Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

U.S. Climate Change Science Program. Vision for the Program and Highlights of the Scientific Strategic Plan

The vision document provides an overview of the Climate Change Science Program (CCSP) long-term strategic plan to enhance scientific understanding of global climate change.This document is a companion to the comprehensive Strategic Plan for the Climate Change Science Program. The report responds to the Presidents direction that climate change research activities be accelerated to provide the best possible scientific information to support public discussion and decisionmaking on climate-related issues.The plan also responds to Section 104 of the Global Change Research Act of 1990, which mandates the development and periodic updating of a long-term national global change research plan coordinated through the National Science and Technology Council.This is the first comprehensive update of a strategic plan for U.S. global change and climate change research since the origal plan for the U.S. Global Change Research Program was adopted at the inception of the program in 1989.

Climate change↗

Sensitivity Analysis of Linear Programming and Quadratic Programming Algorithms for Control Allocation

The Next Generation (NextGen) transport aircraft configurations being investigated as part of the NASA Aeronautics Subsonic Fixed Wing Project have more control surfaces, or control effectors, than existing transport aircraft configurations. Conventional flight control is achieved through two symmetric elevators, two antisymmetric ailerons, and a rudder. The five effectors, reduced to three command variables, produce moments along the three main axes of the aircraft and enable the pilot to control the attitude and flight path of the aircraft. The NextGen aircraft will have additional redundant control effectors to control the three moments, creating a situation where the aircraft is over-actuated and where a simple relationship does not exist anymore between the required effector deflections and the desired moments. NextGen flight controllers will incorporate control allocation algorithms to determine the optimal effector commands and attain the desired moments, taking into account the effector limits. Approaches to solving the problem using linear programming and quadratic programming algorithms have been proposed and tested. It is of great interest to understand their relative advantages and disadvantages and how design parameters may affect their properties. In this paper, we investigate the sensitivity of the effector commands with respect to the desired moments and show on some examples that the solutions provided using the l2 norm of quadratic programming are less sensitive than those using the l1 norm of linear programming.

Frost, Susan A.↗

Success Factors in Human Space Programs - Why Did Apollo Succeed Better Than Later Programs?

The Apollo Program reached the moon, but the Constellation Program (CxP) that planned to return to the moon and go on to Mars was cancelled. Apollo is NASA's greatest achievement but its success is poorly understood. The usual explanation is that President Kennedy announced we were going to the moon, the scientific community and the public strongly supported it, and Congress provided the necessary funding. This is partially incorrect and does not actually explain Apollo's success. The scientific community and the public did not support Apollo. Like Apollo, Constellation was announced by a president and funded by Congress, with elements that continued on even after it was cancelled. Two other factors account for Apollo's success. Initially, the surprise event of Uri Gagarin's first human space flight created political distress and a strong desire for the government to dramatically demonstrate American space capability. Options were considered and Apollo was found to be most effective and technically feasible. Political necessity overrode both the lack of popular and scientific support and the extremely high cost and risk. Other NASA human space programs were either canceled, such as the Space Exploration Initiative (SEI), repeatedly threatened with cancellation, such as International Space Station (ISS), or terminated while still operational, such as the space shuttle and even Apollo itself. Large crash programs such as Apollo are initiated and continued if and only if urgent political necessity produces the necessary political will. They succeed if and only if they are technically feasible within the provided resources. Future human space missions will probably require gradual step-by-step development in a more normal environment.

Success factors↗

Current Status of the DOE/NNSA Nuclear Criticality Safety Program Hands-on Criticality Safety Training Courses

In 2011, the US Department of Energy/National Nuclear Security Administration (DOE/NNSA) Nuclear Criticality Safety Program (NCSP) developed and piloted a 2-week nuclear criticality safety (NCS) practitioner course to support training and qualification of new NCS staff. The course was developed in accordance with the American National Standard Institute/American Nuclear Society (ANSI/ANS) standard for NCS training and qualifications (ANSI/ANS-8.26-2007). In 2013, an NCS manager’s course was developed for process supervisors, managers, regulators, and other professionals with NCS-related responsibilities. These courses consist of classroom education, facility training, and hands-on subcritical and critical experiments training. Each course is currently offered twice per year. The 2-week practitioner course offers a week of classroom training, with practical workshops and exercises focused on teaching students how to perform an NCS evaluation. The second week of training involves hands-on critical and subcritical experiments and measurements. The first week is offered in Las Vegas, Nevada, at the DOE Nevada Field Office or the National Atomic Testing Museum. Depending on the student’s clearance level, the second week is offered at Sandia National Laboratory (SNL) (uncleared and L-cleared students) or at the National Criticality Experiments Research Center (NCERC) (Q-cleared students). The 1-week manager’s course is offered at SNL or NCERC, depending on clearance or interest, and includes classroom and hands-on critical and subcritical experiments and measurements. This paper provides an overview and status report for the DOE/NNSA NCSP training courses in NCS and provides information about future course offerings.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Light Water Reactor Sustainability Program: Integrated Program Plan

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the United States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy’s 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program Integrated Program Plan

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the United States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy’s 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors. 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals. 3. Develop sustainable nuclear fuel cycles. 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Y-12 Groundwater Protection Program CY 2018 Triennial Report of the Monitoring Well Inspection and Maintenance Program Y-12 National Security Complex Oak Ridge, Tennessee

This document is the Triennial Report for the Well Inspection and Maintenance Program of the Y-12 National Security Complex (Y-12) Groundwater Protection Program (GWPP) at U.S. Department of Energy (DOE) Y-12 and includes monitoring well inspections and well maintenance activities performed at Y-12 during calendar years (CYs) 2016 through 2018. This report formally documents well inspections completed by GWPP on active and inactive groundwater monitoring wells that are part of the Y-12 monitoring network and includes well inspections performed by URS|CH2M Oak Ridge, L.L.C. (UCOR), which administers the DOE Office of Environmental Management Y-12 Water Resources Restoration Program (WRRP). The WRRP includes wells that are utilized for the regulatory monitoring of Resource Conservation and Recovery Act (RCRA) post-closure permits and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Remedial Effectiveness and Records of Decision and Solid Waste Disposal Facility (Landfill) permits and includes monitoring wells located at the CERCLA Environmental Management Waste Management Facility. Beginning in 2018, UCOR terminated three of their RCRA post-closure permits and is monitoring the former RCRA-permitted facilities under CERCLA. Consequently, the number of monitoring wells in the Y-12 network that receive UCOR-performed inspections has decreased significantly.

54 ENVIRONMENTAL SCIENCES↗

Program Plan for 2005: NASA Scientific and Technical Information Program

Throughout 2005 and beyond, NASA will be faced with great challenges and even greater opportunities. Following a period of reevaluation, reinvention, and transformation, we will move rapidly forward to leverage new partnerships, approaches, and technologies that will enhance the way we do business. NASA's Scientific and Technical Information (STI) Program, which functions under the auspices of the Agency's Chief Information Officer (CIO), is an integral part of NASA's future. The program supports the Agency's missions to communicate scientific knowledge and understanding and to help transfer NASA's research and development (R&D) information to the aerospace and academic communities and to the public. The STI Program helps ensure that the Agency will remain at the leading edge of R&D by quickly and efficiently capturing and sharing NASA and worldwide STI to use for problem solving, awareness, and knowledge management and transfer.

NASA programs↗

Radioisotope Power Systems Program: A Program Overview

NASA's Radioisotope Power Systems (RPS) Program continues to plan, mature research in energy conversion, and partners with the Department of Energy (DOE) to make RPS ready and available to support the exploration of the solar system in environments where the use of conventional solar or chemical power generation is impractical or impossible to meet potential future mission needs. Recent programs responsibilities include providing investment recommendations to NASA stakeholders on emerging thermoelectric and Stirling energy conversion technologies and insight on NASA investments at DOE in readying a generator for the Mars 2020 mission. This presentation provides an overview of the RPS Program content and status and the approach used to maintain the readiness of RPS to support potential future NASA missions.

Nuclear↗

Overview and Current Progress of the DOE/NNSA Nuclear Criticality Safety Program Training and Education Program

Since 2011, the US Department of Energy/National Nuclear Security Administration (DOE/NNSA) Nuclear Criticality Safety Program (NCSP) has been providing a two-week nuclear criticality safety (NCS) practitioner course to support the training and qualification of new NCS staff. In 2013, an NCS Manager’s course was developed for process supervisors, managers, regulators, and other professionals with NCS-related responsibilities, and, in 2017, an additional course was proposed for Criticality Safety Officers (CSOs). In addition to hands-on training, other NCSP-funded tasks include training on sensitivity/uncertainty methods, NCS resource pipeline tasks, development of NCS guides, maintenance and development of Nuclear Criticality Safety Education Training (NCSET) modules and designing of a new subcritical assembly for hands-on training purposes. This paper provides an overview of the NCSP training and education program. The status of the NCSP hands-on training program will also be provided.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Stress and Burnout Among Residency Program Directors in United States Radiation Oncology Programs

Purpose: To evaluate stressors among radiation oncology residency program directors (PDs) and determine the prevalence and indicators of burnout. Methods and Materials: An anonymous, online, cross-sectional survey was offered to PDs of US radiation oncology programs in the fall of 2014. Survey content examined individual and program demographics, perceptions surrounding the role of PD, and commonly encountered stressors. Burnout was assessed using the validated Maslach Burnout Inventory-Human Services Survey. Results: In total, 47 of 88 PDs (53%) responded to the survey. Although 78% of respondents reported feeling “satisfied” or “highly satisfied” with their current role, 85% planned to remain as PD for <5 years. The most commonly cited stressors were satisfying Accreditation Council for Graduate Medical Education/Residency Review Committee requirements (47%), administrative duties (30%) and resident morale (28%). Three-quarters of respondents were satisfied that they became PDs. Overall, 11% of respondents met criteria for low burnout, 83% for moderate burnout, and 6% for high burnout. Not having served as a PD at a prior institution correlated with high depersonalization (OR 6.75, P=.04) and overall burnout (odds ratio [OR], 15.6; P=.04). Having more years on faculty prior to becoming PD correlated with less emotional exhaustion (OR, 0.44, P=.05) and depersonalization (OR, 0.20, P=.04). Finally, having dedicated time for PD duties correlated with less emotional exhaustion (OR, 0.27, P=.04). Conclusions: Moderate levels of burnout are common in U.S. radiation oncology PDs with regulatory stressors being common. Despite this, many PDs are fulfilled with their role. Longitudinal studies assessing dynamic external factors and their influence on PD burnout would be beneficial.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The Uranium from Seawater Program at the Pacific Northwest National Laboratory: Overview of Marine Testing, Adsorbent Characterization, Adsorbent Durability, Adsorbent Toxicity, and Deployment Studies

The Pacific Northwest National Laboratory’s (PNNL) Marine Science Laboratory (MSL) located along the coast of Washington State is evaluating the performance of uranium adsorption materials being developed for seawater extraction under realistic marine conditions with natural seawater. Two types of exposure systems were employed in this program: flow-through columns for testing of fixed beds of individual fibers and pellets and a recirculating water flume for testing of braided adsorbent material. Testing consists of measurements of the adsorption of uranium and other elements from seawater as a function of time, typically 42 to 56 day exposures, to determine the adsorbent capacity and adsorption rate (kinetics). Analysis of uranium and other trace elements collected by the adsorbents was conducted following strong acid digestion of the adsorbent with 50% aqua regia using either Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES) or Inductively Coupled Plasma Mass Spectrometer (ICP-MS). The ORNL 38H adsorbent had a 56 day adsorption capacity of 3.30 ± 0.68 g U/ kg adsorbent (normalized to a salinity of 35 psu), a saturation adsorption capacity of 4.89 ± 0.83 g U/kg of adsorbent material (normalized to a salinity of 35 psu) and a half-saturation time of 28 ± 10 days. The AF1 adsorbent material had a 56 day adsorption capacity of 3.9 ± 0.2 g U/kg adsorbent material (normalized to a salinity of 35 psu), a saturation capacity of 5.4 ± 0.2 g U/kg adsorbent material (normalized to a salinity of 35 psu) and a half saturation time of 23 ± 2 days. The ORNL amidoxime-based adsorbent materials are not specific for uranium, but also adsorb other elements from seawater. The major doubly charged cations in seawater (Ca and Mg) account for a majority of the cations adsorbed (61% by mass and 74% by molar percent). For the ORNL AF1 adsorbent material, U is the 4th most abundant element adsorbed by mass and 7th most abundant by molar percentage

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Could a bioenergy program stimulate electric vehicle market penetration? Potential impacts of biogas to electricity annual rebate program

Abstract The biogas‐to‐electricity pathway under the Renewable Fuel Standard (RFS) allows for Renewable Identification Number (RIN) credits to be generated when electricity produced from biogas is used in the transportation sector. Though approved as a general pathway, EPA has proposed multiple credit allocation methods to functionalize this pathway. This study describes and evaluates a potential credit allocation framework where vehicle manufacturers generate electricity RIN (E‐RIN) credits and use these credits to increase the sales of plug‐in electric vehicles (PEVs). Under this framework, manufacturers use part of the credit value to reimburse electricity generators, offsetting potential higher biogas electricity generation cost. The remaining credit value is passed on to consumers as an annual PEV rebate to stimulate PEV sales. An iterative simulation framework is developed to fulfill two tasks: (a) to estimate the annual rebate amounts and their upfront value to consumers based on various factors, such as vehicle mileage, E‐RIN equivalence value, and biogas capacity, and (b) to evaluate potential impacts of the E‐RIN program on electrification of the future light‐duty vehicles (LDVs) and energy use. The annual rebate amount varies by vehicle technology and could be up to $870/year for battery electric vehicles (BEVs) and range between $230 and 825/year for plug‐in hybrid electric vehicles (PHEVs) depending on the electric range. These per vehicle rebates decrease when demand for electricity exceeds biogas electricity availability. The effectiveness of the program as modeled here is subject to different factors, such as the E‐RIN equivalence value, biogas electricity generation cost, biogas electricity generation capacity, and consumers’ valuation of the E‐RIN rebate. Our modeling results indicate that an E‐RIN program has the potential to produce nearly $12 billion in E‐RIN credits annually and to significantly increase PEV annual sales by up to 2.3 million and the PEV population by about 19.7 million in 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program (Rev. 3)

Each testing and analytical facility performing waste characterization activities for the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) participates in the Performance Demonstration Program (PDP) to comply with the Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC) (DOE/WIPP-02-3122), the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012), and the Performance Demonstration Program Management Plan (DOE/CBFO-01-3107). The PDP serves as a quality control check for data generated in the characterization of waste destined for WIPP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Y-12 Groundwater Protection Program CY2012 Triennial Report Of The Monitoring Well Inspection And Maintenance Program Y-12 National Security Complex, Oak Ridge, Tennessee

This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspections completed by the GWPP on active and inactive wells at Y-12 during calendar years (CY) 2010 through 2012. In addition, this report also documents well inspections performed under the Y-12 Water Resources Restoration Program, which is administered by URS|CH2M Oak Ridge (UCOR). This report documents well maintenance activities completed since the last triennial inspection event (CY 2009); and provides summary tables of well inspections and well maintenance activities during the reference time period.

54 ENVIRONMENTAL SCIENCES↗

Bachelor of Science-Engineering Technology Program and Fuel Cell Education Program Concentration

The Hydrogen and Fuel Cell Technology education project has addressed DOE goals by supplying readily available, objective, technical, and accurate information that is available to students, industry and the public. In addition, the program has supplied educated trainers and training opportunities for the next generation workforce needed for research, development, and demonstration activities in government, industry, and academia. The project has successfully developed courses and associated laboratories, taught the new courses and labs and integrated the HFCT option into the accredited engineering technology and mechanical engineering programs at the University of North Carolina at Charlotte (UNCC). The project has also established ongoing collaborations with the UNCC energy related centers of the Energy Production & Infrastructure Center (EPIC), the NC Motorsports and Automotive Research Center (NCMARC) and the Infrastructure, Design, Environment and Sustainability Center (IDEAS). The results of the project activities are presented as two major areas – (1) course and laboratory development, offerings and delivery, and (2) program recruitment, promotions and collaborations. Over the project period, the primary activity has been the development and offering of 11 HFCT courses and accompanying laboratories. This process has taken three years with the courses first being developed and then offered each year over the timeframe.

08 HYDROGEN↗