Search NASA⌕ Search

SEARCH · Search NASA

Results for “Orbiter Loads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

EVA assembly and release of highly loaded bolts

The modification of a multi-jackbolt mechanism, Superbolt(TM), for on-orbit release of highly loaded bolts is described. Preload and release test data demonstrate that modification of a commercial product produced a solution for the deployment of the Space Station Remote Manipulator System (SSRMS) that was less expensive, faster, and lighter than other alternatives. Using the Superbolt design, virtually unlimited bolt loads can be applied or released with a standard wrench.

Olmstead, Jim↗

High power solar array switching regulation

It is pointed out that spacecraft utilization projections for the 1980s and beyond show a trend toward extended lifetimes and larger electric power systems. The need for improved power management and energy transfer arising in connection with this trend has resulted in the conduction of a Solar Array Switching Power Management study. A description is presented of initial development work performed in the study, taking into account the characteristics for three mission classes. Attention is given to the manned LEO platform (250-kW average load), the unmanned GEO platform (50-kW average load), and an ion propulsion orbit transfer vehicle (50- to 250 kW load).

Decker, D. K.↗

Shuttle Orbiter Contingency Abort Aerodynamics: Real-Gas Effects and High Angles of Attack

An important element of the Space Shuttle Orbiter safety improvement plan is the improved understanding of its aerodynamic performance so as to minimize the "black zones" in the contingency abort trajectories [1]. These zones are regions in the launch trajectory where it is predicted that, due to vehicle limitations, the Orbiter will be unable to return to the launch site in a two or three engine-out scenario. Reduction of these zones requires accurate knowledge of the aerodynamic forces and moments to better assess the structural capability of the vehicle. An interesting aspect of the contingency abort trajectories is that the Orbiter would need to achieve angles of attack as high as 60deg. Such steep attitudes are much higher than those for a nominal flight trajectory. The Orbiter is currently flight certified only up to an angle of attack of 44deg at high Mach numbers and has never flown at angles of attack larger than this limit. Contingency abort trajectories are generated using the data in the Space Shuttle Operational Aerodynamic Data Book (OADB) [2]. The OADB, a detailed document of the aerodynamic environment of the current Orbiter, is primarily based on wind-tunnel measurements (over a wide Mach number and angle-of-attack range) extrapolated to flight conditions using available theories and correlations, and updated with flight data where available. For nominal flight conditions, i.e., angles of attack of less than 45deg, the fidelity of the OADB is excellent due to the availability of flight data. However, at the off-nominal conditions, such as would be encountered on contingency abort trajectories, the fidelity of the OADB is less certain. The primary aims of a recent collaborative effort (completed in the year 2001) between NASA and Boeing were to determine: 1) accurate distributions of pressure and shear loads on the Orbiter at select points in the contingency abort trajectory space; and 2) integrated aerodynamic forces and moments for the entire vehicle and the control surfaces (body flap, speed brake, and elevons). The latter served the useful purpose of verification of the aerodynamic characteristics that went into the generation of the abort trajectories.

Prabhu, Dinesh K.↗

Utilization of Space Station by the Large Deployment Reflector

The Large Deployable Reflector (LDR), a NASA concept of a very large, orbiting, far infrared submillimeter telescope is described. To be launched in the 1990s, LDR has a projected life of 10 years and is to be serviced every 2 to 3 years. A System Concept and Technology Definition Study of LDR for NASA Ames is currently being conducted. Study results indicate that launch of a 20 m LDR, operating in a 700 to 800 km orbit, requires two shuttle loads. The components of LDR are assembled in a lower parking orbit, and the system is checked out and then transferred to the operational orbit. Furthermore, for servicing, LDR may have to be retrieved to the same lower orbit (and later returned to operational altitude) by an orbit transfer vehicle. These requirements bring up the question of a suitable assembly, checkout, and servicing platform. The deployment process is time consuming and may require special equipment not necessarily available from the orbiter itself. The SS is an attractive choice for that platform.

Bandermann, L. W.↗

Development of a laboratory prototype spraying flash evaporator.

A functional description of the flash evaporator that is being developed as a candidate for the Space Shuttle Environmental Control System thermal control is presented. A single evaporator configuration uses water as an evaporant to accommodate on-orbit peak heat loads and Freon 22 for terrestrial flight phases below 120,000 ft altitude. Development history, test plans, and operational characteristics are described. Detailed information is included to show: design features, fabrication techniques used for a prototype unit, redundancy considerations, and the control arrangement.

Gaddis, J. L.↗

Laboratory prototype flash evaporator

A laboratory prototype flash evaporator that is being developed as a candidate for the space shuttle environmental control system expendable heat sink is described. The single evaporator configuration uses water as an evaporant to accommodate reentry and on-orbit peak heat loads, and Freon 22 for terrestrial flight phases below 120,000 feet altitude. The design features, fabrication techniques used for the prototype unit, redundancy considerations, and the fluid temperature control arrangement are reported in detail. The results of an extensive test program to determine the evaporator operational characteristics under a wide variety of conditions are presented.

Gaddis, J. L.↗

Assessment of analytical and experimental techniques utilized in conducting plume technology tests 575 and 593

Since exhaust plumes affect vehicle base environment (pressure and heat loads) and the orbiter vehicle aerodynamic control surface effectiveness, an intensive program involving detailed analytical and experimental investigations of the exhaust plume/vehicle interaction was undertaken as a pertinent part of the overall space shuttle development program. The program, called the Plume Technology program, has as its objective the determination of the criteria for simulating rocket engine (in particular, space shuttle propulsion system) plume-induced aerodynamic effects in a wind tunnel environment. The comprehensive experimental program was conducted using test facilities at NASA's Marshall Space Flight Center and Ames Research Center. A post-test examination of some of the experimental results obtained from NASA-MSFC's 14 x 14-inch trisonic wind tunnel is presented. A description is given of the test facility, simulant gas supply system, nozzle hardware, test procedure and test matrix. Analysis of exhaust plume flow fields and comparison of analytical and experimental exhaust plume data are presented.

Baker, L. R.↗

Evaluation of a cost-effective loads approach

A shock spectra/impedance method for loads prediction is used to estimate member loads for the Viking Orbiter, a 7800-lb interplanetary spacecraft that has been designed using transient loads analysis techniques. The transient loads analysis approach leads to a lightweight structure but requires complex and costly analyses. To reduce complexity and cost a shock spectra/impedance method is currently being used to design the Mariner Jupiter Saturn spacecraft. This method has the advantage of using low-cost in-house loads analysis techniques and typically results in more conservative structural loads. The method is evaluated by comparing the increase in Viking member loads to the loads obtained by the transient loads analysis approach. An estimate of the weight penalty incurred by using this method is presented. The paper also compares the calculated flight loads from the transient loads analyses and the shock spectra/impedance method to measured flight data.

Garba, J. A.↗

Evaluation of a cost-effective loads approach

A shock spectra/impedance method for loads predictions is used to estimate member loads for the Viking Orbiter, a 7800-lb interplanetary spacecraft that has been designed using transient loads analysis techniques. The transient loads analysis approach leads to a lightweight structure but requires complex and costly analyses. To reduce complexity and cost, a shock spectra/impedance method is currently being used to design the Mariner Jupiter Saturn spacecraft. This method has the advantage of using low-cost in-house loads analysis techniques and typically results in more conservative structural loads. The method is evaluated by comparing the increase in Viking member loads to the loads obtained by the transient loads analysis approach. An estimate of the weight penalty incurred by using this method is presented. The paper also compares the calculated flight loads from the transient loads analyses and the shock spectra/impedance method to measured flight data.

Garba, J. A.↗

Results of two tests in the MSFC 14 by 14-inch trisonic wind tunnel, FA 27 (TWT-655) and FA 28 (TWT-656)

Wind tunnel tests were conducted in a 14- inch wind tunnel with a 0.004 scale model of the space shuttle launch vehicle in order to (1) determine the cause and possible aerodynamic alterations required to eliminate the Orbiter rolling moment couple; (2) determine configuration alterations to alleviate the forward Orbiter external tank loads; and (3) provide data to verify previous data.

Braddock, W. F.↗

Cryogenic and thermal design for the Space Infrared Telescope Facility (SIRTF)

The 1-meter class cryogenically cooled Space Infrared Telescope Facility (SIRTF) planned by NASA, is scheduled for a 1992 launch. SIRTF would be deployed from the Shuttle, and placed into a sun synchronous polar orbit of 700 km. The facility has been defined for a mission with a minimum initial lifetime of one year in orbit with mission extension that could be made possible through in-orbit servicing of the superfluid helium cryogenic system, and use of a thermal control system. The superfluid dewar would use an orbital disconnect system for the tank supports, and vapor cooling of the barrel baffle. The transient analysis of the design shows that the superfluid helium tank with no active feedback comes within temperature requirements for the nominal orbital aperture heat load, quiescent instrument, and chopper conditions.

Lee, J. H.↗

Program Predicts Nonlinear Inverter Performance

Program developed for ac power distribution system on Shuttle orbiter predicts total load on inverters and node voltages at each of line replaceable units (LRU's). Mathematical model simulates inverter performance at each change of state in power distribution system.

Al-Ayoubi, R. R.↗

Flight experience of Solar Mesosphere Explorer's two nickel-cadmium batteries

The performance of the power system on the solar mesosphere explorer (SME) since launch is discussed. Predictions for continued operation for the rest of the project mission are also discussed. The SME satellite's power system was characterized by both insufficient loading and excessive battery charging during the first year of the mission. These conditions affected battery performance and jeopardized the long-term mission. Increased loading on selected orbits has improved battery performance. Long term projections indicate steadily increasing temperatures for the remainder of the mission.

Faber, J.↗

Proteus - An experimenter's view

The scientific experiments package to be carried by the Proteus system takes the form of an Instrument Load carried into orbit by a Space Shuttle, and there mated to a Proteus spacecraft with the Shuttle's Remote Manipulator System. The Proteus system extends to ground support equipment, development tools, and communications, as well as the orbiting satellites. It is expected that Proteus will be able to triple the number of Explorer missions while staying within the current budgetary allocation for such missions. The Proteus spacecraft encompasses a system interface assembly plug, a data handling module, remote interface units, and a power distribution module.

Hibbard, W. D.↗

Effects of specularly reflected radiation on spacecraft temperatures and thermal gradients

This paper describes the effect that specularly reflected solar energy has upon the heating load imposed upon orbiting spacecraft. Because this reflection may increase the total heating by factors of two or three, it is important that it can be computed accurately. An efficient method for treating multiple reflections is given and demonstrated by computing the temperatures and thermal gradients in a reflecting spherical radiator.

Emery, A. F.↗

Space Shuttle Program: Automatic rendezvous, proximity operations, and capture (category 3)

The NASA Johnson Space Center is actively pursuing the development and demonstration of capabilities for automatic rendezvous, proximity operations, and capture (AR&C) using the Space Shuttle as the active vehicle. This activity combines the technologies, expertise, tools, and facilities of the JSC Tracking and Communications Division (EE), Navigation, Control and Aeronautics Division (EG), Automation and Robotics Division (ER), and Structures and Mechanics Division (ES) of the Engineering Directorate and the Flight Design and Dynamics Division (DM) of the Mission Operations Directorate. Potential benefits of AR&C include more efficient and repeatable rendezvous, proximity operations, and capture operations; reduced impacts on the target vehicles (e.g., Orbiter RCS plume loads); reduced flight crew work loads; reduced ground support requirements; and reduced operational constraints. This paper documents the current JSC capabilities/tools/facilities for AR&C and describes a proposed plan for a progression of ground demonstrations and flight tests and demonstrations of AR&C capabilities. This plan involves the maturing of existing technologies in tracking and communications; guidance, navigation and control; mechanisms; manipulators; and systems management and integrating them into several evolutionary demonstration stages.

Jackson, William L.↗

Space Congress, 29th, Cocoa Beach, FL, Apr. 21-24, 1992, Proceedings

The present volume on the quest for new frontiers in space discusses weather impacts on space operations, planning for the performance of future space bases, a new guidance and control unit for the Titan IV vehicle, and nondestructive evaluation of Shuttle Columbia tiles. Attention is given to Space Shuttle payload accommodations and trends in customer demands, a generic propellants transfer unit, making space part of general education, space station on-orbit solar array loads during assembly, and dimensional stability of the attitude reference assembly on SSF. Topics addressed include National Launch System payload accommodations and launch operations, the integrated factory/launch site processing concept, Pioneer 10 interstellar studies, and the role of advanced nuclear propulsion systems in precursor interstellar missions. Also discussed are legal challenges in realizing interstellar initiatives, Mars transportation system synthesis, and NASA's commercial space program.

Source record↗

Summary of Resources for the International Space Station Environmental Control and Life Support System For Core Complete Modules

The Core Complete Environmental Control and Life Support (ECLS) System for the International Space Station (ISS) will consist of components and subsystems in both the United States (U.S.) and International Partner elements which together will perform the functions of Temperature and Humidity Control (THC), Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Water Recovery and Management (WRM), Fire Detection and Suppression (FDS), and Vacuum System (VS) for the station. Due to limited resources available on ISS, detailed attention is given to minimizing and tracking all resources associated with all systems, beginning with estimates during the hardware development phase through measured actuals when flight hardware is built and delivered. A summary of resources consumed by the addition of future U.S. ECLS system hardware to get to Core Complete is presented, including launch weight, average continuous and peak power loads, on-orbit volume and resupply logistics.

Williams, David E.↗