Search NASA⌕ Search

SEARCH · Search NASA

Results for “PERC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Techno-Economic, Feasibility, and Life Cycle Analysis of Renewable Propane (Final Report)

The Propane Education and Research Council (PERC) has engaged with the National Renewable Energy Laboratory (NREL) to develop information that is critical to understanding the current and future landscape for renewable propane (RP) and the value proposition for recovery of RP from existing and planned HEFA biorefineries. In summary the following outcomes are identified from this study: 1) production of incremental RP by increasing the severity of the hydroisomerization step is insignificant to the overall propane yield from a HEFA biorefinery, however production of renewable butane (or LPG 2 ) is quite significant thus suggesting alternate strategies for valorizing these fractions; 2) the value proposition for recovering RP and renewable LPG is quite strong, with capital recovery payback periods of 14 months for a small biorefinery producing 3.5 million gallons per year RP to as short as 2 months for a large biorefinery producing 87 million gallons per year RP. Paybacks for renewable LPG are as much as 50% shorter; and 3) current and projected expansions of renewable diesel will greatly expand the potential availability of RP as a by-product. Several promising new pathways are under development but will not significantly increase production of RP for the next decade.

09 BIOMASS FUELS↗

Propane Fueling Infrastructure Trends: A Decade in Review

This report provides information on propane fueling infrastructure and industry trends over the last 10 years. It is informed primarily by propane fueling station location data collected through the Alternative Fuels Data Center's Alternative Fueling Station Locator from 2011 through 2021. Industry stakeholders, including the Propane Education & Research Council (PERC) and other members of the Alternative Fuels Data Center Station Locator Propane Working Group, also provided data and additional context around trends seen in the data.

33 ADVANCED PROPULSION SYSTEMS↗

Technology Maturation of Wireless Harsh Environment Sensors For Improved Condition Based Monitoring Of Coal Fired Power Generation

The overall goal of this project was to demonstrate and develop the usage of high-temperature (HT) harsh-environment (HE) wireless surface acoustic wave resonator (SAWR) sensor technology to promote reliable maintenance through condition-based maintenance (CBM) for field applications in harsh service conditions associated with power plant environments. The project aimed to advance the HT HE wireless SAWR sensor technology from TRL 5 to TRL 7. In addition to HT HE wireless temperature sensing, efforts were dedicated during this project to investigate, develop and increase the TRL from 3 to 5 for the following technologies: (a) HT HE strain sensors to address additional CBM monitoring needs, such as boiler tube mechanical / thermal stresses, which can provide early indications for boiler tube cracking and failure; and (b) HT aluminum nitride (AlN) and scandium aluminum nitride (ScAlN) based piezoelectric thin film fabrication and implementation of SAW sensors, with the goal of releasing the need to use single crystal piezoelectric materials for SAWRs and thus broaden possible technology applications to non-planar and harder to modify surfaces. To achieve the goals mentioned above, UMaine and its partner, Environetix Technologies Corporation, established partnerships with the following power plants: Longview Power (Maidsville, WV), a coal-fired power plant; Penobscot Energy Recovery Corp (PERC, Orrington, ME), a waste-to-energy power plant; and the UMaine Steam Plant (Orono, ME), an oil / natural gas power plant. To realize wireless HT HE SAWR sensor systems in these harsh service conditions, the University of Maine research team worked with Environetix and these power plants to define, design, fabricate, test and validate a mature prototype wireless temperature SAWR sensor system for boiler tube applications within the HT HE of the reheater pass damper chamber to directly and wirelessly monitor the temperature at eighteen independent boiler tube locations. The system included three levels, or “tiers”, of wireless communication to enable remote monitoring: Tier 1, the wireless link in the reheater pass damper chamber directly accessing the sensors on the boilers; Tier 2, the wireless local area network link, transmitting processed sensor information within the power plant to the Tier 3, a commercial wireless signal carrier company for secure remote data monitoring outside of the power plant. Regarding the wireless sensor system installed at Longview Power, temperature information from the boilers was continuously transmitted from the Longview boilers at Maidsville, WV, to Environetix headquarters, Orono, ME, over a 34 month period, when the system was finally decommissioned. Strain sensors and piezoelectric ScAlN thin film sensors were successfully installed on the exhaust duct at the UMaine Steam Power plant. The advances in wireless strain sensors and thin film piezoelectric film fabrication and testing were performed mostly in UMaine laboratories and field tested at the UMaine Steam Plant, due to its close proximity to UMaine/Environetix, access to the plant facility, and due to difficulties in accessing the other power plants during the COVID shut-down period. The project accomplished the TRL level increase of the targeted CBM technologies through the successful fabrication, installation, test, and validation of dedicated and commercial wireless sensor systems, utilizing the three different power plants. The outcomes of this project, including the wireless sensor data capability, are expected to yield an advance for CBM in harsh power plant environments. The reduction of maintenance costs, improved safety during plant operation, and increased power plant efficiency will lead to increased revenues (i.e., fewer forced outages) due to better process monitoring enabled by the wireless HT HE SAWR temperature sensor technology.

20 FOSSIL-FUELED POWER PLANTS↗

Abstract for CRADA between NETL and the University of Massachusetts Lowell (AGMT-1275)

The demand for printed electronics over conventional electronics is growing each year due to their low costs, low material waste during manufacturing, and compatibility with flexible substrates. The development of inks for printed electronics is a challenge because each printing technology requires different viscosities and curing behaviors to create devices with controlled structures at the micron scale, or smaller. Carbon is a great candidate for fabricating printed electronics devices because it is inexpensive and earth abundant, easily functionalized to impart miscibility with solvent systems, and has electrical properties that can be tuned from insulating to conducting. Despite these advantages, carbons are rarely used for printed electronics because there is a scarcity of inks available for non-contact printing technologies. To address these challenges, the National Energy Technology Laboratory (NETL) will collaborate with the University of Massachusetts Lowell (Participant) through its Printed Electronics Research Collaborative (PERC) to develop engineered carbons and ink formulations optimized specifically for printing radio- and microwave-frequency electronic devices using ink jet, aerosol jet, syringe dispensing, and other additive manufacturing techniques. NETL will process coal, petroleum, and other carbon feedstocks to make engineered carbons with the appropriate composition, microstructure, surface functionalization, and particle morphologies needed to stabilize ink suspensions and impart useful electronic properties to printed devices. The University of Massachusetts Lowell will utilize these engineered carbons to determine which solvent systems and ink additives are needed to achieve the appropriate viscosity, stability, and printability to make useful ink formulations. The University of Massachusetts Lowell will then utilize these inks to manufacture printed resistors and conductors using inkjet, aerosol jet, and syringe dispensing printing methods and will characterize device performance using four-point probe resistivity measurements, contact angle measurements to assess wettability, adhesion evaluation to various substrates, and focused ion beam and scanning electron microscopy for surface and density investigations of printed devices.

36 MATERIALS SCIENCE↗

Scalable Manufacturing of Efficient Perovskite/Silicon Tandem Modules

Crystalline-Si (c-Si) technology produces excellent solar cells with conversion efficiencies of up to 26.7%—nearly their practical limit of 27%—and has been commercialized extensively to produce panels below $\$0.40$/W. Techno-economic analysis shows that module efficiency will continue to be a primary cost driver because of high balance-ofsystems costs, and there is no path to higher efficiencies with single-junction silicon cells. In this project, three research teams from University of North Carolina, Arizona State University and National Renewable National Laboratory worked together to develop perovskite-silicon tandem cells with a high throughput process which can handle 5000 wafers per hour, enabled by very low added CAPEX of ~$20k for a doctor-blade coater. This can potentially increase the module efficiency to 30% (with grid) with small increase of cost, which will drive down the cost of silicon modules to be at least 16% cheaper than present silicon PERC modules. We also explored the alternative narrow bandgap perovskites as silicon replacement for all perovskite tandem cells. This project has substantially advanced the progress of solution-process perovskitessilicon tandem solar cells and perovskite-perovskite tandem solar cells with many inventions and discoveries, evidenced by 18 publications and 6 invention disclosures. Several notable examples include 1) we developed the new idea of small pyramid in combination with solution grown perovskites and demonstrated record-efficiency of 28.5% for 1 cm2 on textured silicon bottom cells and 25.2% for 24 cm2 on chemically etched silicon bottom cells for perovskite-silicon tandem cells. 2) We developed perovskite ink that can coat perovskites onto texture silicon without voids;, and new device structure to enhance the yield of fabrication by reducing shunting 3) We identified the origin of open circuit voltage on mixed halide wide bandgap perovskites, and came with a solution for this problem, reducing the voltage loss to a record small value, which can potentially push the perovskite-silicon tandem cell efficiency to over 31%; 4) We have developed efficient alternative low bandgap semiconductors, i.e. gradient-doped Sn based perovskites by Ba ions, new oxide hole transport layers which increase the efficiency of perovskite/perovskite tandem cells reached record efficiency of 26.3%; 5) We developed bifacial perovskite/perovskite tandem cells by overcoming contacts issues and regaining light absorption, further boosting the equivalent efficiency to 29.3% under 1 sun illumination with 30% albedo light; 6) We developed the first all perovskite tandem module fabricated in air by discovery a combination of oxidization and reduction couples, yield an aperture efficiency of 21.6% for all perovskite mininodules, exceeding that of single junction perovskite minimodules. These discoveries not only accelerate the commercialization of perovskite-silicon tandem solar cells, but also provide guidance in designing other type of perovskite solar cell technologies.

14 SOLAR ENERGY↗

Improvement of screen-printable metallization paste for low-cost silicon solar cells utilizing silver coated copper powders

This aims of this project were to develop low-cost screen-printable Ag|Cu metallization, as alternative to Ag paste, for contacting PERC solar cells with transparent emitter for high performance and reliability. The intended goal was to achieve 81% fill factor with a screen-printable Ag|Cu paste alternative. This was attempted through a three strand approach including Ag|Cu formulation by SVMT, production using cavitation technology by ACI and contact formation through the understanding of (i) the liquid phase sintering of the nano/macro particles of Ag|Cu to achieve bulk metal with very low series resistance, (ii) optimization of contact firing to avoid penetration of Cu into the silicon bulk, and finally (iii) proper analysis to quantify the contributions of each resistance component and keep the total series resistance at 0.2 Ω-cm2, which would result in high fill factor of 81% by UNC Charlotte. The objectives also involved i) the implementation of glass frit with Cu metal that will etch through the ARC for low contact resistance and adhesion, ii) development of Ag|Cu pastes with the optimized glass frit, iii) investigation of the impact of Cu particle size, morphology and loading on the gridline resistance, iv) narrow gridline screen designs along with narrow gridline prints, v) development of fast belt speeds of up to 375 inches per minute (ipm) sintering, and vi) stability study on Ag|Cu contact to high performance and reliability.

14 SOLAR ENERGY↗

Towards 50 Year Lifetime PV Modules: Double Glass vs. Glass/Backsheet

This award aims to increase the lifetime of c-Si modules by lowering the power degradation rate to the goal of 0.2 %/year, while also increasing the harvested irradiance per module using bifacial cells to achieve the 2030 SunShot goal of $0.03/kWh. Increasing the durability and lifetime of modules requires improved module packaging material choices and module architectures to exploit new cell improvements. Bifacial PERC cells (with backside aluminum fingers) are becoming a primary PV technology due to their decreased rear surface recombination and increased light absorption compared to traditional monofacial Al-BSF cells. Bifacial modules with double glass architectures have been deployed to capture the rear-side irradiance thereby increasing the light captured. The choice of a double glass (DG) or glass/backsheet (GB) module leads to two very different chemical (e.g., O 2 , H 2 O) and mechanical environments (e.g., mechanical stress levels) inside the PV module that impact the cell’s operational conditions. The recipient will fabricate 4-cell DG and GB minimodules with various module architectures or constructions (mono- & bifacial cells, transparent & white encapsulants), and conduct stepwise accelerated exposures and characterization.

14 SOLAR ENERGY↗

Solar-Plus-Storage Program Design: Frameworks and Examples [Slides]

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, the largest river in North America flowing into the Pacific Ocean. The four Tribes, through the Columbia River Inter-Tribal Fish Commission (CRITFC), prepared a vision for a more harmonized energy and water system in their 2022 Energy Vision for the Columbia River Basin. In it, the four Tribes envision a future where the Columbia Basin electric power system supports healthy and harvestable fish and wildlife populations, protects Tribal treaty and cultural resources, and provides clean, reliable, and affordable electricity. To help realize the Energy Vision, CRITFC received technical assistance from the National Renewable Energy Laboratory (NREL) through the Communities Local Energy Action Program (LEAP) pilot with the goal of ensuring that the Tribes are fully informed and prepared to integrate their interests into regional power system planning. This resource aims to provide an overview of program and policy design frameworks for behind-the-meter (BTM) energy storage and solar-plus-storage programs and examples from across the United States. This information is intended to build CRITFC's understanding of potential policies and program designs that could support the deployment of solar photovoltaics (PV) and energy storage in the Pacific Northwest.

14 SOLAR ENERGY↗

PV Fleet Performance Data Initiative Final Technical Report (FTR)

Improved analysis and reporting of photovoltaic (PV) field performance increases the certainty of owners and financiers that systems will perform as expected. Advanced module technologies (e.g., PERC, HJT, and bifacial) introduce new degradation mechanisms and performance characteristics. This project will leverage data from the ever-increasing PV fleet to develop models and understanding of the field performance of existing and new technologies. Please see our list of public reports at https://www.nrel.gov/pv/fleet-performance-data-initiative.html. Objective 1: Support the global PV industry with scalable, robust data analysis tools that reduce the uncertainty of PV system performance and loss calculation. Objective 2: Reduce perceived risk arising from degradation rate, soiling loss, and system availability by publishing detailed statistics on U.S. fleet performance. Objective 3: Highlight factors leading to system underperformance including module type, climate, mounting configuration, etc. Objective 4: Enable continued high system performance in modern PV systems, as turnover and advances in technology bring new suppliers and high-efficiency modules into the market.

14 SOLAR ENERGY↗

Wafer-Free Crystalline Silicon Solar Cells (CRADA Final Report)

This CRADA project, based on the DOE Solar Energy Technologies Office (SETO) Solar Prize Voucher program, helped Leap Photovoltaics to develop methodologies to immobilize Si particles by permanently attaching them to an Al-coated substrate and thereby forming carrier-selective electrical contacts to the Si particles. The bigger goal was to help Leap Photovoltaics develop these immobilized and contacted particle arrays into relatively efficient, inexpensive, and industrially relevant solar cells. By using Si particles instead of wafers in a solar cell absorber layer, one can avoid costs associated with growing monocrystalline Si ingots, then diamond-sawing them into wafers, then processing wafers into cells – a mainstream practice in today's high-efficiency Si cell and module technology. Monocrystalline or polycrystalline Si particles can be obtained in various ways: for example, Si kerf from wafer sawing is monocrystalline; recycled Si cell wafers can be ball-milled into particles; particles can be grown using various gas-phase techniques (mostly from SiH4). These Si particles can be assembled onto a substrate and serve as an absorber layer for the solar cell, absorbing photons to generate photocarriers. The challenge with this technique is to collect photocarriers from individual Si particles, with separation of photogenerated electrons to the negative cell’s electrode and positive photogenerated holes to the positive electrode. Therefore, each particle must have two isolated, carrier-selective contacts: one for electrons and one for holes. Plus, particles need to be immobilized onto a solid substrate. The goal of this work was focused on the immobilization of Si particles and creating hole-selective contact to them at the same time, using industrially relevant Si photovoltaic (PV) cell technology: screen printing of Al back-surface field electrodes. This is used in the mainstream Propane Education and Research Council (PERC) technology for hole-collecting contacts at the back of the cell. The work performed at NREL consisted of screen printing of Al metal paste on substrates, spreading Si particles onto it, and thermally processing the structures to form hole-collecting contacts. The final structures were investigated by scanning electron microscopy (SEM) after focused ion beam (FIB) cross-sectioning and polishing. The work was done jointly by NREL staff and Leap Photovoltaics (Leap PV) employees stationed at NREL. The samples were then taken to Leap PV for further processing. Training the Leap PV employee on various NREL techniques (laser cutting, screen printing, thermal processing, characterization) was part of the scope.

14 SOLAR ENERGY↗

Lessons from the IEC Durability of Adhesion Accelerated Test Sequence

The IEC 62788-1-1 and IEC 63209-2 standards use aging sequences for durability of adhesion in photovoltaic (PV) modules, which may be evaluated using the single cantilever beam (SCB) test. Because the encapsulant forms critical interfaces with the front glass and solar cells, degradation at those interfaces under ultraviolet (UV) exposure, elevated temperature, and humidity can lead to interfacial delamination - compromising the long-term reliability. In this work, adhesion durability of UV-transmitting poly(ethylene-co-vinyl acetate) (EVA) encapsulant to glass and to silicon solar cells is evaluated after sequenced UV and damp heat aging (85C/85%RH). Laminates were prepared using StarPhire solar front glass with thin glass or PERC cells, and two EVA formulations with different concentrations of siloxane coupling agent. Adhesion was quantified by measuring critical debond energy using the SCB method. Both formulations exhibit similar qualitative trends, while different adhesion is observed at the periphery despite the use of low-shrink manufacturing. The results show that while glass/EVA adhesion remains stable or increases after UV exposure and shows only moderate changes after damp heat, the EVA/cell interface exhibits an irreversible loss of adhesion following UV and then damp heat exposure. Although glass/EVA interfaces generally exhibit lower debond energies, the EVA/cell interface is significantly more vulnerable to UV-driven degradation, identifying it as the dominant reliability risk location through early- and intermediate-module life. These results demonstrate that accelerated aging sequences can expose large, interface-specific losses in adhesion durability and underscore the importance of interface engineering for long-term PV module reliability.

14 SOLAR ENERGY↗

Operation of the Lower Granite Dam Adult Trap, 2008.

During 2008 we operated the adult salmonid trap at Lower Granite Dam from 7 March through 25 November, except during a short summer period when water temperatures were too high to safely handle fish. We collected and handled a total of 20,463 steelhead Oncorhynchus mykiss and radio-tagged 34 of the hatchery steelhead. We took scale samples from 3,724 spring/summer Chinook salmon O. tshawytscha for age and genetic analysis. We collected and handled a total of 8,254 fall Chinook salmon. Of those fish, 2,520 adults and 942 jacks were transported to Lyons Ferry Hatchery on the Snake River in Washington. In addition, 961 adults and 107 jacks were transported to the Nez Perce Tribal Hatchery on the Clearwater River in Idaho. The remaining 3,724 fall Chinook salmon were passed upstream. Scales samples were taken from 780 fall Chinook salmon tagged with passive integrated transponder (PIT) tags and collected by the sort-by-code system.

13 HYDRO ENERGY↗

Couse/Tenmile Creeks Watershed Project Implementation : 2007 Conservtion Projects. [2007 Habitat Projects Completed].

The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on private lands within Asotin County watersheds. The Tenmile Creek watershed is a 42 square mile tributary to the Snake River, located between Asotin Creek and the Grande Ronde River. Couse Creek watershed is a 24 square mile tributary to the Snake River, located between Tenmile Creek and the Grande Ronde River. Both watersheds are almost exclusively under private ownership. The Washington Department of Fish and Wildlife has documented wild steelhead and rainbow/redband trout spawning and rearing in Tenmile Creek and Couse Creek. The project also provides Best Management Practice (BMP) implementation throughout Asotin County, but the primary focus is for the Couse and Tenmile Creek watersheds. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Farm Service Agency (FSA), Salmon Recovery Funding Board (SRFB), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Washington Department of Ecology (DOE), National Marine Fisheries Service (NOAA Fisheries), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. The Asotin Subbasin Plan identified priority areas and actions for ESA listed streams within Asotin County. Couse Creek and Tenmile Creek are identified as protection areas in the plan. The Conservation Reserve Enhancement Program (CREP) has been successful in working with landowners to protect riparian areas throughout Asotin County. Funding from BPA and other agencies has also been instrumental in protecting streams throughout Asotin County by utilizing the ridge top to ridge top approach.

13 HYDRO ENERGY↗

Emigration of Natural and Hatchery Naco x (Chinook salmon; Oncorhynchus tshawytscha) and Heeyey (Steelhead; Oncorhynchus mykiss) Smolts from the Imnaha River, Oregon from 5 October 2006 to 21 June 2007, Annual Report 2007.

This report summarizes the Nez Perce Tribe (NPT) Department of Fisheries Resources Management (DFRM) results for the Lower Snake River Compensation Plan (LSRCP) Hatchery Evaluation studies and the Imnaha River Smolt Monitoring Program (SMP) for the 2007 smolt migration from the Imnaha River, Oregon. These studies are closely coordinated and provide information about juvenile natural and hatchery spring/summer Naco x (Chinook Salmon; Oncorhynchus tshawytscha) and Heeyey (steelhead; O. mykiss) biological characteristics, emigrant timing, survival, arrival timing and travel time to the Snake River dams and McNary Dam (MCD) on the Columbia River. These studies provide information on listed Naco x (Chinook salmon) and Heeyey (steelhead) for the Federal Columbia River Power System (FCRPS) Biological Opinion (NMFS 2000). The Lower Snake River Compensation Plan program's goal is to maintain a hatchery production program of 490,000 Naco x (Chinook salmon) and 330,000 Heeyey (steelhead) for annual release in the Imnaha River (Carmichael et al. 1998, Whitesel et al. 1998). These hatchery releases occur to compensate for fish losses due to the construction and operation of the four lower Snake River hydroelectric facilities. One of the aspects of the LSRCP hatchery evaluation studies in the Imnaha River is to determine natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolt performance, emigration characteristics and survival (Kucera and Blenden 1998). A long term monitoring effort was established to document smolt emigrant timing and post release survival within the Imnaha River, estimate smolt survival downstream to McNary Dam, compare natural and hatchery smolt performance, and collect smolt-to-adult return information. This project collects information for, and is part of, a larger effort entitled Smolt Monitoring by Federal and Non-Federal Agencies (BPA Project No. 198712700). This larger project provides data on movement of smolts out of major drainages and past dams on the Snake River and Columbia River. In season indices of migration strength and migration timing are provided for the run-at large at key monitoring sites. Marked smolts are utilized to measure travel time and estimate survival through key index reaches. Fish quality and descaling measures are recorded at each monitoring site and provide indicators of the health of the run. Co-managers in the Imnaha River subbasin (Ecovista 2004) have identified the need to collect information on life history, migration patterns, juvenile emigrant abundance, reach specific smolt survivals, and Smolt-to-Adult Return rates (SAR's) for both Heeyey (steelhead) and Naco x (Chinook salmon) smolts. The current study provides information related to the majority of the high priority data needs. Current funding does not allow for determination of a total (annual) juvenile emigrant abundance and lack of adult passive integrated transponder (PIT) tag detectors at the mouth of the Imnaha River results in the inability to calculate tributary specific SAR's. Information is shared with the Fish Passage Center (FPC) on a real time basis during the spring emigration period. The Bonneville Power Administration (BPA) and the United States Fish and Wildlife Service (USFWS) contracted the NPT to monitor emigration timing and tag up to 19,000 emigrating natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolts from the Imnaha River with passive integrated transponder (PIT) tags. The completion of trapping in the spring of 2007 marked the 16th year of emigration studies on the Imnaha River, and the 14th year of participating in the FPC smolt monitoring program. Monitoring and evaluation objectives were to: (1) Evaluate effects of flow, temperature and other environmental factors on juvenile migration timing. (2) Determine emigration timing, travel time, and in-river survival of PIT tagged hatchery Naco x (Chinook salmon) smolts released at the Imnaha River acclimation facility to the Imnaha River juvenile migration trap. (3) Monitor the daily catch and biological characteristics of juvenile Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River screw trap. (4) Determine spring emigration timing of Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River juvenile migration trap. (5) Compare emigration characteristics and survival rates of natural fall and spring tagged juvenile Naco x (Chinook salmon). (6) Determine arrival timing, travel time and estimated survival of PIT tagged natural and hatchery Naco x (Chinook salmon) and natural and hatchery Heeyey (steelhead) smolts from the Imnaha River to Snake and Columbia River dams.

13 HYDRO ENERGY↗

Brood Year 2004: Johnson Creek Chinook Salmon Supplementation Report, June 2004 through March 2006.

The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River spring/summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek to spawn through artificial propagation. This was the sixth season of adult chinook broodstock collection in Johnson Creek following collections in 1998, 2000, 2001, 2002, and 2003. Weir installation was completed on June 21, 2004 with the first chinook captured on June 22, 2004 and the last fish captured on September 6, 2004. The weir was removed on September 18, 2004. A total of 338 adult chinook, including jacks, were captured during the season. Of these, 211 were of natural origin, 111 were hatchery origin Johnson Creek supplementation fish, and 16 were adipose fin clipped fish from other hatchery operations and therefore strays into Johnson Creek. Over the course of the run, 57 natural origin Johnson Creek adult chinook were retained for broodstock, transported to the South Fork Salmon River adult holding and spawning facility and held until spawned. The remaining natural origin Johnson Creek fish along with all the Johnson Creek supplementation fish were released upstream of the weir to spawn naturally. Twenty-seven Johnson Creek females were artificially spawned with 25 Johnson Creek males. Four females were diagnosed with high bacterial kidney disease levels resulting in their eggs being culled. The 27 females produced 116,598 green eggs, 16,531 green eggs were culled, with an average eye-up rate of 90.6% resulting in 90,647 eyed eggs. Juvenile fish were reared indoors at the McCall Fish Hatchery until November 2005 and then transferred to the outdoor rearing facilities during the Visual Implant Elastomer tagging operation. These fish continued rearing in the outdoor collection basin until release in March 2006. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 12,056 of the smolts released were also tagged with Passive Integrated Transponder tags. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 90,450 smolts were released directly into Johnson Creek on March 13 through 15, 2006.

13 HYDRO ENERGY↗

Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program, 2008 Annual Report.

The Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program is designed to rapidly increase numbers of Chinook salmon in stocks that are in imminent danger of extirpation in Catherine Creek (CC), Lostine River (LR) and upper Grande Ronde River (GR). Natural parr are captured and reared to adulthood in captivity, spawned (within stocks) and their progeny reared to smoltification before being released into the natal stream of their parents. This program is co-managed by ODFW, National Marine Fisheries Service, Nez Perce Tribe and Confederated Tribes of the Umatilla Indian Reservation. Presmolt rearing was initially conducted at Lookingglass Fish Hatchery (LFH) but parr collected in 2003 and later were reared at Wallowa Fish Hatchery (WFH). Post-smolt rearing is conducted at Bonneville Fish Hatchery (BOH - freshwater) and at Manchester Research Station (MRS - saltwater). The CC and LR programs are being terminated, as these populations have achieved the goal of a consistent return of 150 naturally spawning adults, so the 2005 brood year was the last brood year collected for theses populations. The Grande Ronde River program continued with 300 fish collected each year. Currently, we are attempting to collect 150 natural parr and incorporate 150 parr collected as eggs from females with low ELISA levels from the upper Grande Ronde River Conventional Hatchery Program. This is part of a comparison of two methods of obtaining fish for a captive broodstock program: natural fish vs. those spawned in captivity. In August 2007, we collected 152 parr (BY 2006) from the upper Grande Ronde River and also have 155 Grande Ronde River parr (BY 2006) that were hatched from eyed eggs at LFH. During 2008, we were unable to collect natural parr from the upper Grande Ronde River. Therefore, we obtained 300 fish from low ELISA females from the upper Grande Ronde River Conventional Program. In October 2008 we obtained 170 eyed eggs from the upper Grande Ronde river Conventional Hatchery Program. We will attempt to collect natural parr in August 2009. This year 752 fish were removed from the captive population: 629 fish survived to gamete production and 123 fish died from various causes prior to spawning. Growth of the Captive Broodstock fish was similar to previous years. The saltwater fish have grown more slowly than those reared in freshwater. A total of 720 fish were sorted as maturing and 629 (87.4%) of them survived to spawn. We collected gametes from 273 females and 350 males from the 2002-2006 brood years in 2008, using 111 spawning matrices and collected 474,187 green eggs (1,737 eggs/female). All ripe males were spawned and no semen was collected for cryo-preservation. Of the 474,187 eggs collected for the BY 2008 F1 generation, 448,373 (94.6%) survived to the eyed stage. 68,612 (15.3%) were culled from females with high ELISA OD values for BKD prevention. For BY 2007, we collected a total of 477,048 eggs from all three populations and 407,369 (85.4%) reached the eyed stage, while 95,024 eyed eggs (23.3%) were culled for BKD prevention. Eyed eggs were hatched at Lookingglass Fish Hatchery, producing 267,131 fry. As parr, 153,371 fish were coded-wire tagged (CWT). For the 2006 F1 brood year, we collected 177,890 eggs and 149,073 (83.8%) reached the eyed stage. 83,826 eyed eggs (56.2%) were culled at the eyed stage for BKD prevention. 61,044 fry were produced (93.6%), 53,688 (88 %) survived to smolt. There were 54 bacterial kidney disease (BKD) mortalities at BOH and MRS, combined in this reporting period. Overall, there were fewer BKD mortalities in 2008 due to a reduced number of fish coming into the Captive Broodstock Program and a shift away from collecting wild parr to using eyed eggs from low ELISA females from the Conventional Hatchery Program. Unknown causes of death accounted for 32 deaths at MRS and BOH, combined in 2008. We continually examine and modify the operations of the Captive Broodstock Program to make improvements wherever possible. We continue to have difficulty with prevention and treatment of BKD outbreaks and continue to use erythromycin and azithromycin to treat this disease. We are also continuing to investigate other possible treatments and prophylactic measures. To reduce the incidence of BKD in offspring of the Captive Broodstock Program, we continue to allow culling of eyed eggs from females with high BKD ELISA values (generally >0.800 OD units but the cull level varies annually, depending on the distribution of ELISA values, number of eggs collected, and management considerations). We are also using ultrasound to determine maturity and sex of fish early in the maturation process and are now able to determine maturity and sex of most maturing fish in early April. This allows us to transfer maturing fish from saltwater to freshwater at a more natural time, which should improve fecundity and egg quality of saltwater-reared fish.

13 HYDRO ENERGY↗

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eighth season (1997-2004) of adult Chinook salmon broodstock collection in the Lostine River and the sixth season (1999-2004) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progency for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2004, acclimation of Lostine River spring Chinook salmon smolts occurred from March 1, 2004 through to April 14, 2004 and a total of 250,249 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2002 egg source and included captive brood (133,781) and conventional (116,468) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2004 began May 10, the first Chinook was captured on May 19, 2004 and the last Chinook was captured on September 16, 2004. The weir and trap were removed on October 1, 2004. A total of 1,091 adult Chinook, including jacks, were captured during the season. The composition of the run included 299 natural origin fish and 792 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 46 natural and 69 hatchery supplementation adults were retained for broodstock and transported to Lookingglass Hatchery for holding and spawning, 537 adult Chinook were passed or transported above the weir to spawn naturally, and 447 hatchery origin adult Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 107 adults retained (eight additional hatchery females were collected and then later returned to the Lostine River to spawn naturally) for broodstock at Lookingglass Hatchery, 22 natural females and 30 supplementation females were represented in spawning. These females produced a total of 221,889 eggs at fertilization. Eye-up was 94.9% which yielded a total of 210,661 conventional program eyed eggs. The fecundity averaged 4,267 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage and then transferred to Oxbow Hatchery where they will be reared to the fingerling stage. They will then be transported back to LGH and reared to the smolt stage and then transported to the Lostine acclimation facility for release in the spring of 2006. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2006.

13 HYDRO ENERGY↗

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2006 Smolt Acclimation and Adult Return Report.

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the tenth season (1997-2006) of adult Chinook salmon broodstock collection in the Lostine River and the eighth season (1999-2006) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2006, acclimation of Lostine River spring Chinook salmon smolts occurred from February 27, 2006 through to April 10, 2006 and a total of 240,568 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2004 egg source and included captive brood (40,982) and conventional (199,586) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2006 began May 15th, the first Chinook was captured on June 14, 2006 and the last Chinook was captured on September 27, 2006. The weir and trap were removed on October 1, 2006. A total of 534 adult Chinook, including jacks, were captured during the season. The composition of the run included 205 natural origin fish and 329 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 33 natural and 120 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning and 397 adult Chinook were passed or transported above the weir to spawn naturally. In 2006, no hatchery origin adult Chinook were transported and out planted in the Wallowa River and Bear Creek to spawn in under seeded habitat. In order to meet egg take goals for the conventional portion of the program, a determination was made that approximately 147 adults were needed for broodstock. As a result 16 (8 males and 8 females) of the 153 fish collected for broodstock were returned to the Lostine River to spawn naturally. Females that were spawned and provided the brood source were made up of 12 natural females and 45 supplementation females. One of these females tested positive for high levels of Bacterial Kidney Disease and consequently this females eggs were destroyed. The remaining females produced a total of 241,372 eggs at fertilization. Eye-up was 85.47% which yielded a total of 206,309 conventional program eyed eggs. The fecundity averaged 4,162 eggs per female. The brood year 2006 eggs will be incubated and reared at Lookingglass Hatchery until they are smolts in the spring of 2008. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2008.

13 HYDRO ENERGY↗