Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Plume Impingement Software Module for Real-Time Proximity Operations

Successfully executing proximity operations in space, such as docking or in-orbit servicing, requires sophisticated spacecraft design that accounts for induced environments. As a chaser vehicle’s attitude control thrusters fire, they create rarefied plumes that can impact the target vehicle, with the potential to overload components, exceed thermal limits, and spin the target vehicle out of control. High-fidelity simulations of the thruster plume impingement environment require the direct simulation Monte Carlo (DSMC) method, but DSMC is too computationally expensive to simulate proximity operations that involve thousands of thruster firings. For this analysis to be tractable, engineering models of the plume flowfield and impingement events are used to simulate these trajectories [1]. Currently, on-orbit plume impingement environments are modeled through an inefficient open-loop analysis cycle where the vehicle’s flight controller and plume impingement teams iterate on the trajectories until they pass the target vehicle’s plume requirements. As complex on-orbit missions evolve and become more frequent, lengthy design cycles will become operational bottlenecks. To address this gap, this work develops an advanced plume impingement module capable of operating at real-time scale that can be integrated with existing mission planning tools and onboard flight systems. The plume module leverages state-of-the-art plume simulation techniques [2] to deliver fast, physics-based impingement predictions in a software architecture that can be tailored to diverse proximity operations scenarios. A prototype of this plume impingement module is built to demonstrate the feasibility of real-time performance. This prototype completes plume impingement calculations in microseconds per target geometry mesh point. The software serves as a foundational capability for plume-aware trajectory design, operational risk assessment, and future autonomous decision-making systems.

Plume Impingement↗

Assessment, Planning, and Execution Considerations for Conjunction Risk Assessment and Mitigation Operations

An operational Conjunction Assessment Risk Analysis (CARA) concept is the real-time process of assessing risk posed by close approaches and reacting to those risks if necessary. The most effective way to completely mitigate conjunction risk is to perform an avoidance maneuver. The NASA Goddard Space Flight Center has implemented a routine CARA process since 2005. Over this period, considerable experience has been gained and many lessons have been learned. This paper identifies and presents these experiences as general concepts in the description of the Conjunction Assessment, Flight Dynamics, and Flight Operations methodologies and processes. These general concepts will be tied together and will be exemplified through a case study of an actual high risk conjunction event for the Aura mission.

Frigm, Ryan C.↗

A Risk Assessment Architecture for Enhanced Engine Operation

On very rare occasions, in-flight emergencies have occurred that required the pilot to utilize the aircraft's capabilities to the fullest extent possible, sometimes using actuators in ways for which they were not intended. For instance, when flight control has been lost due to damage to the hydraulic systems, pilots have had to use engine thrust to maneuver the plane to the ground and in for a landing. To assist the pilot in these situations, research is being performed to enhance the engine operation by making it more responsive or able to generate more thrust. Enabled by modification of the propulsion control, enhanced engine operation can increase the probability of a safe landing during an inflight emergency. However, enhanced engine operation introduces risk as the nominal control limits, such as those on shaft speed, temperature, and acceleration, are exceeded. Therefore, an on-line tool for quantifying this risk must be developed to ensure that the use of an enhanced control mode does not actually increase the overall danger to the aircraft. This paper describes an architecture for the implementation of this tool. It describes the type of data and algorithms required and the information flow, and how the risk based on engine component lifing and operability for enhanced operation is determined.

Litt, Jonathan S.↗

Evolution and Implementation of the NASA Robotic Conjunction Assessment Risk Analysis Concept of Operations

Reacting to potential on-orbit collision risk in an operational environment requires timely and accurate communication and exchange of data, information, and analysis to ensure informed decision-making for safety of flight and responsible use of the shared space environment. To accomplish this mission, it is imperative that all stakeholders effectively manage resources: devoting necessary and potentially intensive resource commitment to responding to high-risk conjunction events and preventing unnecessary expenditure of resources on events of low collision risk. After 10 years of operational experience, the NASA Robotic Conjunction Assessment Risk Analysis (CARA) is modifying its Concept of Operations (CONOPS) to ensure this alignment of collision risk and resource management. This evolution manifests itself in the approach to characterizing, reporting, and refining of collision risk. Implementation of this updated CONOPS is expected to have a demonstrated improvement on the efficacy of JSpOC, CARA, and owner/operator resources.

operations↗

Managing Risk for Cassini During Mission Operations and Data Analysis (MOandDA)

A Risk Management Process has been tailored for Cassini that not only satisfies the requirements of NASA and JPL, but also allows the Program to proactively identify and assess risks that threaten mission objectives. Cassini Risk Management is a team effort that involves both management and engineering staff. The process is managed and facilitated by the Mission Assurance Manager (MAM), but requires regular interactions with Program Staff and team members to instill the risk management philosophy into the day to day mission operations. While Risk Management is well defined for projects in the development phase, it is a relatively new concept for Mission Operations. The Cassini team has embraced this process and has begun using it in an effective, proactive manner, to ensure mission success. It is hoped that the Cassini Risk Management Process will form the basis by which risk management is conducted during MO&DA on future projects. proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working put into place will become visible and will be illusmted in future papers.

risk management↗

NASA Space Cancer Risk Model: 2020 Operational Implementation

Astronauts are exposed to increased radiation from the space environment and from biomedical research studies conducted in the workplace. Federal requirements mandate that these exposures be limited to provide adequate radiation protection1. This report summarizes the National Aeronautics and Space Administration (NASA) Space Cancer Risk (NSCR) model as implemented in 2020 for calculation of risk of exposure-induced death (REID) and risk of exposure-induced cancer (REIC) following occupational radiation exposures for astronauts.

space radiation↗

PRA in Design: Increasing Confidence in Pre-Operational Assessments of Risks (Results of a Joint NASA/NRC Workshop)

In late 2009, the National Aeronautics and Space Administration (NASA) and the U.S. Nuclear Regulatory Commission (NRC) jointly organized a workshop to discuss technical issues associated with application of risk assessments to early phases of system design. The workshop, which was coordinated by the Idaho National Laboratory, involved invited presentations from a number of PRA experts in the aerospace and nuclear fields and subsequent discussion to address the following questions: (a) What technical issues limit decision-makers' confidence in PRA results, especially at a pre-operational phase of the system life cycle? (b) What is being done to address these issues'? (c) What more can be done ? The workshop resulted in participant observations and suggestions on several technical issues, including the pursuit of non-traditional approaches to risk assessment and the verification and validation of risk models. The workshop participants also identified several important non-technical issues, including risk communication with decision makers, and the integration of PRA into the overall design process.

Youngblood, Robert↗

Development of an operational specific CAT risk (SCATR) index

The original formulations of Roach (1970) and Oard (1974) for the calculation of clear air turbulence (CAT) potential from synoptic scale data were extended. An index which gives a measure of the specific risk of encountering CAT - the specific clear air turbulence risk (SCATR) index - was defined. This index takes into account both the locally and advected contributions to the energy necessary for CAT. The advected contribution is associated with the role of atmospheric gravity waves. The SCATR index was calculated for a number of cases where documented encounters with CAT occurred. Of particular interest were those made for cases involving severe CAT. The results for the two severe CAT cases run were quite impressive and elicited considerable interest from operational aviation meteorologists.

Keller, J. L.↗

Preliminary Integrated Safety Analysis of Synthetic Vision Conducted

The goal of the NASA Aviation Safety Program is to develop and demonstrate technologies that could help reduce the aviation fatal accident rate by a factor of 5 by the year 2007 and by a factor of 10 by the year 2022. Integrated safety analysis of day-to-day operations and risks within those operations will provide an understanding of the Aviation Safety Program portfolio beyond what is now available. Synthetic vision is the first of the Aviation Safety Program technologies that has been analyzed by the Logistics Management Institute under a contract with the NASA Glenn Research Center. These synthetic vision analyses include both a reliability analysis and a computer simulation model.

Reveley, Mary S.↗

Preliminary Results Obtained in Integrated Safety Analysis of NASA Aviation Safety Program Technologies

The goal of the NASA Aviation Safety Program (AvSP) is to develop and demonstrate technologies that contribute to a reduction in the aviation fatal accident rate by a factor of 5 by the year 2007 and by a factor of 10 by the year 2022. Integrated safety analysis of day-to-day operations and risks within those operations will provide an understanding of the Aviation Safety Program portfolio. Safety benefits analyses are currently being conducted. Preliminary results for the Synthetic Vision Systems (SVS) and Weather Accident Prevention (WxAP) projects of the AvSP have been completed by the Logistics Management Institute under a contract with the NASA Glenn Research Center. These analyses include both a reliability analysis and a computer simulation model. The integrated safety analysis method comprises two principal components: a reliability model and a simulation model. In the reliability model, the results indicate how different technologies and systems will perform in normal, degraded, and failed modes of operation. In the simulation, an operational scenario is modeled. The primary purpose of the SVS project is to improve safety by providing visual-flightlike situation awareness during instrument conditions. The current analyses are an estimate of the benefits of SVS in avoiding controlled flight into terrain. The scenario modeled has an aircraft flying directly toward a terrain feature. When the flight crew determines that the aircraft is headed toward an obstruction, the aircraft executes a level turn at speed. The simulation is ended when the aircraft completes the turn.

Reveley, Mary S.↗

Design Requirements for Unmanned Rotorcraft Used in Low-Risk Concepts of Operation

This technical report presents the results of the second of two research studies on design and performance requirements supporting airworthiness certification of midrange unmanned aircraft systems (UAS) intended for commercial use. The two studies focused attention on UAS in the middle of the multidimensional spectrum of UAS; that is, UAS with attributes and capabilities exceeding the criteria to operate under Part 107 of the Federal Aviation Regulations (FARs), but without the design or operational capabilities to comply with the airworthiness standards for commercially-operated manned aircraft. The goal of the two studies was to help address the gap in airworthiness standards for some UAS that fall between the extremes.

Hayhurst, Kelly J.↗

Cassini Operational Sun Sensor Risk Management During Proximal Orbit Saturn Ring Plane Crossings

NASA's Cassini Spacecraft, launched on October 15th, 1997 which arrived at Saturn on June 30th, 2004, is the largest and most ambitious interplanetary spacecraft in history. As the first spacecraft to achieve orbit at Saturn, Cassini has collected science data throughout its four-year prime mission (2004–08), and has since been approved for a first and second extended mission through 2017. As part of the final extended missions, Cassini will begin an aggressive and exciting campaign of high inclination, low altitude flybys within the inner most rings of Saturn, skimming Saturn’s outer atmosphere, until the spacecraft is finally disposed of via planned impact with the planet. This final campaign, known as the proximal orbits, requires a strategy for managing the Sun Sensor Assembly (SSA) health, the details of which are presented in this paper.

fault protection↗

IAC Abstract for Orbital Debris Phase II Report

Orbital debris poses a growing risk for spacecraft operations. This risk has most often been measured by proxies, like the number of debris or expected collisions, but few have attempted quantify the consequences of orbital debris or the costs and benefits of different methods to address the problem. This has made it difficult to assess the trade-offs and relative value among proposed actions for the mitigation, tracking, and remediation of debris. In March of 2023, the NASA Office of Technology, Policy, and Strategy (OTPS) took a step toward quantifying these relative values when we released Cost and Benefit Analysis of Orbital Debris Remediation. Since that time, OTPS has continued to build on this work. We have increased the fidelity of our risk model. For example, we added an ensemble of risk models that use varying assumptions of debris populations and lethality, included debris as small as 1mm, and incorporated atmospheric drag to naturally deorbit debris. We have also expanded our cost-benefit calculations to include action that mitigate and track debris, both large and small. The analysis has several important findings regarding the conditions under which debris remediation is more cost-effective than mitigation and tracking, the value of increased shielding of spacecraft and faster timelines for post-mission disposal, and how changes in the portfolio have interdependent effects. This presentation summarizes the body of work, with a particular focus on the risks and benefits to the global spacecraft population.

orbital debris↗

Instrumentation utilisation for risk control in safety operations

Ways in which instrumentation is utilized for risk control for inherently safe (no control or guidance) and flight programmed launch vehicles is presented. Instrumentation and how it is utilized in the launching and recovery of balloons and payloads is also presented. Wind sensing, computer systems, tracking, and telemetry are discussed.

Swayer, F. R.↗

Risk-Assessment for Equipment Operating on the Lunar Surface

Particle-size distribution of lunar dust simulant is evaluated using scanning electron spectroscopy in order to consider approaches to evaluating risk to individual mechanical components operating on the lunar surface. Assessing component risk and risk-mitigation during actual operations will require noninvasive continuous data gathering on numerous parameters. Those data sets would best be evaluated using data-mining algorithms to assess risk, and recovery from risk, of individual mechanical components in real-time.

Richmond, R. C.↗

Managing Risk in Safety Critical Operations - Lessons Learned from Space Operations

The Mission Control Center (MCC) at Johnson Space Center (JSC) has a rich legacy of supporting Human Space Flight operations throughout the Apollo, Shuttle and International Space Station eras. Through the evolution of ground operations and the Mission Control Center facility, NASA has gained a wealth of experience of what it takes to manage the risk in Safety Critical Operations, especially when human life is at risk. The focus of the presentation will be on the processes (training, operational rigor, team dynamics) that enable the JSC/MCC team to be so successful. The presentation will also share the evolution of the Mission Control Center architecture and how the evolution was introduced while managing the risk to the programs supported by the team. The details of the MCC architecture (e.g., the specific software, hardware or tools used in the facility) will not be shared at the conference since it would not give any additional insight as to how risk is managed in Space Operations.

Gonzalez, Steven A.↗

Risk analysis simulation of rover operations for Mars surface exploration

Risk management advocates have long sought to directly influence the early stages of the systems engineering process through a more effective role in system design trade studies. The principal obstacle to this has been the lack of credible ways to represent and quantify mission risk—that is, a combination of the probability of mission success (“system safety”) and science value—for the project manager and the rest of the design team. If it were possible to quantify mission risk, then the effects of proposed mission and system design changes could be calculated, and along with life-cycle costs, could be used to explore the design space more extensively and select better designs. JPL has been working to build the capability to quantify the probability of mission success using a federation of diverse simulations and models, each of which contributes some vital piece of the puzzle. The initial institutional focus has been on Mars surface operations. This ensemble computing framework enables the diverse models and simulations to work together seamlessly. Recent work at JPL has demonstrated the capability to exercise this ensemble from end-to-end using an Oracle-based database to automatically move results from one model/simulation to the next stage in the analysis.

Shishko, Robert↗