docking, orbital assembly, satellite inspection and retrieval, and payload deployment is presented. The fixed base simulation was performed on a hybrid computer and includes a cathode ray tube display so that the maneuvers can be visually monitored by a pilot located in the active vehicle. Both automatic and manual control modes are included and the pilot can switch between the two modes as desired. A complete description of the hybrid simulation is provided and simulation results are described. Major digital subroutines, flow charts, and analog wiring diagrams are provided.

Heeschen, G. M.↗

Skylab program payload integration. TO27 sample array

The objective of the TO27 sample array was to determine the change in optical properties of various transmissive windows, mirrors, and diffraction gratings caused by the deposition of contaminants found about the orbital assembly. The expected information to be obtained from the total TO27 sample array program is as follows: (1) effect of space contaminants on transmittance, reflectance, grating efficiency, and polarization; (2) variations in deposition of contaminants due to substrate, solar radiation, period of exposure, direction of exposure, and geometry effects; (3) identification of contaminants and source of evolution; (4) time of contaminant evolution and lingering time; and (5) guidelines for a model of spacecraft contamination.

Muscari, J. A.↗

Manufacturing in space and materials sciences on Skylab

Two main groups of manufacturing and materials studies were performed during the Skylab missions. The first group of experiments studied processes which are important in orbital assembly and construction, including melting, solidification, brazing, welding, and cutting. The second group concerned the manufacture of specific materials, including metallic alloys, single crystals, doped semiconductors, composite materials, and multicomponent superconductors. The present paper discusses several specific experiments conducted on Skylab. In general, the processes tested produced materials of higher quality in space than they would have on earth. The experiments prove that the elimination of gravitational forces has a decisive effect on a number of materials processes.

Stuhlinger, E.↗

Space shuttle EVA opportunities

A technology assessment is presented on space extravehicular activities (EVA) that will be possible when the space shuttle orbiter is completed and launched. The use of EVA in payload systems design is discussed. Also discussed is space crew training. The role of EVA in connection with the Large Space Telescope and Skylab are described. The value of EVA in constructing structures in space and orbital assembly is examined. Excellent color illustrations are provided which show the proposed EVA functions that were described.

Bland, D. A., Jr.↗

Operations research investigations of satellite power stations

A systems model reflecting the design concepts of Satellite Power Stations (SPS) was developed. The model is of sufficient scope to include the interrelationships of the following major design parameters: the transportation to and between orbits; assembly of the SPS; and maintenance of the SPS. The systems model is composed of a set of equations that are nonlinear with respect to the system parameters and decision variables. The model determines a figure of merit from which alternative concepts concerning transportation, assembly, and maintenance of satellite power stations are studied. A hybrid optimization model was developed to optimize the system's decision variables. The optimization model consists of a random search procedure and the optimal-steepest descent method. A FORTRAN computer program was developed to enable the user to optimize nonlinear functions using the model. Specifically, the computer program was used to optimize Satellite Power Station system components.

Cole, J. W.↗