Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Assessment of Delivery Accuracy in an Operational-Like Environment

In order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.

Air Traffic Scheduling↗

Numerical Simulations of the XR-5 Hall Thruster for Life Assessment at Different Operating Conditions

NASA's Jet Propulsion Laboratory has been investigating the applicability of Aerojet Rocketdyne's XR-5 thruster, a 4.5 kW class Hall thruster, for deep-space missions. Major considerations for qualifying the XR-5 for deep-space missions are demonstration of a wide throttling envelope and a usable life capability in excess of 10,000 h. Numerical simulations with the 2-D axisymmetric code Hall2De are employed to inform the qualification process by assessing erosion rates at the thruster surfaces in a wide range of throttling conditions without the need for conducting costly endurance testing. In previous work at JPL by Jorns et al., the anomalous collision frequency distribution for 11 different throttling conditions of the XR-5 spanning 0.3-4.5 kW were identified based on probe measurements of the electron temperature in the near plume region. In this paper, we provide estimates for the erosion rates at the channel walls and pole covers for the same 11 conditions. Uncertainties in the plasma measurements and in the anomalous collision frequency distribution are addressed by determining upper and lower bounds of the erosion rates. Results suggest that erosion of the walls only occurs in the last 5% of the acceleration channel and the rate of such erosion decreases as the geometry of the thruster changes in time due to magnetic shielding. A quasi-zero-erosion state is eventually achieved in all the examined throttling conditions. Examination of the results for pole surface erosion and estimated cathode life indicates that the XR-5 propellant throughput capability will exceed 700 kg, which provides 50% margin over the usable throughput capability of 466 kg as already demonstrated in wear testing.

Lopez Ortega, Alejandro↗

Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

Garrocq, C. A.↗

Assessment of the operating characteristics of the SSME LOX turbopump pump-end bearing

A bearing/shaft model of the SSME LOX turbopump was developed using the SHABERTH bearing/shaft math modeling computer code. A previously developed bearing/shaft thermal model of the SSME LOX turbopump turbine and bearing was used in conjunction with SHABERTH to evaluate the thermomechanical operating characteristics of the LOX turbopump end bearings. Results show that for the two unmounted diametrical clearances evaluated (4.0 mils and 6.3 mils), the inboard pump end bearing supports about 81% of the isolator load for the small clearance and 77% of the isolator load for the larger clearance. Bearing clearance changes due to thermal effects were 40% for the 4.0 mil diametrical clearance case and 19% for the 6.3 mil clearance case evaluated. The thermal analysis included evaluation of bearing temperatures for a subcooled case and a saturated case. Results indicate that no drastic temperature change occurred between the two cases. Since the rolling element and race surfaces of the subcooled case were at temperatures sufficiently high enough to be vapor blanketed, exceeding saturation temperature at the bearing inlet did not increase surface temperatures greatly.

New, L. S.↗

Human Engineering Operations and Habitability Assessment: A Process for Advanced Life Support Ground Facility Testbeds

Design and Human Engineering (HE) processes strive to ensure that the human-machine interface is designed for optimal performance throughout the system life cycle. Each component can be tested and assessed independently to assure optimal performance, but it is not until full integration that the system and the inherent interactions between the system components can be assessed as a whole. HE processes (which are defining/app lying requirements for human interaction with missions/systems) are included in space flight activities, but also need to be included in ground activities and specifically, ground facility testbeds such as Bio-Plex. A unique aspect of the Bio-Plex Facility is the integral issue of Habitability which includes qualities of the environment that allow humans to work and live. HE is a process by which Habitability and system performance can be assessed.

Connolly, Janis H.↗

Mars Reconnaissance Orbiter Operational Aerobraking Phase Assessment

The Mars Reconnaissance Orbiter (MRO) was inserted into orbit around Mars on March 10, 2005. After a brief delay, it began the process of aerobraking - using the atmospheric drag on the vehicle to reduce orbital period. The aerobraking phase lasted approximately 5 months (April 4 to August 30, 2006), during which teams from the Jet Propulsion Laboratory, Lockheed Martin Space Systems Corporation, and NASA Langley Research Center worked together to monitor and maneuver the spacecraft such that thermal margin on the solar arrays was maintained while schedule margin was upheld to provide a final local mean solar time (LMST) at ascending node of 3:00pm on the final aerobraking orbit. This paper will focus on the contribution of the flight mechanics team at NASA Langley Research Center (LaRC) during the aerobraking phase of the MRO mission.

Prince, Jill L.↗

Vertiport Management from Simulation to Flight: Continued Human Factors Assessment of Vertiport Operations

The Urban Air Mobility concept envisions a new future for transportation in urban environments, primarily focused around vertiport operations. A vertiport refers to an identifiable ground or elevated area used for the vertical takeoff and landing of an aircraft. One critical role within vertiport operations that has been proposed but is under-researched is the vertiport manager. The vertiport manager is expected to manage the ground-to-air operations at the vertiport, but their precise responsibilities, tasks, and challenges are currently undefined. The High Density Vertiplex Subproject at NASA is responsible for developing and testing technologies, concepts, and architectures that will support the infrastructure needed for terminal environments around vertiports. Our previous work investigated ground control station operators performing simulated and live flight operations within a remote operations environment. In the current study, we extended from our previous work to explore the role of a vertiport manager. Specifically, we investigated five participants serving as a vertiport manager across both simulated and live flight operations. We performed multiple knowledge elicitation techniques, a thematic content analysis of qualitative data, and naturalistic observations to create a list of insights, design and training recommendations, and a simplified cognitive task diagram of the vertiport manager’s primary task. Findings from this study are discussed within the context of the current debate on the degree to which this role should be automated. A third alternative is suggested to allow a human vertiport manager to be successful by teaming with increasingly autonomous systems, designing the role to improve safety and efficiency of Urban Air Mobility operations.

AAM↗

Vertiport Management from Simulation to Flight: Continued Human Factors Assessment of Vertiport Operations

The Urban Air Mobility concept envisions a new future for transportation in urban environments, primarily focused around vertiport operations. A vertiport refers to an identifiable ground or elevated area used for the vertical takeoff and landing of an aircraft. One critical role within vertiport operations that has been proposed but is under-researched is the vertiport manager. The vertiport manager is expected to manage the ground-to-air operations at the vertiport, but their precise responsibilities, tasks, and challenges are currently undefined. The High Density Vertiplex Subproject at NASA is responsible for developing and testing technologies, concepts, and architectures that will support the infrastructure needed for terminal environments around vertiports. Our previous work investigated ground control station operators performing simulated and live flight operations within a remote operations environment. In the current study, we extended from our previous work to explore the role of a vertiport manager. Specifically, we investigated five participants serving as a vertiport manager across both simulated and live flight operations. We performed multiple knowledge elicitation techniques, a thematic content analysis of qualitative data, and naturalistic observations to create a list of insights, design and training recommendations, and a simplified cognitive task diagram of the vertiport manager’s primary task. Findings from this study are discussed within the context of the current debate on the degree to which this role should be automated. A third alternative is suggested to allow a human vertiport manager to be successful by teaming with increasingly autonomous systems, designing the role to improve safety and efficiency of Urban Air Mobility operations.

AAM↗

Advocacy and technology assessment

A highly structured treatment is presented of adversarial systems as they apply to technology assessment. One approach to the problem of adequate criteria of assessment focuses upon the internal operations of assessment entities; operations include problem perception, problem formulation, selection, utilization, determination, and evaluation. Potential contributions of advocacy as a mode of inquiry in technology are discussed; advocacy is evaluated by representative sets of criteria of adequate assessment which include participant criteria, perspectives criteria, situations criteria, base values criteria, and strategies criteria.

Jones, E. M.↗

Making Human Spaceflight Practical and Affordable: Spacecraft Designs and their Degree of Operability

As we push toward new and diverse space transportation capabilities, reduction in operations cost becomes increasingly important. Achieving affordable and safe human spaceflight capabilities will be the mark of success for new programs and new providers. The ability to perceive the operational implications of design decisions is crucial in developing safe yet cost competitive space transportation systems. Any human spaceflight program - government or commercial - must make countless decisions either to implement spacecraft system capabilities or adopt operational constraints or workarounds to account for the lack of such spacecraft capabilities. These decisions can benefit from the collective experience that NASA has accumulated in building and operating crewed spacecraft over the last five decades. This paper reviews NASA s history in developing and operating human rated spacecraft, reviewing the key aspects of spacecraft design and their resultant impacts on operations phase complexity and cost. Specific examples from current and past programs - including the Space Shuttle and International Space Station - are provided to illustrate design traits that either increase or increase cost and complexity associated with spacecraft operations. These examples address factors such as overall design performance margins, levels of redundancy, degree of automated failure response, type and quantity of command and telemetry interfaces, and the definition of reference scenarios for analysis and test. Each example - from early program requirements, design implementation and resulting real-time operations experience - to tell the end-to-end "story" Based on these experiences, specific techniques are recommended to enable earlier and more effective assessment of operations concerns during the design process. A formal method for the assessment of spacecraft operability is defined and results of such operability assessments for recent spacecraft designs are provided. Recent experience in applying these techniques to Orion spacecraft development is reviewed to highlight the direct benefits of early operational assessment and collaborative development efforts.

Crocker, Alan R.↗

Evolution and Implementation of the NASA Robotic Conjunction Assessment Risk Analysis Concept of Operations

Reacting to potential on-orbit collision risk in an operational environment requires timely and accurate communication and exchange of data, information, and analysis to ensure informed decision-making for safety of flight and responsible use of the shared space environment. To accomplish this mission, it is imperative that all stakeholders effectively manage resources: devoting necessary and potentially intensive resource commitment to responding to high-risk conjunction events and preventing unnecessary expenditure of resources on events of low collision risk. After 10 years of operational experience, the NASA Robotic Conjunction Assessment Risk Analysis (CARA) is modifying its Concept of Operations (CONOPS) to ensure this alignment of collision risk and resource management. This evolution manifests itself in the approach to characterizing, reporting, and refining of collision risk. Implementation of this updated CONOPS is expected to have a demonstrated improvement on the efficacy of JSpOC, CARA, and owner/operator resources.

operations↗

Airborne simulation of Shuttle/Spacelab management and operation

The ASSESS (Airborne Science/Spacelab Experiments System Simulation) program is discussed. A simulated Spacelab operation was carried out aboard the CV-990 airborne laboratory at Ames Research Center. A scientific payload was selected to conduct studies in upper atmospheric physics and infrared astronomy with principal investigators from France, the Netherlands, England and the U.S. Two experiment operators (EOs) from the U.S. and two from Europe were trained to function as proxies for the principal investigators in operating, maintaining, and repairing the scientific instruments. The simulated mission, in which the EOs and a Mission Manager were confined to the aircraft and living quarters for a 1-week period while making scientific observations during nightly flights, provided experience in the overall management of a complex international payload, experiment preparation, testing, and integration, the training and selection of proxy operators, and data handling.

Mulholland, D. R.↗

Assessing Resilience of Scheduled Performance-Based Navigation Arrival Operations

This paper assesses the resilience of scheduled Performance-Based Navigation (PBN) arrival operations. Resilience is defined as an ability to return to nominal operations following a schedule perturbation. Results from a Human-in-the- Loop (HITL) experiment that included off-nominal events to perturb the schedule are described. The schedule comes from a precision trajectory-based arrival manager. The experiment collected data regarding the response to perturbed schedules in three conditions, where: 1) a disturbance rejection algorithm made schedule adjustments automatically, 2) a Traffic Management Coordinator (TMC) participant made schedule adjustments manually, or 3) no schedule adjustments were made. Analyses showed that the simulation’s scheduled PBN operations have inherent resilience, recovering from more than half of the perturbed schedules even with no schedule adjustments. Resilience to the same off-nominal events improved with schedule adjustments; an increased proportion of perturbed schedules recovered within the length of operation run, and the average duration of the schedule’s perturbed state decreased. Compared to the manual schedule adjustments condition, a greater number of schedule adjustments occurred for the same off-nominal events in the automated condition. However, perturbed schedules were recovered more frequently and perturbations were less severe in the automated condition. Subjective and objective workload in the manual and the automated schedule adjustment conditions were similar to the no schedule adjustment condition.

Resilience↗

An Assessment of Civil Tiltrotor Concept of Operations in the Next Generation Air Transportation System

Based on a previous Civil Tiltrotor (CTR) National Airspace System (NAS) performance analysis study, CTR operations were evaluated over selected routes and terminal airspace configurations assuming noninterference operations (NIO) and runway-independent operations (RIO). This assessment aims to further identify issues associated with these concepts of operations (ConOps), and their dependency on the airspace configuration and interaction with conventional fixed-wing traffic. Safety analysis following a traditional Safety Management System (SMS) methodology was applied to CTR-unique departure and arrival failures in the selected airspace to identify any operational and certification issues. Additional CTR operational cases were then developed to get a broader understanding of issues and gaps that will need to be addressed in future CTR operational studies. Finally, needed enhancements to National Airspace System performance analysis tools were reviewed, and recommendations were made on improvements in these tools that are likely to be required to support future progress toward CTR fleet operations in the Next Generation Air Transportation System (NextGen).

Chung, William W.↗