Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROJECT PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Voyager: Perils of advanced planning, 1960 - 1967

Contract proposals; phased project planning; budgetary problems; Saturn 1 B-Centaur versus Saturn V; mission guidelines and management assignments; and the origins of the Voyager project are discussed.

Source record↗

Definition of optical systems payloads

The various phases in the formulation of a major NASA project include the inception of the project, planning of the concept, and the project definition. A baseline configuration is established during the planning stage, which serves as a basis for engineering trade studies. Basic technological problems should be recognized early, and a technological verification plan prepared before development of a project begins. A progressive series of iterations is required during the definition phase, illustrating the complex interdependence of existing subsystems. A systems error budget should be established to assess the overall systems performance, identify key performance drivers, and guide performance trades and iterations around these drivers, thus decreasing final systems requirements. Unnecessary interfaces should be avoided, and reasonable design and cost margins maintained. Certain aspects of the definition of the Advanced X-ray Astrophysics Facility are used as an example.

Downey, J. A., III↗

Mixed Integer Linear Programming in Planning

This project, Activity Planning with Resources for the Exploration of Space (APRES), uses a mixed-integer linear program (MILP) to solve planning problems. This work enables APRES to interpret a model file and output a solution with improved human readability. A plan model is optimized using a MILP solver and the best solution is taken. Once a plan is generated, it is parsed allowing it to retain only desired information and modified for swift human readability.

Christina Erwin↗

Small planetary mission plan: Report to Congress

This document outlines NASA's small planetary projects plan within the context of overall agency planning. In particular, this plan is consistent with Vision 21: The NASA Strategic Plan, and the Office of Space Science and Applications (OSSA) Strategic Plan. Small planetary projects address focused scientific objectives using a limited number of mature instruments, and are designed to require little or no new technology development. Small missions can be implemented by university and industry partnerships in coordination with a NASA Center to use the unique services the agency provides. The timeframe for small missions is consistent with academic degree programs, which makes them an excellent training ground for graduate students and post-doctoral candidates. Because small missions can be conducted relatively quickly and inexpensively, they provide greater opportunity for increased access to space. In addition, small missions contribute to sustaining a vital scientific community by increasing the available opportunities for direct investigator involvement from just a few projects in a career to many.

Source record↗

A screening model for predicting injection well pressure buildup and plume extent in CO 2 geologic storage projects

We present a new screening model for predicting injection well pressure buildup and CO 2 plume migration for CO 2 geologic sequestration projects. The model requires only limited information and is quite accurate when compared to detailed simulation results. Such models can assist project developers during the early days of project planning (e.g., for 45Q related projects), and also help regulators perform simple checks against detailed numerical models. The screening model consists of two correlations: one for injectivity index in terms of the slope of the CO 2 fractional flow curve, and the second for total storage efficiency within the footprint of plume as a function of gravity number and slope of the CO 2 fractional flow curve. Using these two correlations, as well as a knowledge of some basic reservoir characteristics and estimates of fluid properties from standard correlations, the injection-well pressure buildup and CO 2 plume extent in the formation can be readily estimated. Finally, the new correlations show a good match with the results of the underlying simulations, and also provide good agreement with independent calculations for two example problems.

42 ENGINEERING↗

Evaluation of Minimum Detectable Activities for Stack Sample Analyses

The Rad-NESHAP program takes samples at major point sources to track how much of select nuclides are being emitted out of the stack. Samples are taken at the site where the radiological operations are being performed. The samples are then sent to analytical laboratories for analysis to determine what nuclides exist in the sample. However, due to the sensitivity of the instruments, false positives are often reported. To reduce the number of false positives, the results reported from the analytical labs are compared to set detection limits. Anything below the set detection limit is considered part of the background while anything above the limit is considered a positive hit. Therefore, the detection limit must be set low enough that any false negatives do not result in a significant dose missed at the end of the year but high enough that there are not enough false positives to skew the annual dose being reported. All detection limits listed in this section for the analyses below were designed to meet the stated equivalent emissions rate and subsequent off-site doses. These minimum detectable activities (MDAs) were developed in the 1990s and documented in the memo cited for each analysis below. These limits and memos are all currently referenced in the Quality Assurance Project Plan (QAPP) for the Rad-NESHAP Compliance Task, which is being updated to a Project Implementation Plan (PIP) concurrently with this document. As part of this update process, the original MDAs defined in this section needed to be verified that they were still conservative and meet the off-site dose levels stated.

2019 MDA↗

Performance evaluation of NASA/KSC CAD/CAE graphics local area network

This study had as an objective the performance evaluation of the existing CAD/CAE graphics network at NASA/KSC. This evaluation will also aid in projecting planned expansions, such as the Space Station project on the existing CAD/CAE network. The objectives were achieved by collecting packet traffic on the various integrated sub-networks. This included items, such as total number of packets on the various subnetworks, source/destination of packets, percent utilization of network capacity, peak traffic rates, and packet size distribution. The NASA/KSC LAN was stressed to determine the useable bandwidth of the Ethernet network and an average design station workload was used to project the increased traffic on the existing network and the planned T1 link. This performance evaluation of the network will aid the NASA/KSC network managers in planning for the integration of future workload requirements into the existing network.

Zobrist, George↗

Advanced Characterization of Particulate Flows for Concentrating Solar Power Applications

The overarching goal of this project was to gain a greater fundamental understanding of heat and mass transfer in particulate-media in concentrated solar power (CSP) applications for thermal energy storage (TES) and to disseminate results to support parallel Gen3 research initiatives. Project objectives were achieved through three planned project phases to systematically characterize the heat transfer and flow properties for particulate (granular) flows at elevated temperatures up to 800 °C. These objectives were accomplished using a combination of fundamental experimental measurements, modeling, and simplified flow experiments over a range of temperatures. This work addressed a serious gap within the field related to the understanding and modeling of granular flow behavior and the related heat transfer at different temperatures, which directly correspond to the operating points of CSP applications which use particles for heat storage.

14 SOLAR ENERGY↗

Managemant of NASA's major projects

Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

James, L. B.↗

Software management tools: Lessons learned from use

Experience in inserting software project planning tools into more than 100 projects producing mission critical software are discussed. The problems the software project manager faces are listed along with methods and tools available to handle them. Experience is reported with the Project Manager's Workstation (PMW) and the SoftCost-R cost estimating package. Finally, the results of a survey, which looked at what could be done in the future to overcome the problems experienced and build a set of truly useful tools, are presented.

Reifer, D. J.↗

Integrated Test Approach

This paper describes a testing methodology undertaken on the Facilities Development and Operations Contract (FDOC) by Lockheed Martin. The methodology was defined with the intent of reducing project schedule time to enable NASA's Johnson Space Center (JSC) to be able to deliver the Mission Control Center (MCC) 21 project as quickly as possible. 21 represents the 21st century where NASA JSC is updating its control center with new technology and operational concepts in order to support NASA customers wanting to use control center assets to support space vehicle operations. In collaboration with the NASA customer, a new test concept was conceived early during MCC21 project planning with the goal of reducing project delivery time. One enabler that could help reduce delivery time was testing. Within the project, testing was performed by two entities, software development responsible for subsystem testing and system test responsible for system integration testing. The MCC21 project took a deliberate review of testing to determine how it could be performed differently to realize an overall reduction in test time to support the goal of a more rapid project delivery.

Cotton, Will↗

NASA Work Breakdown Structure (WBS) Handbook

The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements.

Formulation↗

Spacecraft platform cost estimating relationships

The three main cost areas of unmanned satellite development are discussed. The areas are identified as: (1) the spacecraft platform (SCP), (2) the payload or experiments, and (3) the postlaunch ground equipment and operations. The SCP normally accounts for over half of the total project cost and accurate estimates of SCP costs are required early in project planning as a basis for determining total project budget requirements. The development of single formula SCP cost estimating relationships (CER) from readily available data by statistical linear regression analysis is described. The advantages of single formula CER are presented.

Gruhl, W. M.↗

Simulation Of Research And Development Projects

Measures of preference for alternative project plans calculated. Simulation of Research and Development Projects (SIMRAND) program aids in optimal allocation of research and development resources needed to achieve project goals. Models system subsets or project tasks as various network paths to final goal. Each path described in terms of such task variables as cost per hour, cost per unit, and availability of resources. Uncertainty incorporated by treating task variables as probabilistic random variables. Written in Microsoft FORTRAN 77.

Miles, Ralph F.↗

Hyperspectral Technology Transfer to the US Department of Interior: Summary of Results of the NASA/DOI Hyperspectral Technology Transfer Project

In 1997 the Office of Biological Informatics and Outreach (OBIO), Biological Resources Division, US Geological Survey and NASA, Office of Earth Science (OES), initiated a coordinated effort for applying Airborne Visible and Infrared Imaging Spectrometer (AVIRIS) data and analysis, as a technology transfer project, to critical DOI environmental issues in four study sites throughout the United States. This work was accomplished by four US Department of the Interior (DOI) study teams with support from NASA/OES principal investigators and the Office of Earth Science programs. The studies, including personnel, objectives, background, project plans, and milestones were documented in a project website at . This report summarizes the final outcomes of the project, detailing accomplishments, lessons learned, and benefits realized to NASA, the US Geological Survey, and the participating DOI bureaus.

Root, Ralph↗

Nuclear Thermal Propulsion Technology - Summary of FY 1991 Interagency Panel Planning

An Interagency (NASA/DOE/DOD) technical panel has been working in 1991 to evaluate nuclear thermal propulsion (NTP) concepts on a consistent basis, and to continue technology development project planning for a joint project in nuclear propulsion for Space Exploration Initiative (SEI). This paper summarizes the efforts of the panel to date and summarizes the technology plans defined for NTP. Concepts were categorized based on probable technology readiness data, and innovative 'proof-of-concept' tests and analyses were defined. While further studies will be required to provide a consistent comparison of all of the NTP concepts, the current status of the studies is presented.

Clark, John S.↗