Search NASA⌕ Search

SEARCH · Search NASA

Results for “Parts Assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Explicate '78: Uncovering the Implicit Assurance Case in DO-178C

For about two decades, compliance with Software Considerations in Airborne Systems and Equipment Certification (DO-178B/ED-12B) has been the primary means for receiving regulatory approval for using software on commercial airplanes. A new edition of the standard, DO-178C/ED-12C, was published in December 2011, and recognized by regulatory bodies in 2013. The purpose remains unchanged: to provide guidance 'for the production of software for airborne systems and equipment that performs its intended function with a level of confidence in safety that complies with airworthiness requirements.' The text of the guidance does not directly explain how its collection of objectives contributes to achieving this purpose; thus, the assurance case for the document is implicit. This paper presents an explicit assurance case developed as part of research jointly sponsored by the Federal Aviation Administration and the National Aeronautics and Space Administration.

Holloway, C. Michael↗

What Risks are Acceptable for a Class D Project?

This talk is intended to help small project proposers to navigate the process of deciding what risks would be acceptable in their Class D projects, as well as steering away from misinterpretations of risk to mean “doing something different”. This will be largely NASA centric, largely focused on science missions, but there will be more general takeaways.

risk↗

Earth Observing System/Advanced Microwave Sounding Unit-A (EOS/AMSU-A): Developer derating policy

The derating requirements/factors tabulated in Appendix B of the Goddard Space Flight Center Preferred Parts List (GSFC PPL) and Appendix A of MIL-STD-975 (NASA Standard Electrical, Electronic and Electromechanical (EEE) Parts List) should be used. Where differences occur, the PPL derating factors should have precedence over the derating factors of MIL-STD-975. When a derating factor is not provided in either the PPL or MIL-STD-975, the GSFC EOS Parts Branch Specialist should be consulted. In addition, the Performance Assurance Requirement (PAR) stipulates that all piece parts shall function at or above twice the expected ionizing radiation dose.

Maciel, Roberto M.↗

Development and demonstration of manufacturing processes for fabricating graphite/LARC-160 polyimide structural elements, part 4, paragraph B

A quality assurance program was developed which included specifications for celion/LARC-160 polyimide materials and quality control of materials and processes. The effects of monomers and/or polymer variables and prepeg variables on the processibility of celion/LARC prepeg were included. Processes for fabricating laminates, honeycomb core panels, and chopped fiber moldings were developed. Specimens and conduct tests were fabricated to qualify the processes for fabrication of demonstration components.

Source record↗

The NASA Electronic Parts and Packaging (NEPP) Program - Presentation to Korean Aerospace Research Institute

This presentation will provide basic information about NASA's Electronic Parts and Packaging Program (NEPP), for sharing with representatives of the South Korean Aerospace Research Institute (KARI) as part of a larger presentation by Headquarters Office of Safety and Mission Assurance. The NEPP information includes mission and goals, history of the program, basic focus areas, strategies, deliverables and some examples of current tasks.

Technology Challenges↗

JSC Avionics Ionizing Radiation Effects Standard (AIRES)

This document, the JSC Engineering Directorate Avionics Ionizing Radiation Effects Standard (AIRES), provides design, test, and analysis requirements to ensure electronic hardware meets functional, performance and reliability requirements in the mission ionizing radiation environment. This suite of activities is referred to as Radiation Hardening Assurance (RHA) and is an integral part of the hardware design process.

Ionizing Radiation↗

Ares First Stage "Systemology" - Combining Advanced Systems Engineering and Planning Tools to Assure Mission Success

Ares is an integral part of NASA s Constellation architecture that will provide crew and cargo access to the International Space Station as well as low earth orbit support for lunar missions. Ares replaces the Space Shuttle in the post 2010 time frame. Ares I is an in-line, two-stage rocket topped by the Orion Crew Exploration Vehicle, its service module, and a launch abort system. The Ares I first stage is a single, five-segment reusable solid rocket booster derived from the Space Shuttle Program's reusable solid rocket motor. The Ares second or upper stage is propelled by a J-2X main engine fueled with liquid oxygen and liquid hydrogen. This paper describes the advanced systems engineering and planning tools being utilized for the design, test, and qualification of the Ares I first stage element. Included are descriptions of the current first stage design, the milestone schedule requirements, and the marriage of systems engineering, detailed planning efforts, and roadmapping employed to achieve these goals.

Seiler, James↗

Structural technologies - Systems challenges and NASA thrusts.

Some significant areas of emphasis in the NASA airframes structures program are highlighted. The topics treated include automated analysis and design processes, building confidence in advanced composites, improving the technology base for future supersonic and hypersonic vehicles, validation of concepts for active control systems, development of predictive methods for aircraft loads and aeroelasticity, and generation of methodology to assure structural integrity as a part of the design process. An integrated long-range program for fatigue and fracture is recommended.

Brooks, G. W.↗

The Deep Space Network

This report presents DSN progress in flight project support, tracking and data acquisition (TDA) research and technology, network engineering, hardware and software implementation, and operations. Each issue presents material in some, but not all, of the following categories in the order indicated. - Description of the DSN - Mission Support Ongoing Planetary/Interplanetary Flight Projects Advanced Flight Projects - Radio Science - Special Projects - Supporting Research and Technology Tracking and Ground-Based Navigation Communications--Spacecraft/Ground Station Control and Operations Technology Network Control and Data Processing - Network and Facility Engineering and Implementation Network Network Operations Control Center Ground Communications Deep Space Stations - Operations Network Operations Network Operations Control Center Ground Communications Deep Space Stations - Program Planning TDA Planning Quality Assurance In each issue, the part entitled "Description of the DSN" describes the functions and facilities of the DSN and may report the current configuration of one of the five DSN systems (Tracking, Telemetry, Command, Monitor & Control, and Test & Training). The work described in this report series is either performed or managed by the Tracking and Data Acquisition organization of JPL for NASA.

Tracking and Data Acquisition organization↗

The 30-cm ion thruster power processor

A power processor unit for powering and controlling the 30 cm Mercury Electron-Bombardment Ion Thruster was designed, fabricated, and tested. The unit uses a unique and highly efficient transistor bridge inverter power stage in its implementation. The system operated from a 200 to 400 V dc input power bus, provides 12 independently controllable and closely regulated dc power outputs, and has an overall power conditioning capacity of 3.5 kW. Protective circuitry was incorporated as an integral part of the design to assure failure-free operation during transient and steady-state load faults. The implemented unit demonstrated an electrical efficiency between 91.5 and 91.9 at its nominal rated load over the 200 to 400 V dc input bus range.

Herron, B. G.↗

Cost prediction model for various payloads and instruments for the Space Shuttle Orbiter

The following cost parameters of the space shuttle were undertaken: (1) to develop a cost prediction model for various payload classes of instruments and experiments for the Space Shuttle Orbiter; and (2) to show the implications of various payload classes on the cost of: reliability analysis, quality assurance, environmental design requirements, documentation, parts selection, and other reliability enhancing activities.

Hoffman, F. E.↗

Introduction to the internal fluid mechanics research session

Internal fluid mechanics research at LeRC is directed toward an improved understanding of the important flow physics affecting aerospace propulsion systems, and applying this improved understanding to formulate accurate predictive codes. To this end, research is conducted involving detailed experimentation and analysis. The following three papers summarize ongoing work and indicate future emphasis in three major research thrusts: inlets, ducts, and nozzles; turbomachinery; and chemical reacting flows. The underlying goal of the research in each of these areas is to bring internal computational fluid mechanic to a state of practical application for aerospace propulsion systems. Achievement of this goal requires that carefully planned and executed experiments be conducted in order to develop and validate useful codes. It is critical that numerical code development work and experimental work be closely coupled. The insights gained are represented by mathematical models that form the basis for code development. The resultant codes are then tested by comparing them with appropriate experiments in order to ensure their validity and determine their applicable range. The ultimate user community must be a part of this process to assure relevancy of the work and to hasten its practical application. Propulsion systems are characterized by highly complex and dynamic internal flows. Many complex, 3-D flow phenomena may be present, including unsteadiness, shocks, and chemical reactions. By focusing on specific portions of a propulsion system, it is often possible to identify the dominant phenomena that must be understood and modeled for obtaining accurate predictive capability. The three major research thrusts serve as a focus leading to greater understanding of the relevant physics and to an improvement in analytic tools. This in turn will hasten continued advancements in propulsion system performance and capability.

Miller, Brent A.↗

Model Checking Verification and Validation at JPL and the NASA Fairmont IV and V Facility

We show how a technology transfer effort was carried out. The successful use of model checking on a pilot JPL flight project demonstrates the usefulness and the efficacy of the approach. The pilot project was used to model a complex spacecraft controller. Software design and implementation validation were carried out successfully. To suggest future applications we also show how the implementation validation step can be automated. The effort was followed by the formal introduction of the modeling technique as a part of the JPL Quality Assurance process.

Schneider, Frank↗

Strategies for SEE Hardness Assurance From Buy-It-And-Fly-It to Bullet Proof

This part of the course first outlines the conventional Single Event Effect (SEE), radiation hardness assurance (RHA) approach, which emphasizes mission success. Next, Dr. Ladbury will discuss the challenges posed by new satellite platforms (e.g., cubesats, nanosats, etc.), where cost and schedule receive emphasis equal to if not greater than mission success. These additional pressures, along with growing demands to reduce size, weight and power, coupled with increased performance, drive many projects toward expanding their use of commercial-off-the-shelf (COTS) technologies. While this may reduce direct parts cost and procurement lead times, it undermines many cost-reduction strategies used for conventional SEE RHA and can make radiation testing and analysis one of the most significant risksor worse, a risk neglected altogether. That section will end with some approaches for restoring balance in the troika of mission success, cost, and schedule. This is captured in SEE RHA as risk management: identify the threat, evaluate the threat, and mitigate the threat.

commercial-off-the-shelf (COTS)↗

Strategies for SEE Hardness Assurance - From Buy-It-And-Fly-It to Bullet Proof

This part of the course first outlines the conventional Single Event Effect (SEE), radiation hardness assurance (RHA) approach, which emphasizes mission success. Next, Dr. Ladbury will discuss the challenges posed by new satellite platforms (e.g., cubesats, nanosats, etc.), where cost and schedule receive emphasis equal to if not greater than mission success. These additional pressures, along with growing demands to reduce size, weight and power, coupled with increased performance, drive many projects toward expanding their use of commercial-off-the-shelf (COTS) technologies. While this may reduce direct parts cost and procurement lead times, it undermines many cost-reduction strategies used for conventional SEE RHA and can make radiation testing and analysis one of the most significant risks or worse, a risk neglected altogether. That section will end with some approaches for restoring balance in the troika of mission success, cost, and schedule. This is captured in SEE RHA as risk management: identify the threat, evaluate the threat, and mitigate the threat.

commercial-off-the-shelf (COTS)↗

Goal Structured Notation in a Radiation Hardening Safety Case for COTS-Based Spacecraft

A systematic approach is presented to constructing a radiation assurance case using Goal Structured Notation (GSN) for spacecraft containing COTS parts. The GSN paradigm is applied to an SRAM single-event upset experiment board designed to fly on a CubeSat November 2016. Construction of a radiation assurance case without use of hardened parts or extensive radiation testing is discussed.

Assurance Case↗